Drawbridge Operation Regulations:

Federal Register: August 10, 2010 (Volume 75, Number 153)

Rules and Regulations

Page 48276

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

DOCID:fr10au10-4

DEPARTMENT OF HOMELAND SECURITY

Coast Guard 33 CFR Part 117

Docket No. USCG-2010-0659

Drawbridge Operation Regulations; Pequonnock River, Bridgeport,

CT, Maintenance

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

SUMMARY: The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the

Metro North (Peck) Bridge across the Pequonnock River, mile 0.3, at

Bridgeport, Connecticut. The deviation allows the bridge to remain in the closed position to facilitate scheduled maintenance for three months.

DATES: This deviation is effective from August 7, 2010 through November 7, 2010.

ADDRESSES: Documents mentioned in this preamble as being available in the docket are part of docket USCG-2010-0659 and are available online at www.regulations.gov, inserting USCG-2010-0659 in the ``Keyword'' and then clicking ``Search.'' They are also available for inspection or copying at the Docket Management Facility (M-30), U.S. Department of

Transportation, West Building Ground Floor, Room W12-140, 1200 New

Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 p.m.,

Monday through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, call or e-mail Ms. Judy Leung-Yee, Project Officer, First Coast Guard

District, telephone (212) 668-7165, e-mail judy.k.leung-yee@uscg.mil.

If you have questions on viewing the docket, call Renee V. Wright,

Program Manager, Docket Operations, telephone 202-366-9826.

SUPPLEMENTARY INFORMATION: The Metro North (Peck) Bridge, across the

Pequonnock River at mile 0.3, at Bridgeport, Connecticut, has a vertical clearance in the closed position of 26 feet at mean high water and 32 feet at mean low water. The drawbridge operation regulations are listed at 33 CFR 117.219(c).

The owner of the bridge, Metro North Railroad, requested a temporary deviation from the regulations to facilitate scheduled bridge maintenance, mitre rail rehabilitation, at the bridge.

Under this temporary deviation the Metro North (Peck) Bridge may remain in the closed position from August 7, 2010 through November 7, 2010. Vessels that can pass under the bridge in the closed position may do so at all times.

The Metro North (Peck) Bridge received no requests to open in both 2008 and 2009. Waterway users were advised of the requested bridge closure and offered no objection.

In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35.

Dated: July 30, 2010.

Gary Kassof,

Bridge Program Manager, First Coast Guard District.

FR Doc. 2010-19631 Filed 8-9-10; 8:45 am