Passenger Facility Charge Approvals and Disapprovals
Federal Register: December 21, 2009 (Volume 74, Number 243)
Notices
Page 67949-67950
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
DOCID:fr21de09-108
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
Notice of Passenger Facility Charge (PFC) Approvals and
Disapprovals
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Monthly Notice of PFC Approvals and Disapprovals. In November 2009, there were two applications approved. This notice also includes information on one application, approved in October 2009, inadvertently left off the October 2009 notice. Additionally, five approved amendments to previously approved applications are listed.
SUMMARY: The FAA publishes a monthly notice, as appropriate, of PFC approvals and disapprovals under the provisions of the Aviation Safety and Capacity Expansion Act of 1990 (Title IX of the Omnibus Budget
Reconciliation Act of 1990) (Pub. L. 101-508) and Part 158 of the
Federal Aviation Regulations (14 CFR part 158). This notice is published pursuant to paragraph d of Sec. 158.29.
PFC Applications Approved
Public Agency: Port of Oakland, Oakland, California.
Application Number: 09-14-C-00-OAK.
Application Type: Impose and use a PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in this Decision: $293,219,000.
Earliest Charge Effective Date: March 1, 2011.
Estimated Charge Expiration Date: April 1, 2021.
Class of Air Carriers Not Required To Collect PFC's: Nonscheduled/ on-demand air carriers filing FAA Form 1800-31.
Determination: Approved. Based on information contained in the public agency's application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at Metropolitan Oakland International Airport.
Brief Description of Projects Approved for Collection and Use at a
$4.50 PFC Level:
Terminal 1 rehabilitation and retrofit program.
Passenger boarding bridges.
Runway 11/29 light collar replacement.
East apron improvements, phases I and II.
East apron improvements, phase III.
Runway safety area improvements, phases I and II.
Rehabilitate taxiway B.
Rehabilitate taxiway W.
Security enhancements at terminal 2.
Security enhancements for taxiway B overpass.
Lighting control to a new air traffic control tower.
Aircraft rescue and firefighting vehicles.
Closed circuit television program expansion--phases II and Ill.
Brief Description of Projects Approved for Collection and Use at a
$3.00 PFC Level:
Americans with Disabilities Act access improvements.
Terminal 2 roof replacement.
Perimeter airfield dike seismic enhancement study.
Airport security enhancements--security assessment study.
Noise monitoring system upgrade.
PFC administrative costs.
Owner-controlled insurance for terminal 2 improvements.
Decision Date: October 23, 2009.
FOR FURTHER INFORMATION CONTACT: Gretchen Kelly, San Francisco Airports
District Office, (650) 876-2778, extension 623.
Public Agency: Rhode Island Airport Corporation, Warwick, Rhode
Island.
Application Number: 09-06-C-00-PVD.
Application Type: Impose and use a PFC. PFC Level: $4.50.
Total PFC Revenue Approved in this Decision: $15,832,980.
Earliest Charge Effective Date: May 1, 2015.
Estimated Charge Expiration Date: November 1, 2016.
Class of Air Carriers Not Required To Collect PFC's:
Air taxi/commercial operators.
Determination: Approved. Based on information contained in the public agency's application, the FAA has determined that the approved class accounts for less than I percent of the total annual enplanements at T. F. Green Airport.
Brief Description of Projects Approved for Collection and Use at a
$4.50 PFC Level:
Acquire land for noise mitigation.
Extend, mark and light taxiway M.
Brief Description of Projects Approved for Collection and Use at a
$3.00 PFC Level:
Final environmental impact statement.
Taxiway N rehabilitation.
PFC implementation and administration assistance.
Decision Date: November 13, 2009.
For Further Information Contact: Priscilla Scoff, New England
Region Airports Division, (781) 238-7614.
Public Agency: Grand Forks Regional Airport Authority, Grand Forks,
North Dakota.
Application Number: 10-08-C-00-GFK.
Application Type: Impose and use a PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in this Decision: $2,700,456.
Earliest Charge Effective Date: February 1, 2010.
Estimated Charge Expiration Date: August 1, 2017.
Class of Air Carriers Not Required To Collect PFC's: Air taxi/ commercial operators filing FAA Form 1800-31.
Determination: Approved. Based on information contained in the public agency's application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at Grand Forks International Airport.
Brief Description of Project Partially Approved for Collection and
Use: Construction of new passenger terminal building and air carrier apron.
Determination: Partially approved for collection and use. The FAA determination that portions of the project were not PFC-eligible.
Decision Date: November 19, 2009.
For Further Information Contact: Thomas Schauer, Bismarck Airports
District Office, (701) 323-7383.
Page 67950
Amendment to PFC Approvals
Original
Amended
Amendment
Original
Amended
estimated
estimated
Amendment No., city, state
approved date approved net approved net
charge exp.
charge exp.
PFC revenue
PFC revenue
date
date
98-05-C-04-MEI, Meridian, MS....
10/30/09
$234,082
$231,037
09/01/02
09/01/02 99-06-C-03-MEI, Meridian, MS....
10/30/09
148,000
105,760
05/01/04
05/01/04 06-11-C-01-EYW, Key West, FL....
11/05/09
48,440,445
11,882,511
12/01/37
08/01/15 06-11-C-02-EYW, Key West, FL....
11/10/09
11,882,51
11,929,058
11/01/16
09/01/15 06-03-C-01-ABQ, Albuquerque, NM.
11/10/09
66,066,726
68,885,899
07/01/15
07/01/16
Issued in Washington, DC, on December 11, 2009.
Joe Hebert,
Manager, Financial Analysis and Passenger Facility Charge Branch.
FR Doc. E9-30206 Filed 12-18-09; 8:45 am
BILLING CODE 4910-13-M