Approval and Promulgation of Implementation Plans: New Jersey Reasonable Further Progress Plans, Reasonably Available Control Technology, Reasonably Available Control Measures and Conformity Budgets

Federal Register: May 15, 2009 (Volume 74, Number 93)

Rules and Regulations

Page 22837-22840

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

DOCID:fr15my09-12

ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52

EPA-R02-OAR-2008-0497, FRL-8905-7

Approval and Promulgation of Implementation Plans; New Jersey

Reasonable Further Progress Plans, Reasonably Available Control

Technology, Reasonably Available Control Measures and Conformity

Budgets

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

SUMMARY: The Environmental Protection Agency (EPA) is approving portions of two State Implementation Plan revisions submitted by New

Jersey that are intended to meet several Clean Air Act (Act) requirements for attaining the 0.08 part per million (ppm) 8-hour ozone national ambient air quality standards. EPA is approving: the 2008 reasonable further progress plans and associated 2008 ozone projection year emission inventories, contingency measures for the 2008 reasonable further progress plans, 2008 conformity budgets used for planning purposes, and the reasonably available control measure analysis. In addition, EPA is conditionally approving New Jersey's efforts to meet the reasonably available control technology requirement. The intended effect of this action is to approve those programs that meet Act requirements and to further achieve emission reductions that will be critical to attainment of the national ambient air quality standard for ozone in New Jersey's two nonattainment areas.

DATES: Effective Date: This rule is effective on June 15, 2009.

ADDRESSES: EPA has established a docket for this action under Docket ID

No. EPA-R02-OAR-2008-0497. All documents in the docket are listed on the http://www.regulations.gov Web site. Although listed in the index, some information is not publicly available, e.g., CBI or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either electronically through http://www.regulations.gov or in hard copy at the Environmental

Protection Agency, Region II Office, Air Programs Branch, 290 Broadway, 25th Floor, New York, New York 10007-1866. This Docket Facility is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The Docket telephone number is 212-637-4249.

FOR FURTHER INFORMATION CONTACT: Raymond Forde (forde.raymond@epa.gov) concerning emission inventories and reasonable further progress and

Paul Truchan (truchan.paul@epa.gov) concerning other portions of the

SIP revision, Air Programs Branch, Environmental Protection Agency, 290

Broadway, 25th Floor, New York, New York 10007-1866, (212) 637-4249.

SUPPLEMENTARY INFORMATION:

Table of Contents

  1. What action is EPA taking?

  2. What was included in New Jersey's SIP submittals?

  3. What comments were received?

  4. What SIP Elements is EPA approving?

    1. Emission Inventories

    2. Reasonable Further Progress Plans

    3. Contingency Measures

    4. RACT for Stationary Sources

    5. RACM Analysis

    6. Conformity Budgets

    Page 22838

  5. What are EPA's conclusions?

  6. Statutory and Executive Order Reviews

  7. What action is EPA taking?

    The Environmental Protection Agency (EPA) has reviewed elements of

    New Jersey's comprehensive State Implementation Plan (SIP) revision for the 0.08 ppm 8-hour ozone national ambient air quality standards (NAAQS or standard) \1\ along with other related Clean Air Act (Act) requirements necessary to insure attainment of the standard. The EPA is approving: the 2008 reasonable further progress (RFP) plans and associated 2008 ozone projection emission inventories, contingency measures for the 2008 reasonable further progress plans, 2008 conformity budgets used for planning purposes, and the reasonably available control measure analysis, because the State of New Jersey's

    Department of Environmental Protection (NJDEP) has fully addressed the

    Act's requirements. In addition, EPA is conditionally approving the

    RACT SIP for the 8-hour ozone NAAQS based on New Jersey's March 20, 2009 adoption of the additional RACT rules it committed to adopt for 13 source categories.

    \1\ Unless otherwise specifically noted in the action, references to the 8-hour ozone standard are to the 0.08 ppm ozone standard promulgated in 1997.

    For additional details on EPA's analysis and findings the reader is referred to the proposal published in the January 16, 2009 Federal

    Register (74 FR 2945) and a more detailed discussion is contained in the Technical Support Document which is available on line at http:// www.regulations.gov, Docket number EPA-R02-OAR-2008-0497.

  8. What was included in New Jersey's SIP submittals?

    After completing the appropriate public notice and comment procedures, New Jersey made a series of submittals in order to address the Act's 8-hour ozone attainment requirements. On August 1, 2007, New

    Jersey submitted its RACT rules, which included a determination that many of the RACT rules currently contained in its SIP meet the RACT obligation for the 8-hour standard, and also included commitments to adopt revisions to several regulations where the State identified more stringent emission limitations that it believed should now be considered RACT. On October 29, 2007, New Jersey submitted a comprehensive 8-hour ozone SIP for the New Jersey portions of the New

    York-Northern New Jersey-Long Island, NY-NJ-CT and the Philadelphia-

    Wilmington-Atlantic City, PA-NJ-MD-DE nonattainment areas. It included attainment demonstrations, reasonable further progress (RFP) plans for 2008 and 2009, reasonably available control measures analyses for both areas, contingency measures, on-road motor vehicle emission budgets, and general conformity emission budgets for McGuire Air Force Base and

    Lakehurst Naval Air Station. These SIP revisions were subject to notice and comment by the public and the State addressed the comments received on the proposed SIPs before adopting the plans and submitting them for

    EPA review and approval into the SIP. Finally, as part of the RACT evaluation, on December 14, 2007, New Jersey submitted to EPA an assessment of how it planned to address EPA's recently revised Control

    Technique Guidelines (CTGs).

  9. What comments were received?

    No comments were received on the January 16, 2009 proposal.

  10. What SIP Elements is EPA approving?

    1. Emission Inventories

      An emissions inventory is a comprehensive, accurate, current inventory of actual emissions from all sources and is required by section 172(c)(3) of the Act. For ozone nonattainment areas, the emissions inventory must contain volatile organic compounds (VOC) and nitrogen oxides (NOX) emissions because these pollutants are precursors to ozone formation. EPA previously approved New Jersey's 2002 Base Year emission inventories on July 10, 2006 (71 FR 38770). In this rulemaking, EPA is approving the 2008 projection year emission inventories as the State used them in developing the RFP Plans.

    2. Reasonable Further Progress Plans

      Section 182(b)(1) of the Act and EPA's 8-hour ozone implementation rule (40 CFR 51.910) require each 8-hour ozone nonattainment area designated moderate and above to submit an emissions inventory and RFP

      Plan, for review and approval into its SIP, that describes how the area will achieve actual emissions reductions of VOC and NOXfrom a baseline emissions inventory. The RFP SIP must provide for a 15 percent emission reduction (either NOXand/or VOC) accounting for any growth that occurs during the six year period following the baseline emissions inventory year, that is, 2002-2008.

      New Jersey's RFP Plan contains the required emission reductions that result from adopted control measures included in the New Jersey SIP.

      EPA is approving New Jersey's RFP Plans.

    3. Contingency Measures

      For ozone nonattainment areas classified as moderate or above, states must include in their submittal contingency measures to be implemented if the area fails to make RFP or to attain the NAAQS by the applicable attainment date (sections 172(c)(9) and 182(c)(9)).

      Contingency measures are additional controls to be implemented in the event the area fails to meet an RFP or attainment milestone. New

      Jersey's RFP contingency plans contain sufficient emission reductions from specific measures to satisfy EPA requirements. All the emission reductions included in the RFP contingency plans are from adopted measures. EPA is approving New Jersey's RFP contingency plan.

    4. RACT for Stationary Sources

      Sections 172(c)(1), 182(b)(2) and 182(f) of the Act require nonattainment areas that are designated as moderate or above for ozone to adopt RACT. All of New Jersey is subject to this requirement since all counties in the State are located in either of two nonattainment areas that are classified as moderate ozone nonattainment areas for the 8-hour NAAQS for ozone (40 CFR 81.331). The RACT submission from the

      State of New Jersey consists of: (1) A certification that previously adopted RACT controls in New Jersey's SIP for 101 source categories that were approved by EPA under the 1-hour ozone NAAQS are based on the currently available technically and economically feasible controls, and that they continue to represent RACT for the 8-hour ozone implementation purposes; (2) a commitment to adopt new or more stringent regulations that represent RACT control levels for both specific source categories and specific sources; and (3) a negative declaration that for certain of CTGs and/or ACTs there are no sources within New Jersey or that there are no sources above the applicability thresholds. EPA is conditionally approving the RACT SIP for the 8-hour ozone NAAQS based on New Jersey's March 20, 2009 adoption of the additional RACT rules it committed to adopt for 13 source categories.

      EPA will be taking action on these rules in a future rulemaking.

    5. RACM Analysis

      Pursuant to section 172(c)(1) of the Act, states are required to implement all Reasonably Available Control Measures (RACM) as expeditiously as practicable. The State's analysis demonstrated that

      Page 22839

      none of the RACM's, singularly or in combination, will yield emissions benefits sufficient to advance the 2010 attainment date for the two nonattainment areas in which the New Jersey counties are located. EPA is approving New Jersey's moderate area RACM SIP for the two moderate nonattainment areas in which New Jersey is located.

    6. Conformity Budgets

      Consistent with our adequacy review of New Jersey's submittal (73

      FR 41068, July 17, 2008), EPA is approving New Jersey's 2008 motor vehicle emissions budgets associated with the 2008 RFP Plans in Table 1. EPA is also approving the general conformity budgets for McGuire Air

      Force Base (AFB) and Lakehurst Navel Air Station (NAS) in Table 2.

      Table 1--Approved Motor Vehicle Emissions Budgets

      Tons per day

      2008

      MPO

      VOC

      NOX

      NJTPA (except Ocean County).......................

      85.38

      143.60

      NJTPA (Ocean County only).........................

      6.93

      8.69

      DVRPC.............................................

      27.75

      69.67

      SJTPO.............................................

      14.14

      32.93

      Table 2--Approved Emission Budgets for McGuire AFB and Lakehurst NAS

      VOC

      NOX

      Base

      Year

      (tons/ (tons/ year)

      year)

      McGuire AFB.................................

      2008

      730

      1,534 2009

      730

      1,534 2010

      730

      1,534 2011

      730

      1,534

      Lakehurst NAS...............................

      2008

      109

      563 2009

      115

      639 2010

      122

      716 2011

      129

      793

  11. What are EPA's conclusions?

    EPA is approving the following SIP elements required by the Act: 2008 RFP Plans and associated 2008 ozone projection year emission inventories, contingency measures for failure to meet the 2008 RFP Plan milestones, 2008 emission budgets used for planning purposes, and moderate area RACM analysis. EPA is conditionally approving the RACT analysis for the 8-hour ozone NAAQS based on New Jersey having fulfilled it's commitment to adopt RACT rules for 13 source categories by April 1, 2009. EPA will be taking action on these rules in a future rulemaking. If EPA approves the submittal, the RACT analysis will be fully approved in its entirety and will replace the RACT conditionally approved into the SIP. These revisions meet the requirements of the Act and EPA's regulations, and are consistent with EPA's guidance and policy. EPA is taking this action pursuant to section 110 and part D of the Act and EPA's regulations.

  12. Statutory and Executive Order Reviews

    Under the Clean Air Act, the Administrator is required to approve a

    SIP submission that complies with the provisions of the Act and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a).

    Thus, in reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the Clean Air Act.

    Accordingly, this action merely approves state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by State law. For that reason, this action:

    Is not a ``significant regulatory action'' subject to review by the Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993);

    Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);

    Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory

    Flexibility Act (5 U.S.C. 601 et seq.);

    Does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded

    Mandates Reform Act of 1995 (Pub. L. 104-4);

    Does not have Federalism implications as specified in

    Executive Order 13132 (64 FR 43255, August 10, 1999);

    Is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);

    Is not a significant regulatory action subject to

    Executive Order 13211 (66 FR 28355, May 22, 2001);

    Is not subject to requirements of Section 12(d) of the

    National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the Clean Air Act; and

    Does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under

    Executive Order 12898 (59 FR 7629, February 16, 1994).

    In addition, this rule does not have tribal implications as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), because the

    SIP is not approved to apply in Indian country located in the state, and EPA notes that it will not impose substantial direct costs on tribal governments or preempt tribal law.

    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the

    Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the

    United States. EPA will submit a report containing this action and other required information to the U.S. Senate, the U.S. House of

    Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. A major rule cannot take effect until 60 days after it is published in the Federal

    Register. This action is not a ``major rule'' as defined by 5 U.S.C. 804(2).

    Under section 307(b)(1) of the Clean Air Act, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by July 14, 2009. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this action for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action may not be challenged later in proceedings to enforce its requirements. (See section 307(b)(2).)

    List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Hydrocarbons,

    Incorporation by reference, Intergovernmental relations, Oxides of nitrogen, Ozone, Reporting and recordkeeping requirements, Volatile organic compounds.

    Dated: May 5, 2009.

    George Pavlou,

    Acting Regional Administrator, Region 2. 0

    Part 52, chapter I, title 40 of the Code of Federal Regulations is amended as follows:

    Page 22840

    PART 52--[AMENDED] 0 1. The authority citation for part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401 et seq.

    Subpart FF--New Jersey 0 2. Section 52.1582 is amended by adding new paragraph (m) to read as follows:

    Sec. 52.1582 Control strategy and regulations: Ozone.

    * * * * *

    (m)(1) The 2008 Reasonable Further Progress Plans and associated 2008 ozone projection year emission inventories for the New Jersey portion of the New York-Northern New Jersey-Long Island, NY-NJ-CT and the Philadelphia-Wilmington-Atlantic City, PA-NJ-MD-DE nonattainment areas included in New Jersey's October 29, 2007 State Implementation

    Plan revision are approved.

    (2) The contingency measures for failure to meet the 2008 RFP Plan milestones for the New Jersey portion of the New York-Northern New

    Jersey-Long Island, NY-NJ-CT and the Philadelphia-Wilmington-Atlantic

    City, PA-NJ-MD-DE nonattainment areas included in New Jersey's October 29, 2007 State Implementation Plan revision are approved.

    (3) The moderate area Reasonably Available Control Measure Analysis for the New Jersey portion of the New York-Northern New Jersey-Long

    Island, NY-NJ-CT and the Philadelphia-Wilmington-Atlantic City, PA-NJ-

    MD-DE nonattainment areas included in New Jersey's October 29, 2007

    State Implementation Plan revision are approved.

    (4) The 2008 motor vehicle emissions budgets for the New Jersey portion of the New York-Northern New Jersey-Long Island, NY-NJ-CT and the Philadelphia-Wilmington-Atlantic City, PA-NJ-MD-DE nonattainment areas included in New Jersey's October 29, 2007 State Implementation

    Plan revision are approved.

    (5) The general conformity budgets for McGuire AFB and Lakehurst

    NAS included in New Jersey's October 29, 2007 State Implementation Plan revision are approved.

    (6) The Statewide reasonably available control technology (RACT) analysis for the 8-hour ozone included in the August 1, 2007 State

    Implementation Plan revision is conditionally approved.

    FR Doc. E9-11158 Filed 5-14-09; 8:45 am

    BILLING CODE 6560-50-P