Airworthiness directives: Empresa Brasileira de Aeronautica S.A. (EMBRAER),

[Federal Register: June 14, 2007 (Volume 72, Number 114)]

[Rules and Regulations]

[Page 32780-32782]

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

[DOCID:fr14jn07-5]

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. FAA-2006-26354; Directorate Identifier 2006-NM-196-AD; Amendment 39-15095; AD 2007-12-17]

RIN 2120-AA64

Airworthiness Directives; Empresa Brasileira de Aeronautica S.A. (EMBRAER) Model EMB-135 Airplanes and Model EMB-145, -145ER, -145MR, - 145LR, -145XR, -145MP, and -145EP Airplanes

AGENCY: Federal Aviation Administration (FAA), Department of Transportation (DOT).

ACTION: Final rule.

SUMMARY: The FAA is adopting a new airworthiness directive (AD) for certain EMBRAER Model EMB-135 airplanes and Model EMB-145, -145ER, - 145MR, -145LR, -145XR, -145MP, and -145EP airplanes. This AD requires replacing the metallic tubes enclosing the vent and pilot valve wires in the left- and right-hand wing fuel tanks with non-conductive hoses. This AD results from fuel system reviews conducted by the manufacturer. We are issuing this AD to prevent an ignition source inside the fuel tank that could ignite fuel vapor and cause a fuel tank explosion and loss of the airplane.

DATES: This AD becomes effective July 19, 2007.

The Director of the Federal Register approved the incorporation by reference of certain publications listed in the AD as of July 19, 2007.

ADDRESSES: You may examine the AD docket on the Internet at http://dms.dot.gov or in person at the Docket Management Facility, U.S.

Department

[[Page 32781]]

of Transportation, 400 Seventh Street SW., Nassif Building, Room PL- 401, Washington, DC.

Contact Empresa Brasileira de Aeronautica S.A. (EMBRAER), P.O. Box 343--CEP 12.225, Sao Jose dos Campos--SP, Brazil, for service information identified in this AD.

FOR FURTHER INFORMATION CONTACT: Tom Groves, Aerospace Engineer, International Branch, ANM-116, FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425) 227-1503; fax (425) 227-1149.

SUPPLEMENTARY INFORMATION:

Examining the Docket

You may examine the AD docket on the Internet at http://dms.dot.gov

or in person at the Docket Management Facility office between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. The Docket Management Facility office (telephone (800) 647-5527) is located on the plaza level of the Nassif Building at the street address stated in the ADDRESSES section.

Discussion

The FAA issued a supplemental notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 to include an AD that would apply to certain EMBRAER Model EMB-135 airplanes and Model EMB-145, -145ER, -145MR, - 145LR, -145XR, -145MP, and -145EP airplanes. That supplemental NPRM was published in the Federal Register on March 30, 2007 (72 FR 15075). That supplemental NPRM proposed to require replacing the metallic tubes enclosing the vent and pilot valve wires in the left- and right-hand wing fuel tanks with non-conductive hoses. That supplemental NPRM also proposed to add airplanes to the applicability.

Comments

We provided the public the opportunity to participate in the development of this AD. No comments have been received on the supplemental NPRM or on the determination of the cost to the public.

Clarification of Alternative Method of Compliance (AMOC) Paragraph

We have revised this action to clarify the appropriate procedure for notifying the principal inspector before using any approved AMOC on any airplane to which the AMOC applies.

Conclusion

We have carefully reviewed the available data and determined that air safety and the public interest require adopting the AD with the change described previously. We have determined that this change will neither increase the economic burden on any operator nor increase the scope of the AD.

Costs of Compliance

This AD affects about 623 airplanes of U.S. registry. The required actions take about 1 work hour per airplane, at an average labor rate of $80 per work hour. Required parts cost about $1,121 (for each of 30 Model EMB-135BJ airplanes) or $1,788 (for each of 593 remaining airplanes). The estimated cost of the AD per airplane is $1,201 or $1,868. Based on these figures, the estimated cost of the AD for U.S. operators is $1,143,754.

Authority for This Rulemaking

Title 49 of the United States Code specifies the FAA's authority to issue rules on aviation safety. Subtitle I, Section 106, describes the authority of the FAA Administrator. Subtitle VII, Aviation Programs, describes in more detail the scope of the Agency's authority.

We are issuing this rulemaking under the authority described in subtitle VII, part A, subpart III, section 44701, ``General requirements.'' Under that section, Congress charges the FAA with promoting safe flight of civil aircraft in air commerce by prescribing regulations for practices, methods, and procedures the Administrator finds necessary for safety in air commerce. This regulation is within the scope of that authority because it addresses an unsafe condition that is likely to exist or develop on products identified in this rulemaking action.

Regulatory Findings

We have determined that this AD will not have federalism implications under Executive Order 13132. This AD will not have a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government.

For the reasons discussed above, I certify that this AD:

(1) Is not a ``significant regulatory action'' under Executive Order 12866;

(2) Is not a ``significant rule'' under DOT Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); and

(3) Will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act.

We prepared a regulatory evaluation of the estimated costs to comply with this AD and placed it in the AD docket. See the ADDRESSES section for a location to examine the regulatory evaluation.

List of Subjects in 14 CFR Part 39

Air transportation, Aircraft, Aviation safety, Incorporation by reference, Safety.

Adoption of the Amendment

0 Accordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows:

PART 39--AIRWORTHINESS DIRECTIVES

0 1. The authority citation for part 39 continues to read as follows:

Authority: 49 U.S.C. 106(g), 40113, 44701.

Sec. 39.13 [Amended]

0 2. The Federal Aviation Administration (FAA) amends Sec. 39.13 by adding the following new airworthiness directive (AD):

2007-12-17 Empresa Brasileira de Aeronautica S.A. (EMBRAER): Amendment 39-15095. Docket No. FAA-2006-26354; Directorate Identifier 2006-NM-196-AD.

Effective Date

(a) This AD becomes effective July 19, 2007.

Affected ADs

(b) None.

Applicability

(c) This AD applies to the following airplanes, certificated in any category; as described in paragraphs (c)(1) and (c)(2) of this AD.

(1) EMBRAER Model EMB-135ER, -135KE, -135KL, and -135LR airplanes and Model EMB-145, -145ER, -145MR, -145LR, -145XR, -145MP, and -145EP airplanes; as identified in EMBRAER Service Bulletin 145- 28-0023, Revision 07, dated February 7, 2007.

(2) EMBRAER Model EMB-135BJ airplanes, as identified in EMBRAER Service Bulletin 145LEG-28-0018, Revision 01, dated April 20, 2005.

Unsafe Condition

(d) This AD results from fuel system reviews conducted by the manufacturer. We are issuing this AD to prevent an ignition source inside the fuel tank that could ignite fuel vapor and cause a fuel tank explosion and loss of the airplane.

Compliance

(e) You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.

Tube Replacement

(f) Within 5,000 flight hours or 48 months after the effective date of this AD, whichever occurs first: Replace the metallic tubes

[[Page 32782]]

enclosing the vent and pilot valve wires in the left- and right-hand wing fuel tanks with new, improved, non-conductive hoses, in accordance with the Accomplishment Instructions of the service bulletin specified in paragraph (f)(1) or (f)(2) of this AD, as applicable.

(1) For Model EMB-135ER, -135KE, -135KL, -135LR, -145, -145ER, - 145MR, -145LR, -145XR, -145MP, and -145EP airplanes: EMBRAER Service Bulletin 145-28-0023, Revision 07, dated February 7, 2007.

(2) For Model EMB-135BJ airplanes: EMBRAER Service Bulletin 145LEG-28-0018, Revision 01, dated April 20, 2005.

Credit for Actions Done Using Previous Service Information

(g) Actions accomplished before the effective date of this AD in accordance with the service information specified in Table 1 of this AD are considered acceptable for compliance with the corresponding actions specified in this AD.

Table 1.--Acceptable EMBRAER Service Information

Service bulletin

Revision level

Date

145-28-0023............................. Original....................... April 19, 2004. 145-28-0023............................. 01............................. June 9, 2004. 145-28-0023............................. 02............................. November 8, 2004. 145-28-0023............................. 03............................. April 27, 2005. 145-28-0023............................. 04............................. November 7, 2005. 145-28-0023............................. 05............................. May 15, 2006. 145-28-0023............................. 06............................. October 31, 2006. 145LEG-28-0018.......................... Original....................... April 23, 2004.

Alternative Methods of Compliance (AMOCs)

(h)(1) The Manager, ANM-116, International Branch, Transport Airplane Directorate, FAA, has the authority to approve AMOCs for this AD, if requested in accordance with the procedures found in 14 CFR 39.19.

(2) To request a different method of compliance or a different compliance time for this AD, follow the procedures in 14 CFR 39.19. Before using any approved AMOC on any airplane to which the AMOC applies, notify your appropriate principal inspector (PI) in the FAA Flight Standards District Office (FSDO), or lacking a PI, your local FSDO.

Related Information

(i) Brazilian airworthiness directive 2006-06-02, effective June 28, 2006, also addresses the subject of this AD.

Material Incorporated by Reference

(j)(1) You must use EMBRAER Service Bulletin 145-28-0023, Revision 07, dated February 7, 2007; or EMBRAER Service Bulletin 145LEG-28-0018, Revision 01, dated April 20, 2005; as applicable, to perform the actions that are required by this AD, unless the AD specifies otherwise.

(2) EMBRAER Service Bulletin 145LEG-28-0018, Revision 01, dated April 20, 2005, contains the following effective pages:

Revision level shown Page number

on page

Date shown on page

1, 2........................ 01.................. April 20, 2005. 3-20........................ Original............ April 23, 2004.

(Page 2 of EMBRAER Service Bulletin 145LEG-28-0018, Revision 01, dated April 20, 2005, incorrectly shows a revision date of April 20, 2004; that date should be April 20, 2005.)

(3) The Director of the Federal Register approved the incorporation by reference of these documents in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Contact Empresa Brasileira de Aeronautica S.A. (EMBRAER), P.O. Box 343-CEP 12.225, Sao Jose dos Campos--SP, Brazil, for a copy of this service information. You may review copies at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html .

Issued in Renton, Washington, on June 1, 2007. Ali Bahrami, Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. E7-11204 Filed 6-13-07; 8:45 am]

BILLING CODE 4910-13-P

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT