Environmental Impact Statements; Availability, etc.: Small Wind Turbine, North Texas Job Corp Center, McKinney, TX

Federal Register: October 15, 2009 (Volume 74, Number 198)

Notices

Page 52978-52979

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

DOCID:fr15oc09-74

DEPARTMENT OF LABOR

Office of the Secretary

Job Corps: Preliminary Finding of No Significant Impact (FONSI) for the Installation of a Small Wind Turbine at the North Texas Job

Corps Center Located at 1701 North Church Street, McKinney, TX

AGENCY: Office of the Secretary, Department of Labor.

RECOVERY: This project will be wholly funded under the American

Recovery and Reconstruction Act of 2009.

ACTION: Preliminary Finding of No Significant Impact (FONSI) for a

Small Wind Turbine Installation to be located at the North Texas Job

Corps Center,

Page 52979

1701 North Church Street, McKinney, Texas.

SUMMARY: Pursuant to the Council on Environmental Quality Regulations

(40 CFR part 1500-08) implementing procedural provisions of the

National Environmental Policy Act (NEPA), the Department of Labor,

Office of the Secretary (OSEC) in accordance with 29 CFR 11.11(d), gives notice that an Environmental Assessment (EA) has been prepared for a proposed Wind Turbine Installation to be located at the North

Texas Job Corps Center, 1701 North Church Street, McKinney, Texas, and that the proposed plan for the construction of a wind turbine at the

North Texas Job Corps Center will have no significant environmental impact. This Preliminary Finding of No Significant Impact (FONSI) will be made available for public review and comment for a period of 30 days.

DATES: Comments must be submitted by November 16, 2009.

ADDRESSES: Any comment(s) are to be submitted to William A Dakshaw,

P.E., Division of Facilities and Asset Management, Department of Labor, 200 Constitution Avenue, NW., Room N-4460, Washington, DC 20210, (202) 693-2867 (this is not a toll-free number).

FOR FURTHER INFORMATION CONTACT: Copies of the EA are available to interested parties by contacting William A Dakshaw, P.E., Division of

Facilities and Asset Management, Department of Labor, 200 Constitution

Avenue, NW., Room N-4460, Washington, DC 20210, (202) 693-2867 (this is not a toll-free number).

SUPPLEMENTARY INFORMATION: This EA summary addresses the proposed construction of a single 50 kW rated wind turbine at the North Texas

Job Corps Center.

The wind turbine will be installed on self-supporting towers approximately 120' above the ground. The wind turbine will produce clean energy for the North Texas Job Corps center, demonstrate renewable energy capabilities to Job Corps Students and help the program meet federal requirements in Executive Order 13423 for renewable energy production.

This project is not expected to have a negative impact on population demographics, the surrounding area, environmental quality, or natural systems and heritage.

Based on the information gathered during the preparation of the EA, the construction of the Wind Turbine Installation at the North Texas

Job Corps Center, 1701 North Church Street, McKinney, Texas will not create any significant adverse impacts on the environment.

Dated: October 7, 2009.

Lynn Intrepidi,

Interim National Director of Job Corps.

FR Doc. E9-24749 Filed 10-14-09; 8:45 am

BILLING CODE 4510-23-P

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT