Combined Notice of Filings #1

Citation86 FR 13891
Published date11 March 2021
Record Number2021-05069
SectionNotices
CourtEnergy Department,Federal Energy Regulatory Commission
13891
Federal Register / Vol. 86, No. 46 / Thursday, March 11, 2021 / Notices
Suite 1300, Houston, TX 77002–2700.
Any subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: March 5, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–05062 Filed 3–10–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC21–64–000.
Applicants: Tumbleweed Solar, LLC,
Tumbleweed Energy Storage, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of Tumbleweed
Solar, LLC, et al.
Filed Date: 3/4/21.
Accession Number: 20210304–5131.
Comments Due: 5 p.m. ET 3/25/21.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG21–100–000.
Applicants: PGR 2020 Lessee 8, LLC.
Description: Notice of Self-
Certification of Exempt Wholesale
Generator Status of PGR 2020 Lessee 8,
LLC.
Filed Date: 3/5/21.
Accession Number: 20210305–5113.
Comments Due: 5 p.m. ET 3/26/21.
Docket Numbers: EG21–101–000.
Applicants: Sugar Solar, LLC.
Description: Notice of Self-
Certification of Exempt Wholesale
Generator Status of Sugar Solar, LLC.
Filed Date: 3/5/21.
Accession Number: 20210305–5114.
Comments Due: 5 p.m. ET 3/26/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER21–746–001.
Applicants: Mayflower Power & Gas
LLC.
Description: Tariff Amendment:
Amendment to 1 to be effective 4/1/
2021.
Filed Date: 3/4/21.
Accession Number: 20210304–5168.
Comments Due: 5 p.m. ET 3/25/21.
Docket Numbers: ER21–815–001.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: Tariff Amendment:
Amendment to Service Agreement No.
726 to be effective 12/30/2020.
Filed Date: 3/4/21.
Accession Number: 20210304–5178.
Comments Due: 5 p.m. ET 3/25/21.
Docket Numbers: ER21–1073–001.
Applicants: DATC SLTP, LLC.
Description: Tariff Amendment:
Amendment to 2 to be effective 4/11/
2021.
Filed Date: 3/5/21.
Accession Number: 20210305–5212.
Comments Due: 5 p.m. ET 3/26/21.
Docket Numbers: ER21–1075–001.
Applicants: DATC Midwest Holdings,
LLC.
Description: Tariff Amendment:
Amendment to 10 to be effective 4/11/
2021.
Filed Date: 3/5/21.
Accession Number: 20210305–5210.
Comments Due: 5 p.m. ET 3/26/21.
Docket Numbers: ER21–1271–001.
Applicants: Georgia Power Company.
Description: Tariff Amendment: Errata
to Rabun Gap Enhanced Reliability
Upgrade Construction Agreement Filing
to be effective 2/23/2021.
Filed Date: 3/4/21.
Accession Number: 20210304–5191.
Comments Due: 5 p.m. ET 3/25/21.
Docket Numbers: ER21–1272–001.
Applicants: Mississippi Power
Company.
Description: Tariff Amendment: Errata
to Rabun Gap Enhanced Reliability
Upgrade Construction Agreement Filing
to be effective 2/23/2021.
Filed Date: 3/4/21.
Accession Number: 20210304–5192.
Comments Due: 5 p.m. ET 3/25/21.
Docket Numbers: ER21–1274–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
American Transmission Company LLC.
Description: §205(d) Rate Filing:
2021–03–05 SA 2771 ATC-Cloverland
1st Rev CFA to be effective 5/5/2021.
Filed Date: 3/5/21.
Accession Number: 20210305–5023.
Comments Due: 5 p.m. ET 3/26/21.
Docket Numbers: ER21–1275–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
American Transmission Company LLC.
Description: § 205(d) Rate Filing:
2021–03–05 SA 2774 ATC-City of
Cedarburg 1st Rev CFA to be effective 5/
5/2021.
Filed Date: 3/5/21.
Accession Number: 20210305–5026.
Comments Due: 5 p.m. ET 3/26/21.
Docket Numbers: ER21–1276–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
American Transmission Company LLC.
Description: § 205(d) Rate Filing:
2021–03–05_SA 2793 ATC-City of Eagle
River 1st Rev CFA to be effective 5/5/
2021.
Filed Date: 3/5/21.
Accession Number: 20210305–5032.
Comments Due: 5 p.m. ET 3/26/21.
Docket Numbers: ER21–1277–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
American Transmission Company LLC.
Description: § 205(d) Rate Filing:
2021–03–05_SA 2794 ATC-City of
Gladstone 1st Rev CFA to be effective 5/
5/2021.
Filed Date: 3/5/21.
Accession Number: 20210305–5033.
Comments Due: 5 p.m. ET 3/26/21.
Docket Numbers: ER21–1278–000.
Applicants: ISO New England Inc.,
New England Power Pool Participants
Committee.
Description: § 205(d) Rate Filing: ISO–
NE and NEPOOL; Revisions to NYISO
Coordination Agreement to be effective
5/4/2021.
Filed Date: 3/5/21.
Accession Number: 20210305–5076.
Comments Due: 5 p.m. ET 3/26/21.
Docket Numbers: ER21–1279–000.
Applicants: Southern California
Edison Company.
Description: Tariff Cancellation:
Cancel WAPA 161–KV Interconnection
and Operation RS 482 GAC028 to be
effective 5/5/2021.
Filed Date: 3/5/21.
Accession Number: 20210305–5110.
Comments Due: 5 p.m. ET 3/26/21.
Docket Numbers: ER21–1280–000.
Applicants: Southern California
Edison Company.
VerDate Sep<11>2014 16:53 Mar 10, 2021 Jkt 253001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 E:\FR\FM\11MRN1.SGM 11MRN1
khammond on DSKJM1Z7X2PROD with NOTICES
13892
Federal Register / Vol. 86, No. 46 / Thursday, March 11, 2021 / Notices
1
According to a recent report from the National
Oceanic and Atmospheric Administration, extreme
weather events topping $1 billion in estimated
damages and costs are occurring with increasing
frequency. NOAA National Centers for
Environmental Information (NCEI) U.S. Billion-
Dollar Weather and Climate Disasters (2021).
https://www.ncdc.noaa.gov/billions/, https://
www.doi.org/10.25921/stkw-7w73.
2
See, e.g., Quadrennial Energy Review,
Transforming the Nation’s Electricity System: The
Second Installment of the QER, January 2017 at 4–
2 (‘‘The leading cause of power outages in the
United States is extreme weather, including heat
waves, blizzards, thunderstorms, and hurricanes.
Events with severe consequences are becoming
more frequent and intense due to climate change,
and these events have been the principal
contributors to an observed increase in the
frequency and duration of power outages in the
United States.’’).
Description: § 205(d) Rate Filing: SCE
submits New TO Tariff Appendix XIV,
Morongo Transmission WOD Formula
Rate to be effective 5/5/2021.
Filed Date: 3/5/21.
Accession Number: 20210305–5131.
Comments Due: 5 p.m. ET 3/26/21.
Docket Numbers: ER21–1281–000.
Applicants: Arkansas Electric
Cooperative Corporation.
Description: Annual Informational
Attachment O filing of Arkansas Electric
Cooperative Corporation.
Filed Date: 3/5/21.
Accession Number: 20210305–5145.
Comments Due: 5 p.m. ET 3/26/21.
Docket Numbers: ER21–1282–000.
Applicants: Arkansas Electric
Cooperative Corporation.
Description: Annual Informational
Attachment H filing of Arkansas Electric
Cooperative Corporation.
Filed Date: 3/5/21.
Accession Number: 20210305–5147.
Comments Due: 5 p.m. ET 3/26/21.
Docket Numbers: ER21–1283–000.
Applicants: New York Independent
System Operator, Inc., Niagara Mohawk
Power Corporation.
Description: § 205(d) Rate Filing: 205:
Joint TPIA among NYISO, NMPC and
Transco, SA 2599 to be effective 2/19/
2021.
