Gulf South Pipeline Company, LLC;

Citation91 FR 55573
Published date28 August 2026
FR Document2026-17632
Pages55573-55576
SectionNotices
IssuerEnergy Department,Federal Energy Regulatory Commission
Federal Register, Volume 91 Issue 166 (Friday, August 28, 2026)
[Federal Register Volume 91, Number 166 (Friday, August 28, 2026)]
                [Notices]
                [Pages 55573-55576]
                From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
                [FR Doc No: 2026-17632]
                -----------------------------------------------------------------------
                DEPARTMENT OF ENERGY
                Federal Energy Regulatory Commission
                [Docket No. CP26-547-000]
                Gulf South Pipeline Company, LLC;
                 Notice of Intent To Prepare an Environmental Impact Statement for
                the Proposed Texas Gateway Project, Request for Comments on
                Environmental Issues, and Schedule for Environmental Review
                 The staff of the Federal Energy Regulatory Commission (FERC or
                Commission) will prepare an environmental impact statement (EIS) that
                will discuss the environmental effects of the Texas Gateway Project
                involving construction and operation of facilities by Gulf South
                Pipeline Company, LLC (Gulf South) in Panola, Shelby, San Augustine,
                Sabine, Jasper, Newton, and San Jacinto counties, Texas, and Beauregard
                Parish,
                [[Page 55574]]
                Louisiana.\1\ The Commission will use this EIS in its decision-making
                process to determine whether the project is in the public convenience
                and necessity. The schedule for preparation of the EIS is discussed in
                the Schedule for Environmental Review section of this notice.
                ---------------------------------------------------------------------------
                 \1\ For tracking purposes under the National Environmental
                Policy Act, the unique identification number for documents relating
                to this environmental review is EISX-019-20-000-1786695591.
                ---------------------------------------------------------------------------
                 This notice announces the opening of the scoping process the
                Commission will use to gather input from the public and interested
                agencies regarding the project. As part of the National Environmental
                Policy Act (NEPA) review process, the Commission takes into account
                concerns the public may have about proposals and the environmental
                effects that could result from its action whenever it considers the
                issuance of a Certificate of Public Convenience and Necessity/
                authorization. This gathering of public input is referred to as
                ``scoping.'' The main goal of the scoping process is to focus the
                analysis in the environmental document on the important environmental
                issues. Additional information about the Commission's NEPA process is
                described below in the NEPA Process and the EIS section of this notice.
                 By this notice, the Commission requests public comments on the
                scope of issues to address in the environmental document, including
                comments on potential alternatives and effects, and any relevant
                information, studies, or analyses of any kind concerning effects
                affecting the quality of the human environment. To ensure that your
                comments are timely and properly recorded, please submit your comments
                so that the Commission receives them in Washington, DC on or before
                5:00 p.m. Eastern Time on September 24, 2026. Comments may be submitted
                in written form. Further details on how to submit comments are provided
                in the Public Participation section of this notice.
                 If you are a landowner receiving this notice, a pipeline company
                representative may contact you about the acquisition of an easement to
                construct, operate, and maintain the proposed facilities. The company
                would seek to negotiate a mutually acceptable easement agreement. You
                are not required to enter into an agreement. However, if the Commission
                approves the project, the Natural Gas Act conveys the right of eminent
                domain to the company. Therefore, if you and the company do not reach
                an easement agreement, the pipeline company could initiate condemnation
                proceedings in court. In such instances, compensation would be
                determined by a judge in accordance with state law. The Commission does
                not grant, exercise, or oversee the exercise of eminent domain
                authority. The courts have exclusive authority to handle eminent domain
                cases; the Commission has no jurisdiction over these matters.
                 Gulf South provided landowners with a fact sheet prepared by the
                FERC entitled ``An Interstate Natural Gas Facility On My Land? What Do
                I Need To Know?'' which addresses typically asked questions, including
                the use of eminent domain and how to participate in the Commission's
                proceedings. This fact sheet along with other landowner topics of
                interest are available for viewing on the FERC website (www.ferc.gov)
                under the Natural Gas, Landowner Topics link.
                Public Participation
                 There are three methods you can use to submit your comments to the
                Commission. The Commission encourages electronic filing of comments and
                has staff available to assist you at (866) 208-3676 or
                [email protected]. Please carefully follow these instructions
                so that your comments are properly recorded.
                 (1) You can file your comments electronically using the eComment
                feature, which is located on the Commission's website (www.ferc.gov)
                under the link to FERC Online. Using eComment is an easy method for
                submitting brief, text-only comments on a project;
                 (2) You can file your comments electronically by using the eFiling
                feature, which is located on the Commission's website (www.ferc.gov)
                under the link to FERC Online. With eFiling, you can provide comments
                in a variety of formats by attaching them as a file with your
                submission. New eFiling users must first create an account by clicking
                on ``eRegister.'' You will be asked to select the type of filing you
                are making; a comment on a particular project is considered a ``Comment
                on a Filing''; or
                 (3) You can file a paper copy of your comments by mailing them to
                the Commission. Be sure to reference the project docket number (CP26-
                547-000) on your letter. Submissions sent via the U.S. Postal Service
                must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy
                Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC
                20426. Submissions sent via any other carrier must be addressed to:
                Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission,
                12225 Wilkins Avenue, Rockville, MD 20852.
                 For public inquiries and assistance with making filings such as
                interventions, comments, or requests for rehearing, contact the Office
                of Public Participation at (202) 502-6595 or [email protected].
                Summary of the Proposed Project, the Project Purpose and Need, and
                Expected Effects
                 Gulf South proposes to construct and operate the Texas Gateway
                Project which will comprise approximately 154 miles of new natural gas
                pipelines and associated metering and compression facilities in east
                Texas and southwest Louisiana. Gulf South also proposes to construct a
                new compressor station along its existing Index 129 Legacy System in
                San Jacinto County, Texas and expand two existing compressor stations
                located along the new pipeline route. Overall, the project will allow
                Gulf South to transport approximately 1.8 billion cubic feet per day of
                natural gas from existing facilities in Carthage, Texas to delivery
                points in southeast Texas and southwest Louisiana.
                 According to Gulf South, its project would support liquefied
                natural gas (LNG), industrial, and utility demand by connecting
                shippers to diverse natural gas supplies from the Permian, Eagle Ford,
                and Haynesville basins. The project would enhance system reliability,
                supply security, flow assurance, and long-term economic development in
                southwest Louisiana and southeast Texas by linking these production
                areas to the growing market centers in southeast Texas and southwestern
                Louisiana, including LNG export facilities located near the Gillis Hub
                and surrounding Gulf Coast Region.
                 The Texas Gateway Project would consist of the following
                facilities:
                 a new 154-mile-long natural gas pipeline comprised of 36-
                inch- and 42-inch-diameter pipe segments, in Panola, Shelby, San
                Augustine, Sabine, Jasper, Newton, and San Jacinto counties, Texas, and
                Beauregard Parish, Louisiana;
                 three new delivery meter and regulator stations;
                 a new 13,410-horsepower compressor station (the Cleveland
                Compressor Station [CS]) along Gulf South's existing Index 129 Legacy
                System in San Jacinto County, Texas;
                 expansion of compressor capacity at the existing Carthage
                Junction CS in Panola County, Texas and the existing Magasco CS in
                Sabine County, Texas; and
                [[Page 55575]]
                 a new bi-directional check meter and regulator station at
                the Carthage Junction CS in Panora County, Texas.
                 The general location of the project facilities is shown in appendix
                1.\2\
                ---------------------------------------------------------------------------
                 \2\ The appendices referenced in this notice will not appear in
                the Federal Register. Copies of the appendices were sent to all
                those receiving this notice in the mail and are available at
                www.ferc.gov using the link called ``eLibrary.'' For instructions on
                connecting to eLibrary, refer to the last page of this notice. For
                assistance, contact FERC at [email protected] or call toll
                free, (886) 208-3676 or TTY (202) 502-8659.
                ---------------------------------------------------------------------------
                 Construction of the proposed facilities would disturb about 2,970
                acres of land for the above ground facilities and the pipeline.
                Following construction, Gulf South would maintain about 991 acres for
                permanent operation of the project's facilities; the remaining acreage
                would be restored and revert to former uses. About 44 percent of the
                proposed pipeline route parallels existing pipeline, utility, or road
                rights-of-way.
                 Based on an initial review of Gulf South's proposal, Commission
                staff have identified several expected effects that deserve attention
                in the EIS. These include effects from waterbody crossings, including
                two designated Scenic Rivers; effects to wetlands, including permanent
                conversion of about 29 acres of forested wetland to emergent wetland;
                crossing federally managed land, including a designated Wildlife
                Management Area; crossing the El Camino Real de los Tejas Historic
                Trail, crossing private land managed under a conservation easement; and
                potential effects to designated Critical Habitat for species listed
                under the Endangered Species Act.
                The NEPA Process and the EIS
                 The EIS issued by the Commission will discuss effects that could
                occur as a result of the construction and operation of the proposed
                project under the relevant general resource areas:
                 geology and soils;
                 water resources and wetlands;
                 vegetation and wildlife;
                 threatened and endangered species;
                 cultural resources;
                 land use;
                 socioeconomics;
                 air quality and noise; and
                 reliability and safety.
                 Commission staff will also make recommendations on how to lessen or
                avoid effects on the various resource areas. Your comments will help
                Commission staff focus its analysis on the issues that may have a
                significant effect on the human environment.
                 The EIS will present Commission staff's independent analysis of the
                issues. The following are cooperating agencies in the preparation of
                the EIS: \3\ the U.S. Army Corps of Engineers; U.S. Bureau of Land
                Management; U.S. Forest Service; U.S. Fish and Wildlife Service; and
                the U.S. Environmental Protection Agency.
                ---------------------------------------------------------------------------
                 \3\ Cooperating agency responsibilities are addressed in Section
                107(a)(3) of NEPA (42 U.S.C. 4336(a)(3)).
                ---------------------------------------------------------------------------
                 Staff will prepare a draft EIS which will be issued for public
                comment. Commission staff will consider all timely comments received
                during the comment period on the draft EIS and revise the document, as
                necessary, before issuing a final EIS. Any draft and final EIS will be
                available in electronic format in the public record through eLibrary
                \4\ and the Commission's natural gas environmental documents web page
                (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). If eSubscribed, you will receive instant
                email notification when the environmental document is issued.
                ---------------------------------------------------------------------------
                 \4\ For instructions on connecting to eLibrary, refer to the
                last page of this notice.
                ---------------------------------------------------------------------------
                Alternatives Under Consideration
                 The EIS will evaluate reasonable alternatives that are technically
                and economically feasible and meet the purpose and need for the
                proposed action. Alternatives currently under consideration include:
                 the no-action alternative, meaning the project is not
                implemented;
                 pipeline route alternatives, including minor deviations;
                 aboveground facility site alternatives; and
                 compression alternatives.
                 With this notice, the Commission requests specific comments
                regarding any additional potential alternatives to the proposed action
                or segments of the proposed action. Please focus your comments on
                reasonable alternatives (including alternative facility sites and
                pipeline routes) that meet the project objectives, are technically and
                economically feasible, and avoid or lessen environmental effects.
                Consultation Under Section 106 of the National Historic Preservation
                Act
                 In accordance with the Advisory Council on Historic Preservation's
                implementing regulations for section 106 of the National Historic
                Preservation Act, the Commission is using this notice to initiate
                consultation with the applicable State Historic Preservation Offices,
                and other government agencies, interested Indian tribes, and the public
                to solicit their views and concerns regarding the project's potential
                effects on historic properties.\5\ The project EIS will document
                findings on the effects on historic properties and summarize the status
                of consultations under section 106.
                ---------------------------------------------------------------------------
                 \5\ The Advisory Council on Historic Preservation's regulations
                are at Title 36, Code of Federal Regulations, Part 800. Those
                regulations define historic properties as any prehistoric or
                historic district, site, building, structure, or object included in
                or eligible for inclusion in the National Register of Historic
                Places.
                ---------------------------------------------------------------------------
                Schedule for Environmental Review
                 On July 15, 2026, the Commission issued its Notice of Application
                for the project. Among other things, that notice alerted other agencies
                issuing federal authorizations of the requirement to complete all
                necessary reviews and to reach a final decision on the request for a
                federal authorization within 90 days of the date of issuance of the
                Commission staff's final EIS for the project. We developed this
                schedule based on a thorough review of the relevant factors, including
                the size and greenfield nature of the project, the absence of pre-
                filing review, and the need to allot adequate time for coordination
                with cooperating agencies. This notice identifies the Commission
                staff's planned schedule for completion of the final EIS for the
                project, which is based on an issuance of the draft EIS in April 2027,
                opening a 45-day comment period.
                Issuance of Notice of Availability of the final EIS--September 24, 2027
                90-day Federal Authorization Decision Deadline \6\--December 23, 2027
                ---------------------------------------------------------------------------
                 \6\ The Commission's deadline applies to the decisions of other
                federal agencies, and state agencies acting under federally
                delegated authority, that are responsible for federal
                authorizations, permits, and other approvals necessary for proposed
                projects under the Natural Gas Act. Per Title 18 Code of Federal
                Regulations 157.22(a), the Commission's deadline for other agency's
                decisions applies unless a schedule is otherwise established by
                federal law.
                 In accordance with Title 41 of the Fixing America's Surface
                Transportation Act, agencies are to publish completion dates for all
                federal environmental reviews and authorizations. This notice
                identifies the Commission's anticipated schedule for issuance of the
                final order for the project, which is based on the anticipated issuance
                date for the final EIS. We currently anticipate issuing a final order
                ---------------------------------------------------------------------------
                for the project no later than:
                 Issuance of Final Order--December 16, 2027
                 If a schedule change becomes necessary, an additional notice will
                be provided so that the relevant agencies are kept informed of the
                project's progress.
                [[Page 55576]]
                Permits and Authorizations
                 The table below lists the anticipated permits and authorizations
                for the project required under federal law. This list may not be all-
                inclusive and does not preclude any permit or authorization if it is
                not listed here. Agencies with jurisdiction by law and/or special
                expertise may formally cooperate in the preparation of the Commission's
                EIS and may adopt the EIS to satisfy its NEPA responsibilities related
                to this project. Agencies that would like to request cooperating agency
                status should follow the instructions for filing comments provided
                under the Public Participation section of this notice.
                ------------------------------------------------------------------------
                 Agency Permit
                ------------------------------------------------------------------------
                Federal Energy Regulatory Commission... Certificate of Public
                 Convenience and Necessity.
                U.S. Bureau of Land Management......... Right-of-way Grant.
                U.S. Fish and Wildlife Service, Texas Section 7 of the Endangered
                 Coastal and Central Plains Ecological Species Act, Threatened and
                 Services Field Office. Endangered Species
                 Consultation.
                U.S. Fish and Wildlife Service, Section 7 of the Endangered
                 Louisiana Ecological Services Field Species Act, Threatened and
                 Office. Endangered Species
                 Consultation.
                U.S. Army Corps of Engineers, Galveston Section 404 Clean Water Act/
                 District. Section 10 Rivers and Harbors
                 Act--Individual Permit.
                U.S. Army Corps of Engineers, Fort Section 404 Clean Water Act--
                 Worth District. Nationwide Permit 12.
                U.S. Army Corps of Engineers, New Section 404 Clean Water Act/
                 Orleans District. Section 10 Rivers and Harbors
                 Act--Individual Permit.
                U.S. Forest Service.................... Archaeological Resource
                 Protection Act Permit.
                U.S. Forest Service.................... SF-299 Survey Permit.
                Railroad Commission of Texas........... Individual Section 401 Water
                 Quality Certification.
                Railroad Commission of Texas........... Hydrostatic Test Discharge
                 Permit.
                Railroad Commission of Texas........... Landfarming Permit.
                Texas Commission on Environmental General Permit to Discharge
                 Quality. Hydrostatic Test Water
                 (TXG670000).
                Texas Commission on Environmental Temporary Water Rights Permit.
                 Quality.
                Texas Commission on Environmental Permit-by-Rule Air
                 Quality. Authorization.
                Texas Parks and Wildlife Department.... State Threatened and Endangered
                 Species Consultation/
                 Clearance.
                Advisory Council on Historic Section 106 of the National
                 Preservation/Texas Historical Historic Preservation Act.
                 Commission.
                Louisiana Department of Environmental Individual Section 401 Water
                 Quality. Quality Certification.
                Louisiana Department of Environmental Hydrostatic Water Discharge
                 Quality. General Permit (LAG670000).
                Louisiana Department of Wildlife and State Threatened and Endangered
                 Fisheries. Species Clearance.
                Louisiana Department of Wildlife and Louisiana State Scenic River
                 Fisheries. Permit.
                Louisiana State Historic Preservation Section 106 of the National
                 Office. Historic Preservation Act.
                ------------------------------------------------------------------------
                Environmental Mailing List
                 This notice is being sent to the Commission's current environmental
                mailing list for the project which includes federal, state, and local
                government representatives and agencies; local police departments and
                police juries; local fire departments and districts; local learning
                institutions; elected officials; Native American Tribes; environmental
                and public interest groups; other interested parties; and local
                libraries and media outlets. This list also includes all affected
                landowners (as defined in the Commission's regulations) who are
                potential right-of-way grantors, whose property may be used temporarily
                for project purposes, or who own homes within certain distances of
                aboveground facilities, and anyone who submits comments on the project
                and includes a mailing address with their comments. Commission staff
                will update the environmental mailing list as the analysis proceeds to
                ensure that Commission notices related to this environmental review are
                sent to all individuals, organizations, and government entities
                interested in and/or potentially affected by the proposed project.
                State and local government representatives should notify their
                constituents of this proposed project and encourage them to comment on
                their areas of concern.
                 If you need to make changes to your name/address, or if you would
                like to remove your name from themailing list, please complete one of
                the following steps:
                 (1) Send an email to [email protected] stating your
                request. You must include the docket number CP26-547-000 in your
                request. If you are requesting a change to your address, please be sure
                to include your name and the correct address. If you are requesting to
                delete your address from the mailing list, please include your name and
                address as it appeared on this notice. This email address is unable to
                accept comments.
                 OR
                 (2) Return the attached ``Mailing List Update Form'' (appendix 2).
                Additional Information
                 Additional information about the project is available on the FERC
                website at www.ferc.gov using the eLibrary link. Click on the eLibrary
                link, click on ``General Search'' and enter the docket number in the
                ``Docket Number'' field, excluding the last three digits (i.e., CP26-
                547). Be sure you have selected an appropriate date range. For
                assistance with eLibrary, please contact FERC Online Support at
                [email protected] or (866) 208-3676, or for TTY, contact (202)
                502-8659. The eLibrary link also provides access to the texts of all
                formal documents issued by the Commission, such as orders, notices, and
                rulemakings.
                 Additionally, the Commission offers a free service called
                eSubscription. This service provides automatic notification of filings
                made to subscribed dockets, document summaries, and direct links to the
                documents. Go to https://www.ferc.gov/ferc-online/overview to register
                for eSubscription.
                 Public sessions or site visits will be posted on the Commission's
                calendar located at https://www.ferc.gov/news-events/events along with
                other related information.
                (Authority: 18 CFR 2.1)
                 Dated: August 25, 2026.
                Debbie-Anne A. Reese,
                Secretary.
                [FR Doc. 2026-17632 Filed 8-27-26; 8:45 am]
                BILLING CODE 6717-01-P
                

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex