Application for Amendment of License and Soliciting Comments, Motions to Intervene, and Protests: Georgia Power Company
FR, March 24, 2008 › Notices › Federal Energy Regulatory Commission
Linked as:FR, March 24, 2008 › Notices › Federal Energy Regulatory Commission
Linked as:Text
Federal Register: March 24, 2008 (Volume 73, Number 57)
Notices
Page 15509-15510
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
DOCID:fr24mr08-52
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Project No. 2413-100
Georgia Power Company; Notice of Application for Amendment of
License and Soliciting Comments, Motions To Intervene, and Protests
March 17, 2008.
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-Project Use of Project Lands and Waters. b. Project No.: 2413-100. c. Date Filed: February 13, 2007. d. Applicant: Georgia Power Company. e. Name of Project: Wallace Dam Hydroelectric Project. f. Location: The proposal would be located on the Oconee River, in
Greene County, Georgia. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r. h. Applicant Contact: Lee Glenn, Lake Resources Manager, 125
Wallace Dam Road, NE., Eatonton, GA 31024; (706) 485-8704. i. FERC Contact: Gina Krump, Telephone (202) 502-6704, and e-mail:
Gina.Krump@ferc.gov. j. Deadline for Filing Comments, Motions to Intervene, and Protest:
April 18, 2008.
All documents (original and eight copies) should be filed with:
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
The Commission's Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. k. Description of Request: Georgia Power Company (GPC) is seeking
Commission approval to issue a permit to Vintage Communities/Del Webb for the construction of 4 boat docks, totaling 37 slips, a dual boat ramp, and 826 feet of seawall and riprap on approximately 0.12 acre of project lands along the shore of Lake Oconee. The proposed facilities would be located in Greene County, Georgia and serve the residents of the Vintage Communities located outside the project boundary. All proposed work is consistent with GPC's current permitting requirements and U.S. Army Corps of Engineers permits. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed on the Commission's Web site at: http://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online
Page 15510
at: http://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is also available for inspection and reproduction at the address in item
(h) above. m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Any filings must bear in all capital letters the title
``COMMENTS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as applicable, and the Project Number of the particular application to which the filing refers. p. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives. q. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site at: http://www.ferc.gov under the ``e-Filing'' link.
Kimberly D. Bose,
Secretary.
FR Doc. E8-5838 Filed 3-21-08; 8:45 am
BILLING CODE 6717-01-P
Sponsored links
This document cites
ver las páginas en versión mobile | web
ver las páginas en versión mobile | web
© Copyright 2012, vLex. All Rights Reserved.
Contents in vLex United States
Explore vLex
For Professionals
For Partners
Company
Other documents:
40 CFR 60.612 Standards. | 33 cfr 149.620 what happens when the commandant cg-5 reviews and evaluates the construction drawings and specific... | United States v. Patricia K. Langer, (8th Cir. 2005) | 12 USC 4718 - Sec. 4718. Authorization of appropriations | Sentencia nº 1417 de Consiglio di Stato, March 24, 2010 | sentencia nº 4270 de consiglio di stato september 15 2010 | sentencia nº 4204 de corte de apelaciones de valdivia sala segunda march 19 2012 | Sentencia nº 3568 de Consiglio di Stato July 29 2010