Drawbridge Operation Regulation; Willamette River, Portland, OR

Federal Register, Volume 81 Issue 49 (Monday, March 14, 2016)

Federal Register Volume 81, Number 49 (Monday, March 14, 2016)

Rules and Regulations

Pages 13274-13275

From the Federal Register Online via the Government Publishing Office www.gpo.gov

FR Doc No: 2016-05620

=======================================================================

-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

Docket No. USCG-2016-0182

Drawbridge Operation Regulation; Willamette River, Portland, OR

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the operating schedule that governs the Broadway Bridge across the Willamette River, mile 11.7, at Portland, OR. The deviation is necessary to accommodate the Portland Race for the Roses event. This deviation allows the bridge to remain in the closed-to-navigation position to facilitate the safe movement of event participants across the bridge.

DATES: This deviation is effective from 5 a.m. to 10:30 a.m. on April 17, 2016.

ADDRESSES: The docket for this deviation, USCG-2016-0182 is available at http://www.regulations.gov. Type the docket number in the ``SEARCH'' box and click ``SEARCH.'' Click on Open Docket Folder on the line associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, call or email Mr. Steven Fischer, Bridge Administrator, Thirteenth Coast Guard District; telephone 206-220-7282, email Steven.M.Fischer@uscg.mil.

SUPPLEMENTARY INFORMATION: Multnomah County requested for the Broadway Bridge to remain closed to vessel traffic to facilitate the safe, uninterrupted roadway passage of participants in the Portland Race for the Roses event. The Broadway Bridge crosses the Willamette River at mile 11.7, and provides 90 feet of vertical clearance above Columbia River Datum 0.0 while in the closed-to-navigation position. This bridge operates in accordance with 33 CFR 117.897. This deviation allows the bascule span of the Broadway Bridge across the Willamette River, mile 11.7, to remain in the closed-to-navigation position, and need not open for maritime traffic from 5:00 a.m. to 10:30 a.m. on April 17, 2016. The bridge shall operate in accordance to 33 CFR 117.897 at all other times. Waterway usage on this part of the Willamette River includes vessels ranging from commercial tug and barge to small pleasure craft. We have coordinated with the majority of waterway users and there were no objections to this schedule.

Vessels able to pass through the bridge in the closed positions may do so at anytime. The bridge will be able to open for emergencies and there is no immediate alternate route for vessels to pass. The Coast Guard will also inform the users of the waterways through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation.

In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35.

Page 13275

Dated: March 8, 2016.

Steven M. Fischer,

Bridge Administrator, Thirteenth Coast Guard District.

FR Doc. 2016-05620 Filed 3-11-16; 8:45 am

BILLING CODE 9110-04-P

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT