Airworthiness Directives: Bombardier Model CL 600 2B19 (Regional Jet Series 100 & 440) Airplanes

Federal Register: February 22, 2008 (Volume 73, Number 36)

Rules and Regulations

Page 9661-9663

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

DOCID:fr22fe08-3

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration 14 CFR Part 39

Docket No. FAA-2007-0335; Directorate Identifier 2007-NM-292-AD;

Amendment 39-15380; AD 2008-04-08

RIN 2120-AA64

Airworthiness Directives; Bombardier Model CL-600-2B19 (Regional

Jet Series 100 & 440) Airplanes

AGENCY: Federal Aviation Administration (FAA), Department of

Transportation (DOT).

ACTION: Final rule.

SUMMARY: We are adopting a new airworthiness directive (AD) for the products listed above. This AD results from mandatory continuing airworthiness information (MCAI) originated by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI describes the unsafe condition as:

Bombardier Aerospace has completed a system safety review of the

CL-600-2B19 aircraft fuel system against new fuel tank safety standards, introduced in Chapter 525 of the Airworthiness Manual through Notice of Proposed Amendment (NPA) 2002-043. The identified non-compliances were assessed using Transport Canada Policy Letter

No. 525-001 to determine if mandatory corrective action is required.

The assessment and lightning tests showed that certain fuel tube self-bonded couplings do not provide sufficient lightning current capability. The assessment also showed that single failure of the integral bonding wire of the self-bonded couplings or excessive axial clearance at the reducer ferrules of certain self-bonded couplings could affect electrical bonding between fuel tubes.

Insufficient electrical bonding between fuel tubes or insufficient current capability of fuel tube couplings, if not corrected, could result in arcing and potential ignition source inside the fuel tank during lightning strikes and consequent fuel tank explosion. * * *

We are issuing this AD to require actions to correct the unsafe condition on these products.

DATES: This AD becomes effective March 28, 2008.

The Director of the Federal Register approved the incorporation by reference of a certain publication listed in this AD as of March 28, 2008.

ADDRESSES: You may examine the AD docket on the Internet at http:// www.regulations.gov or in person at the U.S. Department of

Transportation, Docket Operations, M-30, West Building Ground Floor,

Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC.

FOR FURTHER INFORMATION CONTACT: Rocco Viselli, Aerospace Engineer,

Airframe and Propulsion Branch, ANE-171, FAA, New York Aircraft

Certification Office, 1600 Stewart Avenue, Suite 410, Westbury, New

York 11590; telephone (516) 228-7331; fax (516) 794-5531.

SUPPLEMENTARY INFORMATION:

Discussion

We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 to include an AD that would apply to the specified products.

That NPRM was published in the Federal Register on December 17, 2007

(72 FR 71273). That NPRM proposed to correct an unsafe condition for the specified products. The MCAI states:

Bombardier Aerospace has completed a system safety review of the

CL-600-2B19 aircraft fuel system against new fuel tank safety standards, introduced in Chapter 525 of the Airworthiness Manual through Notice of Proposed Amendment (NPA) 2002-043. The identified non-compliances were assessed using Transport Canada Policy Letter

No. 525-001 to determine if mandatory corrective action is required.

The assessment and lightning tests showed that certain fuel tube self-bonded couplings do not provide sufficient lightning current capability. The assessment also showed that single failure of the integral bonding wire of the self-bonded couplings or excessive axial clearance at the reducer ferrules of certain self-bonded couplings could affect electrical bonding between fuel tubes.

Insufficient electrical bonding between fuel tubes or insufficient current capability of fuel tube couplings, if not corrected, could result in arcing and potential ignition source inside the fuel tank during lightning strikes and consequent fuel tank explosion. To correct the unsafe condition, this directive mandates the replacement of certain fuel tube couplings with redesigned couplings.

For certain couplings, the replacement includes a detailed inspection for wear of the sleeve and coupling and applicable corrective actions

(including installing new O-rings and sleeves). You may obtain further information by examining the MCAI in the AD docket.

Comments

We gave the public the opportunity to participate in developing this AD. We received no comments on the NPRM or on the determination of the cost to the public.

Conclusion

We reviewed the available data and determined that air safety and the public interest require adopting the AD as proposed.

Differences Between This AD and the MCAI or Service Information

We have reviewed the MCAI and related service information and, in general, agree with their substance. But we might have found it necessary to use different words from those in the MCAI to ensure the

AD is clear for U.S. operators and is enforceable. In making these changes, we do not intend to differ substantively from the information provided in the MCAI and related service information.

We might also have required different actions in this AD from those in the MCAI in order to follow our FAA policies. Any such differences are highlighted in a NOTE within the AD.

Costs of Compliance

We estimate that this AD will affect about 692 products of U.S. registry. We

Page 9662

also estimate that it will take about 21 work-hours per product to comply with the basic requirements of this AD. The average labor rate is $80 per work-hour. Required parts will cost about $2,417 per product. Where the service information lists required parts costs that are covered under warranty, we have assumed that there will be no charge for these parts. As we do not control warranty coverage for affected parties, some parties may incur costs higher than estimated here. Based on these figures, we estimate the cost of this AD to the

U.S. operators to be $2,835,124, or $4,097 per product.

Authority for This Rulemaking

Title 49 of the United States Code specifies the FAA's authority to issue rules on aviation safety. Subtitle I, section 106, describes the authority of the FAA Administrator. ``Subtitle VII: Aviation

Programs,'' describes in more detail the scope of the Agency's authority.

We are issuing this rulemaking under the authority described in

``Subtitle VII, Part A, Subpart III, Section 44701: General requirements.'' Under that section, Congress charges the FAA with promoting safe flight of civil aircraft in air commerce by prescribing regulations for practices, methods, and procedures the Administrator finds necessary for safety in air commerce. This regulation is within the scope of that authority because it addresses an unsafe condition that is likely to exist or develop on products identified in this rulemaking action.

Regulatory Findings

We determined that this AD will not have federalism implications under Executive Order 13132. This AD will not have a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government.

For the reasons discussed above, I certify this AD: 1. Is not a ``significant regulatory action'' under Executive Order 12866; 2. Is not a ``significant rule'' under the DOT Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); and 3. Will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act.

We prepared a regulatory evaluation of the estimated costs to comply with this AD and placed it in the AD docket.

Examining the AD Docket

You may examine the AD docket on the Internet at http:// www.regulations.gov; or in person at the Docket Operations office between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. The AD docket contains the NPRM, the regulatory evaluation, any comments received, and other information. The street address for the Docket Operations office (telephone (800) 647-5527) is in the

ADDRESSES section. Comments will be available in the AD docket shortly after receipt.

List of Subjects in 14 CFR Part 39

Air transportation, Aircraft, Aviation safety, Incorporation by reference, Safety.

Adoption of the Amendment 0

Accordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows:

PART 39--AIRWORTHINESS DIRECTIVES 0 1. The authority citation for part 39 continues to read as follows:

Authority: 49 U.S.C. 106(g), 40113, 44701.

Sec. 39.13 [Amended] 0 2. The FAA amends Sec. 39.13 by adding the following new AD: 2008-04-08 Bombardier, Inc. (Formerly Canadair): Amendment 39-15380.

Docket No. FAA-2007-0335; Directorate Identifier 2007-NM-292-AD.

Effective Date

(a) This airworthiness directive (AD) becomes effective March 28, 2008.

Affected ADs

(b) None.

Applicability

(c) This AD applies to Bombardier Model CL-600-2B19 (Regional

Jet Series 100 & 440) airplanes, certificated in any category, serial numbers 7003 through 7067, and 7069 through 7981.

Subject

(d) Air Transport Association (ATA) of America Code 28: Fuel.

