Electric rate and corporate regulation filings: UGI Power Supply, Inc., et al.,

[Federal Register: March 19, 1999 (Volume 64, Number 53)]

[Notices]

[Page 13567-13570]

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

[DOCID:fr19mr99-64]

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER96-2715-011, et al.]

UGI Power Supply, Inc., et al.; Electric Rate and Corporate Regulation Filings

March 11, 1999.

Take notice that the following filings have been made with the Commission:

  1. UGI Power Supply, Inc.

    [Docket No. ER96-2715-011]

    Take notice that on March 5, 1999, the above-mentioned power marketer fileda quarterly report with the Commission in the above- mentioned proceeding for information only. This filing is available for public inspection and copying in the Public Reference Room or on the internet at www.ferc.fed.us/ online/rims.htm for viewing and downloading (call 202-208-2222 for assistance).

  2. Howell Power Systems, Inc.; Energy Resource Management Corporation; Alternate Power Source, Inc.; The XERXE Group, Inc.

    [Docket Nos. ER94-178-017; ER96-358-011; ER96-1145-010; and ER98-1823- 004]

    Take notice that on March 8, 1999, the above-mentioned power marketers filedquarterly reports with the Commission in the above- mentioned proceedings for information only. These filings are available for public inspection and copying in the Public Reference Room or on the Internet at www.ferc.fed.us/ online/rims.htm for viewing and downloading (call 202-208-2222 for assistance).

  3. Nevada Power Company

    [Docket No. ER99-356-000]

    Take notice that on March 8, 1999, Nevada Power Company filed supplemental information regarding the above-referenced matter.

    Comment date: March 29, 1999, in accordance with Standard Paragraph E at the end of this notice.

  4. Portland General Electric Company

    [Docket No. ER99-2060-000]

    Take notice that on March 4, 1999, Portland General Electric Company (PGE), tendered for filing under PGE's Final Rule pro forma tariff (FERC Electric Tariff First Revised Volume No. 8, Docket No. OA96-137-000), executed Service Agreements for Short-Term Firm Point to Point and Non-Firm Point-to-Point Transmission Service with Koch Energy Trading, Inc.

    Pursuant to 18 CFR Section 35.11, and the Commission's Order in Docket No.

    [[Page 13568]]

    PL93-2-002 issued July 30, 1993, PGE respectfully requests that the Commission grant a waiver of the notice requirements of 18 CFR Section 35.3 to allow the Service Agreements to become effective March 1, 1999.

    A copy of this filing was caused to be served upon Koch Energy Trading, Inc., as noted in the filing letter.

    Comment date: March 24, 1999, in accordance with Standard Paragraph E at the end of this notice.

  5. FirstEnergy System

    [Docket No. ER99-2070-000]

    Take notice that on March 5, 1999, FirstEnergy System fileda Service Agreement to provide Firm Point-to-Point Transmission Service for DukeSolutions, Inc., the Transmission Customer. Services are being provided under the FirstEnergy System Open Access Transmission Tariff submitted for filing by the Federal Energy Regulatory Commission in Docket No. ER97-412-000.

    FirstEnergy requests an effective date of March 3, 1999 for their service agreement.

    Comment date: April 1, 1999, in accordance with Standard Paragraph E at the end of this notice.

  6. FirstEnergy System

    [Docket No. ER99-2071-000]

    Take notice that on March 5, 1999, FirstEnergy System fileda Service Agreement to provide Non-Firm Point-to-Point Transmission Service for DukeSolutions, Inc., the Transmission Customer. Services are being provided under the FirstEnergy System Open Access Transmission Tariff submitted for filing by the Federal Energy Regulatory Commission in Docket No. ER97-412-000.

    FirstEnergy System requests that the effective date of their Service Agreement be March 3, 1999.

    Comment date: March 25, 1999, in accordance with Standard Paragraph E at the end of this notice.

  7. FirstEnergy Corp. And Pennsylvania Power Company

    [Docket No. ER99-2072-000]

    Take notice that on March 5, 1999, FirstEnergy Corp. tendered for filing on behalf of itself and Pennsylvania Power Company, a Service Agreement for Network Integration Service and an Operating Agreement for the Network Integration Transmission Service under the Pennsylvania Electric Choice Program with DukeSolutions, Inc. pursuant to the FirstEnergy System Open Access Tariff. These agreements will enable the parties to obtain Network Integration Service under the Pennsylvania Electric Choice Program in accordance with the terms of the Tariff.

    FirstEnergy Corp., and Pennsylvania Power Company request that the effective date of the Service Agreement be March 3, 1999.

    Comment date: March 25, 1999, in accordance with Standard Paragraph E at the end of this notice.

  8. Southern California Edison Company

    [Docket No. ER99-2073-000]

    Take notice that on March 5, 1999, Southern California Edison Company (SCE) tendered for filing Amendment No. 2 to the Winter Power Sale Agreement between Southern California Edison and PacifiCorp.

    The Amendment addresses revised pricing and scheduling terms of operating procedures necessarily modified to enable the Agreement to provide for use of certain CAISO and PX market prices in determining contract rates for energy and capacity function in the restructured California market for electricity.

    To the extent necessary, SCE seeks waiver of the 60 day prior notice requirement and requests that the Commission make the Amendment effective one day after filing, which would be March 6, 1999.

    Copies of this filing were served upon the Public Utilities Commission of the State California and all interested parties.

    Comment date: March 25, 1999, in accordance with Standard Paragraph E at the end of this notice.

  9. Cinergy Services, Inc.

    [Docket No. ER99-2076-000]

    Take notice that on March 8, 1999, Cinergy Services, Inc., acting as agent for and on behalf of The Cincinnati Gas & Electric Company and PSI Energy, Inc., tendered for filing pursuant to Section 205 of the Federal Power Act and Part 35 of the Commission's Regulations two service agreements between Cinergy Services and Nordic Electric, L.L.C., for sales under Cinergy's market-based Power Sales Tariff.

    Cinergy states that it has served copies of its filing upon Nordic Electric, L.L.C.

    Comment date: March 26, 1999, in accordance with Standard Paragraph E at the end of this notice.

  10. Energy Masters International, Inc.

    [Docket No. ER99-2077-000]

    Take notice that on March 5, 1999, Energy Masters International, Inc. (EMI) tendered for filing a proposed Notice of Cancellation of certain rate schedules on file with the Commission in order to cease its activities as a power marketer.

    EMI has served copies of its Notice of Cancellation on counterparties under the affected rate schedules, and upon intervenors in Docket Nos. ER94-1402-000, ER95-974-000, ER94-1370-000, ER96-493- 000, ER96-513-000, ER96-530-000, ER96-785-000, ER96-786-000, ER96-787- 000, ER96-969-000, ER96-998-000, and ER97-3879-000.

    EMI requests waiver of the Commission's regulations to permit its Notice of Cancellation to become effective on December 30, 1998.

    Comment date: March 25, 1999, in accordance with Standard Paragraph E at the end of this notice.

  11. Public Service Company of New Mexico

    [Docket No. ER99-2078-000]

    Take notice that on March 5, 1999, Public Service Company of New Mexico (PNM) submitted for filing an executed copy of Exhibit B Revision No. 1 to Contract No. 8-07-40-P0695 between PNM and Western Area Power Administration (Western) to correct an error in the maximum amounts of reserved transmission capacity, identified by ``Point of Delivery'', that PNM provides to Western to serve Western's individual customers.

    PNM requests waiver of the Commission's notice requirements to permit Exhibit B Revision No. 1 to Contract No. 8-07-40-P0695 to be made effective retroactive to April 1, 1997.

    Copies of the filing have been provided to Western and the New Mexico Public Regulation Commission. The filing is available for public inspection at PNM's offices in Albuquerque, New Mexico.

    Comment date: March 25, 1999, in accordance with Standard Paragraph E at the end of this notice.

  12. Reliant Energy Ormond Beach, L.L.C.

    [Docket No. ER99-2079-000]

    Take notice that on March 5, 1999, Reliant Energy Ormond Beach, L.L.C. fileda Notice of Succession pursuant to Section 35.16 of the Commission's Regulations under the Federal Power Act. As a result of a name change, Reliant Energy Ormond Beach, L.L.C. is succeeding to the FERC Electric Rate Schedule No. 1, and to the FERC Electric Tariff, Original Volume No. 2 of Ormond Beach Power Generation, L.L.C., effective February 8, 1999.

    Comment date: March 25, 1999, in accordance with Standard Paragraph E at the end of this notice.

    [[Page 13569]]

  13. Reliant Energy Mandalay, L.L.C.

    [Docket No. ER99-2080-000]

    Take notice that on March 5, 1999, Reliant Energy Mandalay, L.L.C. fileda Notice of Succession pursuant to Section 35.16 of the Commission's Regulations under the Federal Power Act. As a result of a name change, Reliant Energy Mandalay, L.L.C. is succeeding to the FERC Electric Rate Schedule No. 1, and to the FERC Electric Tariff, Original Volume No. 2, of Ocean Vista Power Generation, L.L.C., effective February 8, 1999.

    Comment date: March 25, 1999, in accordance with Standard Paragraph E at the end of this notice.

  14. Reliant Energy Ellwood, L.L.C.

    [Docket No. ER99-2081-000]

    Take notice that on March 5, 1999, Reliant Energy Ellwood, L.L.C. fileda Notice of Succession pursuant to Section 35.16 of the Commission's Regulations under the Federal Power Act. As a result of a name change, Reliant Energy Ellwood, L.L.C. is succeeding to the FERC Electric Rate Schedule No. 1, and to the FERC Electric Tariff Original Volume No. 2, of Oeste Power Generation, L.L.C., effective February 8, 1999.

    Comment date: March 25, 1999, in accordance with Standard Paragraph E at the end of this notice.

  15. Reliant Energy Coolwater, L.L.C.

    [Docket No. ER99-2082-000]

    Take notice that on March 5, 1999, Reliant Energy Coolwater, L.L.C. fileda Notice of Succession pursuant to Section 35.16 of the Commission's Regulations under the Federal Power Act. As a result of a name change, Reliant Energy Coolwater, L.L.C. is succeeding to the FERC Electric Rate Schedule No. 1, and to the FERC Electric Tariff Original Volume No. 2, of Alta Power Generation, L.L.C., effective February 8, 1999.

    Comment date: March 25, 1999, in accordance with Standard Paragraph E at the end of this notice.

  16. Reliant Energy Etiwanda, L.L.C.

    [Docket No. ER99-2083-000]

    Take notice that on March 5, 1999, Reliant Energy Etiwanda, L.L.C. fileda Notice of Succession pursuant to Section 35.16 of the Commission's Regulations under the Federal Power Act. As a result of a name change, Reliant Energy Etiwanda, L.L.C. is succeeding to the FERC Electric Rate Schedule No. 1, and to the FERC Electric Tariff Original Volume No. 2 of Mountain Vista Power Generation, L.L.C., effective February 8, 1999.

    Comment date: March 25, 1999, in accordance with Standard Paragraph E at the end of this notice.

  17. Orange and Rockland Utilities Inc.

    [Docket No. ER99-2084-000]

    Take notice that on March 25, 1999, Orange and Rockland Utilities, Inc. (O&R), tendered for filing a Continuing Site/Interconnection Agreement with Southern Energy NY-Gen, L.L.C. (Southern Energy NY-Gen). The Agreement is part of a larger Divestiture Transaction in which O&R will divest all of its electric generation facilities. Southern Energy NY-Gen concurs in the filing.

    O&R has requested an effective date of April 15, 1999.

    Comment date: March 25, 1999, in accordance with Standard Paragraph E at the end of this notice.

  18. Cinergy Services, Inc.

    [Docket No. ER99-2085-000]

    Take notice that on March 8, 1999, Cinergy Services, Inc. (Cinergy), tendered for filing a Firm Point-To-Point Service Agreement under Cinergy's Open Access Transmission Service Tariff (the Tariff), entered into between Cinergy and Merrill Lynch Capital Services, Inc., (MLCS).

    Cinergy and MLCS are requesting an effective date of February 8, 1999.

    Comment date: March 26, 1999, in accordance with Standard Paragraph E at the end of this notice.

  19. Cinergy Services, Inc.

    [Docket No. ER99-2086-000]

    Take notice that on March 8, 1999, Cinergy Services, Inc. (Cinergy), tendered for filing a Non-Firm Point-To-Point Service Agreement under Cinergy's Open Access Transmission Service Tariff (the Tariff) entered into between Cinergy and Merrill Lynch Capital Services, Inc., (MLCS).

    Cinergy and MLCS are requesting an effective date of February 8, 1999.

    Comment date: March 26, 1999, in accordance with Standard Paragraph E at the end of this notice.

  20. Consumers Energy Company

    [Docket No. ER99-2087-000]

    Take notice that on March 8, 1999, Consumers Energy Company (Consumers), tendered for filing executed service agreements for Non- Firm Point-to-Point Transmission Service and Firm Point-to-Point Transmission Service with Cargill-Alliant LLC., both agreements were pursuant to the Joint Open Access Transmission Service Tariff filedon December 31, 1996 by Consumers and The Detroit Edison Company (Detroit Edison) and have effective dates of March 3, 1999.

    Copies of the filedagreement were served upon the Michigan Public Service Commission, Detroit Edison and Cargill-Alliant LLC.

    Comment date: March 26, 1999, in accordance with Standard Paragraph E at the end of this notice.

  21. PP&L, Inc.

    [Docket No. ER99-2088-000]

    Take notice that on March 8, 1999, PP&L, Inc. (PP&L), tendered for filing a Service Agreement dated February 25, 1999 with Select Energy, Inc. (Select), under PP&L's Market-Based Rate and Resale of Transmission Rights Tariff, FERC Electric Tariff, Revised Volume No. 5. The Service Agreement adds Select as an eligible customer under the Tariff.

    PP&L requests an effective date of March 8, 1999, for the Service Agreement.

    PP&L states that copies of this filing have been supplied to Select and to the Pennsylvania Public Utility Commission.

    Comment date: March 26, 1999, in accordance with Standard Paragraph E at the end of this notice.

  22. PP&L, Inc.

    [Docket No. ER99-2089-000]

    Take notice that on March 8, 1999, PP&L, Inc. (PP&L), tendered for filing a Service Agreement dated March 1, 1999, with Great Bay Power Corporation (GBPC), under PP&L's Market-Based Rate and Resale of Transmission Rights Tariff, FERC Electric Tariff, Revised Volume No. 5. The Service Agreement adds GBPC as an eligible customer under the Tariff.

    PP&L requests an effective date of March 8, 1999, for the Service Agreement.

    PP&L states that copies of this filing have been supplied to GBPC and to the Pennsylvania Public Utility Commission.

    Comment date: March 26, 1999, in accordance with Standard Paragraph E at the end of this notice.

  23. Central Illinois Light Company

    [Docket No. ER99-2090-000]

    Take notice that on March 8, 1999, Central Illinois Light Company (CILCO), 300 Liberty Street, Peoria, Illinois 61202, tendered for filing with the Commission a substitute Index of Customers under its Market Rate Power Sales Tariff reflecting a name change for one customer from American Energy Solutions, Inc., to American Energy Trading, Inc.

    [[Page 13570]]

    CILCO requested an effective date of March 5, 1999.

    Copies of the filing were served on the affected customers and the Illinois Commerce Commission.

    Comment date: March 26, 1999, in accordance with Standard Paragraph E at the end of this notice.

  24. Central Illinois Light Company

    [Docket No. ER99-2091-000]

    Take notice that on March 8, 1999, Central Illinois Light Company (CILCO), 300 Liberty Street, Peoria, Illinois 61202, tendered for filing with the Commission an Index of Customers under its Coordination Sales Tariff reflecting a name change for one customer, from American Energy solutions, Inc., to American Energy Trading, Inc., one customer has asked CILCO to terminate their service agreement, Industrial Energy Applications, Inc.

    CILCO requested an effective date of March 5, 1999.

    Copies of the filing were served on the affected customers and the Illinois Commerce Commission.

    Comment date: March 26, 1999, in accordance with Standard Paragraph E at the end of this notice.

  25. Avista Corporation

    [Docket No. ER99-2092-000]

    Take notice that on March 8, 1999, Avista Corporation, tendered for filing, with the Federal Energy Regulatory Commission pursuant to 18 CFR 35.13, an executed Mutual Netting Agreement for allowing arrangements of amounts which become due and owing to one Party to be set off against amounts which are due and owing to the other Party with Coral Power, LLC.

    Avista Corporation requests waiver of the prior notice requirement and requests an effective date of March 1, 1999.

    Comment date: March 26, 1999, in accordance with Standard Paragraph E at the end of this notice.

  26. Avista Corporation

    [Docket No. ER99-2093-000]

    Take notice that on March 8, 1999, Avista Corporation, tendered for filing with the Federal Energy Regulatory Commission pursuant to 18 CFR 35.13, an executed Service Agreement and Certificate of Concurrence under Avista Corporation's FERC Electric Tariff First Revised Volume No. 10, with The Montana Power Company.

    Avista Corporation requests waiver of the prior notice requirements and requests an effective date of March 1, 1999.

    Comment date: March 26, 1999, in accordance with Standard Paragraph E at the end of this notice.

  27. Pacific Gas and Electric Company

    [Docket No. ER99-2094-000]

    Take notice that on March 8, 1999, Pacific Gas and Electric Company (PG&E), tendered for filing two Special Facilities Agreements between PG&E and Geysers Power Company, LLC (Geysers Power). These Special Facilities Agreements permit PG&E to recover the ongoing costs associated with owning, operating and maintaining the Special Facilities including the cost of any alterations and additions. As detailed in the Special Facilities Agreements, PG&E proposes to charge Geysers Power a monthly Cost of Ownership Charge equal to the rate for transmission-level, utility-financed facilities in PG&E's currently effective Electric Rule 2, as filedwith the California Public Utilities Commission (CPUC).

    PG&E's currently effective rate of 1.141% for transmission-level, utility-financed Special Facilities is contained in the CPUC's Advice Letter 1960-G/1587-E, effective August 5, 1996, a copy of which was included in PG&E's October 23, 1996, filing in FERC Docket No. ER97- 205-000 as Attachment 3.

    PG&E has requested permission to use automatic rate adjustments whenever the CPUC authorizes a new Electric Rule 2, Cost of Ownership Rate for transmission-level, utility-financed Special Facilities but cap the rate at 1.49% per month.

    Copies of this filing have been served upon Geysers Power and the CPUC.

    Comment date: March 26, 1999, in accordance with Standard Paragraph E at the end of this notice.

  28. Michael E. Rescoe, Bruce R. Worthington

    [Docket Nos. ID-3247-002; and ID-3248-002]

    Take notice that on March 8, 1999, PG&E Energy Services Corporation, with its principal place of business at 345 California Street, San Francisco, California, 94104, filedwith the Federal Energy Regulatory Commission an application for authority to hold interlocking positions on behalf of Michael E. Rescoe and Bruce R. Worthington, under Section 305(b) of the Federal Power Act, 16 U.S.C. 725(b).

    Comment date: April 7, 1999, in accordance with Standard Paragraph E at the end of this notice.

  29. Pine Bluff Energy LLC

    [Docket No. QF97-61-003]

    Take notice that on March 4, 1999, Pine Bluff Energy LLC filed supplemental information to their application for certification of the Pine Bluff Energy Center as a qualifying cogeneration facility in response to a request from the commission staff to provide additional information regarding technical aspects of the cogeneration facility.

    Comment date: April 5, 1999, in accordance with Standard Paragraph E at the end of this notice.

    Standard Paragraphs

    E. Any person desiring to be heard or to protest such filing should file a motion to intervene or protest with the Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.211 and 385.214). All such motions or protests should be filedon or before the comment date. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a motion to intervene. Copies of these filings are on file with the Commission and are available for public inspection. This filing may also be viewed on the Internet at http://www.ferc.fed.us/online/rims.htm (call 202-208- 2222 for assistance). David P. Boergers, Secretary.

    [FR Doc. 99-6699Filed3-18-99; 8:45 am]

    BILLING CODE 6717-01-P