Approval and Promulgation of Air Quality Implementation Plans: Maryland; Update to Materials Incorporated by Reference

Federal Register, March 19, 2009 (Nbr. Vol. 74, No. 52)

Rules - Environmental Protection Agency
Permanent Link: http://regulations.vlex.com/vid/maryland-update-incorporated-reference-54059062
Id. vLex: VLEX-54059062

Click here to download this article in graphic format (Acrobat Reader)

Document language

Search in this disposition

Go to article

Sponsored Ads:


Text:



Federal Register: March 19, 2009 (Volume 74, Number 52)

Rules and Regulations

Page 11647-11661

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

DOCID:fr19mr09-9

ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52

MD202-3118; FRL-8775-2

Approval and Promulgation of Air Quality Implementation Plans;

Maryland; Update to Materials Incorporated by Reference

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule; notice of administrative change.

SUMMARY: EPA is updating the materials submitted by Maryland that are incorporated by reference (IBR) into the State implementation plan

(SIP). The regulations affected by this update have been previously submitted by the Maryland Department of the Environment (MDE) and approved by EPA. This update affects the SIP materials that are available for public inspection at the National Archives and Records

Administration (NARA), the Air and Radiation Docket and Information

Center located at EPA Headquarters in Washington, DC, and the Regional

Office.

DATES: Effective Date: This action is effective March 19, 2009.

ADDRESSES: SIP materials which are incorporated by reference into 40

CFR part 52 are available for inspection at the following locations:

Air Protection Division, U.S. Environmental Protection Agency, Region

III, 1650 Arch Street, Philadelphia, Pennsylvania 19103; the Air and

Radiation Docket and Information Center, EPA Headquarters Library, Room

Number 3334, EPA West Building, 1301 Constitution Ave., NW.,

Washington, DC 20460, and the National Archives and Records

Administration. If you wish to obtain materials from a docket in the

EPA Headquarters Library, please call the Office of Air and Radiation

(OAR) Docket/Telephone number: (202) 566-1742; or the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http:// www.archives.gov/federal_register/code_of_federal_regulations/ibr_ locations.html.

FOR FURTHER INFORMATION CONTACT: Harold A. Frankford, (215) 814-2108 or by e-mail at frankford.harold@epa.gov.

SUPPLEMENTARY INFORMATION: The SIP is a living document which the State revises as necessary to address the unique air pollution problems in the State. Therefore, EPA from time to time must take action on SIP revisions containing new and/or revised regulations to make them part of the SIP. On May 22, 1997 (62 FR 27968), EPA revised the procedures for incorporating by reference federally-approved SIPs, as a result of consultations between EPA and the Office of the Federal Register (OFR).

The description of the revised SIP document, IBR procedures and

``Identification of plan'' format are discussed in further detail in the May 22, 1997 Federal Register document. On November 29, 2004 (69 FR 69304), EPA published a document in the Federal Register beginning the new IBR procedure for Maryland. On February 2, 2006 (71 FR 5607) and

May 18, 2007 (72 FR 27957), EPA published an update to the IBR material for Maryland. On March 11, 2008 (73 FR 12895), EPA published a correction update to the IBR material pertaining to source-specific requirements. In this document, EPA is doing the following: 1. Announcing the update to the IBR material as of December 1, 2008. 2. Making corrections to the following entries listed in the paragraph 52.1070(c) chart, as described below: a. COMAR 26.11.01.01B(53)--moving the text from the ``State effective date'' and the ``EPA approval date'' columns to the ``EPA approval date'' and ``Additional explanation/citation at 40 CFR 52.1100'' columns respectively; and adding new text to the ``State effective date column.'' b. COMAR 26.11.06.02--correcting the regulatory citation in the

``Additional explanation/citation at 40 CFR 52.1100'' column. c. COMAR 26.11.13.08--correcting the page citation in the ``EPA approval date'' column. d. COMAR 26.11.17.01 and .03--correcting the text in the ``State effective date'' and ``EPA approval date'' columns. e. COMAR 26.11.24.05-1--adding explanatory text to the ``Additional explanation/citation at 40 CFR Sec. 52.1100'' column. f. COMAR 26.11.32.13--revising the explanatory text in the

``Additional explanation/citation at 40 CFR 52.1100'' column.

Page 11648

g. TM81-04 and TM83-05--removing these entries from the chart. EPA had approved revisions to COMAR 26.11.10.07 on September 7, 2001 (66 FR 46727) and November 7, 2001 (66 FR 56222), indicating that TM91-01 had replaced TM81-04 and TM83-05 as the SIP enforceable test method document for iron and steel production facilities. See currently,

Sec. Sec. 52.1100(c)(153)(B)(1) and 52.1100(c)(163)(B)(3). Thus, EPA has determined that the inclusion of entries for TM81-04 and TM91-1 in paragraph 52.1070(c) published on or after November 29, 2004 has been in error. 3. Correcting minor miscellaneous typographical errors in the paragraph (c) and (d) charts. 4. Making corrections to the following entries listed in the paragraph 52.1070(d) chart, as described below: a. PEPCO Chalk Point Units 1 and 2--Adding

``Potomac Electric Power Company'' to the ``Name of source'' column. b. Kaydon Ring and Seal--removing text describing the SIP effective date from the ``Additional explanation'' column. 5. Making corrections to typographical errors of the Federal

Register citations for the following entries listed in the paragraph 52.1070(e) chart: a. 1990 Base Year Emissions Inventory--Kent & Queen Anne's

Counties. b. 1990 Base Year Emissions Inventory--Metropolitan Baltimore Ozone

Nonattainment Area. c. 1990 Base Year Emissions Inventory--Philadelphia-Wilmington-

Trenton OzoneNonattainment Area (Cecil County). d. Post-1996 Rate of Progress Plan & contingency measures--

Philadelphia-Wilmington-Trenton Ozone Nonattainment Area (Cecil

County).

EPA has determined that today's rule falls under the ``good cause'''' exemption in section 553(b)(3)(B) of the Administrative Procedures Act

(APA) which, upon finding ``good cause'' authorizes agencies to dispense with public participation, and section 553(d)(3) which allows an agency to make a rule effective immediately (thereby avoiding the 30-day delayed effective date otherwise provided for in the APA).

Today's rule simply codifies provisions which are already in effect as a matter of law in Federal and approved State programs. Under section 553 of the APA, an agency may find good cause where procedures are

``impractical, unnecessary, or contrary to the public interest.''

Public comment is ``unnecessary'' and ``contrary to the public interest'' since the codification only reflects existing law. Immediate notice in the CFR benefits the public by removing outdated citations and incorrect chart entries.

Statutory and Executive Order Reviews

A. General Requirements

Under the Clean Air Act, the Administrator is required to approve a

SIP submission that complies with the provisions of the Act and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a).

Thus, in reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the Clean Air Act.

Accordingly, this action merely approves state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action:

Is not a ``significant regulatory action'' subject to review by the Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993);

Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);

Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory

Flexibility Act (5 U.S.C. 601 et seq.);

Does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded

Mandates Reform Act of 1995 (Pub. L. 104-4);

Does not have Federalism implications as specified in

Executive Order 13132 (64 FR 43255, August 10, 1999);

Is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);

Is not a significant regulatory action subject to

Executive Order 13211 (66 FR 28355, May 22, 2001);

Is not subject to requirements of Section 12(d) of the

National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the Clean Air Act; and

Does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under

Executive Order 12898 (59 FR 7629, February 16, 1994).

B. Submission to Congress and the Comptroller General

The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the

Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the

United States. EPA will submit a report containing this rule and other required information to the U.S. Senate, the U.S. House of

Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. This rule is not a

``major rule'' as defined by 5 U.S.C. 804(2).

C. Petitions for Judicial Review

EPA has also determined that the provisions of section 307(b)(1) of the Clean Air Act pertaining to petitions for judicial review are not applicable to this action. Prior EPA rulemaking actions for each individual component of the Maryland SIP compilations had previously afforded interested parties the opportunity to file a petition for judicial review in the United States Court of Appeals for the appropriate circuit within 60 days of such rulemaking action. Thus, EPA sees no need in this action to reopen the 60-day period for filing such petitions for judicial review for this ``Identification of plan'' reorganization update action for Maryland.

List of Subjects in 40 CFR Part 52

Environmental protection, Air pollution control, Carbon monoxide,

Incorporation by reference, Intergovernmental relations, Lead, Nitrogen dioxide, Ozone, Particulate matter, Reporting andrecordkeeping requirements, Sulfur oxides, Volatile organic compounds.

Dated: February 2, 2009.

William T. Wisniewski,

Acting Regional Administrator, Region III. 0 40 CFR part 52 is amended as follows:

PART 52--[AMENDED] 0 1. The authority for citation for part 52 continues to read as follows:

Authority: 42.U.S.C. 7401 et seq.

Subpart V--Maryland 0 2. Section 52.1070 is amended by revising paragraphs (b), (c), (d), and

(e) to read as follows:

Sec. 52.1070 Identification of plan.

* * * * *

Page 11649

(b) Incorporation by reference. (1) Material listed as incorporated by reference in paragraphs (c) and (d) was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates on or after December 1, 2008 will be incorporated by reference in the next update to the SIP compilation.

(2) EPA Region III certifies that the rules/regulations provided by

EPA at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State implementation plan as of

December 1, 2008.

(3) Copies of the materials incorporated by reference may be inspected at the EPA Region III Office at 1650 Arch Street,

Philadelphia, PA 19103. For further information, call (215) 814-2108; the EPA, Air and Radiation Docket and Information Center, Room Number 3334, EPA West Building, 1301 Constitution Avenue, NW., Washington, DC 20460. For further information, call (202) 566-1742; or at the National

Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_ regulations/ibr_locations.html.

(c) EPA approved regulations.

EPA-Approved Regulations in the Maryland SIP

Additional

Code of Maryland Administrative

Title/subject

State effective date

EPA approval date

explanation/citation

Regulations (COMAR) citation

at 40 CFR 52.1100

26.11.01 General Administrative Provisions

26.11.01.01A., .01B Exceptions:

Definitions.......... 10/10/01........................ 5/28/02, 67 FR 36810............ (c)(171); Additional

.01B(3), (13), (21) through (23), (25).

EPA approvals are codified at Sec.

Sec. 52.1100(c)(119),

(c)(122), (c)(143),

(c)(148), (c)(158),

(c)(159), and

(c)(164). 26.11.01.01B(53)....................... Definitions--definiti 10/8/07......................... 3/31/08, 73 FR 10673............ Definition reflects on of volatile

the version of 40 organic compound

CFR 51.100(s), as

(VOC).

amended. 26.11.01.02............................ Relationship of

8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(1).

Provisions in this

Subtitle. 26.11.01.03............................ Delineation of Areas. 8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(1). 26.11.01.04............................ Testing and

6/19/06......................... 1/3/07, 72 FR 18................ Paragraph .04C(2) is

Monitoring.

added. The SIP effective date is 3/ 6/07. 26.11.01.05............................ Records and

6/30/97, 12/10/01............... 5/28/02, 67 FR 36810............ (c)(172).

Information. 26.11.01.05-1.......................... Emission Statements.. 12/7/92......................... 10/12/94, 59 FR 51517........... (c)(109). 26.11.01.06............................ Circumvention........ 8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(1). 26.11.01.07............................ Malfunctions and

8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(1).

Other Temporary

Increases in

Emissions. 26.11.01.08............................ Determination of

8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(5).

Ground Level

Concentrations--Acce ptable Techniques. 26.11.01.09............................ Vapor Pressure of

8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(5)

Gasoline. 26.11.01.10............................ Continuous Emission 7/22/91......................... 2/28/96, 61 FR 7418............. (c)(106); TM90-01

Monitoring (CEM)

was approved as

Requirements.

``additional material'', but not

IBR'd.

26.11.02 Permits, Approvals, and Registration

26.11.02.01............................ Definitions.......... 5/8/95.......................... 2/27/03, 68 FR 9012............. (c)(182);

Exceptions: 26.11.02.01B(1), (1- 1), (4)-(6), (10),

(15), (16), (22),

(29)-(33), (37),

(39), (42), (46),

(49), (50), (54). 26.11.02.02............................ General Provisions... 5/8/95.......................... 2/27/03, 68 FR 9012............. (c)(182); Exception:

.02D. 26.11.02.03............................ Federally Enforceable 5/8/95.......................... 2/27/03, 68 FR 9012............. (c)(182).

Permits to Construct and State Permits to

Operate. 26.11.02.04............................ Duration of Permits.. 5/8/95.......................... 2/27/03, 68 FR 9012............. (c)(182); Exception:

.04C(2). 26.11.02.05............................ Violation of Permits 5/8/95.......................... 2/27/03, 68 FR 9012............. (c)(182). and Approvals. 26.11.02.06............................ Denial of

5/8/95, 6/16/97................. 2/27/03, 68 FR 9012............. (c)(182).

Applications for

State Permits and

Approvals. 26.11.02.07............................ Procedures for

5/8/95.......................... 2/27/03, 68 FR 9012............. (c)(182).

Denying, Revoking, or Reopening and

Revising a Permit or

Approval. 26.11.02.08............................ Late Applications and 5/8/95.......................... 2/27/03, 68 FR 9012............. (c)(182).

Delays in Acting on

Applications.

Page 11650

26.11.02.09............................ Sources Subject to

5/8/95, 5/4/98.................. 2/27/03, 68 FR 9012............. (c)(182).

Permits to Construct and Approvals. 26.11.02.10............................ Sources Exempt from 5/8/95, 6/16/97,

2/27/03, 68 FR 9012............. (c)(182).

Permits to Construct 9/22/97, 3/22/99............... and Approvals. 26.11.02.11............................ Procedures for

5/8/95, 6/16/97................. 2/27/03, 68 FR 9012............. (c)(182); Exception:

Obtaining Permits to

.11C.

Construct Certain

Significant Sources. 26.11.02.12............................ Procedures for

5/8/95.......................... 2/27/03, 68 FR 9012............. (c)(182).

Obtaining Approvals of PSD Sources and

NSR Sources, Permits to Construct,

Permits to Construct

MACT Determinations on a Case-by-Case

Basis in Accordance with 40 CFR Part 63,

Subpart B, and

Certain 100-Ton

Sources. 26.11.02.13............................ Sources Subject to

5/8/95.......................... 2/27/03, 68 FR 9012............. (c)(182).

State Permits to

Operate. 26.11.02.14............................ Procedures for

5/8/95, 6/16/97................. 2/27/03, 68 FR 9012............. (c)(182).

Obtaining State

Permits to Operate and Permits to

Construct Certain

Sources and Permits to Construct Control

Equipment on

Existing Sources.

26.11.04 Ambient Air Quality Standards

26.11.04.02............................ State-Adopted

5/8/95.......................... 8/20/01, 66 FR 43485............ (c)(165).

National Ambient Air

Quality Standards. 26.11.04.03............................ Definitions,

2/28/05......................... 6/14/06, 71 FR 34257............

Reference

Conditions, and

Methods of

Measurement. 26.11.04.04............................ Particulate Matter... 2/28/05......................... 6/14/06, 71 FR 34257............ Addition of ambient air quality standard for PM2.5. 26.11.04.05............................ Sulfur Oxides........ 2/28/05......................... 6/14/06, 71 FR 34257............ 26.11.04.06............................ Carbon Monoxide...... 1/5/88; recodified,

4/7/93, 58 FR 18010............. (c)(92). 8/1/88......................... 26.11.04.07............................ Ozone................ 2/28/05......................... 6/14/06, 71 FR 34257............ Addition of an 8- hour ambient air quality standard for ozone. 26.11.04.08............................ Nitrogen Dioxide..... 2/28/05......................... 6/14/06, 71 FR 34257............ 26.11.04.09............................ Lead................. 8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(3).

26.11.05 Air Quality Episode System

26.11.05.01............................ Definitions.......... 6/18/90......................... 4/14/94, 59 FR 17698............ (c)(100). 26.11.05.02............................ General Requirements. 6/18/90......................... 4/14/94, 59 FR 17698............ (c)(100). 26.11.05.03............................ Air Pollution Episode 6/18/90......................... 4/14/94, 59 FR 17698............ (c)(100).

Criteria. 26.11.05.04............................ Standby Emissions

8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(4).

Reduction Plan. 26.11.05.05............................ Control Requirements 6/18/90......................... 4/14/94, 59 FR 17698............ (c)(100). and Standby Orders. 26.11.05.06............................ Tables............... 8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(4).

26.11.06 General Emissions Standards, Prohibitions, and Restrictions

26.11.06.01............................ Definitions.......... 5/8/91.......................... 11/29/94, 59 FR 60908........... (c)(102)(i)(B)(14). 26.11.06.02 [Except: .02A(1)(e),

Visible Emissions.... 11/24/03........................ 8/1/07, 72 FR 41891............. Revised paragraph

(1)(g), (1)(h), (1)(i)].

26.11.06.02A(2). 26.11.06.03............................ Particulate Matter... 11/11/02........................ 8/6/03, 68 FR 46487............. (c)(181). 26.11.06.04............................ Carbon Monoxide in

1/5/88; recodified,

4/7/93, 58 FR 18010............. (c)(92).

Areas III and IV.

8/1/88......................... 26.11.06.05............................ Sulfur Compounds from 11/11/02........................ 8/6/03, 68 FR 46487............. (c)(181).

Other than Fuel

Burning Equipment.

Page 11651

26.11.06.06............................ Volatile Organic

9/22/97......................... 5/7/01, 66 FR 22924............. (c)(156) Note: On 2/

Compounds.

27/03 (68 FR 9012),

EPA approved a revised rule citation with a

State effective date of 5/8/95

(c)(182)(i)(C)

. 26.11.06.10............................ Refuse Burning

8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(5).

Prohibited in

Certain

Installations. 26.11.06.14............................ Control of PSD

10/10/01........................ 5/28/02, 67 FR 36810............ (c)(171). sources. 26.11.06.15............................ Nitrogen Oxides from 8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(5).

Nitric Acid Plants. 26.11.06.16............................ Tables............... 8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(5).

26.11.07 Open Fires

26.11.07.01............................ Definitions.......... 5/22/95......................... 6/11/02, 67 FR 39856............ (c)(173). 26.11.07.02............................ General.............. 5/22/95......................... 2/25/97, 62 FR 8380............. (c)(120). 26.11.07.03............................ Control Officer May 8/11/97......................... 6/11/02, 67 FR 39856............ (c)(173).

Authorize Certain

Open Fires. 26.11.07.04............................ Public Officers May 5/22/95......................... 2/25/97, 62 FR 8380............. (c)(120).

Authorize Certain

Fires. 26.11.07.05............................ Open Fires Allowed

5/22/95......................... 2/25/97, 62 FR 8380............. (c)(120) .05A(3) &

Without

(4), and .05B(3)

Authorization of

are State-

Control Officer or

enforceable only.

Public Officer. 26.11.07.06............................ Safety Determinations 8/11/97......................... 6/11/02, 67 FR 39856............ (c)(173). at Federal

Facilities.

10.18.08/26.11.08 Control of Incinerators

10.18.08/26.11.08.01................... Definitions.......... 9/12/05......................... 9/15/08, 73 FR 53130............ Definition of

``crematory'' is added. 10.18.08.02............................ Applicability........ 7/18/80......................... 8/5/81, 46 FR 39818............. (c)(45). 10.18.08.03............................ Prohibition of

6/8/81.......................... 5/11/82, 47 FR 20126............ (c)(58).

Certain Incinerators in Areas III and IV. 10.18.08/26.11.08.04................... Visible Emissions.... 11/24/03........................ 8/1/07, 72 FR 41891............. Revised paragraph 26.11.08.04C. 10.18.08/26.11.08.05................... Particulate Matter... 9/12/05......................... 9/15/08, 73 FR 53130............ Sections .05A(3) and

.05B(2)(a) are revised. 10.18.08.06............................ Prohibition of

3/25/84......................... 7/2/85, 50 FR 27245............. (c)(82).

Unapproved Hazardous

Waste Incinerators.

26.11.09 Control of Fuel Burning Equipment and Stationary Internal Combustion Engines, and Certain Fuel-Burning Installations

26.11.09.01............................ Definitions.......... 9/12/05......................... 6/13/06, 71 FR 34014............ Revised definition of ``interruptible gas service'' in 26.11.09.01B(4). 26.11.09.02............................ Applicability........ 8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(7). 26.11.09.03............................ General Conditions

6/21/04......................... 7/6/05, 70 FR 38774............. Revised paragraphs for Fuel Burning

26.11.09.03C(1) and

Equipment.

.03C(2). 26.11.09.04............................ Prohibition of

8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(7).

Certain New Fuel

Burning Equipment. 26.11.09.05............................ Visible Emissions.... 11/24/03........................ 8/1/07, 72 FR 41891............. Revised paragraph 26.11.09.05A(3). 26.11.09.06............................ Control of

6/21/04......................... 7/6/05, 70 FR 38774............. Addition of

Particulate Matter.

paragraph 26.11.09.06C. 26.11.09.07............................ Control of Sulfur

8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(7).

Oxides from Fuel

Burning Equipment. 26.11.09.08............................ Control of NOX

11/24/03........................ 9/20/04, 69 FR 56170............ (c)(191).

Emissions for Major

Stationary Sources. 26.11.09.09............................ Tables and Diagrams.. 11/11/02........................ 5/1/03, 68 FR 23206............. (c)(183); Revised

Table 1.

26.11.10 Control of Iron and Steel Production Installations

26.11.10.01............................ Definitions.......... 12/25/00........................ 11/7/01, 66 FR 56222............ (c)(163). 26.11.10.02............................ Applicability........ 11/2/98......................... 9/7/01, 66 FR 46727............. (c)(153). 26.11.10.03............................ Visible Emissions.... 11/24/03........................ 8/1/07, 72 FR 41891............. Revised paragraph 26.11.10.03A(2). 26.11.10.04............................ Control of

11/2/98......................... 9/7/01, 66 FR 46727............. (c)(153).

Particulate Matter. 26.11.10.05............................ Sulfur Content

11/2/98......................... 9/7/01, 66 FR 46727............. (c)(153).

Limitations for Coke

Oven Gas.

Page 11652

26.11.10.06[1]......................... Control of Volatile 12/25/00........................ 11/7/01, 66 FR 56222............ (c)(163).

Organic Compounds from Iron and Steel

Production

Installations. 26.11.10.06[2]......................... Carbon Monoxide...... 8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(8). 26.11.10.07............................ Testing and

12/25/00........................ 11/7/01, 66 FR 56222............ (c)(163).

Observation

Procedures.

26.11.11 Control of Petroleum Products Installations, Including Asphalt Paving, Asphalt Concrete Plants, and Use of Waste Oils

26.11.11.01............................ Applicability........ 8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(9). 26.11.11.02............................ Asphalt Paving....... 4/26/93......................... 1/6/95, 60 FR 2018.............. (c)(113)(i)(B)(1). 26.11.11.03............................ Asphalt Concrete

8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(9).

Plants in Areas I,

II, V, and VI. 26.11.11.06............................ Use of Waste Oils as 8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(9).

Fuel.

26.11.12 Control of Batch Type Hot-Dip Galvanizing Installations

26.11.12.01............................ Definitions.......... 5/8/95.......................... 7/25/00, 64 FR 45743............ (c)(149). 26.11.12.02............................ Applicability........ 5/8/95.......................... 7/25/00, 64 FR 45743............ (c)(149). 26.11.12.03............................ Prohibitions and

5/8/95.......................... 7/25/00, 64 FR 45743............ (c)(149).

Exemptions. 26.11.12.04............................ Visible Emissions.... 8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(10). 26.11.12.05............................ Particulate Matter... 8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(10). 26.11.12.06............................ Reporting

8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(10).

Requirements.

26.11.13 Control of Gasoline and Volatile Organic Compound Storage and Handling

26.11.13.01............................ Definitions.......... 10/18/07........................ 7/18/08, 73 FR 41268............ 26.11.13.02............................ Applicability and

4/26/93......................... 1/6/95, 60 FR 2018.............. (c)(113)(i)(B)(3).

Exemption. 26.11.13.03............................ Large Storage Tanks.. 8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(12). 26.11.13.04............................ Loading Operations... 8/11/97......................... 12/22/98, 63 FR 70667........... (c)(132). 26.11.13.05............................ Gasoline Leaks from 2/15/93......................... 1/6/95, 60 FR 2018.............. (c)(112).

Tank Trucks. 26.11.13.06............................ Plans for Compliance. 4/26/93......................... 1/6/95, 60 FR 2018.............. (c)(113)(i)(B)(5). 26.11.13.07............................ Control of Gasoline 6/18/07......................... 7/17/08, 73 FR 40970............ and VOC Emissions from Portable Fuel

Containers. 26.11.13.08............................ Control of VOC

10/18/07........................ 7/18/08, 73 FR 41268............ New Regulation.

Emissions from

Marine Vessel

Loading.

26.11.14 Control of Emissions From Kraft Pulp Mills

26.11.14.01............................ Definitions.......... 1/8/01, 10/15/01................ 11/7/01, 66 FR 56220............ (c)(170). 26.11.14.02............................ Applicability........ 1/8/01.......................... 11/7/01, 66 FR 56220............ (c)(170). 26.11.14.06............................ Control of Volatile 1/8/01, 10/15/01................ 11/7/01, 66 FR 56220............ (c)(170).

Organic Compounds.

26.11.17 Requirements for Major New Sources and Modifications

26.11.17.01............................ Definitions.......... 11/24/03........................ 9/20/04, 69 FR 56170............ 52.1070(c)(191). 26.11.17.02............................ Applicability........ 4/26/93, 10/2/00................ 2/12/01, 66 FR 9766............. 52.1070(c)(148). 26.11.17.03............................ General Conditions... 11/24/03........................ 9/20/04, 69 FR 56170............ 52.1070(c)(191). 26.11.17.04............................ Baseline for

4/26/93, 10/2/00................ 2/12/01, 66 FR 9766............. 52.1070(c)(148).

Determining Credit for Emission and Air

Quality Offsets. 26.11.17.05............................ Administrative

4/26/93, 10/2/00................ 2/12/01, 66 FR 9766............. 52.1070(c)(148).

Procedures.

26.11.19 Volatile Organic Compounds From Specific Processes

26.11.19.01............................ Definitions.......... 6/5/95.......................... 9/2/97, 62 FR 46199............. (c)(126) Note: On 5/ 13/1998 (63 FR 26462), EPA approved the revised definition of ``major stationary source of VOC `` with a

State effective date of 5/8/1995

(c)(128)

.

Page 11653

26.11.19.02............................ Applicability,

5/4/98, 12/10/01................ 2/3/03, 68 FR 5228.............. (c)(174), (c)(175)

Determining

1. Limited approval

Compliance,

of paragraph .02G

Reporting, and

(9/4/98, 63 FR

General Requirements.

47174) [(c)(131)-

(c)(133)]. 2. On 2/ 27/03 (68 FR 9012),

EPA approved a revised rule citation with a

State effective date of 5/8/95

(c)(182)(i)(D)

. 26.11.19.03............................ Automotive and Light- 9/22/97......................... 11/5/98, 63 FR 59720............ (c)(140).

Duty Truck Coating. 26.11.19.04............................ Can Coating.......... 8/1/88.......................... 11/3/92, 57 FR 49651............ (C)(90)(i)(B)(12). 26.11.19.05............................ Coil Coating......... 8/1/88.......................... 11/3/92, 57 FR 49651............ (C)(90)(i)(B)(12). 26.11.19.06............................ Large Appliance

8/1/88.......................... 11/3/92, 57 FR 49651............ (C)(90)(i)(B)(12).

Coating. 26.11.19.07............................ Paper, Fabric, Vinyl 8/24/98......................... 1/14/2000, 64 FR 2334........... (c)(147). and Other Plastic

Parts Coating. 26.11.19.07-1.......................... Control of VOC

6/15/98......................... 6/17/99, 64 FR 32415............ (c)(142).

Emissions from solid

Resin Decorative

Surface

Manufacturing. 26.11.19.08............................ Metal Furniture

8/1/88.......................... 11/3/92, 57 FR 49651............ (C)(90)(i)(B)(12).

Coating. 26.11.19.09............................ Control of Volatile 6/5/95.......................... 8/4/97, 62 FR 41853............. (c)(123).

Organic Compounds

(VOC) Emissions from cold and Vapor

Degreasing. 26.11.19.10............................ Flexographic and

6/5/95.......................... 9/2/97, 62 FR 46199............. (c)(126).

Rotogravure Printing. 26.11.19.11............................ Control of Volatile 6/5/95.......................... 9/2/97, 62 FR 46199............. (c)(126).

Organic Compounds

(VOC) Emissions from

Sheet-Fed and Web

Lithographic

Printing. 26.11.19.12............................ Dry Cleaning

9/22/97......................... 9/2/98, 63 FR 46662............. (c)(131).

Installations. 26.11.19.13............................ Miscellaneous Metal 5/8/91.......................... 11/29/94, 59 FR 60908........... (c)(102)(i)(B)(6).

Coating. 26.11.19.13-1.......................... Aerospace Coating

10/2/00, 10/15/01............... 11/7/01, 66 FR 56220............ (c)(169).

Operations. 26.11.19.13-2.......................... Brake Shoe Coating

8/24/98......................... 6/17/99, 64 FR 32415............ (c)(142).

Operations. 26.11.19.13-3.......................... Control of VOC

6/29/98......................... 6/17/99, 64 FR 32415............ (c)(142).

Emissions from

Structural Steel

Coating Operations. 26.11.19.14............................ Manufacture of

5/8/91.......................... 11/29/94, 59 FR 60908........... (c)(102)(i)(B)(14).

Synthesized

Pharmaceutical

Products. 26.11.19.15............................ Paint, Resin, and

5/4/98, 3/22/99................. 10/28/99, 64 FR 57989........... (c)(145).

Adhesive

Manufacturing and

Adhesive Application. 26.11.19.16............................ Control of VOC

8/19/91......................... 9/7/94, 59 FR 46180............. (c)(103)(i)(B)(9).

Equipment Leaks. 26.11.19.17............................ Control of Volatile 9/12/05......................... 3/31/06, 71 FR 16237............

Organic Compounds

(VOC) Emissions from

Yeast Manufacturing. 26.11.19.18............................ Control of Volatile 6/10/02......................... 1/15/03, 68 FR 1972............. (c)(177).

Organic Compounds

(VOC) Emissions from

Screen Printing and

Digital Imaging. 26.11.19.19............................ Control of Volatile 10/2/00......................... 5/7/01, 66 FR 22924............. (c)(156).

Organic Compounds

(VOC) Emissions from

Expandable

Polystyrene

Operations. 26.11.19.21............................ Control of Volatile 7/3/95.......................... 10/15/97, 62 FR 53544........... (c)(125)(i)(B)(4).

Organic Compounds

(VOC) Emissions from

Commercial Bakery

Ovens. 26.11.19.22............................ Control of Volatile 8/11/97......................... 9/23/99, 64 FR 41445............ (c)(137).

Organic Compounds

(VOC) Emissions from

Vinegar Generators. 26.11.19.23............................ Control of VOC

5/22/95......................... 8/4/97, 62 FR 41853............. (c)(124).

Emissions from

Vehicle Refinishing. 26.11.19.24............................ Control of VOC

8/11/97......................... 9/23/99, 64 FR 41445............ (c)(137).

Emissions from

Leather Coating

Operations.

Page 11654

26.11.19.25............................ Control of Volatile 8/11/97......................... 1/26/99, 64 FR 3852............. (c)(141).

Organic Compounds from Explosives and

Propellant

Manufacturing. 26.11.19.26............................ Control of Volatile 8/11/97......................... 8/19/99, 64 FR 45182............ (c)(139).

Organic Compound

Emissions from

Reinforced Plastic

Manufacturing. 26.11.19.27............................ Control of Volatile 10/20/97........................ 9/5/01, 66 FR 46379............. (c)(166).

Organic Compounds from Marine Vessel

Coating Operations. 26.11.19.28............................ Control of Volatile 10/2/00......................... 5/7/01, 66 FR 22924............. (c)(157).

Organic Compounds from Bread and Snack

Food Drying

Operations. 26.11.19.29............................ Control of Volatile 10/2/00, 10/15/01............... 11/7/01, 66 FR 56220............ (c)(160).

Organic Compounds from Distilled

Spirits Facilities. 26.11.19.30............................ Control of Volatile 12/10/01, 11/11/02.............. 6/3/03, 68 FR 33000............. (c)(176).

Organic Compounds from Organic

Chemical Production and

Polytetrafluoroethyl ene Installations. 26.11.19.31............................ Control of Volatile 6/5/06.......................... 1/11/07, 72 FR 1289.............

Organic Compounds from Medical Device

Manufacturing.

26.11.20 Mobile Sources

26.11.20.02............................ Motor Vehicle

8/1/88.......................... 11/3/92, 57 FR 49651............ (c)(90)(i)(B)(13)

Emission Control

as 26.11.20.06.

Devices. 26.11.20.03............................ Motor Vehicle Fuel

10/26/92........................ 6/10/94, 59 FR 29957............ (c)(101)(i)(B)(3).

Specifications. 26.11.20.04............................ National Low Emission 3/22/99......................... 12/28/99, 64 FR 72564........... (c)(146).

Vehicle Program.

26.11.24 Stage II Vapor Recovery at Gasoline Dispensing Facilities

26.11.24.01............................ Definitions.......... 1/29/07......................... 1/17/08, 73 FR 3187............. Addition of

``Certified

Inspector'' and ``

`Vapor Recovery

System.'' 26.11.24.01-1.......................... Incorporation by

4/15/02......................... 5/7/03, 68 FR 24363............. (c)(178).

Reference. 26.11.24.02............................ Applicability,

4/15/02......................... 5/7/03, 68 FR 24363............. (c)(178).

Exemptions, and

Effective Date. 26.11.24.03............................ General Requirements. 4/15/02......................... 5/7/03, 68 FR 24363............. (c)(178). 26.11.24.04............................ Testing Requirements. 02/28/05........................ 5/8/06, 71 FR 26688............. 26.11.24.05............................ Inspection

2/15/93......................... 6/9/94, 59 FR 29730............. (c)(107).

Requirements. 26.11.24.05-1.......................... Inspections by a

1/29/07......................... 1/17/08, 73 FR 3187............. Added Section.

Certified Inspector. 26.11.24.06............................ Training Requirements 2/15/93......................... 6/9/94, 59 FR 29730............. (c)(107). for Operation and

Maintenance of

Approved Systems. 26.11.24.07............................ Record-Keeping and

2/28/05......................... 5/8/06, 71 FR 26688.............

Reporting

Requirements. 26.11.24.08............................ Instructional Signs.. 2/15/93......................... 6/9/94, 59 FR 29730............. (c)(107). 26.11.24.09............................ Sanctions............ 2/15/93......................... 6/9/94, 59 FR 29730............. (c)(107).

26.11.25 Control of Glass Melting Furnaces

26.11.25.01............................ Definitions.......... 10/5/98......................... 10/19/05, 70 FR 60738........... 26.11.25.02............................ Applicability and

10/5/98......................... 10/19/05, 70 FR 60738...........

Exemptions. 26.11.25.03............................ Visible Emissions

10/5/98......................... 10/19/05, 70 FR 60738........... from Glass Melting

Furnaces. 26.11.25.04............................ Particulate Matter

10/5/98......................... 10/19/05, 70 FR 60738...........

Emissions from Glass

Melting Furnaces.

Page 11655

26.11.26 Conformity

26.11.26.01............................ Definitions.......... 5/15/95, 6/5/95................. 12/9/98, 63 FR 67782............ (c)(136); definitions of

Applicable implementation plan, Governor,

State, and State air agency. 26.11.26.03............................ General Conformity... 5/15/95, 6/5/95................. 12/9/98, 63 FR 67782............ (c)(136); current

COMAR citation is 26.11.26.04.

26.11.27 Emission Limitations for Power Plants

26.11.27.01............................ Definitions.......... 7/16/07......................... 9/4/08, 73 FR 51599............. 26.11.27.02............................ Applicability and

7/16/07......................... 9/4/08, 73 FR 51599.............

Exceptions. 26.11.27.03............................ General Requirements. 7/16/07......................... 9/4/08, 73 FR 51599............. Exceptions:

Paragraphs

.03B(7)(a)(iii) and

.03D; the word

``and'' at the end of paragraph

.03B(7)(a)(ii). 26.11.27.05............................ Monitoring and

7/16/07......................... 9/4/08, 73 FR 51599.............

Reporting

Requirements. 26.11.27.06............................ Judicial Review of

7/16/07......................... 9/4/08, 73 FR 51599.............

Penalty Waivers.

26.11.29 NOX Reduction and Trading Program

26.11.29.01............................ Definitions.......... 5/1/00.......................... 1/10/01, 66 FR 1866............. (c)(154)(i)(B)(1). 26.11.29.02............................ Incorporation by

5/1/00.......................... 1/10/01, 66 FR 1866............. (c)(154)(i)(B)(1).

Reference. 26.11.29.03............................ Scope and

5/1/00.......................... 1/10/01, 66 FR 1866............. (c)(154)(i)(B)(1).

Applicability. 26.11.29.04............................ General Requirements 5/1/00.......................... 1/10/01, 66 FR 1866............. (c)(154)(i)(B)(1). for Affected Trading

Sources. 26.11.29.05............................ NOX Allowance

5/1/00.......................... 1/10/01, 66 FR 1866............. (c)(154)(i)(B)(1).

Allocations. 26.11.29.06............................ Compliance Supplement 5/1/00.......................... 1/10/01, 66 FR 1866............. (c)(154)(i)(B)(1).

Pool. 26.11.29.07............................ Allowance Banking.... 5/1/00.......................... 1/10/01, 66 FR 1866............. (c)(154)(i)(B)(1). 26.11.29.08............................ Emission Monitoring.. 5/1/00.......................... 1/10/01, 66 FR 1866............. (c)(154)(i)(B)(1). 26.11.29.09............................ Requirements for New 11/24/03........................ 3/22/04, 69 FR 13236............ (c)(184)(i)(C)(1)-(5

Sources and Set-

).

Aside Pool. 26.11.29.10............................ Reporting............ 5/1/00.......................... 1/10/01, 66 FR 1866............. (c)(154)(i)(B)(1). 26.11.29.11............................ Recordkeeping........ 5/1/00.......................... 1/10/01, 66 FR 1866............. (c)(154)(i)(B)(1). 26.11.29.12............................ End-of-Season

5/1/00.......................... 1/10/01, 66 FR 1866............. (c)(154)(i)(B)(1).

Reconciliation. 26.11.29.13............................ Compliance

5/1/00.......................... 1/10/01, 66 FR 1866............. (c)(154)(i)(B)(1).

Certification. 26.11.29.14............................ Penalties............ 5/1/00.......................... 1/10/01, 66 FR 1866............. (c)(154)(i)(B)(1). 26.11.29.15............................ Requirements for

5/1/00.......................... 1/10/01, 66 FR 1866............. (c)(154)(i)(B)(1).

Affected Nontrading

Sources.

26.11.30 Policies and Procedures Relating to Maryland's NOX Reduction and Trading Program

26.11.30.01............................ Scope and

5/1/00.......................... 1/10/01, 66 FR 1866............. (c)(154)(i)(B)(2).

Applicability. 26.11.30.02............................ Definitions.......... 5/1/00.......................... 1/10/01, 66 FR 1866............. (c)(154)(i)(B)(2). 26.11.30.03............................ Procedures Relating 5/1/00.......................... 1/10/01, 66 FR 1866............. (c)(154)(i)(B)(2). to Compliance

Accounts and

Overdraft Accounts. 26.11.30.04............................ Procedures Relating 5/1/00.......................... 1/10/01, 66 FR 1866............. (c)(154)(i)(B)(2). to General Accounts. 26.11.30.05............................ Allowance Banking.... 5/1/00.......................... 1/10/01, 66 FR 1866............. (c)(154)(i)(B)(2). 26.11.30.06............................ Allowance Transfers.. 5/1/00.......................... 1/10/01, 66 FR 1866............. (c)(154)(i)(B)(2). 26.11.30.07............................ Early Reductions..... 5/1/00.......................... 1/10/01, 66 FR 1866............. (c)(154)(i)(B)(2). 26.11.30.08............................ Opt-In Procedures.... 5/1/00.......................... 1/10/01, 66 FR 1866............. (c)(154)(i)(B)(2). 26.11.30.09............................ Allocation of

6/19/06......................... 11/03/06, 71 FR 64647........... New column for 2008

Allowances.

allocations.

26.11.32 Control of Emissions of Volatile Organic Compounds From Consumer Products

26.11.32.01............................ Applicability and

06/18/07........................ 12/10/07, 72 FR 69621...........

Exemptions. 26.11.32.02............................ Incorporation by

06/18/07........................ 12/10/07, 72 FR 69621...........

Reference. 26.11.32.03............................ Definitions.......... 06/18/07........................ 12/10/07, 72 FR 69621........... 26.11.32.04............................ Standards--General... 06/18/07........................ 12/10/07, 72 FR 69621........... 26.11.32.05............................ Standards--Requiremen 08/18/03........................ 12/09/03, 68 FR 68523........... (c)(185). ts for Charcoal

Lighter Materials.

Page 11656

26.11.32.06............................ Standards--Requiremen 06/18/07........................ 12/10/07, 72 FR 69621........... ts for Aerosol

Adhesives. 26.11.32.07............................ Standards--Requiremen 08/18/03........................ 12/09/03, 68 FR 68523........... (c)(185). ts for Floor Wax

Strippers. 26.11.32.08............................ Requirements for

06/18/07........................ 12/10/07, 72 FR 69621........... New Regulation.

Contact Adhesives,

Electronic Cleaners,

Footwear, or Leather

Care Products, and

General Purpose

Cleaners. 26.11.32.09............................ Requirements for

06/18/07........................ 12/10/07, 72 FR 69621........... New Regulation.

Adhesive Removers,

Electrical Cleaners, and Graffiti

Removers. 26.11.32.10............................ Requirements for

06/18/07........................ 12/10/07, 72 FR 69621........... New Regulation.

Solid Air Fresheners and Toilet and

Urinal Care Products. 26.11.32.11............................ Innovative Products-- 06/18/07........................ 12/10/07, 72 FR 69621........... Recodification of

CARB Exemption.

existing Regulation

.08. 26.11.32.12............................ Innovative Products-- 06/18/07........................ 12/10/07, 72 FR 69621...........

Department Exemption. 26.11.32.13............................ Administrative

06/18/07........................ 12/10/07, 72 FR 69621........... Recodification of

Requirements.

existing Regulation

.10; Amended. 26.11.32.14............................ Reporting

06/18/07........................ 12/10/07, 72 FR 69621........... Recodification of

Requirements.

existing Regulation

.11; Amended. 26.11.32.15............................ Variances............ 06/18/07........................ 12/10/07, 72 FR 69621........... Recodification of existing Regulation

.12; Amended. 26.11.32.16............................ Test Methods......... 06/18/07........................ 12/10/07, 72 FR 69621........... Recodification of existing Regulation

.13; Amended. 26.11.32.17............................ Alternative Control 06/18/07........................ 12/10/07, 72 FR 69621........... Recodification of

Plan (ACP).

existing Regulation

.14; Amended. 26.11.32.18............................ Approval of an ACP

06/18/07........................ 12/10/07, 72 FR 69621........... Recodification of

Application.

existing Regulation

.15; Amended. 26.11.32.19............................ Recordkeeping and

06/18/07........................ 12/10/07, 72 FR 69621........... Recodification of

Availability of

existing Regulation

Requested

.16.

Information. 26.11.32.20............................ Violations........... 06/18/07........................ 12/10/07, 72 FR 69621........... Recodification of existing Regulation

.17. 26.11.32.21............................ Surplus Reduction and 06/18/07........................ 12/10/07, 72 FR 69621........... Recodification of

Surplus Trading.

existing Regulation

.18; Amended. 26.11.32.22............................ Limited-use surplus 06/18/07........................ 12/10/07, 72 FR 69621........... Recodification of reduction credits

existing Regulation for early

.19; Amended. formulations of ACP

Products. 26.11.32.23............................ Reconciliation of

06/18/07........................ 12/10/07, 72 FR 69621........... Recodification of

Shortfalls.

existing Regulation

.20; Amended. 26.11.32.24............................ Modifications to an 06/18/07........................ 12/10/07, 72 FR 69621........... Recodification of

ACP.

existing Regulation

.21; Amended. 26.11.32.25............................ Cancellation of an

06/18/07........................ 12/10/07, 72 FR 69621........... Recodification of

ACP.

existing Regulation

.22; Amended. 26.11.32.26............................ Transfer of an ACP... 06/18/07........................ 12/10/07, 72 FR 69621........... Recodification of existing Regulation

.23.

26.11.33 Architectural Coatings

26.11.33.01............................ Applicability and

3/29/04......................... 5/12/05, 70 FR 24979............

Exemptions. 26.11.33.02............................ Test Methods--

3/29/04......................... 5/12/05, 70 FR 24979............

Incorporation by

Reference. 26.11.33.03............................ Definitions.......... 3/29/04......................... 5/12/05, 70 FR 24979............ 26.11.33.04............................ General Standard--VOC 3/29/04......................... 5/12/05, 70 FR 24979............

Content Limits. 26.11.33.05............................ VOC Content Limits... 3/29/04......................... 5/12/05, 70 FR 24979............ 26.11.33.06............................ Most Restrictive VOC 2/28/05......................... 10/19/05, 70 FR 60740........... Addition of sections

Limit.

B(15) through

B(19). 26.11.33.07............................ Painting Restrictions 3/29/04......................... 5/12/05, 70 FR 24979............ 26.11.33.08............................ Thinning............. 3/29/04......................... 5/12/05, 70 FR 24979............ 26.11.33.09............................ Rust Preventive

3/29/04......................... 5/12/05, 70 FR 24979............

Coatings. 26.11.33.10............................ Coatings Not Listed 2/28/05......................... 10/19/05, 70 FR 60740........... in Regulation .05. 26.11.33.11............................ Lacquers............. 3/29/04......................... 5/12/05, 70 FR 24979............ 26.11.33.12............................ Container Labeling

2/28/05......................... 10/19/05, 70 FR 60740........... Deleted section K.

Requirements. 26.11.33.13............................ Record Keeping

2/28/05......................... 10/19/05, 70 FR 60740...........

Requirements.

Page 11657

26.11.33.14............................ Compliance Provisions 3/29/04......................... 5/12/05, 70 FR 24979............ and Test Methods.

11.14.08 Vehicle Emissions Inspection Program

11.14.08.01............................ Title................ 1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144). 11.14.08.02............................ Definitions.......... 1/02/95, 10/19/98............... 10/29/99, 64 FR 58340........... (c)(144). 11.14.08.03............................ Applicability........ 6/10/02......................... 1/16/03, 68 FR 2208............. (c)(179). 11.14.08.04............................ Exemptions........... 1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144). 11.14.08.05............................ Schedule of the

1/02/95, 12/16/96............... 10/29/99, 64 FR 58340........... (c)(144).

Program. 11.14.08.06............................ Certificates......... 6/10/02......................... 1/16/03, 68 FR 2208............. (c)(179). 11.14.08.07............................ Extensions........... 1/02/95, 10/19/98............... 10/29/99, 64 FR 58340........... (c)(144). 11.14.08.08............................ Enforcement.......... 1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144). 11.14.08.09............................ Inspection Standards. 6/10/02......................... 1/16/03, 68 FR 2208............. (c)(179). 11.14.08.10............................ General Requirements 1/02/95, 12/16/96,

10/29/99, 64 FR 58340........... (c)(144). for Inspection and

10/19/98.......................

Preparation for

Inspection. 11.14.08.11............................ Idle Exhaust

10/18/98........................ 10/29/99, 64 FR 58340........... (c)(144).

Emissions Test and

Equipment Checks. 11.14.08.11-1.......................... Transient Exhaust

12/16/96, 10/19/98.............. 10/29/99, 64 FR 58340........... (c)(144).

Emissions Test and

Evaporative Purge

Test Sequence. 11.14.08.12............................ Evaporative Integrity 6/10/02......................... 1/16/03, 68 FR 2208............. (c)(179).

Test, Gas Cap Leak

Test, and On-Board

Diagnostics

Interrogation

Procedures. 11.14.08.13............................ Failed Vehicle and

1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144).

Reinspection

Procedures. 11.14.08.14............................ Dynamometer System

1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144).

Specifications. 11.14.08.15............................ Constant Volume

1/02/95, 10/19/98............... 10/29/99, 64 FR 58340........... (c)(144).

Sampler, Analysis

System, and

Inspector Control

Specifications. 11.14.08.16............................ Evaporative Test

6/10/02......................... 1/16/03, 68 FR 2208............. (c)(179).

Equipment, Gas Cap

Leak Test Equipment, and On-Board

Diagnostics

Interrogation

Equipment

Specifications. 11.14.08.17............................ Quality Assurance and 1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144).

Maintenance--General

Requirements. 11.14.08.18............................ Test Assurance

1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144).

Procedures. 11.14.08.19............................ Dynamometer Periodic 1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144).

Quality Assurance

Checks. 11.14.08.20............................ Constant Volume

1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144).

Sampler Periodic

Quality Assurance

Checks. 11.14.08.21............................ Analysis System

1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144).

Periodic Quality

Assurance Checks. 11.14.08.22............................ Evaporative Test

1/02/95, 10/19/98............... 10/29/99, 64 FR 58340........... (c)(144).

Equipment, Gas Cap

Leak Test Equipment and On-board

Diagnostics

Interrogation

Equipment Periodic

Quality Assurance

Checks. 11.14.08.23............................ Overall System

1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144).

Performance Quality

Assurance. 11.14.08.24............................ Control Charts....... 1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144). 11.14.08.25............................ Gas Specifications... 1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144).

Page 11658

11.14.08.26............................ Vehicle Emissions

1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144).

Inspection Station. 11.14.08.27............................ Technician's Vehicle 1/02/95, 10/19/98............... 10/29/99, 64 FR 58340........... (c)(144).

Report. 11.14.08.28............................ Feedback Reports..... 1/02/95, 10/19/98............... 10/29/99, 64 FR 58340........... (c)(144). 11.14.08.29............................ Certified Emissions 1/02/95, 12/16/96............... 10/29/99, 64 FR 58340........... (c)(144).

Technician. 11.14.08.30............................ Certified Emissions 1/02/95, 12/16/96............... 10/29/99, 64 FR 58340........... (c)(144).

Repair Facility. 11.14.08.31............................ On-Highway Emissions 1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144).

Test. 11.14.08.32............................ Fleet Inspection

1/02/95, 12/16/96,

10/29/99, 64 FR 58340........... (c)(144).

Station.

10/19/98....................... 11.14.08.33............................ Fleet Inspection

1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144).

Standards. 11.14.08.34............................ Fleet Inspection and 1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144).

Reinspection Methods. 11.14.08.35............................ Fleet Equipment and 1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144).

Quality Assurance

Requirements. 11.14.08.36............................ Fleet Personnel

1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144).

Requirements. 11.14.08.37............................ Fleet Calibration Gas 1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144).

Specifications and

Standard Reference

Materials. 11.14.08.38............................ Fleet Recordkeeping 1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144).

Requirements. 11.14.08.39............................ Fleet Fees........... 1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144). 11.14.08.40............................ Fleet License

1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144).

Suspension and

Revocation. 11.14.08.41............................ Audits............... 1/02/95......................... 10/29/99, 64 FR 58340........... (c)(144). 11.14.08.42............................ Fleet Inspection

1/02/95, 2/16/96,

10/29/99, 64 FR 58340........... (c)(144).

After 1998.

10/19/98.......................

03.03.05 Motor Fuel Inspection [Contingency SIP Measure]

03.03.05.01............................ Definitions.......... 12/18/95........................ 1/30/96, 61 FR 2982............. (c)(101)(i)(B)(4);

Approved as a contingency SIP measure as part of the CO Maintenance

Plans for Baltimore and DC. [(c)(117) and (c)(118)]. 03.03.05.01-1.......................... Standard

12/18/95........................ 1/30/96, 61 FR 2982.............

Specifications for

Gasoline. 03.03.05.02-1.......................... Other Motor Vehicle 10/26/92........................ 6/10/94, 58 FR 29957............

Fuels. 03.03.05.05............................ Labeling of Pumps.... 12/18/95........................ 1/30/96, 61 FR 2982............. 03.03.05.08............................ Samples and Test

10/26/92........................ 6/10/94, 58 FR 29957............

Tolerance. 03.03.05.15............................ Commingled Products.. 10/26/92........................ 6/10/94, 58 FR 29957............

03.03.06 Emissions Control Compliance [Contingency SIP Measure]

03.03.06.01............................ Definitions.......... 12/18/95........................ 1/30/96, 61 FR 2982............. (c)(101)(i)(B)(5);

Approved as a contingency SIP measure as part of the CO Maintenance

Plans for Baltimore and DC. [(c)(117) and (c)(118)]. 03.03.06.02............................ Vapor Pressure

10/26/92........................ 6/10/94, 58 FR 29957............

Determination. 03.03.06.03............................ Oxygen Content

12/18/95........................ 1/30/96, 61 FR 2982.............

Determination. 03.03.06.04............................ Registration......... 10/26/92........................ 6/10/94, 58 FR 29957............ 03.03.06.05............................ Record Keeping....... 10/26/92........................ 6/10/94, 58 FR 29957............ 03.03.06.06............................ Transfer

12/18/95........................ 1/30/96, 61 FR 2982.............

Documentation.

TM Technical Memoranda

TM91-01 [Except Methods 1004A through

Test Methods and

11/2/98......................... 9/7/01, 66 FR 46727............. (c)(153)(i)(D)(5)

E].

Equipment

(Supplement 3 is

Specifications for

added).

Stationary Sources.

Page 11659

(d) EPA approved state source-specific requirements.

State effective

Additional

Name of source

Permit number/type

date

EPA approval date

explanation

Potomac Electric Power Company 49352,

1/27/78 4/2/79, 44 FR 19192 52.1100(c)(22); FRN

(PEPCO)--Chalk Point Units

Amended Consent

republished 5/3/79 1 and 2.

Order.

(44 FR 25840).

Potomac Electric Power Company 49352,

7/26/78 12/6/79, 44 FR

52.1100(c)(25).

(PEPCO)--Dickerson.

Amended Consent

70141.

Order.

Beall Jr./Sr. High School....... Consent Order......

1/30/79 3/18/80, 45 FR

52.1100(c)(26). 17144.

Mt. Saint Mary's College........ Consent Order......

3/8/79 3/18/80, 45 FR

52.1100(c)(26). 17144.

Potomac Electric Power Company

Secretarial Order..

7/19/79 9/3/80, 45 FR 58340 52.1100(c)(34).

(PEPCO)--Chalk Point.

Maryland Slag Co................ Consent Agreement

10/31/80 9/8/81, 41 FR 44757 52.1100(c)(49).

(Order).

Northeast Maryland Waste

Secretarial Order..

11/20/81 7/7/82, 47 FR 29531 52.1100(c)(65)

Disposal Authority.

(Wheelabrator-

Frye, Inc.).

Northeast Maryland Waste

Secretarial Order..

2/25/83 8/24/83, 45 FR

52.1100(c)(70)

Disposal Authority and

55179.

(Shutdown of

Wheelabrator-Frye, Inc. and the

landfill for

Mayor and City Council of

offsets).

Baltimore and BEDCO Development

Corp.

Westvaco Corp................... Consent Order...... 9/6/83; Rev. 1/ 12/20/84, 49 FR

52.1100(c)(74). 26/84 49457.

Potomac Electric Power Company

Administrative

9/13/99 12/15/00, 65 FR

52.1100(c)(151).

(PEPCO).

Consent Order.

78416.

Thomas Manufacturing Corp....... Consent Decree.....

2/15/01 11/15/01, 66 FR

52.1100(c)(167). 57395.

Constellation Power Source

Consent Order and

4/25/01 2/27/02, 67 FR 8897 52.1100(c)(168).

Generation, Inc.--Brandon

NOX RACT Averaging

Shores Units 1 & 2;

Plan Proposal.

Gould Street Unit 3;

H.A. Wagner Units 1, 2, 3 & 4; C.P. Crane Units 1 & 3; and Riverside

Unit 4.

Kaydon Ring and Seal, Inc....... Consent Order......

3/5/04 8/31/04, 69 FR

(c)(190). 53002.

Perdue Farms, Inc............... Consent Order......

2/1/05 1/11/07, 72 FR 1291 52.1070(d)(1).

(e) EPA-approved nonregulatory and quasi-regulatory material.

Name of non-regulatory SIP

Applicable

Additional revision

geographic area

State submittal date EPA approval date

explanation

Base Year Emissions Inventory.. Metropolitan

9/20/95............... 10/30/95, 60 FR 52.1075(a) CO.

Baltimore Ozone

55321.

Nonattainment

Area 1990. 1990 Base Year Emissions

Metropolitan

3/21/94............... 1/30/96, 61 FR

52.1075(b) CO.

Inventory.

Washington Ozone 10/12/95.............. 2931.

Nonattainment

Area. 1990 Base Year Emissions

All ozone

3/21/94............... 9/27/96, 61 FR

52.1075(c) VOC,

Inventory.

nonattainment

50715.

NOX, CO. areas. 1990 Base Year Emissions

Kent & Queen

3/21/94............... 9/27/96, 61 FR

52.1075(d) VOC,

Inventory.

Anne's Counties.

50715.

NOX, CO. 1990 Base Year Emissions

Metropolitan

3/21/94............... 4/23/97, 62 FR

52.1075(e) VOC,

Inventory.

Washington Ozone

19676.

NOX, CO.

Nonattainment

Area. 1990 Base Year Emissions

Metropolitan

12/24/97.............. 7/8/98, 63 FR

52.1075(f) VOC,

Inventory.

Washington Ozone

36854.

NOX.

Nonattainment

Area. 1990 Base Year Emissions

Metropolitan

12/24/97.............. 2/3/00, 65 FR

52.1075(g) VOC,

Inventory.

Baltimore Ozone

5245.

NOX.

Nonattainment

Area. 1990 Base Year Emissions

Philadelphia-

12/24/97, 4/29/98, 12/ 2/3/00, 65 FR

52.1075(h) VOC,

Inventory.

Wilmington-

21/99, 12/28/00.

5252, 9/19/01,

NOX.

Trenton Ozone

66 FR 48209.

Nonattainment

Area (Cecil

County). 15% Rate of Progress Plan...... Philadelphia-

7/12/95, 95- 7/29/97, 62 FR

52.1076(a).

Wilmington-

20.

40457.

Trenton Ozone

Nonattainment

Area (Cecil

County).

Stage II Vapor Recovery

Western Maryland 11/5/97............... 12/9/98, 63 FR

52.1076(b).

Comparability Plan.

& Eastern Shore

67780.

Counties. 15% Rate of Progress Plan...... Metropolitan

10/7/98............... 2/3/00, 65 FR

52.1076(c).

Baltimore Ozone

5245.

Nonattainment

Area. 15% Rate of Progress Plan...... Metropolitan

5/5/98................ 7/19/00, 65 FR

52.1076(d).

Washington Ozone

44686.

Nonattainment

Area.

Post-1996 Rate of Progress Plan Philadelphia-

12/24/97, 4/24/98..... 2/3/00, 65 FR

52.1076(f).

& contingency measures.

Wilmington-

5252.

Trenton Ozone

Nonattainment

Area (Cecil

County). 8/18/98, 12/21/99..... 9/19/01, 66 FR 44809.

Page 11660

12/28/00, 3/8/04...... 4/15/04, 69 FR

52.1076(f)(3). 19939.

Ozone Attainment Plan.......... Philadelphia-

4/29/98, 8/18/98, 12/ 10/29/01, 66 FR 52.1076(h).

Wilmington-

21/99, 12/28/00, 8/31/ 54578.

Trenton Ozone

01.

Nonattainment

Area (Cecil

County). 9/2/03................ 10/27/03, 68 FR 61103.

Transportation Conformity

Philadelphia-

4/29/98, 8/18/98, 12/ 10/29/01, 66 FR 52.1076(i).

Budgets.

Wilmington-

21/99, 12/28/00.

54578.

Trenton Ozone

Nonattainment

Area (Cecil

County).

Post-1996 Rate of Progress Plan Metropolitan

12/24/97, 4/24/98, 8/ 9/26/01, 66 FR

52.1076(j).

& contingency measures.

Baltimore Ozone 18/98, 12/21/99, 12/ 49108.

Nonattainment

28/00.

Area.

Ozone Attainment Plan.......... Metropolitan

4/29/98, 8/18/98, 12/ 10/30/01, 66 FR 52.1076(k).

Baltimore Ozone 21/99, 12/28/00, 8/31/ 54666.

Nonattainment

01.

Area. 9/2/03................ 10/27/03, 68 FR 52.1076(k). 61103.

Mobile budgets................. Metropolitan

8/31/01............... 10/30/01, 66 FR 52.1076(l).

Baltimore Ozone

54666.

Nonattainment

Area. 9/2/03................ 10/27/03, 68 FR 61103.

Mobile budgets (2005).......... Metropolitan

9/2/03................ 10/27/03, 68 FR 52.1076(m).

Baltimore Ozone

61103.

Nonattainment

Area.

Philadelphia-

Wilmington-

Trenton Ozone

Nonattainment

Area (Cecil

County).

Mobile budgets (2005 Rate of

Metropolitan

11/3/03............... 2/13/04, 69 FR

52.1076(n).

Progress Plan).

Baltimore Ozone

7133.

Nonattainment

Area.

Extension for incorporation of All ozone

7/9/02................ 1/16/03, 68 FR

52.1078(b). the on-board diagnostics (OBD) nonattainment

2208. testing program into the

areas.

Maryland I/M SIP.

Photochemical Assessment

Metropolitan

3/24/94............... 9/11/95, 60 FR

52.1080.

Monitoring Stations (PAMS)

Baltimore and

47081.

Program.

Metropolitan

Washington Ozone

Nonattainment

Areas.

Consultation with Local

All nonattainment 10/8/81............... 4/8/82, 47 FR

52.1100(c)(63).

Officials (CAA Sections 121 &

& PSD areas.

15140. 127).

Lead (Pb) SIP.................. City of Baltimore 10/23/80.............. 2/23/82, 47 FR

52.1100(c)(60), 7835.

(61).

TM90-01--``Continuous Statewide........ 9/18/91............... 2/28/96, 61 FR

52.1100(c)(106);

Emission Monitoring Policies

7418.

approved into and Procedures''--October 1990.

SIP as

``additional material'', but not IBR'd.

Carbon Monoxide Maintenance

City of Baltimore- 9/20/95............... 10/31/95, 60 FR 52.1100(c)(117).

Plan.

Regional

55321.

Planning

District 118. 7/15/04............... 04/04/05, 70 FR

Revised Carbon 16958.

Monoxide

Maintenance Plan

Base Year

Emissions

Inventory using

MOBILE6.

Carbon Monoxide Maintenance

Montgomery County 10/12/95.............. 1/30/96, 61 FR

52.1100(c)(118).

Plan.

Election

2931.

Districts 4, 7, and 13; Prince

Georges County

Election

Districts 2, 6, 16, 16, 17 and 18. 3/3/04................ 04/04/05, 70 FR

Revised Carbon 16958.

Monoxide

Maintenance Plan

Base Year

Emissions

Inventory using

MOBILE6.

Ozone Maintenance Plan......... Kent and Queen

2/4/04................ 10/21/04, 69 FR 52.1100(c)(187);

Anne's Counties.

61766.

SIP effective date is 11/22/ 04. 1996-1999 Rate-of-Progress Plan Washington DC 1- 12/20/97, 5/20/99..... 5/16/05, 70 FR

Only the TCMs in

SIP and the Transportation

hour ozone

25688.

Appendix H of

Control Measures (TCMs) in

nonattainment

the 5/20/1999

Appendix H.

area.

revision. 1999 motor vehicle emissions budgets of 128.5 tons per day

(tpy) of VOC and 196.4 tpy of

NOX. 1990 Base Year Inventory

Washington DC 1- 9/2/03, 2/24/04....... 5/16/05, 70 FR

.

Revisions.

hour ozone

25688. nonattainment area.

Page 11661

1999-2005 Rate-of-Progress Plan Washington DC 1- 9/2/03, 2/24/04....... 5/16/05, 70 FR

Only the TCMs in

SIP Revision and the

hour ozone

25688.

Appendix J of

Transportation Control

nonattainment

the 2/24/2004

Measures (TCMs) in Appendix J. area.

revision 2002 motor vehicle emissions budgets (MVEBs) of 125.2 tons per day (tpy) for VOC and 290.3 tpy of

NOX, and, 2005

MVEBs of 97.4 tpy for VOC and 234.7 tpy of

NOX.

VMT Offset SIP Revision........ Washington DC 1- 9/2/03, 2/24/04....... 5/16/05, 70 FR hour ozone

25688. nonattainment area.

Contingency Measure Plan....... Washington, DC

9/2/03, 2/24/04....... 5/16/05, 70 FR

Area.

25688. 1-hour Ozone Modeled

Washington DC 1- 9/2/03, 2/24/04....... 5/16/05, 70 FR

Demonstration of Attainment.

hour ozone

25688. nonattainment area.

Attainment Demonstration and

Washington County 12/20/04, 2/28/05..... 8/17/05, 70 FR

Early Action Plan for the

48283.

Washington County Ozone Early

Action Compact Area. 1-hour Ozone Attainment Plan... Washington DC 1- 9/2/2003, 2/24/2004... 11/16/05, 70 FR hour ozone

69440. nonattainment area. 8-Hour Ozone Maintenance Plan

Kent and Queen

05/2/06, 05/19/06..... 12/22/06, 71 FR for the Kent and Queen Anne's

Anne's Counties.

76920.

Area.

FR Doc. E9-5827 Filed 3-18-09; 8:45 am

BILLING CODE 6560-50-P

Sponsored Ads:




Activate your free trial now

Make your order

Need help? Contact us

Try vLex for FREE for 3 days

Access legal information from United States including:

  • Constitutions
  • Forms and Contracts
  • Legal Books and Journals
  • Case Law
  • News and Business
  • Regulations
  • U.S. Code

Try vLex without any commitment for 3 days and see why you need it.

3

days of Free Access