Applications: Algonquin Gas Transmission, LLC
FR, June 30, 2008 › Notices › Federal Energy Regulatory Commission
Linked as:FR, June 30, 2008 › Notices › Federal Energy Regulatory Commission
Linked as:Text
Federal Register: June 30, 2008 (Volume 73, Number 126)
Notices
Page 36852-36853
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
DOCID:fr30jn08-52
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Docket No. CP08-420-000
;PF07-15-000
Algonquin Gas Transmission, LLC; Notice of Application
June 20, 2008.
Take notice that on June 9, 2008, Algonquin Gas Transmission, LLC
(Algonquin), 5400 Westheimer Court, Houston, Texas 77056, filed in the above referenced docket an application pursuant to section 7(c) of the
Natural Gas Act (NGA), and parts 157 of the Commission's regulations for an order granting a certificate of public convenience to construct, install, own, operate and maintain natural gas pipelines facilities necessary to provide at least 746,500 dekatherms per day (Dth/d) of firm transportation capacity. The proposed HubLine/East to West Project consists of constructing 31.4 miles of multi-diameter pipeline and related facilities, including the new 10,310 horsepower Rehoboth
Compressor Station in Rehoboth, MA, all of which are located in
Massachusetts, Rhode Island, Connecticut, and New Jersey. Algonquin also requests: (i) Authority to charge its existing HubLine 2003
Project rate for service on the HubLine/East to West Project facilities; and (ii) any waivers, authority, and further relief as may be necessary to implement the proposal contain in its application, all as more fully set forth in the application which is on file with the
Commission and open to public inspection. The filing may also be viewed on the Web at http://www.ferc.gov using the ``eLibrary'' link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC
Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208- 3676, or TTY, contact (202) 502-8659.
Any questions concerning this application may be directed to Garth
Johnson, General Manager, Certificates and Reporting, P.O. Box 1642,
Houston, Texas 77251-1642, or at (713) 627-5415, or gjohnson@spectraenergy.com.
On September 10, 2007, the Commission staff granted Algonquin's request to utilize the National Environmental Policy Act (NEPA) Pre-
Filling Process and assigned Docket No. PF07-15-000 to staff activities involving the HubLine/East to West Project. Now, as the filing of
Algonquin's application on June 9, 2008, the NEPA Pre-Filling Process for this project has ended. From this time forward, Algonquin's proceeding will be conducted in Docket No. CP08-420-000, as noted in the caption of this Notice.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either complete its environmental assessment (EA) and place it into the Commission's public record (eLibrary) for this proceeding, or issue a Notice of
Schedule for Environmental Review. If a Notice of Schedule for
Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff's issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission's public record for this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
Page 36853
this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding.
However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission's rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest.
Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission's environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission's final order.
The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at http://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription'' link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: July 11, 2008.
Kimberly D. Bose,
Secretary.
FR Doc. E8-14685 Filed 6-27-08; 8:45 am
BILLING CODE 6717-01-P
Sponsored links
ver las páginas en versión mobile | web
ver las páginas en versión mobile | web
© Copyright 2012, vLex. All Rights Reserved.
Contents in vLex United States
Explore vLex
For Professionals
For Partners
Company
Other documents:
August H Franzen | Weddings; Otto-Loewenberg | Maytag: Take Appliances for a Spin; in More Than 40 Stores, Customers Are Allowed to Try Out Ovens, Dryers and Washing Machines | Astrology | decisioni plenarie - sentenza nº 2 de consiglio di stato, may 17, 2010 | Sentencia nº 5779 de Consiglio di Stato, November 19, 2009 | Sentenza nº 3186 de Consiglio di Stato May 22 2009 | Sentencia nº 3966 de Consiglio di Stato, July 18, 2008