Environmental statements; availability, etc.: Libby and Hungry Horse Dams, MT; alternative flood control and fish operations,

FR, December 21, 2005Notices › Engineers Corps

Linked as:

Text




Federal Register: December 21, 2005 (Volume 70, Number 244)NoticesPage 75795From the Federal Register Online via GPO Access [wais.access.gpo.gov]

DOCID:fr21de05-39

DEPARTMENT OF DEFENSE

Department of the Army, Corps of Engineers

Upper Columbia Alternative Flood Control and Fish Operations, Libby and Hungry Horse Dams, MT

AGENCY: Corps of Engineers, DoD.

ACTION: Notice of Availability of Draft Environmental Impact Statement and Notice of Public Hearings; correction.

SUMMARY: On November 10, 2005, the Corps of Engineers and the Bureau of Reclamation, Interior, issued a Notice of Availability of a Draft Environmental Impact Statement (DEIS) and Notice of Public Hearings (see 70 CFR 68409). The due date for comments period provided in the DATES section of that notice was incorrectly identified as December 27, 2005. The correct due date for comments is January 3, 2006 (45 days from the November 18, 2005, Federal Register publication date of the EPA weekly notice of DEIS availability).

Dated: December 13, 2005. Debra M. Lewis, District Engineer, Seattle District, U.S. Army Corps of Engineers. [FR Doc. E5-7610 Filed 12-20-05; 8:45 am]

BILLING CODE 3710-92-P

Sponsored links




ver las páginas en versión mobile | web

ver las páginas en versión mobile | web

© Copyright 2012, vLex. All Rights Reserved.

Contents in vLex United States

Explore vLex

For Professionals

For Partners

Company