Reason

(e) The mandatory continuing airworthiness information (MCAI) states:

Bombardier Aerospace has completed a system safety review of the

CL-600-2B19 aircraft fuel system against new fuel tank safety standards, introduced in Chapter 525 of the Airworthiness Manual through Notice of Proposed Amendment (NPA) 2002-043. The identified non-compliances were assessed using Transport Canada Policy Letter

No. 525-001 to determine if mandatory corrective action is required.

The assessment and lightning tests showed that certain fuel tube self-bonded couplings do not provide sufficient lightning current capability. The assessment also showed that single failure of the integral bonding wire of the self-bonded couplings or excessive axial clearance at the reducer ferrules of certain self-bonded couplings could affect electrical bonding between fuel tubes.

Insufficient electrical bonding between fuel tubes or insufficient current capability of fuel tube couplings, if not corrected, could result in arcing and potential ignition source inside the fuel tank during lightning strikes and consequent fuel tank explosion. To correct the unsafe condition, this directive mandates the replacement of certain fuel tube couplings with redesigned couplings.

For certain couplings, the replacement includes a detailed inspection for wear of the sleeve and coupling and applicable corrective actions (including installing new O-rings and sleeves).

Actions and Compliance

(f) Within 5000 flight hours after the effective date of this

AD, unless already done, replace fuel tube couplings inside the wing and center fuel tanks with redesigned couplings, in accordance with the Accomplishment Instructions of Bombardier Service Bulletin 601R- 28-054, Revision A, dated August 7, 2006. Do all applicable inspections and corrective actions before further flight.

FAA AD Differences

Note: This AD differs from the MCAI and/or service information as follows: No differences.

Other FAA AD Provisions

(g) The following provisions also apply to this AD:

(1) Alternative Methods of Compliance (AMOCs): The Manager, New

York Aircraft Certification Office, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. Send information to ATTN: Rocco Viselli, Aerospace

Engineer, Airframe and Propulsion Branch, ANE-171, FAA, New York

Aircraft Certification Office, 1600 Stewart Avenue, Suite 410,

Westbury, New York 11590; telephone (516) 228-7331; fax (516) 794- 5531. Before using any approved AMOC on any airplane to which the

AMOC applies, notify your appropriate principal inspector (PI) in the FAA Flight Standards District Office (FSDO), or lacking a PI, your local FSDO.

(2) Airworthy Product: For any requirement in this AD to obtain corrective actions from a manufacturer or other source, use these actions if they are FAA-approved. Corrective actions are considered

FAA-approved if they are approved by the State of Design Authority

(or their delegated agent). You are required to assure the product is airworthy before it is returned to service.

(3) Reporting Requirements: For any reporting requirement in this AD, under the provisions of the Paperwork Reduction Act, the

Office of Management and Budget (OMB) has approved the information collection requirements and has assigned OMB Control Number 2120- 0056.

Page 9663

Related Information

(h) Refer to MCAI Canadian Airworthiness Directive CF-2007-23, dated October 18, 2007, and Bombardier Service Bulletin 601R-28-054,

Revision A, dated August 7, 2006, for related information.

Material Incorporated by Reference

(i) You must use Bombardier Service Bulletin 601R-28-054,

Revision A, dated August 7, 2006, to do the actions required by this

AD, unless the AD specifies otherwise.

(1) The Director of the Federal Register approved the incorporation by reference of this service information under 5

U.S.C. 552(a) and 1 CFR part 51.

(2) For service information identified in this AD, contact

Bombardier, Inc., Canadair, Aerospace Group, P.O. Box 6087, Station

Centre-ville, Montreal, Quebec H3C 3G9, Canada.

(3) You may review copies at the FAA, Transport Airplane

Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the

National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call (202) 741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr- locations.html.

Issued in Renton, Washington, on February 13, 2008.

Stephen P. Boyd,

Assistant Manager, Transport Airplane Directorate, Aircraft

Certification Service.

FR Doc. E8-3070 Filed 2-21-08; 8:45 am

BILLING CODE 4910-13-P

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT