Final General Conformity Determination: AES Sparrows Point LNG, LLC, et al.; Proposed Sparrows Point LNG Terminal and Pipeline Project
FR, April 20, 2010 › Notices › Federal Energy Regulatory Commission
Linked as:FR, April 20, 2010 › Notices › Federal Energy Regulatory Commission
Linked as:Text
Federal Register: April 20, 2010 (Volume 75, Number 75)
Notices
Page 20591
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
DOCID:fr20ap10-53
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Docket Nos. CP07-62-000 and CP07-63-000
AES Sparrows Point LNG, LLC and Mid-Atlantic Express, LLC; Notice of Final General Conformity Determination for Pennsylvania for the
Proposed Sparrows Point LNG Terminal and Pipeline Project
April 13, 2010.
On March 1, 2010, the staff of the Federal Energy Regulatory
Commission (FERC or Commission) issued a revised draft Final General
Conformity Determination (GCD) for Pennsylvania to assess the potential air quality impacts associated with the construction and operation of a liquefied natural gas (LNG) import terminal and natural gas pipeline proposed by AES Sparrows Point LNG, LLC and Mid-Atlantic Express, LLC, in the above-referenced dockets. In accordance with the General
Conformity Regulations under the Code of Federal Regulations chapter 40 section 51.856 the draft Final GCD was issued for a 30-day public comment period. No comments were received on the draft Final GCD for
Pennsylvania; therefore, the Commission staff is issuing this notice to announce the draft Final GCD is now the Final GCD for Pennsylvania.
The GCD was prepared to satisfy the requirements of the Clean Air
Act. The FERC staff concludes that the Project will achieve conformity in Pennsylvania. On December 29, 2009, a separate Final General
Conformity Determination was issued for Maryland concluding that the
Project will achieve conformity in Maryland as well.
Copies of the revised draft Final GCD were previously mailed to the
U.S. Environmental Protection Agency, Region III, the Maryland
Department of Natural Resources, the Maryland Department of
Environment, the Pennsylvania Department of Environmental Protection, and the Virginia Department of Environmental Quality.
The GCD for Pennsylvania addresses the potential air quality impacts from the construction and operation of the following LNG terminal and natural gas pipeline facilities:
A ship unloading facility, with two berths, capable of receiving LNG ships with capacities up to 217,000 m\3\;
Three 160,000 m\3\ (net capacity) full-containment LNG storage tanks;
A closed-loop shell and tube heat exchanger vaporization system;
Various ancillary facilities including administrative offices, warehouse, main control room, security building, and a platform control room;
Meter and regulation (M&R) station within the LNG Terminal site; and
Approximately 88 miles of 30-inch-diameter natural gas pipeline (48 miles in Maryland and 40 miles in Pennsylvania), a pig launcher and receiver facility at the beginning and ending of the pipeline, 10 mainline valves, and three M&R stations, one at each of three interconnection sites at the end of the pipeline.
The Final GCD is the revised draft Final GCD which was placed in the public files of the FERC on March 1, 2010 and is available for public viewing on the FERC's Web site at http://www.ferc.gov using the eLibrary link. A limited number of copies of the revised draft Final
GCD are available for distribution and public inspection at: Federal
Energy Regulatory Commission, Public Reference Room, 888 First Street,
NE., Room 2A, Washington, DC 20426, (202) 502-8371.
Additional information about the project is available from the
Commission's Office of External Affairs at (866) 208-FERC. The administrative public record for this proceeding to date is on the FERC
Web site http://www.ferc.gov. Go to Documents & Filings and choose the eLibrary link. Under eLibrary, click on ``General Search,'' and enter the docket number excluding the last three digits in the Docket Number field (e.g., CP07-62). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at:
FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY call (202) 502-8659. The eLibrary link on the FERC Web site also provides access to the texts of formal documents issued by the
Commission, such as orders, notices, and rulemakings.
Kimberly D. Bose,
Secretary.
FR Doc. 2010-8998 Filed 4-19-10; 8:45 am
BILLING CODE 6717-01-P
Sponsored links
ver las páginas en versión mobile | web
ver las páginas en versión mobile | web
© Copyright 2012, vLex. All Rights Reserved.
Contents in vLex United States
Explore vLex
For Professionals
For Partners
Company
Other documents:
The Kurdistan Region - a Bright Future in the Other Iraq | My Medicare Matters(Tm) Awards $900,000 in Grants to Nine Community Organizations for Initiatives to Reach Low-Income Seniors | blunt on dean: 'one voice' -- the loudest | Ricoh Buying Office Supplier Ikon for $1.62 Billion | arrêtés du 12 février 1999 acceptant la renonciation à des concessions de mines de houille | Sentenza Breve nº 4448 de Tribunali Amministrativi Regionali, Emilia Romagna, T.A.R. - Emilia Romagna - Bologna, October 22, 2008 | Se designa como Cuentadante responsable de la Unidad Administradora de la Dirección Regional Barinas al ciudadano Héctor Aquiles Morao Lara. | Résultats de délibérations CONSEIL SUPERIEUR DE L AUDIOVISUEL CSA