Approval and Promulgation of Implementation Plans; Atlanta, Georgia 1997 8-Hour Ozone Nonattainment Area; Reasonable Further Progress Plan

Federal Register, Volume 78 Issue 213 (Monday, November 4, 2013)

Federal Register Volume 78, Number 213 (Monday, November 4, 2013)

Rules and Regulations

Pages 65877-65882

From the Federal Register Online via the Government Printing Office www.gpo.gov

FR Doc No: 2013-25780

Page 65877

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

EPA-R04-OAR-2013-0147; FRL-9902-19-Region 4

Approval and Promulgation of Implementation Plans; Atlanta, Georgia 1997 8-Hour Ozone Nonattainment Area; Reasonable Further Progress Plan

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: EPA is taking final action to approve a state implementation plan (SIP) revision, submitted by the State of Georgia, through the Georgia Environmental Protection Division (GA EPD), on October 21, 2009, to address the reasonable further progress (RFP) plan requirements for the Atlanta, Georgia 1997 8-hour ozone national ambient air quality standards (NAAQS) nonattainment area (hereafter referred to as the ``Atlanta Area'' or ``the Area''). The Atlanta Area is comprised of Barrow, Bartow, Carroll, Cherokee, Clayton, Cobb, Coweta, Dekalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Hall, Henry, Newton, Paulding, Rockdale, Spalding and Walton Counties in Georgia. EPA is also finding adequate the motor vehicle emissions budgets (MVEB) for volatile organic compounds (VOC) and nitrogen oxides (NOx) that were included in Georgia's RFP plan. Further, EPA is approving these MVEB. EPA is also responding to comments received on the Agency's May 29, 2013, direct final rulemaking to approve the RFP plan requirements for the Atlanta Area.

DATES: This rule is effective on December 4, 2013.

ADDRESSES: EPA has established a docket for this action under Docket Identification No. EPA-R04-OAR-2013-0147. All documents in the docket are listed on the www.regulations.gov Web site. Although listed in the index, some information is not publicly available, i.e., Confidential Business Information or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either electronically through www.regulations.gov or in hard copy at the Regulatory Development Section, Air Planning Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental Protection Agency, Region 4, 61 Forsyth Street SW., Atlanta, Georgia 30303-8960. EPA requests that if at all possible, you contact the person listed in the FOR FURTHER INFORMATION CONTACT section to schedule your inspection. The Regional Office's official hours of business are Monday through Friday 8:30 a.m. to 4:30 p.m., excluding Federal holidays.

FOR FURTHER INFORMATION CONTACT: Ms. Sara Waterson of the Regulatory Development Section, in the Air Planning Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental Protection Agency, Region 4, 61 Forsyth Street SW., Atlanta, Georgia 30303-8960. The telephone number is (404) 562-9061. Ms. Sara Waterson can be reached via electronic mail at waterson.sara@epa.gov.

SUPPLEMENTARY INFORMATION:

Table of Contents

  1. This Action

  2. Background

  3. Response to Comments

  4. Final Action

  5. Statutory and Executive Order Reviews

  6. This Action

    EPA is taking final action to approve Georgia's October 21, 2009, SIP revision to meet RFP plan \1\ requirements of the Clean Air Act (CAA or Act) for the Atlanta Area.\2\ The RFP plan demonstrates that, during the period of 2002 through 2008, NOX emissions will be reduced by at least 15 percent for the 13-County portion \3\ of the Atlanta Area (hereafter referred to as the ``13-County Area'') and VOC emissions will be reduced by at least 15 percent for the seven-county portion \4\ of the Atlanta Area (hereafter referred to as the ``7-

    County Area''). As part of the RFP, EPA is approving the 2008 VOC MVEB and the 2008 NOX MVEB, which were included in the October 21, 2009, RFP plan for the Atlanta Area. EPA is taking this action because it is consistent with CAA requirements for RFP. The MVEB for the Atlanta Area, expressed in tons per day (tpd), are provided in Table 1 below. Through this action, EPA is also finding adequate the MVEBs for transportation conformity purposes for the 1997 8-hour standard.

    ---------------------------------------------------------------------------

    \1\ For the 1997 8-hour ozone NAAQS, the plan to demonstrate reasonable further progress is known as the RFP plan; whereas the plan to demonstrate reasonable further progress for the 1-hour ozone NAAQS is known as the Rate-of-Progress (ROP) plan.

    \2\ Georgia previously submitted an ROP plan (also referred to as the 15 Percent VOC Plan) for the portion of the Atlanta Area that was previously designated nonattainment for the former 1-hour ozone NAAQS. EPA approved Georgia's ROP plan for the 1-hour ozone NAAQS for the Atlanta Area on April 26, 1999. See 64 FR 20196.

    \3\ The 13-County portion is comprised of the counties designated nonattainment in the 1-hour ozone nonattainment area: Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Henry, Paulding, and Rockdale. See 56 FR 56694, November 6, 1991.

    \4\ Seven additional ``ring'' counties were added to the original 1-hour ozone nonattainment area for the 8-hour ozone nonattainment designations. These additional counties are: Barrow, Bartow, Carroll, Hall, Newton, Spalding, and Walton. See 69 FR 23857, April 30, 2004.

    Table 1--MVEB for the 1997

    8-Hour Ozone Atlanta Area

    ------------------------------------------------------------------------

    VOC NOX

    ------------------------------------------------------------------------

    2008 20-County MVEB (tpd)

    ------------------------------------------------------------------------

    Total................................. 171.83 272.67

    ------------------------------------------------------------------------

    For more detailed information on the RFP plan, please see the direct final rulemaking published on May 29, 2013, at 78 FR 32135.

  7. Background

    1. General Background

      The Atlanta Area was designated nonattainment for the 1997 8-hour ozone NAAQS on April 30, 2004 (effective June 15, 2004), using 2001-

      2003 ambient air quality data. See 69 FR 23857, April 30, 2004 (codified at 40 CFR 81.311). The Atlanta Area is comprised of the 13 counties of the former 1-hour ozone nonattainment area plus seven additional ``ring'' counties. On June 23, 2011, EPA determined that the Atlanta Area attained the 1997 8-hour ozone NAAQS. See 76 FR 36873. As a result of the determination of attainment, the requirements for the Area to submit an attainment demonstration and associated reasonable available control measures (RACM), RFP plan, contingency measures, and other planning SIP revisions related to attainment of the 1997 8-hour ozone NAAQS were suspended. Despite the determination of attainment, Georgia opted to leave its previously submitted SIP submission related to the RFP requirements for the 1997 8-hour ozone NAAQS before EPA for action. Georgia submitted its RFP plan, as well as two additional SIP revisions under a separate cover letter, on October 21, 2009, related to attainment of the 1997 8-hour ozone NAAQS in the Atlanta Area. Today's rulemaking is approving only the RFP plan submittal, including the associated MVEB. On May 29, 2013 (78 FR 32135), EPA published a direct final rule approving Georgia's October 21, 2009, SIP submission addressing the RFP plan requirements, including NOX and VOC

      Page 65878

      MVEB, for the Atlanta Area. EPA published an accompanying proposed approval in the event that comments were received such that the direct final rule needed to be withdrawn. Specifically, in the direct final rule, EPA stated that if adverse comments were received by June 28, 2013, the rule would be withdrawn and not take effect, but that the proposed rule would still remain in effect and that an additional public comment period would not be instituted if EPA could sufficiently address any comments received on the direct final rulemaking. On June 28, 2013, EPA received comments from a single commenter and, therefore, EPA withdrew the direct final rule. EPA is now taking action to approve Georgia's October 21, 2009, SIP revision as it relates to the RFP plan requirements for the 1997 8-hour ozone NAAQS.

    2. Background for Rate-of-Progress (ROP) Requirements for the 1-Hour Ozone NAAQS

      Because Atlanta was classified as a ``serious'' nonattainment area under the 1-hour ozone NAAQS, Georgia was required to develop a SIP to reduce emissions of VOC in the 13-County Atlanta 1-hour ozone nonattainment area by 15 percent from 1990 to 1996. This plan, also known as Georgia's ROP plan SIP or the 15 Percent VOC Plan, was approved on April 26, 1999. See 64 FR 20186.

      For the 1-hour ozone NAAQS, the CAA also requires post-1996 emission reductions of VOC and/or NOX totaling 3 percent per year, averaged over each consecutive three-year period beginning in 1996 and continuing through the attainment date. Georgia chose to rely solely on NOX emission reductions in its post-1996 ROP SIP (the 9 Percent Plan). This plan was required to describe how Georgia would achieve RFP towards attaining the 1-hour ozone NAAQS between 1996 and 1999, the attainment deadline for serious nonattainment areas. Georgia's 9 Percent Plan was approved on March 19, 1999. See 64 FR 13348.

      On September 26, 2003, EPA re-classified the 13-county Atlanta 1-

      hour ozone nonattainment area to ``severe.'' See 68 FR 55469. Among other requirements, this reclassification required submission of a severe area post-1999 ROP SIP. Georgia submitted the post-1999 ROP SIP on December 24, 2003. The Atlanta severe area post-1999 ROP SIP contained a description of how the 3 percent per year reductions in ozone precursor emissions, required over the period from November 15, 1999, through November 15, 2004, would be achieved. It also contained MVEB for the Atlanta 1-hour ozone nonattainment area. EPA approved Georgia's post-1999 ROP SIP for the Atlanta Area on July 19, 2004 (69 FR 42880). EPA's approval of Georgia's post-1999 ROP SIP for the Atlanta Area completed the State's ROP obligation for the 1-hour ozone NAAQS.

    3. Background for RFP Requirements for the 1997 8-Hour Ozone NAAQS

      On November 29, 2005 (70 FR 71612), as revised on June 8, 2007 (72 FR 31727), EPA published a rule entitled ``Final Rule To Implement the 8-Hour Ozone National Ambient Air Quality Standard--Phase 2; Final Rule To Implement Certain Aspects of the 1990 Amendments Relating to New Source Review and Prevention of Significant Deterioration as They Apply in Carbon Monoxide, Particulate Matter and Ozone NAAQS; Final Rule for Reformulated Gasoline'' (hereafter referred to as the Phase 2 Rule). Section 182(b)(1) of the CAA and EPA's Phase 2 Rule \5\ require a state, for each 1997 8-hour ozone nonattainment area that is classified as moderate, to submit an emissions inventory and a RFP plan to show how the state will reduce emissions of VOC.

      ---------------------------------------------------------------------------

      \5\ RFP regulations are at 40 CFR 51.910.

      ---------------------------------------------------------------------------

      Specifically, in ozone nonattainment areas with air quality classified as ``moderate'' or worse for the 1997 8-hour ozone NAAQS, the RFP \6\ requirement prescribes emission reductions from the baseline totaling 15 percent within six years of the base year (i.e., by the end of 2008). Per 40 CFR part 51.910(a)(1)(iii), moderate and higher classification areas of which a portion has an approved 1-hour ozone 15 Percent VOC Plan can choose to treat the nonattainment area as two parts, each with a separate RFP target, and may substitute reductions in NOX for VOC in the sub-area with the approved 15 Percent Plan. The 15-percent reduction for the sub-area without an approved 1-hour ozone 15 Percent VOC Plan, however, must be achieved entirely through VOC reductions. As noted previously, seven additional ``ring'' counties were added to the original 1-hour ozone nonattainment area for the 1997 8-hour ozone nonattainment designations. Georgia relied solely on NOX emission reductions for the 13-County portion of the Atlanta Area with an approved 15 Percent VOC Plan and relied solely on VOC reductions for the seven ``ring'' counties.

      ---------------------------------------------------------------------------

      \6\ Pursuant to CAA section 172(c)(9), RFP plans must include contingency measures that will take effect without further action by the State or EPA, which includes additional controls that would be implemented if the Area fails to reach the RFP milestones. While the CAA does not specify the type of measures or quantity of emissions reductions required, EPA provided guidance interpreting the CAA that implementation of these contingency measures would provide additional emissions reductions of up to 3 percent of the adjusted base year inventory in the year following the RFP milestone year (i.e., in this case 2008). For more information on contingency measures please see the April 16, 1992, General Preamble (57 FR 13498, 13510) and the November 29, 2005, Phase 2 8-hour ozone standard implementation rule (70 FR 71612, 71650). Finally, RFP plans must also include a MVEB for the precursors for which the plan is developed.

      ---------------------------------------------------------------------------

  8. Response to Comments

    As noted, EPA received comments from a single commenter. A summary of the comments received and EPA's response is provided below.

    Comment 1: The Commenter contends that ``EPA cannot approve Georgia's RFP plan until the measures which it relies upon can provide measurable and creditable reductions.'' Specifically, the Commenter asserts that Georgia Rule 391-3-1-.02(2)(jjj) (``Rule (jjj)'') serves as the primary basis for achieving more stringent limits on the amount of NOX emitted by coal-fired electrical power plants. The Commenter believes that because Rule (jjj) does not require maximum heat input for each subject unit, that the rule allows for significant variability in the legally-allowable total amount of NOX emitted, and as such, emissions reductions associated with this rule are not creditable. The Commenter also asserts that since each coal-

    fired power plant's ``source-specific alternative emission limits'' were determined using only one point of reference, those limits may not be representative of the unit's actual emissions at later points in time. Finally, the Commenter claims that title V permits for Georgia coal-fire electrical power plants do not contain enforceable heat input limits.

    Response 1: The Commenter's assertion that the Rule (jjj) measures relied on as part of the Georgia RFP plan do not provide for measurable and creditable reductions is incorrect. EPA notes that the Rule (jjj) and the title V permit requirements cited by Commenter are specific to point sources, however, the RFP plan's overall 15 percent reduction from the 2008 adjusted base year emissions inventory may come from any emission source sector (i.e., point, area, nonroad, or mobile emissions), and Georgia projected the majority of its reductions to be from on-road and non-road mobile emissions. Notwithstanding the relatively small contribution of the Rule (jjj) emission reductions to the RFP plan's reductions, the emission reductions associated with Rule (jjj) are creditable in the RFP plan since the rule

    Page 65879

    is a legally enforceable SIP provision and, as described in the proposed rule, EPA finds the methodology used by GA EPD to estimate the emission reductions from Rule (jjj) to be appropriate. See 78 FR 32135, 32138-142. Further, because the six-year RFP plan period has already occurred, EPA has been able to review the Agency's Acid Rain database \7\ and verify that the three sources subject to Rule (jjj) in the State did reduce emissions by the quantity estimated in the RFP plan submittal. The actual NOX emission reductions from May through September 2002 to the comparable period in 2008 are consistent with these estimates.

    ---------------------------------------------------------------------------

    \7\ http://ampd.epa.gov/ampd/.

    ---------------------------------------------------------------------------

    Finally, EPA notes that the commenter does not explain why a maximum heat input limit \8\ would be relevant to this submittal. While the maximum heat input would be relevant in a calculation of allowable emissions, the emissions reductions estimates for purposes of an RFP plan may be based on the expected actual emissions from the facility on a typical summer day.\9\ There is no inherent connection between the necessary data used to prepare the RFP plan submittal and the maximum heat input allowed. The maximum heat input, which is a measure of the maximum hourly capacity of a unit to burn fuel, is not appropriate for calculating expected actual emissions because it fails to take into account the expected operation of the emission sources. For instance, many of the coal-fired power plants referenced by the commenter typically operate somewhat below their maximum heat input rate depending on age and condition of the boiler. Further, most units do not operate continuously, so utilization may also be relevant to an expected actual emission projection. Consequently, the typical summer day emission projections employed in Georgia's RFP plan, which are a function of total summer heat input and projected actual operating hours, provide a more appropriate basis for the emissions calculations included with the RFP plan being approved through this notice. As noted above, EPA has also reviewed these projected emission reductions with the actual emission reductions achieved during the RFP plan period and found them to be consistent with the plan's projected emissions.

    ---------------------------------------------------------------------------

    \8\ The maximum heat input is a measure of the maximum hourly capacity of a unit to burn fuel. Generally, this is the maximum rate for the design of the boiler, which typically represents the physical limitation of the boiler.

    \9\ The General Preamble for the Implementation of Title I of the Clean Air Act Amendments of 1990 describes in relevant part EPA's basis for reliance upon the ``typical summer day'' approach for purposes of projecting expected actual emissions. See 57 FR 13498, 13507.

    ---------------------------------------------------------------------------

    Comment 2: The Commenter stated ``with respect to the measures meant to address NOX emissions from EGU's, EPA cannot approve Rule (jjj) unless there are maximum heat inputs incorporated into the rule.''

    Response 2: As the Commenter noted, EPA has already approved Rule (jjj). See 64 FR 67491 and 74 FR 62249. This rulemaking does not contemplate action on Rule (jjj) and thus this comment regarding the approvability is outside of the scope of this rulemaking.

  9. Final Action

    EPA is taking final action to approve an October 21, 2009, SIP revision to meet the RFP requirements for the Atlanta Area for the 1997 8-hour ozone NAAQS. Additionally, EPA is approving the NOX and VOC MVEB for the Atlanta Area that were included in Georgia's RFP plan. These budgets will be available for use by the transportation conformity partners on November 4, 2013. Furthermore, EPA is finding the budgets adequate. These actions are being taken pursuant to section 110 of the CAA.

  10. Statutory and Executive Order Reviews

    Under the CAA, the Administrator is required to approve a SIP submission that complies with the provisions of the Act and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the CAA. Accordingly, this action merely approves state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action:

    Is not a ``significant regulatory action'' subject to review by the Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993);

    does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);

    is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.);

    does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4);

    does not have Federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999);

    is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);

    is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001);

    is not subject to requirements of Section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the CAA; and

    does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994).

    In addition, this rule does not have tribal implications as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), because the SIP is not approved to apply in Indian country located in the state, and EPA notes that it will not impose substantial direct costs on tribal governments or preempt tribal law.

    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this action and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. A major rule cannot take effect until 60 days after it is published in the Federal Register. This action is not a ``major rule'' as defined by 5 U.S.C. 804(2).

    Under section 307(b)(1) of the CAA, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by January 3, 2014. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this action for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action may not be challenged later in proceedings to enforce its requirements. See section 307(b)(2).

    Page 65880

    List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Incorporation by reference, Intergovernmental relations, Ozone, Reporting and recordkeeping requirements, and Volatile organic compounds.

    Dated: October 21, 2013.

    Beverly H. Banister,

    Acting Regional Administrator, Region 4.

    40 CFR part 52 is amended as follows:

    PART 52--APPROVAL AND PROMULGATION OF PLANS

    0

    1. The authority citation for part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401 et seq.

    Subpart II--Georgia

    0

    2. Section 52.570(e), is amended by revising the table in paragraph (e) to read as follows:

    Sec. 52.570 Identification of plan.

    * * * * *

    (e) * * *

    EPA-Approved Georgia Non-Regulatory Provisions

    ----------------------------------------------------------------------------------------------------------------

    Applicable State submittal

    Name of nonregulatory SIP geographic or date/effective EPA approval date Explanation

    provision nonattainment area date

    ----------------------------------------------------------------------------------------------------------------

    High Occupancy Vehicle (HOV) Atlanta 11/15/93 and 3/18/99, 4/26/99 ..................

    lane on I-85 from Chamblee- Metropolitan Area. amended on 6/17/ and 11/5/09.

    Tucker Road to State Road 316. 96 and 2/5/10.

    High Occupancy Toll (HOT) lane

    on I-85 from Chamblee-Tucker

    Road to State Road 316.

    Clean Fuel Vehicles Revolving Atlanta 6/17/96........... 4/26/99. ..................

    Loan Program. Metropolitan Area.

    Regional Commute Options Program Atlanta 6/17/96........... 4/26/99. ..................

    and HOV Marketing Program. Metropolitan Area.

    HOV lanes on I-75 and I-85...... Atlanta 6/17/96........... 4/26/99. ..................

    Metropolitan Area.

    Two Park and Ride Lots: Rockdale Atlanta 6/17/96........... 4/26/99. ..................

    County-Sigman at I-20 and Metropolitan Area.

    Douglas County-Chapel Hill at I-

    20.

    MARTA Express Bus routes (15 Atlanta 6/17/96........... 4/26/99. ..................

    buses). Metropolitan Area.

    Signal preemption for MARTA Atlanta 6/17/96........... 4/26/99. ..................

    routes 15 and 23.

    Improve and expand service on Atlanta 6/17/96........... 4/26/99. ..................

    MARTA's existing routes in Metropolitan Area.

    southeast DeKalb County.

    Acquisition of clean fuel buses Atlanta 6/17/96........... 4/26/99. ..................

    for MARTA and Cobb County Metropolitan Area.

    Transit.

    ATMS/Incident Management Program Atlanta 6/17/96........... 4/26/99. ..................

    on I-75/I-85 inside I-285 and Metropolitan Area.

    northern ARC of I-285 between I-

    75 and I-85.

    Upgrading, coordination and Atlanta 6/17/96........... 4/26/99. ..................

    computerizing intersections. Metropolitan Area.

    Reserved

    Atlantic Steel Transportation Atlanta 3/29/00........... 8/28/00. ..................

    Control Measure. Metropolitan Area.

    Procedures for Testing and Atlanta 7/31/00........... 7/10/01. ..................

    Monitoring Sources of Air Metropolitan Area.

    Pollutants.

    Enhanced Inspection/Maintenance Atlanta 9/20/00........... 7/10/01. ..................

    Test Equipment, Procedures and Metropolitan Area.

    Specifications.

    Preemption Waiver Request for Atlanta 5/31/00........... 2/22/02. ..................

    Low-RVP, Low-Sulfur Gasoline Metropolitan Area.

    Under Air Quality Control Rule

    391-3-1-.02(2)(bbb).

    Technical Amendment to the Atlanta 11/9/01........... 2/22/02. ..................

    Georgia Fuel Waiver Request of Metropolitan Area.

    May 31, 2000.

    Georgia's State Implementation Atlanta 7/17/01........... 5/7/02. ..................

    Plan for the Atlanta Ozone Metropolitan Area.

    Nonattainment Area.

    Post-1999 Rate of Progress Plan. Atlanta 12/24/03.......... 7/19/04, 69 FR ..................

    Metropolitan Area. 42884.

    Severe Area Vehicle Miles Atlanta 1-hour 6/30/04........... 6/14/05, 70 FR ..................

    Traveled (VMT SIP) for the ozone severe 34358.

    Atlanta 1-hour severe ozone nonattainment

    nonattainment area. area.

    Page 65881

    Atlanta 1-hour ozone attainment Atlanta severe 1- 2/1/05............ 6/14/05, 70 FR ..................

    area 2015 maintenance plan. hour ozone 34660.

    maintenance area.

    Attainment Demonstration for the Walker and Catoosa 12/31/04.......... 8/26/05, 70 FR ..................

    Chattanooga Early Action Area. Counties. 50199.

    Attainment Demonstration for the Columbia and 12/31/04.......... 8/26/05, 70 FR ..................

    Lower Savannah-Augusta Early Richmond Counties. 50195.

    Action Compact Area.

    Alternative Fuel Refueling Douglas County, GA 9/19/06........... 11/28/06, 71 FR ..................

    Station/Park and Ride 68743.

    Transportation Center, Project

    DO-AR-211 is removed.

    Macon 8-hour Ozone Maintenance Macon, GA 6/15/07........... 9/19/07, 72 FR ..................

    Plan. encompassing a 53432.

    portion of Monroe

    County.

    Murray County 8-hour Ozone Murray County..... 6/15/07........... 10/16/07, 72 FR ..................

    Maintenance Plan. 58538.

    Atlanta Early Progress Plan..... Barrow, Bartow, 1/12/07........... 2/20/08, 73 FR ..................

    Carroll, 9206.

    Cherokee,

    Clayton, Cobb,

    Coweta, DeKalb,

    Douglas, Fayette,

    Forsyth, Fulton,

    Gwinnett, Hall,

    Henry, Newton,

    Paulding,

    Rockdale,

    Spalding and

    Walton counties.

    Rome; 1997 Fine Particulate Floyd County...... 10/27/2009........ 1/12/12, 77 FR ..................

    Matter 2002 Base Year Emissions 1873.

    Inventory.

    Chattanooga; Fine Particulate Catoosa and Walker 10/27/09.......... 2/8/12; 77 FR ..................

    Matter 2002 Base Year Emissions Counties. 6467.

    Inventory.

    110(a)(1) and (2) Infrastructure Georgia........... 10/13/2007........ 2/6/2012, 77 FR ..................

    Requirements for the 1997 8- 5706.

    Hour Ozone National Ambient Air

    Quality Standards.

    Atlanta 1997 Fine Particulate Barrow, Bartow, 07/06/2010........ 3/1/2012, 77 FR ..................

    Matter 2002 Base Year Emissions Carroll, 12487.

    Inventory. Cherokee,

    Clayton, Cobb,

    Coweta, DeKalb,

    Douglas, Fayette,

    Forsyth, Fulton,

    Gwinnett, Hall,

    Henry, Newton,

    Paulding,

    Rockdale,

    Spalding and

    Walton Counties

    in their

    entireties and

    portions of Heard

    and Putnam

    Counties.

    Macon 1997 Fine Particulate Bibb County and 8/17/2009......... 3/02/12, 77 FR ..................

    Matter 2002 Base Year Emissions Monroe County. 12724.

    Inventory.

    Atlanta 1997 8-Hour Ozone 2002 Barrow, Bartow, 10/21/2009........ 4/24/2012, 77 FR ..................

    Base-Year Emissions Inventory. Carroll, 24399.

    Cherokee,

    Clayton, Cobb,

    Coweta, DeKalb,

    Douglas, Fayette,

    Forsyth, Fulton,

    Gwinnett, Hall,

    Henry, Newton,

    Paulding,

    Rockdale,

    Spalding and

    Walton Counties

    in their

    entireties.

    Regional Haze Plan.............. Statewide......... 2/11/10........... 6/28/12, 77 FR ..................

    38501.

    Regional Haze Plan Supplement Statewide......... 11/19/10.......... 6/28/12, 77 FR ..................

    (including BART and Reasonable 38501.

    Progress emissions limits).

    110(a)(1) and (2) Infrastructure Georgia........... 7/23/2008......... 10/25/2012, 77 FR With the exception

    Requirements for 1997 Fine 65125. of

    Particulate Matter National 110(a)(2)(D)(i).

    Ambient Air Quality Standards.

    110(a)(1) and (2) Infrastructure Georgia........... 10/21/2009........ 10/25/2012, 77 FR With the exception

    Requirements for 2006 Fine 65125. of

    Particulate Matter National 110(a)(2)(D)(i).

    Ambient Air Quality Standards.

    Negative Declaration for Control Atlanta 1997 8- 10/21/2009........ 09/28/2013. ..................

    of VOC Emissions from Reactor Hour Ozone

    Processes and Distillation Nonattainment

    Operations in Synthetic Organic Area.

    Chemical Manufacturing Industry

    (SOCMI) EPA-450/4-91-031,

    August 1993.

    Page 65882

    Negative Declaration for Control Atlanta 1997 8- 10/21/2009........ 09/28/2013. ..................

    of VOC Emissions from Equipment Hour Ozone

    Leaks from Natural Gas/Gasoline Nonattainment

    Processing Plants EPA-450/3-83- Area.

    007, December 1983.

    Negative Declaration for Control Atlanta 1997 8- 10/21/2009........ 09/28/2013. ..................

    of VOC Leaks from Synthetic Hour Ozone

    Organic Chemical Polymer and Nonattainment

    Resin Manufacturing Equipment Area.

    EPA-450/3-83-006, March 1984.

    Negative Declaration for Control Atlanta 1997 8- 10/21/2009........ 09/28/2013. ..................

    of VOC Emissions from Air Hour Ozone

    Oxidation Processes in Nonattainment

    Synthetic Organic Chemical Area.

    Manufacturing Industry (SOCMI),

    EPA-450/3-84-015, December 1984.

    110(a)(1) and (2) Infrastructure Georgia........... 7/23/2008......... 4/12/2013......... Addressing element

    Requirements for 1997 Fine 110(a)(2)(D)(i)(I

    Particulate Matter National I) prong 3 only.

    Ambient Air Quality Standards.

    110(a)(1) and (2) Infrastructure 110(a)(1) and (2) 10/21/2009........ 4/12/2013......... Addressing element

    Requirements for 2006 Fine Infrastructure 110(a)(2)(D)(i)(I

    Particulate Matter National Requirements for I) prong 3 only.

    Ambient Air Quality Standards. 1997 Fine

    Particulate

    Matter National

    Ambient Air

    Quality Standards.

    1997 8-Hour Ozone Reasonable Atlanta 1997 8- 10/21/2009........ 11/4/13. ..................

    Further Progress Plan for the Hour Ozone

    Atlanta Area. Nonattainment

    Area.

    ----------------------------------------------------------------------------------------------------------------

    FR Doc. 2013-25780 Filed 11-1-13; 8:45 am

    BILLING CODE 6560-50-P

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT