Environmental Impact Statements; Availability, etc.: Record of Decision for the Yuma Field Office Resource Management Plan
FR, January 29, 2010 › Notices › Land Management Bureau
Linked as:FR, January 29, 2010 › Notices › Land Management Bureau
Linked as:Text
Federal Register: January 29, 2010 (Volume 75, Number 19)
Notices
Page 4842
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
DOCID:fr29ja10-96
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
LLAZC02000L16100000.DR0000.241A
Notice of Availability of Record of Decision for the Yuma Field
Office Resource Management Plan/Environmental Impact Statement
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of availability.
SUMMARY: The Bureau of Land Management (BLM) announces the availability of the Record of Decision (ROD)/Approved Resource Management Plan (RMP) for the Yuma Field Office (YFO) located in Arizona and California. The
Arizona State Director signed the ROD on July 28, 2009, which constitutes the final decision of the BLM and makes the approved RMP effective immediately.
ADDRESSES: Copies of the ROD/Approved RMP are available upon request from the Bureau of Land Management, Yuma Field Office, 2555 Gila Ridge
Road, Yuma, Arizona 85365, or via the Internet at http://www.blm.gov/ az/st/en/prog/planning/yuma_plan.html.
FOR FURTHER INFORMATION CONTACT: James T. Shoaff, Field Manager, Bureau of Land Management, Yuma Field Office, 2555 Gila Ridge Road, Yuma,
Arizona 85365.
SUPPLEMENTARY INFORMATION: One of BLM's objectives during the planning process was to understand the views of various public interest groups by providing opportunities for meaningful participation. Through communication media such as meetings, newsletters, and news releases, the public was provided opportunities to identify issues that needed to be addressed. The public also provided comments during the 90-day public comment period on the Draft Environmental Impact Statement
(EIS), which were addressed in the Final EIS. The Approved RMP/Final
EIS was developed with the following cooperating agencies: the Bureau of Reclamation; the Arizona Game and Fish Department; the Arizona
Department of Transportation; the Federal Highway Administration; the
Imperial, Cibola, and Kofa National Wildlife Refuges; the Fort Yuma
Quechan Tribe; the Marine Corps Air Station, Yuma; Natural Resource
Conservation Service; the Yuma County Department of Public Works; the city of Yuma; the U.S. Army Yuma Proving Ground; the U.S. Department of
Agriculture, the Natural Resources Conservation Service; the U.S.
Department of Homeland Security, Customs and Border Patrol; the Cocopah
Indian Tribe; the town of Quartzsite; the Wellton-Mohawk Irrigation
District; and the Yavapai-Apache Nation. The BLM also initiated consultation with tribes that have oral traditions or cultural concerns relating to the planning area or that are documented as having occupied or used portions of the planning area during prehistoric or historic times.
The Approved RMP includes strategies for protecting and preserving the biological, cultural, recreational, geological, educational, scientific, and scenic values that balance multiple uses of the BLM- administered lands throughout the YFO planning area. The planning area encompasses more than 1.2 million acres of BLM-administered lands.
The ROD and Approved RMP include one new Area of Critical
Environmental Concern (ACEC): Dripping Springs Natural and Cultural
ACEC (11,733 acres). One existing ACEC is expanded under the new plan:
Gila River Cultural ACEC (from 3,668 to 28,504 acres). The Gila River
Cultural ACEC is renamed the Sears Point Cultural ACEC. The following types of resource use limitations generally apply to these ACECs:
(1) Allowable uses are limited to those which are compatible with the natural or cultural resources for which the area is designated; (2)
Recreation facilities are limited to projects that protect ACEC values; and (3) Travel is permitted only on designated open and signed routes.
Detailed information is provided in the Special Designations Management section of the Approved RMP.
The Preferred Alternative in the Draft Resource Management Plan/
Draft EIS (published December 15, 2006) was revised to include comments received during the 90-day public comment period. The resulting alternative became the Proposed Plan in the Proposed Resource
Management Plan/Final EIS (PRMP/FEIS), published on April 11, 2008.
Seven protests were received during the Final EIS 30-day protest period. The Proposed Plan was clarified based on these protests. The
Proposed Plan is now called the ``Approved RMP'' and is attached to the
ROD. As a result of protests, only minor editorial modifications were made in preparing the Approved RMP. These modifications provided further clarification of some of the decisions. Minor clarifications and changes between the Proposed Plan/Final EIS and the ROD/Approved
Plan include the recalculation of Geographic Information System acreage to ensure consistency between lands available for grazing and those unavailable for grazing in the YFO, and minor text changes to clarify certain decisions. The BLM has determined that the Approved RMP provides an optimal balance between authorized resource use and the protection and long-term sustainability of sensitive resources within the planning area.
Neither the Arizona Governor's Office nor the California Governor's
Office identified any inconsistencies between the Proposed RMP/Final
EIS and state or local plans, policies, and programs following the 60- day Governors' Consistency Reviews (initiated March 6, 2008), in accordance with planning regulations at 43 CFR part 1610.3-2(e).
The Approved RMP does not contain implementation decisions. Future activity-level plans will address the implementation of the approved
RMP. These implementation plans will provide the required additional site-specific planning and National Environmental Policy Act (NEPA) analyses. At that time, such decisions will become appealable. The appeal process will be outlined in the future individual implementation
(activity or project-level) plans.
Authority: H-1790-1 National Environmental Policy Act Handbook,
January 30, 2008.
James G. Kenna,
Arizona State Director.
FR Doc. 2010-1726 Filed 1-28-10; 8:45 am
BILLING CODE 4310-32-P
Sponsored links
ver las páginas en versión mobile | web
ver las páginas en versión mobile | web
© Copyright 2012, vLex. All Rights Reserved.
Contents in vLex United States
Explore vLex
For Professionals
For Partners
Company
Other documents:
Man Shot Another Hurt at Coopers Creek Party | Magrath Search Will Be Credible Committee Could Be Named by Sept 12 | fugitivos se entregan a la justicia | Kohl's Set to Open at the Highlands in Ohio County | Decisión de Juzgado Superior Octavo en lo Civil Mercantil y del Transito de Caracas de November 05 2010 | decisión de juzgado superior en lo civil y contencioso administrativo de la región centro norte de carabobo, de august 02, 2010 | Decisión de Juzgado Segundo del Municipio Barinas de Barinas, de March 10, 2010 | Decisión nº PJ0132010000044 de Sala Décimo Tercero de Juicio de Protección del Niño y Adolescente de Caracas de January 20 2010