Hazardous waste program authorizations: Florida,

[Federal Register: October 14, 2004 (Volume 69, Number 198)]

[Rules and Regulations]

[Page 60964-60967]

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

[DOCID:fr14oc04-9]

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 271

[FRL-7825-8]

Florida: Final Authorization of State Hazardous Waste Management Program Revision

AGENCY: Environmental Protection Agency (EPA).

ACTION: Immediate final rule.

SUMMARY: Florida has applied to EPA for Final authorization of the changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA). EPA has determined that these changes satisfy all requirements needed to qualify for Final authorization, and is authorizing the State's changes through this immediate final action. EPA is publishing this rule to authorize the changes without a prior proposal because we believe this action is not controversial and do not expect comments that oppose it. Unless we get written comments which oppose this authorization during the comment period, the decision to authorize Florida's changes to their hazardous waste program will take effect. If we get comments that oppose this action, we will publish a document in the Federal Register withdrawing this rule before it takes effect and a separate document in the proposed rules section of this Federal Register will serve as a proposal to authorize the changes.

DATES: This Final authorization will become effective on December 13, 2004, unless EPA receives adverse written comment by November 15, 2004. If EPA receives such comment, it will publish a timely withdrawal of this immediate final rule in the Federal Register and inform the public that this authorization will not take effect.

ADDRESSES: Send written comments to Audrey E. Baker, Florida Authorizations Coordinator, RCRA Programs Branch, Waste Management Division, U.S. Environmental Protection Agency, The Sam Nunn Federal Center, 61 Forsyth Street, SW., Atlanta, Georgia 30303-8960; (404) 562- 8483. You may also e-mail your comments to

[[Page 60965]]

Baker.Audrey@epa.gov or submit your comments at http://www.regulations.gov. We must receive your comments by November 15,

2004. You can view and copy Florida's application from 8 a.m. to 5 p.m. at The Florida Department of Environmental Protection, Twin Towers Office Building, 2600 Blair Stone Road, Tallahassee, Florida 32399-2400 and from 8:30 a.m. to 3:45 p.m. EPA, Region 4 Library, The Sam Nunn Atlanta Federal Center, 61 Forsyth Street, SW., Atlanta, Georgia 30303- 8960, Phone number (404) 562-8190, Patricia Strougal, Librarian.

FOR FURTHER INFORMATION CONTACT: Audrey E. Baker, Florida Authorizations Coordinator, RCRA Programs Branch, Waste Management Division, U.S. Environmental Protection Agency, The Sam Nunn Federal Center, 61 Forsyth Street, SW., Atlanta, Georgia 30303-8960; (404) 562- 8483.

SUPPLEMENTARY INFORMATION:

  1. Why Are Revisions to State Programs Necessary?

    States which have received final authorization from EPA under RCRA section 3006(b), 42 U.S.C. 6926(b), must maintain a hazardous waste program that is equivalent to, consistent with, and no less stringent than the Federal program. As the Federal program changes, States must change their programs and ask EPA to authorize the changes. Changes to State programs may be necessary when Federal or State statutory or regulatory authority is modified or when certain other changes occur. Most commonly, States must change their programs because of changes to EPA's regulations in 40 Code of Federal Regulations (CFR) parts 124, 260 through 266, 268, 270, 273 and 279.

  2. What Decisions Have We Made in This Rule?

    We conclude that Florida's application to revise its authorized program meets all of the statutory and regulatory requirements established by RCRA. Therefore, we grant Florida Final authorization to operate its hazardous waste program with the changes described in the authorization application. Florida has responsibility for permitting Treatment, Storage, and Disposal Facilities (TSDFs) within its borders and for carrying out the aspects of the RCRA program described in its revised program application, subject to the limitations of the Hazardous and Solid Waste Amendments of 1984 (HSWA). New Federal requirements and prohibitions imposed by Federal regulations that EPA promulgates under the authority of HSWA take effect in authorized States before they are authorized for the requirements. Thus, EPA will implement those requirements and prohibitions in Florida, including issuing permits, until the State is granted authorization to do so.

  3. What Is the Effect of Today's Authorization Decision?

    The effect of this decision is that a facility in Florida subject to RCRA will now have to comply with the authorized State requirements instead of the equivalent Federal requirements in order to comply with RCRA. Florida has enforcement responsibilities under its State hazardous waste program for violations of such program, but EPA retains its authority under RCRA sections 3007, 3008, 3013, and 7003, which include, among others, authority to:

    Do inspections, and require monitoring, tests, analyses or reports

    Enforce RCRA requirements and suspend or revoke permits

    Take enforcement actions regardless of whether the State has taken its own actions

    This action does not impose additional requirements on the regulated community because the regulations for which Florida is being authorized by today's action are already effective, and are not changed by today's action.

  4. Why Wasn't There a Proposed Rule Before Today's Rule?

    EPA did not publish a proposal before today's rule because we view this as a routine program change and do not expect comments that oppose this approval. We are providing an opportunity for public comment now. In addition to this rule, in the proposed rules section of today's Federal Register we are publishing a separate document that proposes to authorize the State program changes.

  5. What Happens if EPA Receives Comments That Oppose This Action?

    If EPA receives comments that oppose this authorization, we will withdraw this rule by publishing a document in the Federal Register before the rule becomes effective. EPA will base any further decision on the authorization of the State program changes on the proposal mentioned in the previous paragraph. We will then address all public comments in a later final rule. You may not have another opportunity to comment. If you want to comment on this authorization, you must do so at this time.

    If we receive comments that oppose only the authorization of a particular change to the State hazardous waste program, we will withdraw that part of this rule but the authorization of the program changes that the comments do not oppose will become effective on the date specified above. The Federal Register withdrawal document will specify which part of the authorization will become effective, and which part is being withdrawn.

  6. What Has Florida Previously Been Authorized for?

    Florida initially received Final authorization on January 29, 1985, effective February 12, 1985 (50 FR 3908), to implement the RCRA hazardous waste management program. We granted authorization for changes to their program on December 1, 1987, effective March 3, 1988 (52 FR 45634), December 16, 1988, effective January 3, 1989 (53 FR 50529), December 14, 1990, effective February 12, 1991 (55 FR 51416), February 5, 1992, effective April 6, 1992 (57 FR 4371), February 7, 1992, effective April 7, 1992 (57 FR 4738), May 20, 1992, effective July 20, 1992 (57 FR 21351), November 9, 1993, effective January 10, 1994, (58 FR 59367), July 11, 1994, effective September 9, 1994 (59 FR 35266), August 16, 1994, effective October 17, 1994 (59 41979), October 26, 1994, effective December 27, 1994 (59 FR 53753), April 1, 1997, effective June 2, 1997 (62 FR 15407), August 23, 2001, effective October 22, 2001 (66 FR 44307), August 20, 2002, effective October 21, 2002 (67 FR 53886 and 67 FR 53889). The authorized Florida program, through RCRA Cluster IV, was incorporated by reference into the CFR on January 20, 1998, effective March 23, 1998 (63 FR 2896). Florida received corrective action authority on September 18, 2000, effective November 18, 2000 (65 FR 56256).

  7. What Changes Are We Authorizing With Today's Action?

    Florida has submitted final complete program revision applications on seeking authorization of their changes in accordance with 40 CFR 271.21. Florida's revision consists of provisions promulgated July 1, 1997 through June 30, 1998 (RCRA Cluster VIII), July 1, 1998 through June 30, 1999 (RCRA IX), and July 1, 1999 through June 30, 2000, otherwise known as RCRA Cluster X. The rule adoption for RCRA Cluster VIII was effective on February 4, 2000. The rule adoption for RCRA Clusters IX and X was effective on December 20, 2000. Florida Statutes Chapter 403 allows the Florida Department of Environmental Protection to administer the rules

    [[Page 60966]]

    governing hazardous waste management in the state. We now make an immediate final decision, subject to receipt of written comments that oppose this action, that Florida's hazardous waste program revisions satisfy all of the requirements necessary to qualify for Final authorization. Therefore, we grant Florida Final authorization for the following program changes:

    Description of federal requirement

    Federal Register

    Analogous state authority

    Checklist 160, Land Disposal July 14, 1997

    Rule 62-730.183, Florida Administrative Code Restrictions Phase III-- 62 FR 37694-37699

    (F.A.C.). Emergency Extension of the K088 National Capacity Variance, Amendment. Checklist 161, Emergency August 28, 1997

    Rule 62-730.183, F.A.C. Revision of the Carbamate 62 FR 45568-45573 Land Disposal Restrictions. Checklist 163, Organic Air December 8, 1997

    Rules 62-730.180(1), 62-730.180(2), 62- Emission Standards for

    62 FR 64636-64671

    730.220(3) F.A.C. Tanks, Surface Impoundments, and Containers, Clarification and Technical Amendment. Checklist 164, Kraft Mill April 15, 1998

    Rule 62-730.030(1), F.A.C. Steam Stripper Condensate 63 FR 18504-18751 Exclusion. Checklist 167A, Land Disposal May 26, 1998

    Rule 62--730.183, F.A.C. Restrictions Phase IV-- 63 FR 28556-28753 Treatment Standards for Metal Wastes and Mineral Processing Wastes. Checklist 167C, Land Disposal May 26, 1998

    Rule 62-730.183, F.A.C. Restrictions Phase IV-

    62 FR 28556-28753 Corrections. Checklist 167E, Bevill

    May 26, 1998

    Rule 62-730.030(1), F.A.C. Exclusion Revisions and 63 FR 28556-28753 Clarifications. Checklist 168, Hazardous June 19, 1998

    Rules 62-730.030(1) and 62-730-220(3), F.A.C. Waste Combustors; Revised 63 FR 33782-33829 Standards. Checklist 169, Petroleum August 6, 1998

    Rules 62-730.030(1), 62-730.181(1), and 62- Refining Process Wastes. 63 FR 42110-42189

    730.183(1), F.A.C. Checklist 170, Land Disposal August 31, 1998

    Rule 62-730.183(1), F.A.C. Restrictions Phase IV--Zinc 63 FR 46332-46334 Micronutrient Fertilizers Amendments. Checklist 171, Emergency September 4, 1998

    Rule 62-730.183(1), F.A.C. Revision of the Land

    63 FR 47410-47418 Disposal Restrictions (LDR) Treatment Standards for Listed Hazardous Wastes from Carbamate Production. Checklist 172, Land Disposal September 9, 1998

    Rule 62-730.183(1), F.A.C. Restrictions Phase IV-- 63 FR 48124-48127 Extension of Compliance Date for Characteristic Slags. Checklist 173, Land Disposal September 24, 1998

    Rule 62-730.183(1), F.A.C. Restrictions; Treatment 63 FR 51254-51267 Standards for Spent Potliners from Primary Aluminum Reduction (K088); Final Rule. Checklist 174, Post-Closure October 22, 1998

    Rules 62-730.180(1), 62-730.180(2), 62- Permit and Closure Process. 63 FR 56710-56735

    730.220(3) F.A.C. Checklist 175, HWIR-Media.... November 30, 1998

    Rules 62-730.020(1), 62-730.030(1), 62- 63 FR 65874-65947

    730.180(1), 62-730.180(2), 62-730.183(1), 62- 730.220(3), F.A.C. Checklist 176, Universal December 24, 1998

    Rules 62-730.181(1), 62-730.185(1), F.A.C. Waste Rule--Technical

    63 FR 71225-71230 Amendments. Checklist 177, Organic Air January 21, 1999

    Rules 62-730.160(1), 62-730.180(1), 62- Emission Standards:

    64 FR 3382

    730.180(2), F.A.C Clarification and Technical Amendments. Checklist 179, Land Disposal May 11, 1999

    Rules 62-730.030(1), 62-730.160(1), 62- Restrictions Phase IV-- 64 FR 25408-25417

    730.183(1), F.A.C. Technical Corrections and Clarifications to Treatment Standards. Checklist 180, Test

    May 14, 1999

    Rule 62-730.021(1)(a), F.A.C. Procedures for the Analysis 64 FR 26315-26327 of Oil and Grease and Non- Polar Material. Checklist 183, Land Disposal October 20, 1999

    Rules 62-730.030(2), 62.730.160(1), 62- Restrictions Phase IV-- 64 FR 56469-56472

    730.183(2), F.A.C. Technical Corrections. Checklist 184, Accumulation March 8, 2000

    Rule 62-730.160(1), F.A.C. Time for Waste Water

    65 FR 12378-12398 Treatment Sludges. Checklist 185, Organobromine March 17, 2000

    Rules 62-730.030(2) 62-730.183(2), F.A.C. Production Wastes Vacatur. 65 FR 14472-14475 Checklist 187, Petroleum June 8, 2000

    Rules 62-730.030(2) 62-730.183(2), F.A.C. Refining Process Wastes-- 64 FR 36365-36367 Clarification.

  8. Where Are the Revised State Rules Different From the Federal Rules?

    Florida did not follow the April 9, 1999, vacatur issued by the U.S. Court of Appeals for the District of Columbia as it relates to the listing of organobromine production wastes at 40 CFR 268.40/Table ``Treatment Standards for Hazardous Wastes'' and 268.48(a)/Table Universal Treatment Standards (UTS). The State adopted the federal regulations as published in the May 26, 1998, rule in tables 40 CFR 268.40 and 268.48.

    1. Who Handles Permits After the Authorization Takes Effect?

    Florida will issue permits for all the provisions for which it is authorized and will administer the permits it issues. EPA will continue to administer any RCRA hazardous waste permits or portions of permits which we issued prior to the effective date of this authorization until they expire or are terminated. We will not issue any more new permits or new portions of permits for the provisions listed in the Table above after the effective date of this authorization. EPA will continue to implement and issue permits for HSWA requirements for which Florida is not yet authorized.

  9. What Is Codification and Is EPA Codifying Florida's Hazardous Waste Program as Authorized in This Rule?

    Codification is the process of placing the State's statutes and regulations that comprise the State's authorized hazardous waste program into the Code of Federal Regulations. We do this by referencing the authorized State rules in 40 CFR part 272. We reserve the amendment of 40 CFR part 272, subpart

    [[Page 60967]]

    L for this authorization of Florida's program changes until a later date.

  10. Administrative Requirements

    The Office of Management and Budget has exempted this action from the requirements of Executive Order 12866 (58 FR 51735, October 4, 1993), and therefore this action is not subject to review by OMB. This action authorizes State requirements for the purpose of RCRA 3006 and imposes no additional requirements beyond those imposed by State law. Accordingly, I certify that this action will not have a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.). Because this action authorizes pre-existing requirements under State law and does not impose any additional enforceable duty beyond that required by State law, it does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Public Law 104-4). For the same reason, this action also does not significantly or uniquely affect the communities of Tribal governments, as specified by Executive Order 13175 (65 FR 67249, November 9, 2000). This action will not have substantial direct effects on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government, as specified in Executive Order 13132 (64 FR 43255, August 10, 1999), because it merely authorizes State requirements as part of the State RCRA hazardous waste program without altering the relationship or the distribution of power and responsibilities established by RCRA. This action also is not subject to Executive Order 13045 (62 FR 19885, April 23, 1997), because it is not economically significant and it does not make decisions based on environmental health or safety risks. This rule is not subject to Executive Order 13211, ``Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use'' (66 FR 28355 (May 22, 2001)) because it is not a significant regulatory action under Executive Order 12866.

    Under RCRA 3006(b), EPA grants a State's application for authorization as long as the State meets the criteria required by RCRA. It would thus be inconsistent with applicable law for EPA, when it reviews a State authorization application, to require the use of any particular voluntary consensus standard in place of another standard that otherwise satisfies the requirements of RCRA. Thus, the requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) do not apply. As required by section 3 of Executive Order 12988 (61 FR 4729, February 7, 1996), in issuing this rule, EPA has taken the necessary steps to eliminate drafting errors and ambiguity, minimize potential litigation, and provide a clear legal standard for affected conduct. EPA has complied with Executive Order 12630 (53 FR 8859, March 15, 1988) by examining the takings implications of the rule in accordance with the ``Attorney General's Supplemental Guidelines for the Evaluation of Risk and Avoidance of Unanticipated Takings'' issued under the executive order. This rule does not impose an information collection burden under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).

    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this document and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication in the Federal Register. A major rule cannot take effect until 60 days after it is published in the Federal Register. This action is not a ``major rule'' as defined by 5 U.S.C. 804(2). This action will be effective December 13, 2004.

    List of Subjects in 40 CFR Part 271

    Environmental protection, Administrative practice and procedure, Confidential business information, Hazardous waste, Hazardous waste transportation, Indian lands, Intergovernmental relations, Penalties, Reporting and recordkeeping requirements.

    Authority: This action is issued under the authority of 42 U.S.C. 6912(a), 6926, 6974(b).

    Dated: March 26, 2004. A. Stanley Meiburg, Acting Regional Administrator, Region 4.

    [FR Doc. 04-22590 Filed 10-13-04; 8:45 am]

    BILLING CODE 6560-50-P

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT