Great Basin and Northern Railroad-Change in Operators Exemption-City of Ely and Nevada Northern Railway Foundation

Published date27 November 2020
Citation85 FR 76147
Record Number2020-26201
SectionNotices
CourtSurface Transportation Board
Federal Register, Volume 85 Issue 229 (Friday, November 27, 2020)
[Federal Register Volume 85, Number 229 (Friday, November 27, 2020)]
                [Notices]
                [Pages 76147-76148]
                From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
                [FR Doc No: 2020-26201]
                =======================================================================
                -----------------------------------------------------------------------
                SURFACE TRANSPORTATION BOARD
                [Docket No. FD 36459]
                Great Basin and Northern Railroad--Change in Operators
                Exemption--City of Ely and Nevada Northern Railway Foundation
                 Great Basin and Northern Railroad (Great Basin), a Class III rail
                carrier, has filed a verified notice of exemption pursuant to 49 CFR
                1150.41 to assume operations over approximately 0.9 miles of rail line
                between milepost 127.0 and milepost 127.9 at or near McGill Junction in
                White Pine County, Nev. (the Line). The Line is owned by the City of
                Ely (the City) and the Nevada Northern Railway Foundation (the
                Foundation), and is currently operated
                [[Page 76148]]
                by S&S Shortline Leasing, LLC (S&S). Great Basin states that it
                anticipates reaching an agreement with the City and the Foundation in
                the near future for rights to operate over the Line. According to Great
                Basin, it will replace S&S as the operator of the Line, and S&S has
                agreed to discontinue its service over the Line concurrent with its
                replacement by Great Basin.
                 Great Basin states that the Line is a segment of a longer rail line
                running from milepost 0.0 at or near Cobre, Nev., to and beyond McGill
                Junction. In addition to the Line, S&S currently operates the portion
                of the longer line from milepost 0.0 to milepost 127.0. See S&S
                Shortline Leasing, LLC--Operation Exemption--City of Ely, Nev., et al.,
                FD 35284 (STB served Aug. 14, 2009). Great Basin states that it
                operates the remaining portion of the line from milepost 127.9 to
                milepost 146.1 at or near Keystone, Nev., and two branch lines
                connecting to this line segment. See Great Basin & N.R.R.--Change in
                Operators Exemption--City of Ely, et al., FD 34506 (STB served June 7,
                2004) (addressing the portion of the line from milepost 127.9 to
                milepost 146.1).
                 Great Basin certifies that the proposed transaction does not
                involve a provision or agreement that may limit future interchange with
                a third-party connecting carrier. Great Basin also certifies that its
                projected revenues as a result of the transaction will not result in
                the creation of a Class II or Class I rail carrier and will not exceed
                $5 million.
                 Under 49 CFR 1150.42(b), a change in operator requires that notice
                be given to shippers. Great Basin states that no active rail shippers
                are on or served by the Line.
                 The transaction may be consummated on or after December 13, 2020,
                the effective date of the exemption (30 days after the verified notice
                was filed).
                 If the verified notice contains false or misleading information,
                the exemption is void ab initio. Petitions to revoke the exemption
                under 49 U.S.C. 10502(d) may be filed at any time. The filing of a
                petition to revoke will not automatically stay the effectiveness of the
                exemption. Petitions for stay must be filed no later than December 4,
                2020 (at least seven days before the exemption becomes effective).
                 All pleadings, referring to Docket No. FD 36459, should be filed
                with the Surface Transportation Board via e-filing on the Board's
                website. In addition, a copy of each pleading must be served on Great
                Basin's representative, Jeffrey O. Moreno, Thompson Hine LLP, 1919 M
                Street NW, Suite 700, Washington, DC 20036.
                 According to Great Basin, this action is categorically excluded
                from environmental review under 49 CFR 1105.6(c) and from historic
                preservation reporting requirements under 49 CFR 1105.8(b).
                 Decided: November 20, 2020.
                 By the Board, Allison C. Davis, Director, Office of Proceedings.
                Tammy Lowery,
                Clearance Clerk.
                [FR Doc. 2020-26201 Filed 11-25-20; 8:45 am]
                BILLING CODE 4915-01-P
                

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT