Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act

Federal Register, Volume 83 Issue 105 (Thursday, May 31, 2018)

Federal Register Volume 83, Number 105 (Thursday, May 31, 2018)

Notices

Page 24983

From the Federal Register Online via the Government Publishing Office www.gpo.gov

FR Doc No: 2018-11701

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Certification Notice--252

Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act

AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of Filing.

-----------------------------------------------------------------------

SUMMARY: On April 25, 2018, Birdsboro Power LLC, as owner and operator of a new baseload electric generating powerplant, submitted a coal capability self-certification to the Department of Energy (DOE). The FUA and regulations thereunder require DOE to publish a notice of filing of self-certification in the Federal Register.

ADDRESSES: Copies of coal capability self-certification filings are available for public inspection, upon request, in the Office of Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G-

024, Forrestal Building, 1000 Independence Avenue SW, Washington, DC 20585.

FOR FURTHER INFORMATION CONTACT: Christopher Lawrence at (202) 586-

5260.

SUPPLEMENTARY INFORMATION: On April 25, 2018, Birdsboro Power LLC, as owner and operator of a new baseload electric generating powerplant, submitted a coal capability self-certification to the Department of Energy (DOE) pursuant to Sec. 201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE regulations in 10 CFR 501.60, 61. The FUA and regulations thereunder require DOE to publish a notice of filing of self-certification in the Federal Register. 42 U.S.C. 8311(d)(1) and 10 CFR 501.61(c). Title II of FUA, as amended (42 U.S.C. 8301 et seq.), provides that no new baseload powerplant may be constructed or operated without the capability to use coal or another alternate fuel as a primary energy source. Pursuant to the FUA, in order to meet the requirement of coal capability, the owner or operator of such a facility proposing to use natural gas or petroleum as its primary energy source shall certify to the Secretary of Energy (Secretary), prior to construction or prior to operation as a baseload powerplant, that such powerplant has the capability to use coal or another alternate fuel. Such certification establishes compliance with FUA section 201(a) as of the date it is filed with the Secretary. 42 U.S.C. 8311.

The following owner of a proposed new baseload electric generating powerplant has filed a self-certification of coal-capability with DOE pursuant to FUA section 201(d) and in accordance with DOE regulations in 10 CFR 501.60, 61:

Owner: Birdsboro Power LLC

Capacity: 525 megawatts (MW)

Plant Location: Birdsboro, Berks County, PA

In-Service Date: Expected in approximately April 2019

Issued in Washington, DC, on May 24, 2018.

Christopher Lawrence,

Electricity Policy Analyst, Office of Electricity Delivery and Energy Reliability.

FR Doc. 2018-11701 Filed 5-30-18; 8:45 am

BILLING CODE 6450-01-P

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT