Applications, hearings, determinations, etc.: Dominion Cove Point LNG, LP,
FR, November 10, 2004 › Notices › Federal Energy Regulatory Commission
Linked as:FR, November 10, 2004 › Notices › Federal Energy Regulatory Commission
Linked as:Text
Federal Register: November 10, 2004 (Volume 69, Number 217)NoticesPage 65155From the Federal Register Online via GPO Access [wais.access.gpo.gov]
DOCID:fr10no04-64
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Docket No. RP05-43-000Dominion Cove Point LNG, LP; Notice of Proposed Changes in FERC Gas Tariff
November 2, 2004.
Take notice that on October 28, Dominion Cove Point LNG, LP (Cove Point) tendered for filing as part of its FERC Gas Tariff, Original Volume No. 1, the following tariff sheets, to become effective December 27, 2004:
Fifth Revised Sheet No. 5 Fifth Revised Sheet No. 6 Fifth Revised Sheet No. 8 Sixth Revised Sheet No. 11 Third Revised Sheet No. 23 Second Revised Sheet No. 51 Third Revised Sheet No. 71 Third Revised Sheet No. 72 Second Revised Sheet No. 203 Second Revised Sheet No. 213 First Revised Sheet No. 214 First Revised Sheet No. 215 Second Revised Sheet No. 243 Second Revised Sheet No. 400 First Revised Sheet No. 450 First Revised Sheet No. 455 First Revised Sheet No. 460 First Revised Sheet No. 465 Second Revised Sheet No. 475
Cove Point states that it is proposing a series of clarifications and/or modifications of its tariff to bring certainty to issues related to contract expirations and renewals and rights of first refusal (ROFR), and to the potential future uses of FPS capacity. Specifically, Cove Point states that it is addressing the following: negotiation of a contractual ROFR, negotiation of evergreen provisions, extension of contract terms, elimination of ``Elected FTS'' service option, and future allocation of FPS storage capacity to LTD-1 service.
Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission's regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
This filing is accessible on-line at http://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's Public Reference Room in Washington, D.C. There is an ``eSubscription'' link on the web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Magalie R. Salas, Secretary.
FR Doc. E4-3099 Filed 11-9-04; 8:45 amBILLING CODE 6717-01-P
Sponsored links
ver las páginas en versión mobile | web
ver las páginas en versión mobile | web
© Copyright 2012, vLex. All Rights Reserved.
Contents in vLex United States
Explore vLex
For Professionals
For Partners
Company
Other documents:
arnold industries introduces web site. | business week ranks apex pc solutions fourth on 1998 list of the 100 best small corporations . | MainControl Enhances Unix Support Of Award-Winning MC/EMpower Product Suite. | rio nevada mines operatorship and property update. | Decisión nº 2C33861-04 de Tribunal Segundo de Control Los Teques de Miranda de May 21 2004 | decisión de juzgado de los municipios sucre y cruz salmeron acosta de sucre, de april 29, 2004 | Decisión nº WJ01-S-000487 de Juzgado Tercero de Control de Vargas, de September 04, 2003 | Decisión de Juzgado Superior en lo Civil, Mercantil, Transito y de Menores de Miranda, de April 10, 2003