Notice of Quarterly Report (October 1, 2013-December 31, 2014)

Federal Register, Volume 81 Issue 196 (Tuesday, October 11, 2016)

Federal Register Volume 81, Number 196 (Tuesday, October 11, 2016)

Notices

Pages 70139-70171

From the Federal Register Online via the Government Publishing Office www.gpo.gov

FR Doc No: 2016-24512

Page 70139

=======================================================================

-----------------------------------------------------------------------

MILLENNIUM CHALLENGE CORPORATION

MCC FR 16-07

Notice of Quarterly Report (October 1, 2013--December 31, 2014)

AGENCY: Millennium Challenge Corporation.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for the fiscal year (FY) quarters October 1, 2013 to December 31, 2014, on assistance provided under section 605 of the Millennium Challenge Act of 2003 (22 U.S.C. 7701 et seq.), as amended (the Act), and on transfers or allocations of funds to other federal agencies under section 619(b) of the Act. The following report will be made available to the public by publication in the Federal Register and on the Internet Web site of the MCC (www.mcc.gov) in accordance with section 612(b) of the Act.

Dated: October 5, 2016.

Sarah E. Fandell,

VP/General Counsel and Corporate Secretary, Millennium Challenge Corporation.

As used in MCC's disclosures under section 605 of the Act:

``Total Obligation'' for listed Compacts includes both ``Compact Implementation Funding'' under section 609(g) of the Act as well as funding under section 605 of the Act.

``Disbursements'' are cash outlays rather than expenditures.

``Measures'' are the same Key Performance Indicators that MCC reports each quarter. The Key Performance Indicators may change over time to more accurately reflect compact implementation progress. The unit for these measures is ``a number of'' unless otherwise indicated.

``Program Administration and Control'' funds are used to pay items such as salaries, rent, and the cost of office equipment, as well as audit and oversight agent fees.

``Pending Subsequent Reports'' amounts represent disbursements made to the Compact permitted account that will be allocated to individual projects in subsequent quarters and reported as such in subsequent quarterly reports. The ``Cumulative Disbursements'' amount for ``Pending Subsequent Reports'' represents the balance of such outlays remaining at the end of the reporting period.

Closed Compacts do not have any quarterly disbursements; however, they are included in the report if deobligations took place during the reporting period. Closed Compacts include: Armenia, Benin I, Burkina Faso, Cabo Verde I, El Salvador I, Georgia I, Ghana I, Honduras, Lesotho I, Madagascar, Mali, Mongolia I, Morocco I, Mozambique, Namibia, Nicaragua, Tanzania and Vanuatu.

Unless otherwise indicated, all programs and projects were solicited.

605 Assistance--Disbursements

In United States dollars

--------------------------------------------------------------------------------------------------------------------------------------------------------

Total FY 2014 FY 2014 FY 2014 FY 2014 FY 2015 Cumulative

Entity provided assistance Program/project name obligation Quarter 1 Quarter 2 Quarter 3 Quarter 4 Quarter 1 disbursements

--------------------------------------------------------------------------------------------------------------------------------------------------------

Burkina Faso....................... Agriculture Project... 141,510,059 11,393,735 9,790,338 15,405,386 8,402,118 3,324,525 140,420,941

Bright 2 School 26,840,570 0 0 0 0 0 26,840,570

Project.

Land Tenure Project... 58,434,615 3,975,944 5,654,577 7,801,917 9,865,824 3,447,221 58,244,614

Monitoring and 7,880,000 424,223 242,078 67,134 437,447 191,644 4,669,395

Evaluation.

Pending Subsequent 0 -507,539 484,451 453,947 -754,421 -180,104 363,539

Report.

Program Administration 49,758,545 2,404,048 1,718,737 2,052,781 2,175,099 2,480,361 48,345,809

and Control.

Roads Project......... 194,530,681 13,041,011 24,609,125 31,397,256 29,573,406 17,544,857 193,891,857

--------------------------------------------------------------------------------------------------------------------

Total Burkina Faso.... 478,954,470 30,731,422 42,499,307 57,178,420 49,699,473 26,808,504 472,776,725

--------------------------------------------------------------------------------------------------------------------------------------------------------

Cabo Verde II...................... Land Management For 17,260,000 615,975 559,468 333,731 490,929 259,147 3,268,991

Investment Projects.

Monitoring and 1,390,000 566 -1,481 10,220 11,150 10,735 36,765

Evaluation.

Pending Subsequent 0 69,969 -62,154 22,752 -11,104 6,032 25,495

Report.

Program Administration 7,850,000 258,835 349,255 320,156 343,206 270,631 2,841,607

and Control.

Water, Sanitation and 39,730,000 501,339 200,358 678,551 898,674 1,267,782 4,050,504

Hygiene Project.

--------------------------------------------------------------------------------------------------------------------

Total Cabo Verde II... 66,230,000 1,446,684 1,045,446 1,365,409 1,732,856 1,814,326 10,223,361

--------------------------------------------------------------------------------------------------------------------------------------------------------

El Salvador II..................... Business Development 3,300,000 0 0 0 0 0 0

Services.

Human Capital Project. 900,000 0 0 0 0 0 0

Infrastructure Project 1,500,000 0 0 0 0 0 0

Monitoring and 400,000 0 0 0 0 0 0

Evaluation.

Pending Subsequent 0 0 0 0 0 0 0

Report.

Program Administration 3,900,000 0 0 0 0 0 0

and Control.

--------------------------------------------------------------------------------------------------------------------

Total El Salvador II.. 10,000,000 0 0 0 0 0 0

--------------------------------------------------------------------------------------------------------------------------------------------------------

Georgia II......................... Education Project..... 76,500,000 44,290 159,933 140,131 1,294 331,945 677,594

Monitoring and 3,500,000 0 0 0 0 0 0

Evaluation.

Pending Subsequent 0 209,055 -77,780 177,616 51,163 -320,798 39,256

Report.

Program Administration 14,000,000 505,624 407,151 334,171 391,417 736,270 2,374,633

and Control.

Tertiary Education 30,000,000 431,731 388,954 199,789 1,463,627 1,532,985 4,017,085

Project.

Vocational Education 16,000,000 0 0 0 0 69,300 69,300

Project.

--------------------------------------------------------------------------------------------------------------------

Total Georgia II...... 140,000,000 1,190,700 878,258 851,707 1,907,501 2,349,702 7,177,868

--------------------------------------------------------------------------------------------------------------------------------------------------------

Ghana.............................. Administrative........ 0 0 0 0 0 0 0

Agriculture Project... 188,731,530 -407,393 0 407,393 -180,293 0 188,731,530

Infrastructure Project 0 0 0 0 0 0 0

Monitoring and 6,941,811 0 0 0 0 0 6,941,811

Evaluation.

Pending Subsequent 0 3,700,000 0 -3,700,000 0 0 0

Report.

Program Administration 36,874,551 0 0 0 1 0 36,874,550

and Control.

Rural Development 76,030,565 0 0 0 127,291 0 76,030,565

Project.

Page 70140

Transportation Project 227,710,512 -3,292,608 0 3,292,608 53,000 0 227,710,512

--------------------------------------------------------------------------------------------------------------------

Total Ghana........... 536,288,969 0 0 0 0 0 536,288,968

--------------------------------------------------------------------------------------------------------------------------------------------------------

Ghana II........................... Access to Electricity 700,000 0 0 0 0 0 0

Project.

Energy Efficiency and 0 0 0 0 0 0 0

Demand Side

Management Project.

Financial and 7,600,800 0 0 0 0 0 0

Operational

Turnaround

(Electricity Company

of Ghana 1).

Financial and 3,529,000 0 0 0 0 0 0

Operational

Turnaround (Northern

Electricity

Distribution Company).

Financial and 0 0 0 0 0 0 0

Operational

Turnaround

(Electricity Company

of Ghana 2).

Monitoring and 1,510,000 0 0 0 0 0 0

Evaluation.

Pending Subsequent 0 0 0 0 0 0 0

Report.

Power Generation 4,854,800 0 0 0 0 0 0

Sector Improvement

Project.

Program Administration 7,455,400 0 0 0 0 0 0

and Control.

Regulatory 3,250,000 0 0 0 0 0 0

Strengthening and

Capacity Building

Project.

--------------------------------------------------------------------------------------------------------------------

Total Ghana II........ 28,900,000 0 0 0 0 0 0

--------------------------------------------------------------------------------------------------------------------------------------------------------

Indonesia.......................... Community Nutrition 129,500,000 5,335 36,978 181,792 253,944 11,822,595 34,759,317

Project.

Green Prosperity 332,500,000 34,962 62,580 66,609 141,356 777,506 1,182,494

Project.

Monitoring and 12,200,000 0 0 0 0 720,664 720,664

Evaluation.

Pending Subsequent 0 317,285 -120,503 377,840 -174,359 256,222 729,754

Report.

Procurement 50,000,000 351,912 341,260 471,128 816,074 1,925,931 4,009,914

Modernization Project.

Program Administration 75,800,000 1,402,143 1,512,095 1,954,049 2,499,064 2,322,534 13,595,118

and Control.

--------------------------------------------------------------------------------------------------------------------

Total Indonesia....... 600,000,000 2,111,637 1,832,410 3,051,419 3,536,080 17,825,452 54,997,260

--------------------------------------------------------------------------------------------------------------------------------------------------------

Jordan............................. Expansion of 97,120,950 15,128,511 11,768,335 940,143 9,282,359 1,248,335 76,116,031

Wastewater Treatment

Capacity.

Monitoring and 2,809,894 21,610 28,847 219,805 21,662 21,675 375,783

Evaluation.

Pending Subsequent 0 -35,119 4,053 -5,097 23,043 3,021 34,447

Report.

Program Administration 19,650,805 386,135 467,561 429,410 490,247 575,135 4,326,590

and Control.

Wastewater Collection. 66,989,225 3,532,261 2,768,093 3,419,241 5,502,460 4,992,258 32,752,377

Water Network 88,529,127 3,669,481 4,160,537 2,180,324 3,954,905 6,103,494 24,484,800

Restructuring and

Rehabilitation.

--------------------------------------------------------------------------------------------------------------------

Total Jordan.......... 275,100,000 22,702,880 19,197,425 7,183,826 19,274,676 12,943,918 138,090,029

--------------------------------------------------------------------------------------------------------------------------------------------------------

Lesotho............................ Capacity Building..... 0 0 0 0 0 0 0

Civil/Legal Sector 0 0 0 0 0 0 0

Support.

Health Sector Project. 143,650,195 15,919,722 -753,987 23,881 0 0 143,650,195

Land Tenure Project... 0 0 0 0 0 0 0

Monitoring and 5,500,728 256,974 181,013 0 0 0 5,500,728

Evaluation.

Pending Subsequent 0 -199,501 1 -12,942 0 0 0

Report.

Private Sector 24,162,433 1,986,028 0 0 0 0 24,162,433

Development Project.

Procurement and 0 0 0 0 0 0 0

Administration.

Program Administration 34,918,925 2,188,853 101,302 -10,939 0 0 34,918,925

and Control.

Water Sector Project.. 149,813,612 14,004,878 -1 0 0 0 149,813,612

--------------------------------------------------------------------------------------------------------------------

Total Lesotho......... 358,045,892 34,156,953 -471,671 0 0 0 358,045,892

--------------------------------------------------------------------------------------------------------------------------------------------------------

Malawi............................. Gender Integration 0 0 0 0 0 0 0

Project.

Monitoring and 6,960,100 35,880 143,520 0 0 1,131 186,464

Evaluation.

Natural Resource 28,026,000 213,866 91,018 379,585 300,685 10,819 995,972

Management Project.

Pending Subsequent 0 248,392 -180,088 -11,041 45,236 -6,728 250,859

Report.

Power Project......... 255,648,800 572,012 134,447 1,035,243 2,253,940 1,735,978 5,731,621

Power Sector Reform 25,553,400 221,705 249,385 724,681 718,116 1,335,602 3,472,531

Project.

Program Administration 34,511,700 1,027,028 1,383,181 2,356,867 1,627,106 1,629,994 9,346,909

and Control.

Total Malawi.......... 350,700,000 2,318,884 1,821,463 4,485,335 4,945,082 4,706,796 19,984,357

Mali............................... Alatona Irrigation 252,895,691 0 0 0 0 0 252,895,69

Project.

Bamako-Senou Airport 143,371,915 0 0 0 -31,476 0 143,371,915

Improvement Project.

Industrial Park 2,637,472 0 0 0 0 0 2,637,472

Project.

Monitoring and 1,688,026 0 0 0 0 0 1,688,027

Evaluation.

Pending Subsequent 0 0 0 0 0 0 0

Report.

Program Administration 35,003,642 0 0 0 0 0 35,003,642

and Control.

--------------------------------------------------------------------------------------------------------------------

Total Mali............ 435,596,747 0 0 0 -31,476 0 435,596,747

--------------------------------------------------------------------------------------------------------------------------------------------------------

Moldova............................ Monitoring and 3,538,930 213,834 63,212 382,519 220,343 14,623 1,634,272

Evaluation.

Page 70141

Pending Subsequent 0 -118,059 199,517 810,446 -293,684 -594,765 134,081

Report.

Program Administration 23,247,668 1,223,387 813,895 832,821 836,381 905,775 13,680,202

and Control.

Road Rehabilitation 112,390,000 20,756,036 2,755,131 11,349,069 14,836,137 21,216,346 101,421,448

Project.

Transition To High 122,823,402 9,798,457 4,753,661 15,362,042 10,226,080 12,254,189 72,924,459

Value Agriculture

Project.

--------------------------------------------------------------------------------------------------------------------

Total Moldova......... 262,000,000 31,873,654 8,585,415 28,736,897 25,825,256 33,796,167 189,794,463

--------------------------------------------------------------------------------------------------------------------------------------------------------

Mongolia........................... Energy and 40,420,819 275,302 14,282 17,246 0 0 40,420,819

Environmental Project.

Health Project........ 41,873,775 3,261,083 18,608 0 0 0 41,873,776

Monitoring and 5,085,246 392,984 0 0 0 0 5,085,246

Evaluation.

Pending Subsequent 0 -615,790 -57,984 0 0 0 0

Report.

Program Administration 28,610,318 1,328,261 662,064 149,507 -74,754 0 28,610,318

and Control.

Property Rights 28,543,830 318,125 20,212 0 0 0 28,543,830

Project.

Rail Project.......... 369,560 0 0 0 0 0 369,560

Roads Project......... 74,775,867 6,147,460 4,236 0 0 0 74,775,867

Vocational Education 49,322,727 111,456 17,530 0 0 0 49,322,727

Project.

--------------------------------------------------------------------------------------------------------------------

Total Mongolia........ 269,002,143 11,218,881 678,948 166,754 -74,754 0 269,002,143

--------------------------------------------------------------------------------------------------------------------------------------------------------

Morocco............................ Artisan and Fez Medina 84,019,666 15,726,838 -323,055 329,816 0 0 84,019,666

Project.

Enterprise Support 15,126,518 3,211 49 0 0 0 15,126,518

Project.

Financial 0 0 0 0 0 0 0

Accountability.

Financial Services 42,817,020 1,928,094 0 0 0 0 42,817,020

Project.

Fruit Tree 324,163,440 30,388,407 1 0 0 0 323,369,991

Productivity Project.

Monitoring and 16,255,526 2,789,915 0 0 0 0 16,255,526

Evaluation.

Pending Subsequent 0 -1,053,506 -136,770 -46,373 0 0 0

Report.

Program Administration 56,500,517 3,891,292 -18 26,022 0 0 56,500,517

and Control.

Rural Development 0 0 0 0 0 0 0

Project.

Small-Scale Fisheries 111,281,204 18,507,220 310,950 -309,465 0 0 111,281,204

Project.

Transportation Project 0 0 0 0 0 0 0

--------------------------------------------------------------------------------------------------------------------

Total Morocco......... 650,163,890 72,181,470 -148,843 0 0 0 649,370,442

--------------------------------------------------------------------------------------------------------------------------------------------------------

Mozambique......................... Farmer Income Support 18,857,349 1,855,435 19,893 0 0 0 18,857,349

Project.

Land Tenure Project... 39,466,421 3,668,233 -31,999 0 0 0 39,466,421

Monitoring and 4,073,077 851,699 21,760 0 0 0 4,073,077

Evaluation.

Pending Subsequent 0 -2,837,741 -3,115,537 -46,329 0 0 0

Report.

Program Administration 48,483,703 6,187,513 1,870,307 46,329 706,997 0 48,483,703

and Control.

Rehabilitation/ 136,802,301 17,844,298 95,729 0 0 0 136,802,301

Construction Of Roads

Project.

Water Supply and 200,221,661 23,300,256 2,150,510 0 0 0 200,221,661

Sanitation Project.

--------------------------------------------------------------------------------------------------------------------

Total Mozambique...... 447,904,512 50,869,694 1,010,662 0 706,997 0 447,904,512

--------------------------------------------------------------------------------------------------------------------------------------------------------

Namibia............................ Agriculture Project... 51,439,139 3,092,659 4,301,409 3,858,573 2,064,357 2,237,463 50,029,275

Education Project..... 141,886,916 12,286,634 8,956,394 9,803,025 13,032,538 4,370,143 137,237,213

Monitoring and 6,886,182 84,364 290,198 632,806 672,659 773,743 6,415,390

Evaluation.

Pending Subsequent 0 1,676,086 -516,092 -7,268,389 310,960 646,860 3,716,700

Report.

Program Administration 35,789,383 1,665,196 1,235,533 1,423,372 1,598,913 3,994,297 33,365,598

and Control.

Rural Development 0 0 0 0 0 0 0

Project.

Tourism Project....... 68,475,842 4,619,357 5,669,962 11,283,451 10,496,386 6,288,359 65,464,315

--------------------------------------------------------------------------------------------------------------------

Total Namibia......... 304,477,463 23,424,296 19,937,405 19,732,839 28,175,814 18,310,864 296,228,491

--------------------------------------------------------------------------------------------------------------------------------------------------------

Philippines........................ Community Development 120,000,000 4,129,561 7,696,771 7,155,121 7,748,991 7,125,483 75,901,515

Grants Project.

KALAHI-CIDSS Project.. 0 0 0 0 0 0 0

Monitoring and 8,207,000 173,308 135,260 99,022 139,294 168,264 2,027,532

Evaluation.

Pending Subsequent 0 2,111,447 21,877 -1,617,650 911,404 -1,092,558 5,058,482

Report.

Program Administration 36,910,000 1,060,649 1,075,900 1,114,616 1,113,703 1,468,306 14,398,261

and Control.

Revenue Administration 54,300,000 55,909 1,125,801 2,645,058 875,506 1,116,814 11,666,358

Reform Project.

Roads Project......... 214,493,000 7,517,140 3,797,637 8,678,866 16,632,689 10,530,412 95,566,371

--------------------------------------------------------------------------------------------------------------------

Total Philippines..... 433,910,000 15,048,013 13,853,246 18,075,033 27,421,587 19,316,721 204,618,519

--------------------------------------------------------------------------------------------------------------------------------------------------------

Senegal............................ Demand Assessment..... 0 0 0 0 0 0 0

Irrigation............ 170,341,171 8,082,655 16,444,544 19,022,475 12,166,091 15,456,116 100,655,919

Land Tenure Project... 0 0 0 0 0 0 0

Monitoring and 3,757,500 16,716 28,420 24,849 41,683 128,216 774,411

Evaluation.

Pending Subsequent 0 -719,147 166,031 -535,530 249,080 22,606 568,061

Report.

Pre-Feasibility and 0 0 0 0 0 0 0

Feasibility Analysis.

Program Administration 41,188,830 1,212,154 1,243,739 1,768,298 1,290,872 1,433,630 20,493,819

and Control.

Roads Project......... 324,712,499 10,925,884 16,542,582 25,570,082 17,326,600 24,658,251 135,713,053

--------------------------------------------------------------------------------------------------------------------

Total Senegal......... 540,000,000 19,518,262 34,425,315 45,850,174 31,074,326 41,698,818 258,205,264

--------------------------------------------------------------------------------------------------------------------------------------------------------

Page 70142

Tanzania........................... Energy Sector Project. 199,461,627 22,613,285 0 0 0 0 199,461,627

Monitoring and 4,632,363 387,554 0 0 0 0 4,632,363

Evaluation.

Pending Subsequent 0 0 0 0 0 0 0

Report.

Program 30,480,760 1,631,748 10,372 0 0 0 30,480,760

Administration and

Control.

Transport Sector 405,402,512 44,755,778 0 0 0 0 405,402,512

Project.

Water Sector Project.. 54,568,652 5,093,064 0 0 0 0 54,568,652

--------------------------------------------------------------------------------------------------------------------

Total Tanzania........ 694,545,914 74,481,428 10,372 0 0 0 694,545,914

--------------------------------------------------------------------------------------------------------------------------------------------------------

Zambia............................. Infrastructure Project 0 0 0 0 0 0 0

Monitoring and 5,841,000 0 6,843 1,268 0 0 25,999

Evaluation.

Pending Subsequent 0 -17,617 18,233 58,777 6,634 7,788 110,436

Report.

Program Administration 38,823,951 1,716,377 1,050,630 1,612,473 1,673,344 1,928,332 10,096,838

and Control.

Water Supply and 8,137,125 0 0 -1,324,821 0 1,205,107 8,017,411

Sanitation Project.

Water Supply, 301,955,564 62,473 80,042 173,719 529,434 322,397 1,456,503

Sanitation and

Drainage Project.

--------------------------------------------------------------------------------------------------------------------

Total Zambia.......... 354,757,640 1,761,233 1,155,748 521,417 2,209,413 3,463,624 19,707,186

--------------------------------------------------------------------------------------------------------------------------------------------------------

605 Assistance--Measures

--------------------------------------------------------------------------------------------------------------------------------------------------------

FY 2014 FY 2015

Country Objectives ---------------------------------------------------------------------------------------------------

Quarter 1 Quarter 2 Quarter 3 Quarter 4 Quarter 1

--------------------------------------------------------------------------------------------------------------------------------------------------------

Burkina Faso.................... Agriculture Hectares of new Hectares of new Hectares of new Hectares of new

Development perimeter perimeter perimeter perimeter

Project development in Di. development in Di. development in Di. development in Di.

Objectives: Responsible Responsible Responsible Responsible

Expanded members of Water members of Water members of Water members of Water

productive use of User Associations User Associations User Associations User Associations

land in order to trained in the trained in the trained in the trained in the

increase the Sourou. Sourou. Sourou. Sourou.

volume and value Farmers trained... Farmers trained... Farmers trained... Farmers trained...

of agricultural Farmers who have Farmers who have Farmers who have Farmers who have

production in applied improved applied improved applied improved applied improved

Project Zones. practices as a practices as a practices as a practices as a

result of result of result of result of

training. training. training. training.

Local water Local water Local water Local water

committees committees committees committees

established and established and established and established and

operational in operational in operational in operational in

the Comoeacute the Comoeacute the Comoeacute the Comoeacute

and Mouhoun. and Mouhoun. and Mouhoun. and Mouhoun.

Basin Water Basin Water Basin Water Basin Water

Resources Resources Resources Resources

Development and Development and Development and Development and

Management Master Management Master Management Master Management Master

Plan developed Plan developed Plan developed Plan developed

and validated. and validated. and validated. and validated.

Hectares under Hectares under Hectares under Hectares under

improved improved improved improved

practices as a practices as a practices as a practices as a

result of result of result of result of

training. training. training. training.

BRIGHT II School Percent of girls Percent of girls Percent of girls Percent of girls

Project regularly regularly regularly regularly

Objectives: attending (90 attending (90 attending (90 attending (90

Increased primary percent percent percent percent

school completion attendance) attendance) attendance) attendance)

rates for girls. BRIGHT II schools. BRIGHT II schools. BRIGHT II schools. BRIGHT II schools.

Girls promotion Girls promotion Girls promotion Girls promotion

rates to next rates to next rates to next rates to next

grade in BRIGHT grade in BRIGHT grade in BRIGHT grade in BRIGHT

II schools. II schools. II schools. II schools.

Percent of girls Percent of girls Percent of girls Percent of girls

dropping out of dropping out of dropping out of dropping out of

school. school. school. school.

Page 70143

Percent of girls Percent of girls Percent of girls Percent of girls

passing the passing the passing the passing the

annual Primary annual Primary annual Primary annual Primary

Certificate exam Certificate exam Certificate exam Certificate exam

in BRIGHT II in BRIGHT II in BRIGHT II in BRIGHT II

schools. schools. schools. schools.

Students enrolled Students enrolled Students enrolled Students enrolled

in BRIGHT II in BRIGHT II in BRIGHT II in BRIGHT II

schools (both schools (both schools (both schools (both

girls and boys). girls and boys). girls and boys). girls and boys).

Land Tenure Stakeholders Stakeholders Stakeholders Stakeholders

Project trained. trained. trained. trained.

Objectives: Rural hectares Rural hectares Rural hectares Rural hectares

Increased formalized in the formalized in the formalized in the formalized in the

investment in new zone of Di, new zone of Di, new zone of Di, new zone of Di,

land and rural targeted under targeted under targeted under targeted under

productivity the Agriculture the Agriculture the Agriculture the Agriculture

through improved Development Development Development Development

land tenure project. project. project. project.

security and land Land Land Land Land

management. administration administration administration administration

offices offices offices offices

established or established or established or established or

upgraded. upgraded. upgraded. upgraded.

Municipal Municipal Municipal Municipal

buildings buildings buildings buildings

constructed. constructed. constructed. constructed.

Rural land Rural and Rural land Rural land ..................

possession possession possession possession

certificates certificates certificates certificates

approved by the approved by the approved by the approved by the

local government. local government. local government. local government.

Land conflicts Land conflicts Land conflicts Land conflicts ..................

recorded in the recorded in the recorded in the recorded in the

17 communes of 17 communes of 17 communes of 17 communes of

phase I of the phase I of the phase I of the phase I of the

Rural Land Rural Land Rural Land Rural Land

Governance Governance Governance Governance

project. project. project. project.

Land resolved in Land resolved in Land resolved in Land resolved in ..................

the 17 communes the 17 communes the 17 communes the 17 communes

of Phase I of the of Phase I of the of Phase I of the of Phase I of the

Rural Land Rural Land Rural Land Rural Land

Governance Governance Governance Governance

project. project. project. project.

Roads Project Periodic road Periodic road Periodic road Periodic road

Objectives: maintenance maintenance maintenance maintenance

Enhanced access coverage rate coverage rate coverage rate coverage rate

to markets (for all funds) (for all funds) (for all funds) (for all funds)

through (percent). (percent). (percent). (percent).

investments in Kilometers of Kilometers of Kilometers of Kilometers of

the road network. primary roads primary roads primary roads primary roads

completed. completed. completed. completed.

Percent disbursed Percent disbursed Percent disbursed Percent disbursed ..................

of road of road of road of road

construction construction construction construction

contracts contracts contracts contracts

(primary roads). (primary roads). (primary roads). (primary roads).

Kilometers of Kilometers of Kilometers of Kilometers of ..................

rural roads rural roads rural roads rural roads

completed. completed. completed. completed.

Percent disbursed Percent disbursed Percent disbursed Percent disbursed ..................

of road of road of road of road

construction construction construction construction

contracts (rural contracts (rural contracts (rural contracts (rural

roads). roads). roads). roads).

Page 70144

Cabo Verde II................... Land Management Legal and Legal and Legal and Legal and Legal and

for Investment regulatory regulatory regulatory regulatory regulatory

Projects reforms adopted. reforms adopted. reforms adopted. reforms adopted. reforms adopted.

Objectives: Field test of Field test of Field test of Field test of Field test of

Increased ``Fieldwork ``Fieldwork ``Fieldwork ``Fieldwork ``Fieldwork

investments in Operations Operations Operations Operations Operations

and value of Manual'' and Manual'' and Manual'' and Manual'' and Manual'' and

property; methodology methodology methodology methodology methodology

improved ease of completed on Sal. completed on Sal. completed on Sal. completed on Sal. completed on Sal.

doing business; Stakeholders Stakeholders Stakeholders Stakeholders

increased receiving formal receiving formal receiving formal receiving formal

investments and on-the-job on-the-job on-the-job on-the-job

value added in training or training or training or training or

tourism; technical technical technical technical

increased assistance assistance assistance assistance

employment. regarding roles, regarding roles, regarding roles, regarding roles,

responsibilities responsibilities responsibilities responsibilities

or new or new or new or new

technologies. technologies. technologies. technologies.

Percent of

targeted surface

area on target

island (Sal)

incorporated into

the Land

Management

Information and

Transaction

System (LMITS).

Households in

intervention

island(s) of high

tourism

investment

potential with

land rights

formalized

through project.

Parcels corrected

or incorporated

in land system.

Land

administration

offices

established or

upgraded.

Adoption of

``Operations

Manual'' for the

Rights and

Boundaries

Activity

fieldwork in full

force and effect.

Page 70145

Water, Sanitation, Value of implicit Value of implicit Value of implicit Value of implicit Value of implicit

and Hygiene subsidy reduction subsidy reduction subsidy reduction subsidy reduction subsidy reduction

Project (U.S. dollars). (U.S. dollars). (U.S. dollars). (U.S. dollars). (U.S. dollars).

Objectives: Operating cost Operating cost Operating cost Operating cost Operating cost

Increased access coverage coverage coverage coverage coverage

to improved water (percent). (percent). (percent). (percent). (percent).

and sanitation; Service coverage Service coverage Service coverage Service coverage Service coverage

reduced household by corporatized by corporatized by corporatized by corporatized by corporatized

costs for water; utilities utilities utilities utilities utilities

reduced incidence (percent). (percent). (percent). (percent). (percent).

of waterborne Continuity of Continuity of Continuity of Continuity of Continuity of

disease; improved service (hours/ service (hours/ service (hours/ service (hours/ service (hours/

capital day). day). day). day). day).

accumulation; Objective measure Objective measure Objective measure Objective measure Objective measure

increase of water quality of water quality of water quality of water quality of water quality

productive (percent. (percent. (percent. (percent. (percent).

government Non-revenue water Non-revenue water Non-revenue water Non-revenue water Non-revenue water

spending. for Multiple for Multiple for Multiple for Multiple for Multiple

Municipal Utility/ Municipal Utility/ Municipal Utility/ Municipal Utility/ Municipal Utility/

utilities utilities utilities utilities utilities

(percent). (percent). (percent). (percent). (percent).

Value of signed Value of signed Value of signed Value of signed Value of signed

water and water and water and water and water and

sanitation sanitation sanitation sanitation sanitation

construction construction construction construction construction

contracts. contracts. contracts. contracts. works contracts.

Percent disbursed Percent disbursed Percent disbursed Percent disbursed Percent disbursed

of water and of water and of water and of water and of water and

sanitation sanitation sanitation sanitation sanitation

construction construction construction construction construction

contracts. contracts. contracts. contracts. works contracts.

Strategic National Strategic National Strategic National Strategic National Strategic National

Master Plan and Master Plan and Master Plan and Master Plan and Master Plan and

Strategic Strategic Strategic Strategic Strategic

Environmental and Environmental and Environmental and Environmental and Environmental and

Social Assessment Social Assessment Social Assessment Social Assessment Social Assessment

approved by approved by approved by approved by approved by

appropriate appropriate appropriate appropriate appropriate

authorities. authorities. authorities. authorities. authorities.

Value of signed Value of signed Value of signed Value of signed Value of signed

water and water and water and water and water and

sanitation sanitation sanitation sanitation sanitation

feasibility and feasibility and feasibility and feasibility and feasibility and

design contracts. design contracts. design contracts. design contracts. design contracts.

Percent disbursed Percent disbursed Percent disbursed Percent disbursed Percent disbursed

of water and of water and of water and of water and of water and

sanitation sanitation sanitation sanitation sanitation

feasibility and feasibility and feasibility and feasibility and feasibility and

design contracts. design contracts. design contracts. design contracts. design contracts.

Percent disbursed Percent disbursed Percent disbursed Percent disbursed Percent disbursed

of technical of technical of technical of technical of technical

advisory services advisory services advisory services advisory services advisory services

and training and training and training and training and training

contracts in contracts in contracts in contracts in contracts in

support of the support of the support of the support of the support of the

Water, Sanitation Water, Sanitation Water, Sanitation Water, Sanitation Water, Sanitation

and Hygiene and Hygiene and Hygiene and Hygiene and Hygiene

Project. Project. Project. Project. Project.

Value disbursed of Value disbursed of Value disbursed of Value disbursed of Value disbursed of

Infrastructure Infrastructure Infrastructure Infrastructure Infrastructure

Grant Facility Grant Facility Grant Facility Grant Facility Grant Facility

Social Funds for Social Funds for Social Funds for Social Funds for Social Funds for

disadvantaged disadvantaged disadvantaged disadvantaged disadvantaged

groups and/or groups and/or groups and/or groups and/or groups and/or

poor households. poor households. poor households. poor households. poor households.

Page 70146

Value of all Value of all

signed technical signed technical

advisory services advisory services

and training and training

contracts in contracts in

support of the support of the

Water, Sanitation Water, Sanitation

and Hygiene and Hygiene

Project. Project.

Collection Ratio.

Multiple municipal

utilities staff

per 1,000 potable

water

connections.

El Salvador II.................. Business Measures pending.. Measures pending.. Measures pending.. Measures pending.. Measures pending.

Development

Services.

Human Capital

Project.

Infrastructure

Project.

Georgia II...................... Education Project. Measures pending.. Measures pending.. Measures pending.. Measures pending.. Schools fully

rehabilitated.

Science labs

installed and

equipped.

Percent disbursed

of educational

facility

construction,

rehabilitation,

and equipping

contracts.

School-based

professional

development

facilitators

trained.

School principals

trained.

Science, math,

English, and

information and

communication

technology

teachers trained.

Completion of

teacher training

design framework.

International

assessments

completed

Completion of

pilot testing of

national

assessment

instruments.

Vocational Measures pending.. Measures pending.. Measures pending.. Measures pending.. Students

Education Project. participating in

MCC-supported

Technical

Vocational

Education and

Training (TVET)

programs.

Industry co-

investment in

TVET provision.

Page 70147

Date first grant

agreement is

signed.

Total grant

outlays.

Tertiary Education Measures pending.. Measures pending.. Measures pending.. Measures pending.. Students enrolled

Project. in MCC-supported

U.S. bachelor's

programs.

First cohort of

students enter

MCC-funded

science,

technology,

engineering and

math bachelor's

program.

Signing of

partnership

agreement between

the Government of

Georgia and

university

partner.

Georgian partner

university

faculty members

receiving

training from

U.S. partner

institution.

Ghana II........................ Access to Measures pending.. Measures pending.. Measures pending.. Measures pending.. Measures pending.

Electricity

Project.

Energy Efficiency

and Demand Side

Management

Project.

Power Generation

Sector

Improvement

Project.

Regulatory

Strengthening and

Capacity Building

Project.

Indonesia....................... Community Value of Generasi Value of Generasi Value of Generasi Value of Generasi Value of Generasi

Nutrition Project block grants block grants block grants block grants block grants

Objectives: funded. funded. funded. funded. funded.

Reduce and

prevent low birth

weight and

childhood

stunting and

malnourishment of

children in

project areas,

and to increase

household income

through cost

savings,

productivity

growth and higher

lifetime earnings.

Service providers Service providers Service providers Service providers Service providers Service providers

trained on infant trained on infant trained on infant trained on infant trained on infant trained on

and young child and young child and young child and young child and young child mother, infant

feeding. feeding. feeding. feeding. feeding. and young child

feeding.

Page 70148

Communications Communications Communications Communications Communications Date

Campaign design Campaign design Campaign design Campaign design Campaign design Communications

complete. complete. complete. complete. complete. Campaign design

complete.

Micro-nutrient Micro-nutrient Micro-nutrient Micro-nutrient Micro-nutrient Micro-nutrient

packages packages packages packages packages packages

delivered (Iron delivered (Iron delivered (Iron delivered (Iron delivered (Iron delivered (Iron

Folic) (millions). Folic) (millions). Folic) (millions). Folic) (millions). Folic) (millions). Folic).

Micro-nutrient Micro-nutrient Micro-nutrient Micro-nutrient Micro-nutrient

packages packages packages packages packages

delivered delivered delivered delivered delivered

(Taburia) (Taburia) (Taburia) (Taburia) (Taburia).

(millions). (millions). (millions). (millions).

Generasi proposals Generasi proposals Generasi proposals Generasi proposals

Generasi Generasi Generasi Generasi

facilitators facilitators facilitators facilitators

trained on trained on trained on trained on

stunting and stunting and stunting and stunting and

gender. gender. gender. gender.

Sanitation

triggering

events.

Service providers

trained on growth

monitoring.

Green Prosperity Signed memoranda Signed memoranda Signed memoranda Signed memoranda Signed memoranda

Project of understanding of understanding of understanding of understanding of understanding

Objectives: between the between the between the between the between the

Increase Indonesia Indonesia Indonesia Indonesia Indonesia

productivity and accountable accountable accountable accountable accountable

reduce reliance entity and entity and entity and entity and entity and

on fossil fuels districts. districts. districts. districts. districts.

by expanding Green Knowledge Green Knowledge Green Knowledge Green Knowledge Green Knowledge

renewable energy; work plan work plan work plan work plan work plan

and Increase completed. completed. completed. completed. completed.

productivity and Financial service Financial service Financial service Financial service

reduce land-based provider provider provider provider

greenhouse gas partnerships partnerships partnerships partnerships

emissions by established (loan established (loan established (loan established (loan

improving land agreement). agreement). agreement). agreement).

use practices and Financial service Financial service Financial service Financial service

management of provider provider provider provider

natural resources. partnerships partnerships partnerships partnerships

established established established established

(grant (grant (grant (grant

partnerships). partnerships). partnerships). partnerships).

Financial service Financial service Financial service Financial service

provider provider provider provider

partnerships partnerships partnerships partnerships

established established established established

(grant managers). (grant managers). (grant managers). (grant managers).

Project financing Project financing Project financing Project financing

approved by the approved by the approved by the approved by the

Green Prosperity Green Prosperity Green Prosperity Green Prosperity

Finance Facility. Finance Facility. Finance Facility. Finance Facility.

Formal district Formal district Formal district Formal district

adoption of adoption of adoption of adoption of

guidelines for guidelines for guidelines for guidelines for

participatory participatory participatory participatory

village boundary village boundary village boundary village boundary

setting. setting. setting. setting.

Financial service Financial service Financial service Financial service

provider provider provider provider

partnerships partnerships partnerships partnerships

established established established established

(implementing (implementing (implementing (implementing

entity entity entity entity

agreements). agreements). agreements). agreements).

Page 70149

Project funds Project funds Project funds Project funds

disbursed by the disbursed by the disbursed by the disbursed by the

Technical Technical Technical Technical

Assistance and Assistance and Assistance and Assistance and

Oversight Oversight Oversight Oversight

Activity Activity Activity Activity

(percent). (percent). (percent). (percent).

Hectares targeted

for improved

practices for

sustainable

agriculture

(including agro-

forestry) as a

result of Green

Prosperity-funded

projects and/or

partnerships.

Hectares targeted

for protection

through Green

Prosperity-funded

projects and/or

partnerships.

Additional

capacity of

renewable energy

planned.

Grant agreements

approved by Green

Prosperity

Finance Facility.

Villages assisted

in participatory

boundary setting.

District land use,

land cover, and

permits and

licenses

inventories

created.

Proposals that

receive project

preparation

support.

Procurement Procurement Procurement Procurement Procurement Procurement

Modernization management management management management management

Project information information information information information

Objectives: system adopted. system adopted. system adopted. system adopted. system adopted

Achieve Creation of Creation of Creation of Creation of (Phase I).

significant sustainable sustainable sustainable sustainable Date the

government procurement procurement procurement procurement sustainable

expenditure policy National policy National policy National policy National procurement

savings on Action Plan. Action Plan. Action Plan. Action Plan. policy National

procured goods Framework Framework Framework Framework Action Plan

and services, agreements signed agreements signed agreements signed agreements signed endorsed.

while assuring and catalogued. and catalogued. and catalogued. and catalogued.

their quality Procurement Procurement Procurement Procurement

satisfies the Service Unit Service Unit Service Unit Service Unit

public need, and staff trained. staff trained. staff trained. staff trained.

to achieve the Creation of public Creation of public Creation of public Creation of public

delivery of private private private private

public services partnership partnership partnership partnership

as planned. standard bidding standard bidding standard bidding standard bidding

documents. documents. documents. documents.

Date e-catalogue

system

established.

Mentor visits

conducted.

Page 70150

Hours of training

conducted.

Jordan.......................... Expansion Of Treated wastewater Treated wastewater Treated wastewater Treated wastewater Treated wastewater

Wastewater used in used in used in used in used in

Treatment agriculture (as a agriculture (as a agriculture (as a agriculture (as a agriculture (as a

Capacity percent of all percent of all percent of all percent of all percent of all

Objectives: water used for water used for water used for water used for water used for

Increase the irrigation in irrigation in irrigation in irrigation in irrigation in

volume of treated Northern and Northern and Northern and Northern and Northern and

wastewater Middle Jordan Middle Jordan Middle Jordan Middle Jordan Middle Jordan

available as a Valley). Valley). Valley). Valley). Valley).

substitute for Value disbursed of Value disbursed of Value disbursed of Value disbursed of Value disbursed of

freshwater in construction construction construction construction construction

agricultural use. contracts; MCC contracts; MCC contracts; MCC contracts; MCC contracts; MCC

contribution. contribution. contribution. contribution. contribution.

Total engineering, Total engineering, Total engineering, Total engineering, Total engineering,

procurement, and procurement, and procurement, and procurement, and procurement, and

construction construction construction construction construction

costs of As-Samra costs of As-Samra costs of As-Samra costs of As-Samra costs of As-Samra

Expansion. Expansion. Expansion. Expansion. Expansion.

Wastewater Sewer blockage Sewer blockage Sewer blockage Sewer blockage Sewer blockage

Collection events; annual. events; annual. events; annual. events; annual. events; annual.

Objectives: Volume of Volume of Volume of Volume of Volume of

Increase access wastewater wastewater wastewater wastewater wastewater

to the wastewater collected; collected; collected; collected; collected;

network, increase (millions of (millions of (millions of (millions of (millions of

the volume of cubic meters per cubic meters per cubic meters per cubic meters per cubic meters per

wastewater year). year). year). year). year).

collected and Residential Residential Residential Residential Residential

reduce the population population population population population

incidents of connected to the connected to the connected to the connected to the connected to the

sewage overflow. sewer system sewer system sewer system sewer system sewer system

(percent). (percent). (percent). (percent). (percent).

Expand network Expand network Expand network Expand network Expand network

(kilometers). (kilometers). (kilometers). (kilometers). (kilometers).

Value disbursed of Value disbursed of Value disbursed of Value disbursed of Value disbursed of

sanitation sanitation sanitation sanitation sanitation

construction construction construction construction construction

contracts. contracts. contracts. contracts. contracts.

Water Network Network water Network water Network water Network water Network water

Restructuring and consumption per consumption per consumption per consumption per consumption per

Rehabilitation capita capita capita capita capita

Objectives: (residential and (residential and (residential and (residential and (residential and

Reduce water non-residential); non-residential); non-residential); non-residential); non-residential);

losses, improve liters/capita/day. liters/capita/day. liters/capita/day. liters/capita/day. liters/capita/

continuity of Operating cost Operating cost Operating cost Operating cost day.

water service and coverage--Water coverage--Water coverage--Water coverage--Water Operating cost

improve overall Authority Jordan Authority Jordan Authority Jordan Authority Jordan coverage--Water

efficiency and Zarqa. Zarqa. Zarqa. Zarqa. Authority Jordan

use of network Non-Revenue Water Non-Revenue Water Non-Revenue Water Non-Revenue Water Zarqa.

water delivery (percent). (percent). (percent). (percent). Non-Revenue Water

leading to Continuity of Continuity of Continuity of Continuity of (percent).

households Supply time; Supply time; Supply time; Supply time; Continuity of

substituting hours per week. hours per week. hours per week. hours per week. Supply time;

network water for Restructured and Restructured and Restructured and Restructured and hours per week.

costly rehabilitated rehabilitated rehabilitated rehabilitated Restructured and

alternatives. primary and primary and primary and primary and rehabilitated

secondary secondary secondary secondary primary and

pipelines pipelines pipelines pipelines secondary

(kilometers). (kilometers). (kilometers). (kilometers). pipelines

(kilometers).

Restructured and Restructured and Restructured and Restructured and Restructured and

rehabilitated rehabilitated rehabilitated rehabilitated rehabilitated

tertiary tertiary tertiary tertiary tertiary

pipelines pipelines pipelines pipelines pipelines

(kilometers). (kilometers). (kilometers). (kilometers). (kilometers).

Page 70151

Value disbursed of Value disbursed of Value disbursed of Value disbursed of Value disbursed of

water water water water water

construction construction construction construction construction

contracts--Infras contracts--Infras contracts--Infras contracts--Infras contracts--Water

tructure Activity tructure Activity tructure Activity tructure Activity Network Project.

and Water Smart and Water Smart and Water Smart and Water Smart

Homes Activity. Homes Activity. Homes Activity. Homes Activity.

National Aid Fund National Aid Fund National Aid Fund National Aid Fund National Aid Fund

households with households with households with households with households with

improved water improved water improved water improved water improved water

and wastewater and wastewater and wastewater and wastewater and wastewater

network. network. network. network. network.

National Aid Fund National Aid Fund National Aid Fund National Aid Fund National Aid Fund

households households households households households

connected to the connected to the connected to the connected to the connected to the

wastewater wastewater wastewater wastewater wastewater

network as a network as a network as a network as a network as a

result of the result of the result of the result of the result of the

Water Smart Homes Water Smart Homes Water Smart Homes Water Smart Homes Water Smart Homes

Activity. Activity. Activity. Activity. Activity.

Lesotho......................... Health Sector Deliveries Compact closed.... Compact closed.... Compact closed.... Compact closed.

Project conducted in

Objectives: health centers

Increase access (percent).

to life-extending People with HIV

anti-retroviral still alive 12

treatment and months after

essential health initiation of

services by treatment

providing a (percent).

sustainable Tuberculosis

delivery platform. notifications

(per 100,000

population).

Health centers

equipped

(percent).

Physical

completion of

health center

facilities

(percent).

Physical

completion of

Outpatient

Departments

(percent).

Physical

completion of the

Botsabelo

facilities

(percent).

Private Sector Debit/smart cards Compact closed.... Compact closed.... Compact closed.... Compact closed.

Development issued.

Project Bonds registered..

Objectives: Change in time for

Stimulate property

investment by transactions

improving access (percent).

to credit, Urban land parcels

reducing regularized and

transaction costs registered.

and increasing Stakeholders

the participation trained.

of women in the Time required to

economy. resolve

commercial

disputes (days).

Cases filed at the

commercial court.

Page 70152

Women holding

titles to land.

People trained....

Water Sector Physical Compact closed.... Compact closed.... Compact closed.... Compact closed.

Project completion of

Objectives: Metolong water

Improve the water treatment works

supply for contract

industrial and (percent).

domestic needs, Households with

and enhance rural provisions to

livelihoods connect to water

through improved networks.

watershed Non-revenue water

management. (percent).

Physical

completion of

Urban Water

supply works

contracts

(percent).

Ventilated

improved pit

latrines built.

Water points

constructed.

Malawi.......................... Natural Resource Value of signed Value of signed Value of signed Value of signed Value of signed

Management weed and sediment weed and sediment weed and sediment weed and sediment weed and sediment

Project management management management management management

Objectives: activity activity activity activity activity

Increase contracts. contracts. contracts. contracts. contracts.

efficiency of Distribution of Distribution of Distribution of Distribution of

hydropower invasive aquatic invasive aquatic invasive aquatic invasive aquatic

generation. species (cubic species (cubic species (cubic species (cubic

kilometers). kilometers). kilometers). kilometers).

Amount of weed Amount of weed Amount of weed Amount of weed ..................

harvested at harvested at harvested at harvested at

Liwonde barrage Liwonde barrage Liwonde barrage Liwonde barrage

(metric tons). (metric tons). (metric tons). (metric tons).

Grant agreements

in place with

civil society and

private sector

service

providers.

Value of signed

Environmental and

Natural Resource

Management &

Social and Gender

Assessment

project

contracts.

Power Project Percent disbursed Percent disbursed Percent disbursed Percent disbursed Percent disbursed

Objectives: of feasibility of feasibility of feasibility of feasibility of feasibility

Improve the and design and design and design and design and design

availability, contracts. contracts. contracts. contracts. contracts.

reliability and Average duration Average duration Average duration Average duration

quality of the of outages/ of outages/ of outages/ of outages/

power supply by interruptions interruptions interruptions interruptions

increasing the (hours). (hours). (hours). (hours).

throughput Average frequency Average frequency Average frequency Average frequency

capacity and of forced outages/ of forced outages/ of forced outages/ of forced outages/

stability of the Interruptions Interruptions Interruptions Interruptions

national (ratio). (ratio). (ratio). (ratio).

electricity grid.

Page 70153

Average frequency Average frequency Average frequency

of forced outages/ of forced outages/ of forced outages/

Interruptions Interruptions Interruptions

(ratio). (ratio). (ratio).

Value of signed

power

infrastructure

construction

contracts.

Power Sector Cost recovery Cost recovery Cost recovery Cost recovery

Reform Project ratio--operating ratio--operating ratio--operating ratio--operating

Objectives: expenses expenses expenses expenses

Create an (percent). (percent). (percent). (percent).

enabling Debt- equity ratio Debt- equity ratio Debt- equity ratio Debt- equity ratio

environment for Average creditor Average Average Average

future expansion days. collections collections collections

by strengthening period (days). period (days). period (days).

sector

institutions and

enhancing

regulation and

governance of the

sector.

Electricity Supply

Corporation of

Malawi

Maintenance

Expenditures

ratio to planned

maintenance

budget.

Bad Debt.

Approved tariff

levels and

schedules

(actual) (U.S.

cents/kilowatt

hour).

Tariff levels and Tariff levels and Tariff levels and Tariff levels and

schedules (U.S. schedules (U.S. schedules (U.S. schedules (U.S.

cents/kilowatt cents/kilowatt cents/kilowatt cents/kilowatt

hour). hour). hour). hour).

Moldova......................... Road Reduced cost for Reduced cost for Reduced cost for Reduced cost for Reduced cost for

Rehabilitation road users. road users. road users. road users. road users.

Project Average annual Average annual Average annual Average annual Average annual

Objectives: daily traffic. daily traffic. daily traffic. daily traffic. daily traffic.

Enhance Road maintenance Road maintenance Road maintenance Road maintenance Road maintenance

transportation expenditure. expenditure. expenditure. expenditure. expenditure.

conditions.

Kilometers of Kilometers of Kilometers of Kilometers of Kilometers of

roads completed. roads completed. roads completed. roads completed. roads completed.

Percent of Percent of Percent of Percent of Percent of

contracted roads contracted roads contracted roads contracted roads contracted roads

works disbursed. works disbursed. works disbursed. works disbursed. works disbursed.

Road safety Road safety Road safety Road safety Road safety

training for training for training for training for training for

children (number children (number children (number children (number children (number

of children). of children). of children). of children). of children).

Date Resettlement Date Resettlement Date Resettlement Date Resettlement Date Resettlement

Action Plan Action Plan Action Plan Action Plan Action Plan

completed. completed. completed. completed. completed.

Trafficking in Trafficking in Trafficking in Trafficking in Trafficking in

persons training persons training persons training persons training persons training

participants. participants. participants. participants. participants.

Roughness (meters

per kilometer).

Page 70154

Temporary

employment

generated in road

construction

(number

employed).

Hectares under Hectares under Hectares under Hectares under Hectares under

improved or new improved or new improved or new improved or new improved or new

irrigation. irrigation. irrigation. irrigation. irrigation.

Centralized Centralized Centralized Centralized Centralized

irrigation irrigation irrigation irrigation irrigation

systems systems systems systems systems

rehabilitated. rehabilitated. rehabilitated. rehabilitated. rehabilitated.

Percent disbursed Percent disbursed Percent disbursed Percent disbursed Percent disbursed

of irrigation of irrigation of irrigation of irrigation of irrigation

construction construction construction construction construction

contracts. contracts. contracts. contracts. contracts.

Management Management Management Management Management

transfer transfer transfer transfer transfer

agreements signed. agreements signed. agreements signed. agreements signed. agreements

signed.

New high value New high value New high value New high value New high value

agriculture agriculture agriculture agriculture agriculture

infrastructure in infrastructure in infrastructure in infrastructure in infrastructure in

place (metric place (metric place (metric place (metric place (metric

tons). tons). tons). tons). tons).

Loans past due.... Loans past due.... Loans past due.... Loans past due.... Loans past due.

Value of Value of Value of Value of Value of

agricultural and agricultural and agricultural and agricultural and agricultural and

rural loans. rural loans. rural loans. rural loans. rural loans.

Loan borrowers.... Loan borrowers.... Loan borrowers.... Loan borrowers.... Loan borrowers.

Loan borrowers Loan borrowers Loan borrowers Loan borrowers Loan borrowers

(female). (female). (female). (female). (female).

Value of sales Value of sales Value of sales Value of sales Value of sales

facilitated. facilitated. facilitated. facilitated. facilitated.

Farmers who have Farmers who have Farmers who have Farmers who have Farmers who have

applied improved applied improved applied improved applied improved applied improved

practices as a practices as a practices as a practices as a practices as a

result of result of result of result of result of

training. training. training. training. training.

Farmers trained... Farmers trained... Farmers trained... Farmers trained... Farmers trained.

Farmers trained Farmers trained Farmers trained Farmers trained Farmers trained

(female). (female). (female). (female). (female).

Enterprises Enterprises Enterprises Enterprises Enterprises

assisted. assisted. assisted. assisted. assisted.

Enterprises Enterprises Enterprises Enterprises Enterprises

assisted (female). assisted (female). assisted (female). assisted (female). assisted

(female).

Water user Water user Water user Water user

associations associations associations associations

achieving achieving achieving achieving

financial financial financial financial

sustainability. sustainability. sustainability. sustainability.

Transition To High Value of signed Value of signed Value of signed Value of signed Value of signed

Value Agriculture irrigation irrigation irrigation irrigation irrigation

Project construction construction construction construction construction

Objectives: contracts. contracts. contracts. contracts. contracts.

Increase incomes Date Revised Legal Date Revised Legal Date Revised Legal Date Revised Legal Date Revised Legal

in the Water Management Water Management Water Management Water Management Water Management

agricultural Framework passed. Framework passed. Framework passed. Framework passed. Framework passed.

sector; Create Water user Water user Water user Water user Water user

models for associations with associations with associations with associations with associations with

transition to active and active and active and active and active and

high value representative representative representative representative representative

agriculture (HVA) governance. governance. governance. governance. governance.

in CIS areas and Water user Water user Water user Water user Water user

an enabling associations with associations with associations with associations with associations with

environment gender-balanced gender-balanced gender-balanced gender-balanced gender-balanced

(legal, financial management and management and management and management and management and

and market) for governance. governance. governance. governance. governance.

replication.

Page 70155

Enterprises that Enterprises that Enterprises that Enterprises that Enterprises that

have applied have applied have applied have applied have applied

improved improved improved improved improved

techniques. techniques. techniques. techniques. techniques.

Percent disbursed Percent disbursed Percent disbursed Percent disbursed Percent disbursed

of irrigation of irrigation of irrigation of irrigation of irrigation

feasibility and feasibility and feasibility and feasibility and feasibility and

design contracts. design contracts. design contracts. design contracts. design contracts.

Value of signed Value of signed Value of signed Value of signed Value of signed

irrigation irrigation irrigation irrigation irrigation

feasibility and feasibility and feasibility and feasibility and feasibility and

design contracts. design contracts. design contracts. design contracts. design contracts.

Temporary

employment

generated in

irrigation.

The Central

Phytosanitary Lab

is certified.

Mongolia........................ Energy and Heat-only boilers Compact closed.... Compact closed.... Compact closed.... Compact closed.

Environmental sites upgraded.

Project Subsidized stoves

Objectives: sold..

Increased wealth Power dispatched

and productivity from substation

through greater (millions of

fuel use kilowatt hours)..

efficiency and

decreasing health

costs from air

pollution in

Ulaanbaatar.

Health Project Amount of civil Compact closed.... Compact closed.... Compact closed.... Compact closed.

Objectives: society grants

Reduce the risk (U.S. dollars).

of premature Cervical cancer

death and cases detected

disability from early (percent).

NCDs and traffic Screening for

injuries. hypertension

(percent).

School teachers

trained.

Health staff

trained.

Primary healthcare

facilities with

non-communicable

disease services

(percent).

Property Rights Wells completed...

Project

Objectives:

Increase the

security and

capitalization of

land assets held

by lower-income

Mongolians, and

increase peri-

urban herder

productivity and

incomes.

Page 70156

Stakeholders Compact closed.... Compact closed.... Compact closed.... Compact closed.

trained.

Leases awarded....

Project herder

groups limiting

their livestock

population to the

carrying capacity

of their leases

on farms in 3

central aimags

(Ulaanbaatar,

Darkhan and

Erdenet)

(percent).

Official cost

prescribed for

property

transactions

(first-time)

(U.S. dollars).

Household with

land rights

formalized.

Legal and

regulatory

reforms adopted.

Stakeholders

trained.

Roads Project Kilometers of Compact closed.... Compact closed.... Compact closed.... Compact closed.

Objectives: More roads completed.

efficient Kilometers of

transport for roads under

trade and access design.

to services.

Percent disbursed

of road

construction

contracts.

Technical Students Compact closed.... Compact closed.... Compact closed.... Compact closed.

Vocational participating in

Education Project MCC-supported

Objectives: education

Increase activities.

employment and Public-private

income among partnership

unemployed and funding

underemployed contributed to

Mongolians. Technical

Vocational

Education and

Training (TVET)

schools (percent).

Educational

facilities

constructed or

rehabilitated.

Instructors

trained.

Page 70157

Morocco......................... Artisan and Fez Total receiving Compact closed.... Compact closed.... Compact closed.... Compact closed.

Medina Project literacy training.

Objectives: Graduates of MCC-

Increase revenue supported

from cultural and functional

artisan literacy program

activities, and (female).

improve Graduates of MCC-

educational and supported

professional functional

qualifications of literacy program

compact (male).

beneficiaries. Total receiving

professional

training.

Females receiving

professional

training.

Graduates of

vocational

training program

(residential,

apprenticeship

and continuing

education).

Drop-out rates of

participants of

residential and

apprenticeship

programs

(percent).

Potters trained...

MCC-subsidized gas

kilns bought by

artisans.

Adoption rate of

improved

production

practices

promoted by the

project (percent).

Tourist circuits

improved or

created.

Small and medium

enterprises

(SMEs) that

append the label

on their products.

SMEs participating

in promotion

events.

Sites constructed

or rehabilitated

(4 foundouks,

Place Lalla

Ydouna, Ain

Nokbi).

Beneficiaries of

Ain Nokbi

construction and

artisan

resettlement

program.

Page 70158

Enterprise Support Reduction in SME Compact closed.... Compact closed.... Compact closed.... Compact closed.

Project mortality

Objectives: (treatment firms

Improve the with respect to

outcomes of the control firms)

Moukawalati and one year after

National support

Initiative for completion

Human Development (percent).

programs by Days of individual

increasing the coaching.

viability of Beneficiaries

young enterprises trained.

created through

these programs.

Financial Services Value of loan Compact closed.... Compact closed.... Compact closed.... Compact closed.

Project agreements

Objectives: between

Improve micro- microcredit

enterprise associations and

services and Jaida (millions

remove most of Moroccan

severe dirhams).

constraints to Microfinance

the development institutions'

of the portfolio at risk

microfinance at 30 days

sector based on (percent).

market principals. Value of loans

granted through

mobile branches

(U.S. dollars).

Clients reached

through mobile

branches.

Value of loan

disbursements to

Jaida (U.S.

dollars).

Fruit Tree Area planted and Compact closed.... Compact closed.... Compact closed.... Compact closed.

Productivity delivered to

Project farmers

Objectives: (hectares).

Stimulate growth Area in expansion

in the perimeters for

agricultural which water and

sector and reduce soil conservation

the volatility of measures have

agricultural been implemented

production by (hectares).

restructuring Cumulative area of

farming from irrigated

grains towards perimeters

fruit tree rehabilitated

cultivation. (hectares).

Yield of

rehabilitated

olive trees in

irrigated areas

(metric tons per

hectare).

Average

agricultural

revenue per farm

in oasis areas

(U.S. dollars).

Page 70159

Hectares under

improved

irrigation.

Yield of

rehabilitated

date palms in

oasis areas

(metric tons per

hectare).

In vitro seedlings

successfully

planted.

Farmers trained

(in all areas

targeted by the

project).

Catalyst Fund

proposals

approved.

Disbursements

under the

catalyst fund

(U.S. dollars).

Small-Scale Boats benefitting Compact closed.... Compact closed.... Compact closed.... Compact closed.

Fisheries Project from landing

Objectives: sites and ports.

Supported by Artisan fishers

modern landing- who received a

site training

infrastructure, certificate.

equipment and Average price of

storage fish at auction

facilities, markets (Moroccan

develop value- dirhams per

chain activities kilogram).

related to the Work days created

fishing industry for construction

encouraging jobs in landing

greater access to sites, ports, and

national and wholesale market

international sites.

markets, while Active mobile fish

improving the vendors trained

fish quality and and equipped by

preserving the project.

resources.

Net annual income

of mobile fish

vendors (U.S.

dollars).

Mozambique...................... Farmer Income Survival rate of Compact closed.... Compact closed.... Compact closed.... Compact closed.

Support Project coconut seedlings

Objectives: To (percent).

protect and Coconut seedlings

restore income planted.

from coconuts and Farmers trained in

their derivatives surveillance and

and expand pest and disease

farmers' control for

productive coconuts.

capacity through Farmers trained in

income planting and post

diversification.. planting

management of

coconuts.

Hectares of

alternative crops

under production.

Page 70160

Farmers trained in

alternative crop

production and

productivity

enhancing

strategies.

Farmers using

alternative crop

production and

productivity

enhancing

strategies

(percent).

Businesses

receiving

Business

Development Fund

grants.

Land Tenure People trained Compact closed.... Compact closed.... Compact closed.... Compact closed.

Project (paralegal

Objectives: courses at Legal

Establish and Judicial

efficient and Training Centre,

secure land general training

access for at National

households, Directorate for

communities, and Land and

investors. Forestry, etc.).

Land

administration

offices

established or

upgraded.

Land tenure

regularization

(LTR) urban

parcels mapped.

LTR land use

property rights

certificates

(DUATs) delivered

to the urban

beneficiaries.

LTR rural hectares

mapped.

LTR DUATs

delivered to the

rural

beneficiaries.

Community Land

Fund rural

hectares

formalized.

Community Land

Fund communities

land areas mapped.

Rehabilitation/ Percent of roads Compact closed.... Compact closed.... Compact closed.... Compact closed.

Construction of works contracts

Roads Project disbursed.

Objectives: To Kilometers of

increase access roads issued take-

to productive over certificates.

resources and

markets while

reducing

associated

transport costs.

Page 70161

Water Supply and Value of municipal Compact closed.... Compact closed.... Compact closed.... Compact closed.

Sanitation sanitation and

Project drainage systems

Objectives: To construction

increase access contracts signed.

to reliable Amount disbursed

sources of for municipal

potable water sanitation and

supply in urban drainage

and rural areas construction

and improved contracts.

sanitation in Value of contracts

urban and peri- signed for

urban areas. construction of

water systems.

Percent of revised

construction

contract

disbursed for

water systems.

Rural water points

constructed.

Percent of rural

population of the

six intervention

districts with

access to

improved water

sources.

Amount disbursed

for rural water

points

construction

contracts (U.S.

dollars).

Persons trained in

hygiene and

sanitary best

practices.

Namibia......................... Agriculture Participating Participating Participating Participating Participating

Project households households households households households

Objectives: registered in the registered in the registered in the registered in the registered in the

Enhance the Community-Based Community-Based Community-Based Community-Based Community-Based

health and Rangeland and Rangeland and Rangeland and Rangeland and Rangeland and

marketing Livestock Livestock Livestock Livestock Livestock

efficiency of Management sub- Management sub- Management sub- Management sub- Management sub-

livestock in the activity. activity. activity. activity. activity.

Northern Communal Grazing areas with Grazing areas with Grazing areas with Grazing areas with Grazing areas with

Areas of Namibia documented documented documented documented documented

and to increase combined combined combined combined combined

income from management plans. management plans. management plans. management plans. management plans.

indigenous Parcels corrected Parcels corrected Parcels corrected Parcels corrected Parcels corrected

natural products or incorporated or incorporated or incorporated or incorporated or incorporated

accruing to the in land system. in land system. in land system. in land system. in land system.

poor nationwide.

Stakeholders Stakeholders Stakeholders Stakeholders Stakeholders

trained. trained. trained. trained. trained.

Cattle tagged with Cattle tagged with Cattle tagged with Cattle tagged with Cattle tagged with

RFID tags. RFID tags. RFID tags. RFID tags. RFID tags.

Value of grant Value of grant Value of grant Value of grant Value of grant

agreements signed agreements signed agreements signed agreements signed agreements signed

under the under the under the under the under the

Livestock Livestock Livestock Livestock Livestock

Efficiency Fund. Efficiency Fund. Efficiency Fund. Efficiency Fund. Efficiency Fund.

Farmers trained... Farmers trained... Farmers trained... Farmers trained... Farmers trained.

Page 70162

Payment to Payment to Payment to Payment to Payment to

producers from producers from producers from producers from producers from

Indigenous Indigenous Indigenous Indigenous Indigenous

Natural Products Natural Products Natural Products Natural Products Natural Products

sales. sales. sales. sales. sales.

Grazing areas Grazing areas Grazing areas Grazing areas Grazing areas

doing combined doing combined doing combined doing combined doing combined

herding. herding. herding. herding. herding.

Legal and Legal and Legal and Legal and Legal and

regulatory regulatory regulatory regulatory regulatory

reforms adopted. reforms adopted. reforms adopted. reforms adopted. reforms adopted.

New state New state New state New state New state

veterinary veterinary veterinary veterinary veterinary

offices offices offices offices offices

operational. operational. operational. operational. operational.

Education Project Learners (any Learners (any Learners (any Learners (any Learners (any

Objectives: level) level) level) level) level)

Improve the participating in participating in participating in participating in participating in

quality of the the 47 schools the 47 schools the 47 schools the 47 schools the 47 schools

workforce in sub-activity. sub-activity. sub-activity. sub-activity. sub-activity.

Namibia by Educational Educational Educational Educational Educational

enhancing the facilities facilities facilities facilities facilities

equity and constructed, constructed, constructed, constructed, constructed,

effectiveness of rehabilitated, rehabilitated, rehabilitated, rehabilitated, rehabilitated,

basic vocational, equipped in the equipped in the equipped in the equipped in the equipped in the

and tertiary 47 schools 47 schools 47 schools 47 schools 47 schools

education and of subhyphenactivi subhyphenactivi subhyphenactivi subhyphenactivi subhyphenactivi

technical skills. ty. ty. ty. ty. ty.

Textbooks Textbooks Textbooks Textbooks Textbooks

delivered. delivered. delivered. delivered. delivered.

Educators trained Educators trained Educators trained Educators trained Educators trained

to be textbook to be textbook to be textbook to be textbook to be textbook

management management management management management

trainers. trainers. trainers. trainers. trainers.

Educators trained Educators trained Educators trained Educators trained Educators trained

to be textbook to be textbook to be textbook to be textbook to be textbook

utilization utilization utilization utilization utilization

trainers. trainers. trainers. trainers. trainers.

Visits to Namibia Visits to Namibia Visits to Namibia Visits to Namibia Visits to Namibia

accountable accountable accountable accountable accountable

entity assisted entity assisted entity assisted entity assisted entity assisted

regional study regional study regional study regional study regional study

and resource and resource and resource and resource and resource

centers. centers. centers. centers. centers.

Compliance rate Compliance rate Compliance rate Compliance rate Compliance rate

for National for National for National for National for National

Training Fund Training Fund Training Fund Training Fund Training Fund

levy. levy. levy. levy. levy.

Graduates from MCC- Graduates from MCC- Graduates from MCC- Graduates from MCC- Graduates from MCC-

supported supported supported supported supported

education education education education education

activities. activities. activities. activities. activities.

Percent of schools Percent of schools Percent of schools Percent of schools Percent of schools

with positions with positions with positions with positions with positions

filled to teach filled to teach filled to teach filled to teach filled to teach

information, information, information, information, information,

communication and communication and communication and communication and communication and

technology technology technology technology technology

literacy. literacy. literacy. literacy. literacy.

Regional study and Regional study and Regional study and Regional study and Regional study and

resource centers resource centers resource centers resource centers resource centers

opened to opened to opened to opened to opened to

visitors. visitors. visitors. visitors. visitors.

Percent of Percent of Percent of Percent of Percent of

positions at positions at positions at positions at positions at

regional study regional study regional study regional study regional study

and resource and resource and resource and resource and resource

centers staffed. centers staffed. centers staffed. centers staffed. centers staffed.

Page 70163

Community skills Community skills Community skills Community skills Community skills

development development development development development

centers and arts centers and arts centers and arts centers and arts centers and arts

and crafts and crafts and crafts and crafts and crafts

centers completed. centers completed. centers completed. centers completed. centers

completed.

Modified National Modified National Modified National Modified National Modified National

Student Financial Student Financial Student Financial Student Financial Student Financial

Assistance Fund Assistance Fund Assistance Fund Assistance Fund Assistance Fund

management management management management management

information information information information information

system completed. system completed. system completed. system completed. system completed.

Tourism Project Tourists to Etosha Tourists to Etosha Tourists to Etosha Tourists to Etosha Tourists to Etosha

Objectives: Grow National Park. National Park. National Park. National Park. National Park

the Namibian Galton Gate Plan Galton Gate Plan Galton Gate Plan Galton Gate Plan Galton Gate Plan

tourism industry implemented. implemented. implemented. implemented. implemented.

with a focus on Unique visits on Unique visits on Unique visits on Unique visits on Unique visits on

increasing income Namibia Tourism Namibia Tourism Namibia Tourism Namibia Tourism Namibia Tourism

to households in Board website. Board website. Board website. Board website. Board website.

communal Leisure tourist Leisure tourist Leisure tourist Leisure tourist Leisure tourist

conservancies. arrivals. arrivals. arrivals. arrivals. arrivals.

North American North American North American North American North American

tourism tourism tourism tourism tourism

businesses businesses businesses businesses businesses

(travel agencies (travel agencies (travel agencies (travel agencies (travel agencies

and tour and tour and tour and tour and tour

operators) that operators) that operators) that operators) that operators) that

offer Namibian offer Namibian offer Namibian offer Namibian offer Namibian

tours or tour tours or tour tours or tour tours or tour tours or tour

packages. packages. packages. packages. packages.

Annual gross Annual gross Annual gross Annual gross Annual gross

revenue to revenue to revenue to revenue to revenue to

conservancies conservancies conservancies conservancies conservancies

receiving receiving receiving receiving receiving

assistance from assistance from assistance from assistance from assistance from

Namibia Namibia Namibia Namibia Namibia

accountable accountable accountable accountable accountable

entity (Namibian entity (Namibian entity (Namibian entity (Namibian entity (Namibian

dollars). dollars). dollars). dollars). dollars).

Amount of new Amount of new Amount of new Amount of new Amount of new

private sector private sector private sector private sector private sector

investment investment investment investment investment

secured by secured by secured by secured by secured by

conservancies conservancies conservancies conservancies conservancies

assisted by assisted by assisted by assisted by assisted by

Namibia Namibia Namibia Namibia Namibia

accountable accountable accountable accountable accountable

entity (Namibian entity (Namibian entity (Namibian entity (Namibian entity (Namibian

dollars). dollars). dollars). dollars). dollars).

Value of grants Value of grants Value of grants Value of grants Value of grants

issued by the issued by the issued by the issued by the issued by the

Conservancy Conservancy Conservancy Conservancy Conservancy

Development Development Development Development Development

Support Grant Support Grant Support Grant Support Grant Support Grant

Fund (Namibian Fund (Namibian Fund (Namibian Fund (Namibian Fund (Namibian

dollars). dollars). dollars). dollars). dollars).

Galton Gate Galton Gate Galton Gate Galton Gate Galton Gate

construction: construction: construction: construction: construction:

schedule schedule schedule schedule schedule

performance index. performance index. performance index. performance index. performance

index.

Ombika Gate Ombika Gate Ombika Gate Ombika Gate Ombika Gate

construction: construction: construction: construction: construction:

schedule schedule schedule schedule schedule

performance index. performance index. performance index. performance index. performance

index.

Philippines..................... Community New jobs in New jobs in New jobs in New jobs in New jobs in

Development tourism created tourism created tourism created tourism created tourism created

Grants Project. in conservancies. in conservancies. in conservancies. in conservancies. in conservancies.

Page 70164

Completed KALAHI- Completed KALAHI- Completed KALAHI-

CIDSS (KC) sub- CIDSS (KC) sub- CIDSS (KC) sub-

projects projects projects

implemented in implemented in implemented in

compliance with compliance with compliance with

technical plans technical plans technical plans

and within and within and within

schedule and schedule and schedule and

budget. budget. budget.

Communities and/or Communities and/or Communities and/or Communities and/or

barangays with KC barangays with KC barangays with KC barangays with KC

sub-projects that sub-projects that sub-projects that sub-projects that

have a have a have a have a

sustainability sustainability sustainability sustainability

evaluation rating evaluation rating evaluation rating evaluation rating

of satisfactory of satisfactory of satisfactory of satisfactory

or better or better or better or better

(percent). (percent). (percent). (percent).

KALAHI-CIDSS Municipalities Municipalities Municipalities Percentage of Percentage of

Project that provide that provide that provide municipalities municipalities

Objectives: The their KC local their KC local their KC local that provide that provide

KALAHI-CIDSS (KC) counterpart counterpart counterpart their KC local their KC local

Project expects contributions contributions(LCC contributions counterpart counterpart

to improve the (LCC) based on ) based on their (LCC) based on contributions contributions

responsiveness of their LCC LCC delivery plan their LCC (LCC) based on (LCC) based on

local governments delivery plan (percent). delivery plan their LCC their LCC

to community (percent). (percent). delivery plan. delivery plan.

needs, encourage

communities to

engage in

development

activities, and

deliver benefits

to barangay

residents through

the individual

sub-projects.

Sub-projects Sub-projects

completed with completed with

100 percent 100 percent

physical physical

accomplishment. accomplishment.

Barangays that

have completed

all the trainings

during the social

preparation

stage.

Barangays that

have completed

Thematic

Environment

Management System

TEMS Training.

Barangays that

have completed

gender-related

training.

Page 70165

Roads Project Kilometers of road Kilometers of road Kilometers of road Kilometers of road Value of road

Objectives: The sections sections sections sections construction

Secondary completed. completed. completed. completed. contracts

National Roads Value of road Value of road Value of road Value of road disbursed.

Development construction construction construction construction

Project expects contracts signed. contracts signed. contracts signed. contracts signed.

to lower vehicle Value of road Value of road Value of road Value of road

operating costs construction construction construction construction

and save the time contracts signed. contracts signed. contracts signed. contracts signed.

of those

Filipinos living

near the roads.

Project-affected Project-affected Project-affected Project-affected Project-affected

parties resettled. parties resettled. parties resettled. parties resettled. parties

resettled.

Kilometers of

roads with

vehicle-passable

(lanes).

Project-affected

entities

compensated

(female).

Revenue Successful case Successful case Successful case Successful case Successful case

Administration resolutions. resolutions. resolutions. resolutions. resolutions.

Reform Project

Objectives: The

Revenue

Administration

Reform Project

expects to

increase tax

revenues over

time and support

the Department of

Finance's

initiatives to

detect and deter

corruption within

its revenue

agencies.

Personnel charged Personnel charged Personnel charged Personnel charged Personnel charged

with graft, with graft, with graft, with graft, with graft,

corruption, corruption, corruption, corruption, corruption,

lifestyle and/or lifestyle and/or lifestyle and/or lifestyle and/or lifestyle and/or

criminal cases. criminal cases. criminal cases. criminal cases. criminal cases.

Revenue District Revenue District Revenue District Revenue District Revenue District

Offices using Offices using Offices using Offices using Offices using

electronic tax electronic tax electronic tax electronic tax electronic tax

information information information information information

system (percent). system (percent). system (percent). system (percent). system (percent).

Audit cases Audit cases Audit cases Percentage of Percentage of

performed using performed using performed using audit cases audit cases

automated audit automated audit automated audit performed using performed using

tools (percent). tools (percent). tools (percent). automated audit automated audit

tools. tools.

Average time taken Average time taken Average time taken Average time taken

to complete to complete to complete to complete

investigation investigation investigation investigation

(days). (days). (days). (days).

Audits............ Audits............ Audits............ Percentage of

automatically-

generated audits.

Page 70166

Audits completed Audits completed Audits completed

in compliance in compliance in compliance

with prescribed with prescribed with prescribed

period of 120 period of 120 period of 120

days (percent). days (percent). days (percent).

Percentage of

audits completed

in compliance

with prescribed

period of 180

days.

Revenue collection

per audit

(millions of

Philippine

pesos).

Revenue from new

and existing

business

registrants.

Senegal......................... Irrigation Tons of irrigated Tons of irrigated Rice paddy Rice paddy Rice paddy

Objectives: rice production. rice production. production (tons). production (tons). production

Improve Hectares under Hectares under Hectares under Hectares under (tons).

productivity of production. production. production. production across Hectares under

the agricultural cropping seasons. production across

sector. cropping season.

Percent of Percent of Percent disbursed Percent disbursed Percent disbursed

disbursement on disbursement on of irrigation of irrigation of irrigation

the construction the construction construction construction construction

contracts signed contracts signed contracts. contracts. contracts.

for the for the

irrigation irrigation

infrastructures infrastructures

in the Delta and in the Delta and

the Ngallenka. the Ngallenka.

New conflicts New conflicts Conflicts Conflicts Conflicts

resolved resolved successfully successfully successfully

(percent). (percent). mediated. mediated. mediated.

People trained on People trained on Participants in Participants in Participants in

land security land security the training the training the training

tools. tools. modules on land modules on land modules on land

tenure security tenure security tenure security

tools. tools. tools.

Women trained on Women trained on Participants in Participants in Participants in

land security land security the training the training the training

tools. tools. modules on land modules on land modules on land

tenure security tenure security tenure security

tools (female). tools (female). tools (female).

Cropping intensity Cropping intensity Cropping intensity Cropping intensity Cropping intensity

(hectares under (hectares under (hectares under (hectares under (hectares under

production per production per production per production per production per

year/cultivable year/cultivable year/cultivable year/cultivable year/cultivable

hectares) (Delta hectares) (Delta hectares) (Delta hectares) (Delta hectares) (Delta

Activity). Activity). Activity). Activity). Activity).

Cropping intensity Cropping intensity Cropping intensity Cropping intensity Cropping intensity

(hectares under (hectares under (hectares under (hectares under (hectares under

production per production per production per production per production per

year/cultivable year/cultivable year/cultivable year/cultivable year/cultivable

hectares) (Podor hectares) (Podor hectares) (Podor hectares) (Podor hectares) (Podor

Activity). Activity). Activity). Activity). Activity).

Value of the Value of the Value of the Value of the Value of the

construction construction construction construction construction

contracts signed contracts signed contracts signed contracts signed contracts signed

for the for the for the for the for the

irrigation irrigation irrigation irrigation irrigation

infrastructure in infrastructure in infrastructure in infrastructure in infrastructure in

the Delta. the Delta. the Delta. the Delta. the Delta.

Value of the Value of the Value of the Value of the Value of the

construction construction construction construction construction

contracts signed contracts signed contracts signed contracts signed contracts signed

for the for the for the for the for the

irrigation irrigation irrigation irrigation irrigation

infrastructure in infrastructure in infrastructure in infrastructure in infrastructure in

Ngallenka. Ngallenka. Ngallenka. Ngallenka. Ngallenka.

Page 70167

Potentially Potentially

irrigable lands irrigable lands

area (Delta and area (Delta and

Ngallenka) Ngallenka)

(hectares). (hectares).

Total area with Total area with Total area with

improved improved improved

irrigation irrigation irrigation

infrastructure infrastructure infrastructure

(Delta and (Delta and (Delta and

Ngallenka) Ngallenka) Ngallenka)

(hectares). (hectares). (hectares).

Temporary

employment

generated in

irrigation

(number

employed).

Hectares

formalized

(having a land

allocation title

and registered).

Roads Project Percent of Percent of Percent disbursed Percent disbursed Percent disbursed

Objectives: disbursements for disbursements for of road of road of road

Expand Access to the contract the contract construction construction construction

Markets and signed for the signed for the contracts. contracts. contracts.

Services. constructions of constructions of

the National Road the National Road

(RN) #2 and (RN) #2 and

National Road National Road

(RN) #6. (RN) #6.

Kilometers of Kilometers of Kilometers of Kilometers of Kilometers of

roads roads roads roads roads

rehabilitated on rehabilitated on rehabilitated on rehabilitated on rehabilitated on

the RN#2. the RN#2. the RN#2. the RN#2. the RN#2.

International International Roughness (RN#2).. Roughness (RN#2).. Roughness (RN#2).

Roughness Index Roughness Index

on the RN#2. on the RN#2.

International International Roughness (RN#6).. Roughness (RN#6).. Roughness (RN#6).

Roughness Index Roughness Index

on the RN#6. on the RN#6.

Value of contracts Value of contracts Value of signed Value of signed Value of signed

signed for the signed for the road construction road construction road construction

construction of construction of contracts. contracts. contracts.

the RN#2 and the the RN#2 and the

RN#6. RN#6.

Kilometers of Kilometers of Kilometers of Kilometers of Kilometers of

roads roads rehabilitated rehabilitated rehabilitated

rehabilitated on rehabilitated on roads on RN#6. roads on RN#6. roads on RN#6.

the RN#6. the RN#6.

Kilometers of Kilometers of Kilometers of Kilometers of

roads covered by roads covered by roads under roads under

the contract for the contract for design of the design of the

the studies, the the studies, the RN#2. RN#2.

supervision and supervision and

management of the management of the

RN#2. RN#2.

Kilometers of Kilometers of Kilometers of Kilometers of

roads covered by roads covered by roads under roads under

the contract for the contract for design of the design of the

the studies, the the studies, the RN#6. RN#6.

supervision and supervision and

management of the management of the

RN#6. RN#6.

Page 70168

Temporary

employment

generated in road

construction

(number

employed).

Tanzania........................ Energy Sector Current power Compact closed.... Compact closed.... Compact closed.... Compact closed.

Project customers

Objectives: (Zanzibar

Increased value Interconnector

added. Activity).

Transmission and

distribution

substations

capacity

(megawatt peak)

(Zanzibar

Interconnector

Activity).

Technical and non-

technical losses

(Zanzibar)

(percent).

Kilometers of 132

kilovolt (kv)

lines constructed.

Percent disbursed

on overhead lines

contract.

Current power

customers

(Malagarsi

Hydropower and

Kigoma

Distribution

Activity).

Capacity of

photovoltaic (PV)

systems installed

(kilowatt peak).

Current power

customers (all

six project

regions in

Mainland).

Kilometers of 33/

11 kV lines

constructed.

Transmission and

distribution

substations

capacity

(megavolt ampere)

(all six project

regions in

Mainland).

Technical and non-

technical losses

(all six project

regions in

Mainland and

Kigoma) (percent).

Cost recovery

ratio.

Page 70169

Transport Sector Percent disbursed Compact closed.... Compact closed.... Compact closed.... Compact closed.

Project on construction

Objectives: contracts.

Increased cash Surfacing

crop revenue; complete: Tunduma-

Increased Sumbawanga

aggregate visitor (percent).

spending.

Surfacing

complete: Tanga-

Horohoro

(percent).

Surfacing

complete:

Namtumbo-Songea

(percent).

Surfacing

complete:

Peramiho-Mbinga

(percent).

Kilometers of

roads completed

(taken over)

(Mainland Roads

Activity).

Pemba: Percent

disbursed on

construction

contract.

Surfacing

complete: Pemba

(percent).

Kilometers of

roads completed

(taken over)

(Zanzibar Rural

Roads Activity).

Road maintenance

expenditures:

Mainland Trunk

Roads (percent).

Road maintenance

expenditures:

Zanzibar Rural

Roads (percent).

Runway surfacing

complete

(percent).

Water Sector Volume of water Compact closed.... Compact closed.... Compact closed.... Compact closed

Project produced

Objectives: (millions of

Increased liters per day)

investment in (Lower Ruvu Plant

human and Expansion

physical capital; Activity).

Reduced Operations and

prevalence of maintenance cost

water-related recovery

diseases. (percent) (Lower

Ruvu Plant

Expansion

Activity).

Page 70170

Volume of water

produced

(millions of

liters per day)

(Morogoro Water

Supply Activity).

Operations and

Maintenance Cost

Recovery

(percent)

(Morogoro Water

Supply Activity).

Zambia.......................... Water Supply, Measures pending.. Measures pending.. Percent disbursed Percent disbursed Percent disbursed

Sanitation and of water and of water and of water and

Drainage Project sanitation sanitation sanitation

Objectives: construction construction construction

Increase access contracts. contracts. contracts.

to clean water to Volume of water Volume of water Volume of water

generate time and produced (cubic produced (cubic produced (cubic

cost savings for meters per day). meters per day). meters per day).

beneficiaries. Proposals received Proposals received Proposals

Grantees.......... Grantees.......... received.

Grantees.

People trained in People trained in People trained in

social and gender social and gender social and gender

integration and integration and integration and

social inclusion. social inclusion. social inclusion.

People trained in People trained in People trained in

social and gender social and gender social and gender

integration and integration and integration and

social inclusion social inclusion social inclusion

(female). (female). (female).

People trained in People trained in People trained in

social and gender social and gender social and gender

integration and integration and integration and

social inclusion social inclusion social inclusion

(male). (male). (male).

Meters installed Meters installed Meters installed

or replaced. or replaced. or replaced.

Value of Value of

compensation for compensation for

displaced displaced

businesses and businesses and

households (U.S. households (U.S.

dollars). dollars).

Value of water, Value of water,

sanitation and sanitation and

drainage drainage

construction construction

contracts signed contracts signed

(U. S. dollars). (U. S. dollars).

Households and Households and

businesses businesses

displaced. displaced.

People trained in

hygiene and

sanitary best

practices.

People trained in

hygiene and

sanitary best

practices

(female).

Page 70171

People trained in

hygiene and

sanitary best

practices (male).

--------------------------------------------------------------------------------------------------------------------------------------------------------

619(b)--Transfer or Allocation of Funds

------------------------------------------------------------------------

United States agency to which

funds were transferred or Amount Description of

allocated program or project

------------------------------------------------------------------------

None.......................... None............. None.

------------------------------------------------------------------------

FR Doc. 2016-24512 Filed 10-7-16; 8:45 am

BILLING CODE 9211-03-P

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT