Applications, hearings, determinations, etc.: Columbia Gas Tranmission Corp.,

FR, April 15, 1999Notices › Federal Energy Regulatory Commission

Linked as:

Text




Federal Register: April 15, 1999 (Volume 64, Number 72)NoticesPage 18611From the Federal Register Online via GPO Access [wais.access.gpo.gov]

DOCID:fr15ap99-56

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

Docket No. CP99-292-000Columbia Gas Transmission Corporation; Notice of Request Under Blanket Authorization

April 9, 1999.

Take notice that on April 7, 1999, Columbia Gas Transmission (Columbia), 12801 Fair Lakes Parkway, Fairfax, Virginia 22030-0146, fileda request with the Commission in Docket No. CP99-292-000, pursuant to Sections 157.205 and 157.211 of the Commission's Regulations under the Natural Gas Act (NGA) for authorization to construct and operate the facilities necessary to establish two additional points of delivery to an existing customer for firm transportation service authorized in blanket certificate issued in Docket No. CP83-76-000, all as more fully set forth in the request on file with the Commission and open to public inspection. This filing may be viewed on the web at http://www.ferc.fed.us/online/rims.htm (call 202-208-2222 for assistance).

Columbia proposes to construct and operate the facilities necessary to establish two points of delivery to Mountaineer Gas Company (MGC), in Upshur County, West Virginia which would involve construction of interconnecting facilities located on Columbia's existing right-of way. The estimated cost to construct the new points of delivery would be $300 and would be treated as an O&M Expense.

Any person or the Commission's staff may, within 45 days after the Commission has issued this notice, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to Section 157.205 of the Regulations under the NGA (18 CFR 157.205) a protest to the request. If no protest is filedwithin the allowed time, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filedand not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the NGA. Linwood A. Watson, Jr., Acting Secretary.

FR Doc. 99-9366Filed4-14-99; 8:45 amBILLING CODE 6717-01-M

Sponsored links




ver las páginas en versión mobile | web

ver las páginas en versión mobile | web

© Copyright 2012, vLex. All Rights Reserved.

Contents in vLex United States

Explore vLex

For Professionals

For Partners

Company