Filed Date: 3/5/21.
Accession Number: 20210305–5152.
Comments Due: 5 p.m. ET 3/26/21.
Docket Numbers: ER21–1284–000.
Applicants: New York State Electric &
Gas Corporation.
Description: § 205(d) Rate Filing:
Revisions to 2020 Facilities Agreement
Update to be effective 3/6/2021.
Filed Date: 3/5/21.
Accession Number: 20210305–5183.
Comments Due: 5 p.m. ET 3/26/21.
Docket Numbers: ER21–1285–000.
Applicants: NSTAR Electric
Company.
Description: § 205(d) Rate Filing:
Design and Engineering Agreement ?
Vineyard Wind LLC to be effective 3/6/
2021.
Filed Date: 3/5/21.
Accession Number: 20210305–5196.
Comments Due: 5 p.m. ET 3/26/21.
Docket Numbers: ER21–1286–000.
Applicants: New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing: 205:
NYISO ISO–NE Coordination
Agreement to be effective 5/5/2021.
Filed Date: 3/5/21.
Accession Number: 20210305–5197.
Comments Due: 5 p.m. ET 3/26/21.
Docket Numbers: ER21–1287–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
2021–03–05_OATT Gen Mod & Replcmt
Proc to be effective 5/5/2021.
Filed Date: 3/5/21.
Accession Number: 20210305–5213.
Comments Due: 5 p.m. ET 3/26/21.
Docket Numbers: ER21–1288–000.
Applicants: California Independent
System Operator Corporation.
Description: §205(d) Rate Filing:
2021–03–05 Transmission Control
Agreement Amendment to Add
Morongo Transmission to be effective 5/
6/2021.
Filed Date: 3/5/21.
Accession Number: 20210305–5246.
Comments Due: 5 p.m. ET 3/26/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: http://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 5, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–05069 Filed 3–10–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD21–13–000]
Climate Change, Extreme Weather, and
Electric System Reliability; Notice of
Technical Conference
Take notice that Federal Energy
Regulatory Commission (Commission)
staff will convene a technical
conference to discuss issues
surrounding the threat to electric system
reliability posed by climate change and
extreme weather events. Commissioners
may attend and participate in the
technical conference.
Reliable electric service is vital to the
nation’s economy, national security, and
public health and safety, and prolonged
power outages can have significant
humanitarian consequences, as the
nation recently witnessed in Texas and
the south-central United States. This
technical conference will address
concerns that because extreme weather
events are increasing in frequency,
1
intensity, geographic expanse, and
duration, the number and severity of
weather-induced events in the electric
power industry may also increase.
2
This technical conference will also
address the specific challenges posed to
electric system reliability by climate
change and extreme weather, which
may vary by region. For example,
addressing the reliability challenges
associated with wildfires may not be
appropriate in a region where a different
challenge, such as weather-driven fuel
supply interruptions, is more likely to
occur.
Through this proceeding in Docket
No. AD21–13–000, the Commission
seeks to understand the near, medium
and long-term challenges facing the
regions of the country; how
decisionmakers in the regions are
evaluating and addressing those
challenges; and whether further action
from the Commission is needed to help
achieve an electric system that can
withstand, respond to, and recover from
extreme weather events.
The technical conference will be held
on the afternoons of Tuesday, June 1,
2021 and Wednesday, June 2, 2021 from
approximately 1 p.m. to 5:00 p.m.
Eastern Time each day. The technical
conference will be held via
teleconference (over WebEx) and will be
open to the public. Registration for the
conference is not required and there is
no fee for attendance. A supplemental
notice will be issued seeking comments
prior to the technical conference.
Following comment submissions, an
additional supplemental notice will be
issued with further details regarding the
technical conference agenda, as well as
VerDate Sep<11>2014 16:53 Mar 10, 2021 Jkt 253001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 E:\FR\FM\11MRN1.SGM 11MRN1
khammond on DSKJM1Z7X2PROD with NOTICES

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT