Notice of Quarterly Report (October 1, 2013-December 31, 2014)
Federal Register, Volume 81 Issue 196 (Tuesday, October 11, 2016)
Federal Register Volume 81, Number 196 (Tuesday, October 11, 2016)
Notices
Pages 70139-70171
From the Federal Register Online via the Government Publishing Office www.gpo.gov
FR Doc No: 2016-24512
Page 70139
=======================================================================
-----------------------------------------------------------------------
MILLENNIUM CHALLENGE CORPORATION
MCC FR 16-07
Notice of Quarterly Report (October 1, 2013--December 31, 2014)
AGENCY: Millennium Challenge Corporation.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for the fiscal year (FY) quarters October 1, 2013 to December 31, 2014, on assistance provided under section 605 of the Millennium Challenge Act of 2003 (22 U.S.C. 7701 et seq.), as amended (the Act), and on transfers or allocations of funds to other federal agencies under section 619(b) of the Act. The following report will be made available to the public by publication in the Federal Register and on the Internet Web site of the MCC (www.mcc.gov) in accordance with section 612(b) of the Act.
Dated: October 5, 2016.
Sarah E. Fandell,
VP/General Counsel and Corporate Secretary, Millennium Challenge Corporation.
As used in MCC's disclosures under section 605 of the Act:
``Total Obligation'' for listed Compacts includes both ``Compact Implementation Funding'' under section 609(g) of the Act as well as funding under section 605 of the Act.
``Disbursements'' are cash outlays rather than expenditures.
``Measures'' are the same Key Performance Indicators that MCC reports each quarter. The Key Performance Indicators may change over time to more accurately reflect compact implementation progress. The unit for these measures is ``a number of'' unless otherwise indicated.
``Program Administration and Control'' funds are used to pay items such as salaries, rent, and the cost of office equipment, as well as audit and oversight agent fees.
``Pending Subsequent Reports'' amounts represent disbursements made to the Compact permitted account that will be allocated to individual projects in subsequent quarters and reported as such in subsequent quarterly reports. The ``Cumulative Disbursements'' amount for ``Pending Subsequent Reports'' represents the balance of such outlays remaining at the end of the reporting period.
Closed Compacts do not have any quarterly disbursements; however, they are included in the report if deobligations took place during the reporting period. Closed Compacts include: Armenia, Benin I, Burkina Faso, Cabo Verde I, El Salvador I, Georgia I, Ghana I, Honduras, Lesotho I, Madagascar, Mali, Mongolia I, Morocco I, Mozambique, Namibia, Nicaragua, Tanzania and Vanuatu.
Unless otherwise indicated, all programs and projects were solicited.
605 Assistance--Disbursements
In United States dollars
--------------------------------------------------------------------------------------------------------------------------------------------------------
Total FY 2014 FY 2014 FY 2014 FY 2014 FY 2015 Cumulative
Entity provided assistance Program/project name obligation Quarter 1 Quarter 2 Quarter 3 Quarter 4 Quarter 1 disbursements
--------------------------------------------------------------------------------------------------------------------------------------------------------
Burkina Faso....................... Agriculture Project... 141,510,059 11,393,735 9,790,338 15,405,386 8,402,118 3,324,525 140,420,941
Bright 2 School 26,840,570 0 0 0 0 0 26,840,570
Project.
Land Tenure Project... 58,434,615 3,975,944 5,654,577 7,801,917 9,865,824 3,447,221 58,244,614
Monitoring and 7,880,000 424,223 242,078 67,134 437,447 191,644 4,669,395
Evaluation.
Pending Subsequent 0 -507,539 484,451 453,947 -754,421 -180,104 363,539
Report.
Program Administration 49,758,545 2,404,048 1,718,737 2,052,781 2,175,099 2,480,361 48,345,809
and Control.
Roads Project......... 194,530,681 13,041,011 24,609,125 31,397,256 29,573,406 17,544,857 193,891,857
--------------------------------------------------------------------------------------------------------------------
Total Burkina Faso.... 478,954,470 30,731,422 42,499,307 57,178,420 49,699,473 26,808,504 472,776,725
--------------------------------------------------------------------------------------------------------------------------------------------------------
Cabo Verde II...................... Land Management For 17,260,000 615,975 559,468 333,731 490,929 259,147 3,268,991
Investment Projects.
Monitoring and 1,390,000 566 -1,481 10,220 11,150 10,735 36,765
Evaluation.
Pending Subsequent 0 69,969 -62,154 22,752 -11,104 6,032 25,495
Report.
Program Administration 7,850,000 258,835 349,255 320,156 343,206 270,631 2,841,607
and Control.
Water, Sanitation and 39,730,000 501,339 200,358 678,551 898,674 1,267,782 4,050,504
Hygiene Project.
--------------------------------------------------------------------------------------------------------------------
Total Cabo Verde II... 66,230,000 1,446,684 1,045,446 1,365,409 1,732,856 1,814,326 10,223,361
--------------------------------------------------------------------------------------------------------------------------------------------------------
El Salvador II..................... Business Development 3,300,000 0 0 0 0 0 0
Services.
Human Capital Project. 900,000 0 0 0 0 0 0
Infrastructure Project 1,500,000 0 0 0 0 0 0
Monitoring and 400,000 0 0 0 0 0 0
Evaluation.
Pending Subsequent 0 0 0 0 0 0 0
Report.
Program Administration 3,900,000 0 0 0 0 0 0
and Control.
--------------------------------------------------------------------------------------------------------------------
Total El Salvador II.. 10,000,000 0 0 0 0 0 0
--------------------------------------------------------------------------------------------------------------------------------------------------------
Georgia II......................... Education Project..... 76,500,000 44,290 159,933 140,131 1,294 331,945 677,594
Monitoring and 3,500,000 0 0 0 0 0 0
Evaluation.
Pending Subsequent 0 209,055 -77,780 177,616 51,163 -320,798 39,256
Report.
Program Administration 14,000,000 505,624 407,151 334,171 391,417 736,270 2,374,633
and Control.
Tertiary Education 30,000,000 431,731 388,954 199,789 1,463,627 1,532,985 4,017,085
Project.
Vocational Education 16,000,000 0 0 0 0 69,300 69,300
Project.
--------------------------------------------------------------------------------------------------------------------
Total Georgia II...... 140,000,000 1,190,700 878,258 851,707 1,907,501 2,349,702 7,177,868
--------------------------------------------------------------------------------------------------------------------------------------------------------
Ghana.............................. Administrative........ 0 0 0 0 0 0 0
Agriculture Project... 188,731,530 -407,393 0 407,393 -180,293 0 188,731,530
Infrastructure Project 0 0 0 0 0 0 0
Monitoring and 6,941,811 0 0 0 0 0 6,941,811
Evaluation.
Pending Subsequent 0 3,700,000 0 -3,700,000 0 0 0
Report.
Program Administration 36,874,551 0 0 0 1 0 36,874,550
and Control.
Rural Development 76,030,565 0 0 0 127,291 0 76,030,565
Project.
Page 70140
Transportation Project 227,710,512 -3,292,608 0 3,292,608 53,000 0 227,710,512
--------------------------------------------------------------------------------------------------------------------
Total Ghana........... 536,288,969 0 0 0 0 0 536,288,968
--------------------------------------------------------------------------------------------------------------------------------------------------------
Ghana II........................... Access to Electricity 700,000 0 0 0 0 0 0
Project.
Energy Efficiency and 0 0 0 0 0 0 0
Demand Side
Management Project.
Financial and 7,600,800 0 0 0 0 0 0
Operational
Turnaround
(Electricity Company
of Ghana 1).
Financial and 3,529,000 0 0 0 0 0 0
Operational
Turnaround (Northern
Electricity
Distribution Company).
Financial and 0 0 0 0 0 0 0
Operational
Turnaround
(Electricity Company
of Ghana 2).
Monitoring and 1,510,000 0 0 0 0 0 0
Evaluation.
Pending Subsequent 0 0 0 0 0 0 0
Report.
Power Generation 4,854,800 0 0 0 0 0 0
Sector Improvement
Project.
Program Administration 7,455,400 0 0 0 0 0 0
and Control.
Regulatory 3,250,000 0 0 0 0 0 0
Strengthening and
Capacity Building
Project.
--------------------------------------------------------------------------------------------------------------------
Total Ghana II........ 28,900,000 0 0 0 0 0 0
--------------------------------------------------------------------------------------------------------------------------------------------------------
Indonesia.......................... Community Nutrition 129,500,000 5,335 36,978 181,792 253,944 11,822,595 34,759,317
Project.
Green Prosperity 332,500,000 34,962 62,580 66,609 141,356 777,506 1,182,494
Project.
Monitoring and 12,200,000 0 0 0 0 720,664 720,664
Evaluation.
Pending Subsequent 0 317,285 -120,503 377,840 -174,359 256,222 729,754
Report.
Procurement 50,000,000 351,912 341,260 471,128 816,074 1,925,931 4,009,914
Modernization Project.
Program Administration 75,800,000 1,402,143 1,512,095 1,954,049 2,499,064 2,322,534 13,595,118
and Control.
--------------------------------------------------------------------------------------------------------------------
Total Indonesia....... 600,000,000 2,111,637 1,832,410 3,051,419 3,536,080 17,825,452 54,997,260
--------------------------------------------------------------------------------------------------------------------------------------------------------
Jordan............................. Expansion of 97,120,950 15,128,511 11,768,335 940,143 9,282,359 1,248,335 76,116,031
Wastewater Treatment
Capacity.
Monitoring and 2,809,894 21,610 28,847 219,805 21,662 21,675 375,783
Evaluation.
Pending Subsequent 0 -35,119 4,053 -5,097 23,043 3,021 34,447
Report.
Program Administration 19,650,805 386,135 467,561 429,410 490,247 575,135 4,326,590
and Control.
Wastewater Collection. 66,989,225 3,532,261 2,768,093 3,419,241 5,502,460 4,992,258 32,752,377
Water Network 88,529,127 3,669,481 4,160,537 2,180,324 3,954,905 6,103,494 24,484,800
Restructuring and
Rehabilitation.
--------------------------------------------------------------------------------------------------------------------
Total Jordan.......... 275,100,000 22,702,880 19,197,425 7,183,826 19,274,676 12,943,918 138,090,029
--------------------------------------------------------------------------------------------------------------------------------------------------------
Lesotho............................ Capacity Building..... 0 0 0 0 0 0 0
Civil/Legal Sector 0 0 0 0 0 0 0
Support.
Health Sector Project. 143,650,195 15,919,722 -753,987 23,881 0 0 143,650,195
Land Tenure Project... 0 0 0 0 0 0 0
Monitoring and 5,500,728 256,974 181,013 0 0 0 5,500,728
Evaluation.
Pending Subsequent 0 -199,501 1 -12,942 0 0 0
Report.
Private Sector 24,162,433 1,986,028 0 0 0 0 24,162,433
Development Project.
Procurement and 0 0 0 0 0 0 0
Administration.
Program Administration 34,918,925 2,188,853 101,302 -10,939 0 0 34,918,925
and Control.
Water Sector Project.. 149,813,612 14,004,878 -1 0 0 0 149,813,612
--------------------------------------------------------------------------------------------------------------------
Total Lesotho......... 358,045,892 34,156,953 -471,671 0 0 0 358,045,892
--------------------------------------------------------------------------------------------------------------------------------------------------------
Malawi............................. Gender Integration 0 0 0 0 0 0 0
Project.
Monitoring and 6,960,100 35,880 143,520 0 0 1,131 186,464
Evaluation.
Natural Resource 28,026,000 213,866 91,018 379,585 300,685 10,819 995,972
Management Project.
Pending Subsequent 0 248,392 -180,088 -11,041 45,236 -6,728 250,859
Report.
Power Project......... 255,648,800 572,012 134,447 1,035,243 2,253,940 1,735,978 5,731,621
Power Sector Reform 25,553,400 221,705 249,385 724,681 718,116 1,335,602 3,472,531
Project.
Program Administration 34,511,700 1,027,028 1,383,181 2,356,867 1,627,106 1,629,994 9,346,909
and Control.
Total Malawi.......... 350,700,000 2,318,884 1,821,463 4,485,335 4,945,082 4,706,796 19,984,357
Mali............................... Alatona Irrigation 252,895,691 0 0 0 0 0 252,895,69
Project.
Bamako-Senou Airport 143,371,915 0 0 0 -31,476 0 143,371,915
Improvement Project.
Industrial Park 2,637,472 0 0 0 0 0 2,637,472
Project.
Monitoring and 1,688,026 0 0 0 0 0 1,688,027
Evaluation.
Pending Subsequent 0 0 0 0 0 0 0
Report.
Program Administration 35,003,642 0 0 0 0 0 35,003,642
and Control.
--------------------------------------------------------------------------------------------------------------------
Total Mali............ 435,596,747 0 0 0 -31,476 0 435,596,747
--------------------------------------------------------------------------------------------------------------------------------------------------------
Moldova............................ Monitoring and 3,538,930 213,834 63,212 382,519 220,343 14,623 1,634,272
Evaluation.
Page 70141
Pending Subsequent 0 -118,059 199,517 810,446 -293,684 -594,765 134,081
Report.
Program Administration 23,247,668 1,223,387 813,895 832,821 836,381 905,775 13,680,202
and Control.
Road Rehabilitation 112,390,000 20,756,036 2,755,131 11,349,069 14,836,137 21,216,346 101,421,448
Project.
Transition To High 122,823,402 9,798,457 4,753,661 15,362,042 10,226,080 12,254,189 72,924,459
Value Agriculture
Project.
--------------------------------------------------------------------------------------------------------------------
Total Moldova......... 262,000,000 31,873,654 8,585,415 28,736,897 25,825,256 33,796,167 189,794,463
--------------------------------------------------------------------------------------------------------------------------------------------------------
Mongolia........................... Energy and 40,420,819 275,302 14,282 17,246 0 0 40,420,819
Environmental Project.
Health Project........ 41,873,775 3,261,083 18,608 0 0 0 41,873,776
Monitoring and 5,085,246 392,984 0 0 0 0 5,085,246
Evaluation.
Pending Subsequent 0 -615,790 -57,984 0 0 0 0
Report.
Program Administration 28,610,318 1,328,261 662,064 149,507 -74,754 0 28,610,318
and Control.
Property Rights 28,543,830 318,125 20,212 0 0 0 28,543,830
Project.
Rail Project.......... 369,560 0 0 0 0 0 369,560
Roads Project......... 74,775,867 6,147,460 4,236 0 0 0 74,775,867
Vocational Education 49,322,727 111,456 17,530 0 0 0 49,322,727
Project.
--------------------------------------------------------------------------------------------------------------------
Total Mongolia........ 269,002,143 11,218,881 678,948 166,754 -74,754 0 269,002,143
--------------------------------------------------------------------------------------------------------------------------------------------------------
Morocco............................ Artisan and Fez Medina 84,019,666 15,726,838 -323,055 329,816 0 0 84,019,666
Project.
Enterprise Support 15,126,518 3,211 49 0 0 0 15,126,518
Project.
Financial 0 0 0 0 0 0 0
Accountability.
Financial Services 42,817,020 1,928,094 0 0 0 0 42,817,020
Project.
Fruit Tree 324,163,440 30,388,407 1 0 0 0 323,369,991
Productivity Project.
Monitoring and 16,255,526 2,789,915 0 0 0 0 16,255,526
Evaluation.
Pending Subsequent 0 -1,053,506 -136,770 -46,373 0 0 0
Report.
Program Administration 56,500,517 3,891,292 -18 26,022 0 0 56,500,517
and Control.
Rural Development 0 0 0 0 0 0 0
Project.
Small-Scale Fisheries 111,281,204 18,507,220 310,950 -309,465 0 0 111,281,204
Project.
Transportation Project 0 0 0 0 0 0 0
--------------------------------------------------------------------------------------------------------------------
Total Morocco......... 650,163,890 72,181,470 -148,843 0 0 0 649,370,442
--------------------------------------------------------------------------------------------------------------------------------------------------------
Mozambique......................... Farmer Income Support 18,857,349 1,855,435 19,893 0 0 0 18,857,349
Project.
Land Tenure Project... 39,466,421 3,668,233 -31,999 0 0 0 39,466,421
Monitoring and 4,073,077 851,699 21,760 0 0 0 4,073,077
Evaluation.
Pending Subsequent 0 -2,837,741 -3,115,537 -46,329 0 0 0
Report.
Program Administration 48,483,703 6,187,513 1,870,307 46,329 706,997 0 48,483,703
and Control.
Rehabilitation/ 136,802,301 17,844,298 95,729 0 0 0 136,802,301
Construction Of Roads
Project.
Water Supply and 200,221,661 23,300,256 2,150,510 0 0 0 200,221,661
Sanitation Project.
--------------------------------------------------------------------------------------------------------------------
Total Mozambique...... 447,904,512 50,869,694 1,010,662 0 706,997 0 447,904,512
--------------------------------------------------------------------------------------------------------------------------------------------------------
Namibia............................ Agriculture Project... 51,439,139 3,092,659 4,301,409 3,858,573 2,064,357 2,237,463 50,029,275
Education Project..... 141,886,916 12,286,634 8,956,394 9,803,025 13,032,538 4,370,143 137,237,213
Monitoring and 6,886,182 84,364 290,198 632,806 672,659 773,743 6,415,390
Evaluation.
Pending Subsequent 0 1,676,086 -516,092 -7,268,389 310,960 646,860 3,716,700
Report.
Program Administration 35,789,383 1,665,196 1,235,533 1,423,372 1,598,913 3,994,297 33,365,598
and Control.
Rural Development 0 0 0 0 0 0 0
Project.
Tourism Project....... 68,475,842 4,619,357 5,669,962 11,283,451 10,496,386 6,288,359 65,464,315
--------------------------------------------------------------------------------------------------------------------
Total Namibia......... 304,477,463 23,424,296 19,937,405 19,732,839 28,175,814 18,310,864 296,228,491
--------------------------------------------------------------------------------------------------------------------------------------------------------
Philippines........................ Community Development 120,000,000 4,129,561 7,696,771 7,155,121 7,748,991 7,125,483 75,901,515
Grants Project.
KALAHI-CIDSS Project.. 0 0 0 0 0 0 0
Monitoring and 8,207,000 173,308 135,260 99,022 139,294 168,264 2,027,532
Evaluation.
Pending Subsequent 0 2,111,447 21,877 -1,617,650 911,404 -1,092,558 5,058,482
Report.
Program Administration 36,910,000 1,060,649 1,075,900 1,114,616 1,113,703 1,468,306 14,398,261
and Control.
Revenue Administration 54,300,000 55,909 1,125,801 2,645,058 875,506 1,116,814 11,666,358
Reform Project.
Roads Project......... 214,493,000 7,517,140 3,797,637 8,678,866 16,632,689 10,530,412 95,566,371
--------------------------------------------------------------------------------------------------------------------
Total Philippines..... 433,910,000 15,048,013 13,853,246 18,075,033 27,421,587 19,316,721 204,618,519
--------------------------------------------------------------------------------------------------------------------------------------------------------
Senegal............................ Demand Assessment..... 0 0 0 0 0 0 0
Irrigation............ 170,341,171 8,082,655 16,444,544 19,022,475 12,166,091 15,456,116 100,655,919
Land Tenure Project... 0 0 0 0 0 0 0
Monitoring and 3,757,500 16,716 28,420 24,849 41,683 128,216 774,411
Evaluation.
Pending Subsequent 0 -719,147 166,031 -535,530 249,080 22,606 568,061
Report.
Pre-Feasibility and 0 0 0 0 0 0 0
Feasibility Analysis.
Program Administration 41,188,830 1,212,154 1,243,739 1,768,298 1,290,872 1,433,630 20,493,819
and Control.
Roads Project......... 324,712,499 10,925,884 16,542,582 25,570,082 17,326,600 24,658,251 135,713,053
--------------------------------------------------------------------------------------------------------------------
Total Senegal......... 540,000,000 19,518,262 34,425,315 45,850,174 31,074,326 41,698,818 258,205,264
--------------------------------------------------------------------------------------------------------------------------------------------------------
Page 70142
Tanzania........................... Energy Sector Project. 199,461,627 22,613,285 0 0 0 0 199,461,627
Monitoring and 4,632,363 387,554 0 0 0 0 4,632,363
Evaluation.
Pending Subsequent 0 0 0 0 0 0 0
Report.
Program 30,480,760 1,631,748 10,372 0 0 0 30,480,760
Administration and
Control.
Transport Sector 405,402,512 44,755,778 0 0 0 0 405,402,512
Project.
Water Sector Project.. 54,568,652 5,093,064 0 0 0 0 54,568,652
--------------------------------------------------------------------------------------------------------------------
Total Tanzania........ 694,545,914 74,481,428 10,372 0 0 0 694,545,914
--------------------------------------------------------------------------------------------------------------------------------------------------------
Zambia............................. Infrastructure Project 0 0 0 0 0 0 0
Monitoring and 5,841,000 0 6,843 1,268 0 0 25,999
Evaluation.
Pending Subsequent 0 -17,617 18,233 58,777 6,634 7,788 110,436
Report.
Program Administration 38,823,951 1,716,377 1,050,630 1,612,473 1,673,344 1,928,332 10,096,838
and Control.
Water Supply and 8,137,125 0 0 -1,324,821 0 1,205,107 8,017,411
Sanitation Project.
Water Supply, 301,955,564 62,473 80,042 173,719 529,434 322,397 1,456,503
Sanitation and
Drainage Project.
--------------------------------------------------------------------------------------------------------------------
Total Zambia.......... 354,757,640 1,761,233 1,155,748 521,417 2,209,413 3,463,624 19,707,186
--------------------------------------------------------------------------------------------------------------------------------------------------------
605 Assistance--Measures
--------------------------------------------------------------------------------------------------------------------------------------------------------
FY 2014 FY 2015
Country Objectives ---------------------------------------------------------------------------------------------------
Quarter 1 Quarter 2 Quarter 3 Quarter 4 Quarter 1
--------------------------------------------------------------------------------------------------------------------------------------------------------
Burkina Faso.................... Agriculture Hectares of new Hectares of new Hectares of new Hectares of new
Development perimeter perimeter perimeter perimeter
Project development in Di. development in Di. development in Di. development in Di.
Objectives: Responsible Responsible Responsible Responsible
Expanded members of Water members of Water members of Water members of Water
productive use of User Associations User Associations User Associations User Associations
land in order to trained in the trained in the trained in the trained in the
increase the Sourou. Sourou. Sourou. Sourou.
volume and value Farmers trained... Farmers trained... Farmers trained... Farmers trained...
of agricultural Farmers who have Farmers who have Farmers who have Farmers who have
production in applied improved applied improved applied improved applied improved
Project Zones. practices as a practices as a practices as a practices as a
result of result of result of result of
training. training. training. training.
Local water Local water Local water Local water
committees committees committees committees
established and established and established and established and
operational in operational in operational in operational in
the Comoeacute the Comoeacute the Comoeacute the Comoeacute
and Mouhoun. and Mouhoun. and Mouhoun. and Mouhoun.
Basin Water Basin Water Basin Water Basin Water
Resources Resources Resources Resources
Development and Development and Development and Development and
Management Master Management Master Management Master Management Master
Plan developed Plan developed Plan developed Plan developed
and validated. and validated. and validated. and validated.
Hectares under Hectares under Hectares under Hectares under
improved improved improved improved
practices as a practices as a practices as a practices as a
result of result of result of result of
training. training. training. training.
BRIGHT II School Percent of girls Percent of girls Percent of girls Percent of girls
Project regularly regularly regularly regularly
Objectives: attending (90 attending (90 attending (90 attending (90
Increased primary percent percent percent percent
school completion attendance) attendance) attendance) attendance)
rates for girls. BRIGHT II schools. BRIGHT II schools. BRIGHT II schools. BRIGHT II schools.
Girls promotion Girls promotion Girls promotion Girls promotion
rates to next rates to next rates to next rates to next
grade in BRIGHT grade in BRIGHT grade in BRIGHT grade in BRIGHT
II schools. II schools. II schools. II schools.
Percent of girls Percent of girls Percent of girls Percent of girls
dropping out of dropping out of dropping out of dropping out of
school. school. school. school.
Page 70143
Percent of girls Percent of girls Percent of girls Percent of girls
passing the passing the passing the passing the
annual Primary annual Primary annual Primary annual Primary
Certificate exam Certificate exam Certificate exam Certificate exam
in BRIGHT II in BRIGHT II in BRIGHT II in BRIGHT II
schools. schools. schools. schools.
Students enrolled Students enrolled Students enrolled Students enrolled
in BRIGHT II in BRIGHT II in BRIGHT II in BRIGHT II
schools (both schools (both schools (both schools (both
girls and boys). girls and boys). girls and boys). girls and boys).
Land Tenure Stakeholders Stakeholders Stakeholders Stakeholders
Project trained. trained. trained. trained.
Objectives: Rural hectares Rural hectares Rural hectares Rural hectares
Increased formalized in the formalized in the formalized in the formalized in the
investment in new zone of Di, new zone of Di, new zone of Di, new zone of Di,
land and rural targeted under targeted under targeted under targeted under
productivity the Agriculture the Agriculture the Agriculture the Agriculture
through improved Development Development Development Development
land tenure project. project. project. project.
security and land Land Land Land Land
management. administration administration administration administration
offices offices offices offices
established or established or established or established or
upgraded. upgraded. upgraded. upgraded.
Municipal Municipal Municipal Municipal
buildings buildings buildings buildings
constructed. constructed. constructed. constructed.
Rural land Rural and Rural land Rural land ..................
possession possession possession possession
certificates certificates certificates certificates
approved by the approved by the approved by the approved by the
local government. local government. local government. local government.
Land conflicts Land conflicts Land conflicts Land conflicts ..................
recorded in the recorded in the recorded in the recorded in the
17 communes of 17 communes of 17 communes of 17 communes of
phase I of the phase I of the phase I of the phase I of the
Rural Land Rural Land Rural Land Rural Land
Governance Governance Governance Governance
project. project. project. project.
Land resolved in Land resolved in Land resolved in Land resolved in ..................
the 17 communes the 17 communes the 17 communes the 17 communes
of Phase I of the of Phase I of the of Phase I of the of Phase I of the
Rural Land Rural Land Rural Land Rural Land
Governance Governance Governance Governance
project. project. project. project.
Roads Project Periodic road Periodic road Periodic road Periodic road
Objectives: maintenance maintenance maintenance maintenance
Enhanced access coverage rate coverage rate coverage rate coverage rate
to markets (for all funds) (for all funds) (for all funds) (for all funds)
through (percent). (percent). (percent). (percent).
investments in Kilometers of Kilometers of Kilometers of Kilometers of
the road network. primary roads primary roads primary roads primary roads
completed. completed. completed. completed.
Percent disbursed Percent disbursed Percent disbursed Percent disbursed ..................
of road of road of road of road
construction construction construction construction
contracts contracts contracts contracts
(primary roads). (primary roads). (primary roads). (primary roads).
Kilometers of Kilometers of Kilometers of Kilometers of ..................
rural roads rural roads rural roads rural roads
completed. completed. completed. completed.
Percent disbursed Percent disbursed Percent disbursed Percent disbursed ..................
of road of road of road of road
construction construction construction construction
contracts (rural contracts (rural contracts (rural contracts (rural
roads). roads). roads). roads).
Page 70144
Cabo Verde II................... Land Management Legal and Legal and Legal and Legal and Legal and
for Investment regulatory regulatory regulatory regulatory regulatory
Projects reforms adopted. reforms adopted. reforms adopted. reforms adopted. reforms adopted.
Objectives: Field test of Field test of Field test of Field test of Field test of
Increased ``Fieldwork ``Fieldwork ``Fieldwork ``Fieldwork ``Fieldwork
investments in Operations Operations Operations Operations Operations
and value of Manual'' and Manual'' and Manual'' and Manual'' and Manual'' and
property; methodology methodology methodology methodology methodology
improved ease of completed on Sal. completed on Sal. completed on Sal. completed on Sal. completed on Sal.
doing business; Stakeholders Stakeholders Stakeholders Stakeholders
increased receiving formal receiving formal receiving formal receiving formal
investments and on-the-job on-the-job on-the-job on-the-job
value added in training or training or training or training or
tourism; technical technical technical technical
increased assistance assistance assistance assistance
employment. regarding roles, regarding roles, regarding roles, regarding roles,
responsibilities responsibilities responsibilities responsibilities
or new or new or new or new
technologies. technologies. technologies. technologies.
Percent of
targeted surface
area on target
island (Sal)
incorporated into
the Land
Management
Information and
Transaction
System (LMITS).
Households in
intervention
island(s) of high
tourism
investment
potential with
land rights
formalized
through project.
Parcels corrected
or incorporated
in land system.
Land
administration
offices
established or
upgraded.
Adoption of
``Operations
Manual'' for the
Rights and
Boundaries
Activity
fieldwork in full
force and effect.
Page 70145
Water, Sanitation, Value of implicit Value of implicit Value of implicit Value of implicit Value of implicit
and Hygiene subsidy reduction subsidy reduction subsidy reduction subsidy reduction subsidy reduction
Project (U.S. dollars). (U.S. dollars). (U.S. dollars). (U.S. dollars). (U.S. dollars).
Objectives: Operating cost Operating cost Operating cost Operating cost Operating cost
Increased access coverage coverage coverage coverage coverage
to improved water (percent). (percent). (percent). (percent). (percent).
and sanitation; Service coverage Service coverage Service coverage Service coverage Service coverage
reduced household by corporatized by corporatized by corporatized by corporatized by corporatized
costs for water; utilities utilities utilities utilities utilities
reduced incidence (percent). (percent). (percent). (percent). (percent).
of waterborne Continuity of Continuity of Continuity of Continuity of Continuity of
disease; improved service (hours/ service (hours/ service (hours/ service (hours/ service (hours/
capital day). day). day). day). day).
accumulation; Objective measure Objective measure Objective measure Objective measure Objective measure
increase of water quality of water quality of water quality of water quality of water quality
productive (percent. (percent. (percent. (percent. (percent).
government Non-revenue water Non-revenue water Non-revenue water Non-revenue water Non-revenue water
spending. for Multiple for Multiple for Multiple for Multiple for Multiple
Municipal Utility/ Municipal Utility/ Municipal Utility/ Municipal Utility/ Municipal Utility/
utilities utilities utilities utilities utilities
(percent). (percent). (percent). (percent). (percent).
Value of signed Value of signed Value of signed Value of signed Value of signed
water and water and water and water and water and
sanitation sanitation sanitation sanitation sanitation
construction construction construction construction construction
contracts. contracts. contracts. contracts. works contracts.
Percent disbursed Percent disbursed Percent disbursed Percent disbursed Percent disbursed
of water and of water and of water and of water and of water and
sanitation sanitation sanitation sanitation sanitation
construction construction construction construction construction
contracts. contracts. contracts. contracts. works contracts.
Strategic National Strategic National Strategic National Strategic National Strategic National
Master Plan and Master Plan and Master Plan and Master Plan and Master Plan and
Strategic Strategic Strategic Strategic Strategic
Environmental and Environmental and Environmental and Environmental and Environmental and
Social Assessment Social Assessment Social Assessment Social Assessment Social Assessment
approved by approved by approved by approved by approved by
appropriate appropriate appropriate appropriate appropriate
authorities. authorities. authorities. authorities. authorities.
Value of signed Value of signed Value of signed Value of signed Value of signed
water and water and water and water and water and
sanitation sanitation sanitation sanitation sanitation
feasibility and feasibility and feasibility and feasibility and feasibility and
design contracts. design contracts. design contracts. design contracts. design contracts.
Percent disbursed Percent disbursed Percent disbursed Percent disbursed Percent disbursed
of water and of water and of water and of water and of water and
sanitation sanitation sanitation sanitation sanitation
feasibility and feasibility and feasibility and feasibility and feasibility and
design contracts. design contracts. design contracts. design contracts. design contracts.
Percent disbursed Percent disbursed Percent disbursed Percent disbursed Percent disbursed
of technical of technical of technical of technical of technical
advisory services advisory services advisory services advisory services advisory services
and training and training and training and training and training
contracts in contracts in contracts in contracts in contracts in
support of the support of the support of the support of the support of the
Water, Sanitation Water, Sanitation Water, Sanitation Water, Sanitation Water, Sanitation
and Hygiene and Hygiene and Hygiene and Hygiene and Hygiene
Project. Project. Project. Project. Project.
Value disbursed of Value disbursed of Value disbursed of Value disbursed of Value disbursed of
Infrastructure Infrastructure Infrastructure Infrastructure Infrastructure
Grant Facility Grant Facility Grant Facility Grant Facility Grant Facility
Social Funds for Social Funds for Social Funds for Social Funds for Social Funds for
disadvantaged disadvantaged disadvantaged disadvantaged disadvantaged
groups and/or groups and/or groups and/or groups and/or groups and/or
poor households. poor households. poor households. poor households. poor households.
Page 70146
Value of all Value of all
signed technical signed technical
advisory services advisory services
and training and training
contracts in contracts in
support of the support of the
Water, Sanitation Water, Sanitation
and Hygiene and Hygiene
Project. Project.
Collection Ratio.
Multiple municipal
utilities staff
per 1,000 potable
water
connections.
El Salvador II.................. Business Measures pending.. Measures pending.. Measures pending.. Measures pending.. Measures pending.
Development
Services.
Human Capital
Project.
Infrastructure
Project.
Georgia II...................... Education Project. Measures pending.. Measures pending.. Measures pending.. Measures pending.. Schools fully
rehabilitated.
Science labs
installed and
equipped.
Percent disbursed
of educational
facility
construction,
rehabilitation,
and equipping
contracts.
School-based
professional
development
facilitators
trained.
School principals
trained.
Science, math,
English, and
information and
communication
technology
teachers trained.
Completion of
teacher training
design framework.
International
assessments
completed
Completion of
pilot testing of
national
assessment
instruments.
Vocational Measures pending.. Measures pending.. Measures pending.. Measures pending.. Students
Education Project. participating in
MCC-supported
Technical
Vocational
Education and
Training (TVET)
programs.
Industry co-
investment in
TVET provision.
Page 70147
Date first grant
agreement is
signed.
Total grant
outlays.
Tertiary Education Measures pending.. Measures pending.. Measures pending.. Measures pending.. Students enrolled
Project. in MCC-supported
U.S. bachelor's
programs.
First cohort of
students enter
MCC-funded
science,
technology,
engineering and
math bachelor's
program.
Signing of
partnership
agreement between
the Government of
Georgia and
university
partner.
Georgian partner
university
faculty members
receiving
training from
U.S. partner
institution.
Ghana II........................ Access to Measures pending.. Measures pending.. Measures pending.. Measures pending.. Measures pending.
Electricity
Project.
Energy Efficiency
and Demand Side
Management
Project.
Power Generation
Sector
Improvement
Project.
Regulatory
Strengthening and
Capacity Building
Project.
Indonesia....................... Community Value of Generasi Value of Generasi Value of Generasi Value of Generasi Value of Generasi
Nutrition Project block grants block grants block grants block grants block grants
Objectives: funded. funded. funded. funded. funded.
Reduce and
prevent low birth
weight and
childhood
stunting and
malnourishment of
children in
project areas,
and to increase
household income
through cost
savings,
productivity
growth and higher
lifetime earnings.
Service providers Service providers Service providers Service providers Service providers Service providers
trained on infant trained on infant trained on infant trained on infant trained on infant trained on
and young child and young child and young child and young child and young child mother, infant
feeding. feeding. feeding. feeding. feeding. and young child
feeding.
Page 70148
Communications Communications Communications Communications Communications Date
Campaign design Campaign design Campaign design Campaign design Campaign design Communications
complete. complete. complete. complete. complete. Campaign design
complete.
Micro-nutrient Micro-nutrient Micro-nutrient Micro-nutrient Micro-nutrient Micro-nutrient
packages packages packages packages packages packages
delivered (Iron delivered (Iron delivered (Iron delivered (Iron delivered (Iron delivered (Iron
Folic) (millions). Folic) (millions). Folic) (millions). Folic) (millions). Folic) (millions). Folic).
Micro-nutrient Micro-nutrient Micro-nutrient Micro-nutrient Micro-nutrient
packages packages packages packages packages
delivered delivered delivered delivered delivered
(Taburia) (Taburia) (Taburia) (Taburia) (Taburia).
(millions). (millions). (millions). (millions).
Generasi proposals Generasi proposals Generasi proposals Generasi proposals
Generasi Generasi Generasi Generasi
facilitators facilitators facilitators facilitators
trained on trained on trained on trained on
stunting and stunting and stunting and stunting and
gender. gender. gender. gender.
Sanitation
triggering
events.
Service providers
trained on growth
monitoring.
Green Prosperity Signed memoranda Signed memoranda Signed memoranda Signed memoranda Signed memoranda
Project of understanding of understanding of understanding of understanding of understanding
Objectives: between the between the between the between the between the
Increase Indonesia Indonesia Indonesia Indonesia Indonesia
productivity and accountable accountable accountable accountable accountable
reduce reliance entity and entity and entity and entity and entity and
on fossil fuels districts. districts. districts. districts. districts.
by expanding Green Knowledge Green Knowledge Green Knowledge Green Knowledge Green Knowledge
renewable energy; work plan work plan work plan work plan work plan
and Increase completed. completed. completed. completed. completed.
productivity and Financial service Financial service Financial service Financial service
reduce land-based provider provider provider provider
greenhouse gas partnerships partnerships partnerships partnerships
emissions by established (loan established (loan established (loan established (loan
improving land agreement). agreement). agreement). agreement).
use practices and Financial service Financial service Financial service Financial service
management of provider provider provider provider
natural resources. partnerships partnerships partnerships partnerships
established established established established
(grant (grant (grant (grant
partnerships). partnerships). partnerships). partnerships).
Financial service Financial service Financial service Financial service
provider provider provider provider
partnerships partnerships partnerships partnerships
established established established established
(grant managers). (grant managers). (grant managers). (grant managers).
Project financing Project financing Project financing Project financing
approved by the approved by the approved by the approved by the
Green Prosperity Green Prosperity Green Prosperity Green Prosperity
Finance Facility. Finance Facility. Finance Facility. Finance Facility.
Formal district Formal district Formal district Formal district
adoption of adoption of adoption of adoption of
guidelines for guidelines for guidelines for guidelines for
participatory participatory participatory participatory
village boundary village boundary village boundary village boundary
setting. setting. setting. setting.
Financial service Financial service Financial service Financial service
provider provider provider provider
partnerships partnerships partnerships partnerships
established established established established
(implementing (implementing (implementing (implementing
entity entity entity entity
agreements). agreements). agreements). agreements).
Page 70149
Project funds Project funds Project funds Project funds
disbursed by the disbursed by the disbursed by the disbursed by the
Technical Technical Technical Technical
Assistance and Assistance and Assistance and Assistance and
Oversight Oversight Oversight Oversight
Activity Activity Activity Activity
(percent). (percent). (percent). (percent).
Hectares targeted
for improved
practices for
sustainable
agriculture
(including agro-
forestry) as a
result of Green
Prosperity-funded
projects and/or
partnerships.
Hectares targeted
for protection
through Green
Prosperity-funded
projects and/or
partnerships.
Additional
capacity of
renewable energy
planned.
Grant agreements
approved by Green
Prosperity
Finance Facility.
Villages assisted
in participatory
boundary setting.
District land use,
land cover, and
permits and
licenses
inventories
created.
Proposals that
receive project
preparation
support.
Procurement Procurement Procurement Procurement Procurement Procurement
Modernization management management management management management
Project information information information information information
Objectives: system adopted. system adopted. system adopted. system adopted. system adopted
Achieve Creation of Creation of Creation of Creation of (Phase I).
significant sustainable sustainable sustainable sustainable Date the
government procurement procurement procurement procurement sustainable
expenditure policy National policy National policy National policy National procurement
savings on Action Plan. Action Plan. Action Plan. Action Plan. policy National
procured goods Framework Framework Framework Framework Action Plan
and services, agreements signed agreements signed agreements signed agreements signed endorsed.
while assuring and catalogued. and catalogued. and catalogued. and catalogued.
their quality Procurement Procurement Procurement Procurement
satisfies the Service Unit Service Unit Service Unit Service Unit
public need, and staff trained. staff trained. staff trained. staff trained.
to achieve the Creation of public Creation of public Creation of public Creation of public
delivery of private private private private
public services partnership partnership partnership partnership
as planned. standard bidding standard bidding standard bidding standard bidding
documents. documents. documents. documents.
Date e-catalogue
system
established.
Mentor visits
conducted.
Page 70150
Hours of training
conducted.
Jordan.......................... Expansion Of Treated wastewater Treated wastewater Treated wastewater Treated wastewater Treated wastewater
Wastewater used in used in used in used in used in
Treatment agriculture (as a agriculture (as a agriculture (as a agriculture (as a agriculture (as a
Capacity percent of all percent of all percent of all percent of all percent of all
Objectives: water used for water used for water used for water used for water used for
Increase the irrigation in irrigation in irrigation in irrigation in irrigation in
volume of treated Northern and Northern and Northern and Northern and Northern and
wastewater Middle Jordan Middle Jordan Middle Jordan Middle Jordan Middle Jordan
available as a Valley). Valley). Valley). Valley). Valley).
substitute for Value disbursed of Value disbursed of Value disbursed of Value disbursed of Value disbursed of
freshwater in construction construction construction construction construction
agricultural use. contracts; MCC contracts; MCC contracts; MCC contracts; MCC contracts; MCC
contribution. contribution. contribution. contribution. contribution.
Total engineering, Total engineering, Total engineering, Total engineering, Total engineering,
procurement, and procurement, and procurement, and procurement, and procurement, and
construction construction construction construction construction
costs of As-Samra costs of As-Samra costs of As-Samra costs of As-Samra costs of As-Samra
Expansion. Expansion. Expansion. Expansion. Expansion.
Wastewater Sewer blockage Sewer blockage Sewer blockage Sewer blockage Sewer blockage
Collection events; annual. events; annual. events; annual. events; annual. events; annual.
Objectives: Volume of Volume of Volume of Volume of Volume of
Increase access wastewater wastewater wastewater wastewater wastewater
to the wastewater collected; collected; collected; collected; collected;
network, increase (millions of (millions of (millions of (millions of (millions of
the volume of cubic meters per cubic meters per cubic meters per cubic meters per cubic meters per
wastewater year). year). year). year). year).
collected and Residential Residential Residential Residential Residential
reduce the population population population population population
incidents of connected to the connected to the connected to the connected to the connected to the
sewage overflow. sewer system sewer system sewer system sewer system sewer system
(percent). (percent). (percent). (percent). (percent).
Expand network Expand network Expand network Expand network Expand network
(kilometers). (kilometers). (kilometers). (kilometers). (kilometers).
Value disbursed of Value disbursed of Value disbursed of Value disbursed of Value disbursed of
sanitation sanitation sanitation sanitation sanitation
construction construction construction construction construction
contracts. contracts. contracts. contracts. contracts.
Water Network Network water Network water Network water Network water Network water
Restructuring and consumption per consumption per consumption per consumption per consumption per
Rehabilitation capita capita capita capita capita
Objectives: (residential and (residential and (residential and (residential and (residential and
Reduce water non-residential); non-residential); non-residential); non-residential); non-residential);
losses, improve liters/capita/day. liters/capita/day. liters/capita/day. liters/capita/day. liters/capita/
continuity of Operating cost Operating cost Operating cost Operating cost day.
water service and coverage--Water coverage--Water coverage--Water coverage--Water Operating cost
improve overall Authority Jordan Authority Jordan Authority Jordan Authority Jordan coverage--Water
efficiency and Zarqa. Zarqa. Zarqa. Zarqa. Authority Jordan
use of network Non-Revenue Water Non-Revenue Water Non-Revenue Water Non-Revenue Water Zarqa.
water delivery (percent). (percent). (percent). (percent). Non-Revenue Water
leading to Continuity of Continuity of Continuity of Continuity of (percent).
households Supply time; Supply time; Supply time; Supply time; Continuity of
substituting hours per week. hours per week. hours per week. hours per week. Supply time;
network water for Restructured and Restructured and Restructured and Restructured and hours per week.
costly rehabilitated rehabilitated rehabilitated rehabilitated Restructured and
alternatives. primary and primary and primary and primary and rehabilitated
secondary secondary secondary secondary primary and
pipelines pipelines pipelines pipelines secondary
(kilometers). (kilometers). (kilometers). (kilometers). pipelines
(kilometers).
Restructured and Restructured and Restructured and Restructured and Restructured and
rehabilitated rehabilitated rehabilitated rehabilitated rehabilitated
tertiary tertiary tertiary tertiary tertiary
pipelines pipelines pipelines pipelines pipelines
(kilometers). (kilometers). (kilometers). (kilometers). (kilometers).
Page 70151
Value disbursed of Value disbursed of Value disbursed of Value disbursed of Value disbursed of
water water water water water
construction construction construction construction construction
contracts--Infras contracts--Infras contracts--Infras contracts--Infras contracts--Water
tructure Activity tructure Activity tructure Activity tructure Activity Network Project.
and Water Smart and Water Smart and Water Smart and Water Smart
Homes Activity. Homes Activity. Homes Activity. Homes Activity.
National Aid Fund National Aid Fund National Aid Fund National Aid Fund National Aid Fund
households with households with households with households with households with
improved water improved water improved water improved water improved water
and wastewater and wastewater and wastewater and wastewater and wastewater
network. network. network. network. network.
National Aid Fund National Aid Fund National Aid Fund National Aid Fund National Aid Fund
households households households households households
connected to the connected to the connected to the connected to the connected to the
wastewater wastewater wastewater wastewater wastewater
network as a network as a network as a network as a network as a
result of the result of the result of the result of the result of the
Water Smart Homes Water Smart Homes Water Smart Homes Water Smart Homes Water Smart Homes
Activity. Activity. Activity. Activity. Activity.
Lesotho......................... Health Sector Deliveries Compact closed.... Compact closed.... Compact closed.... Compact closed.
Project conducted in
Objectives: health centers
Increase access (percent).
to life-extending People with HIV
anti-retroviral still alive 12
treatment and months after
essential health initiation of
services by treatment
providing a (percent).
sustainable Tuberculosis
delivery platform. notifications
(per 100,000
population).
Health centers
equipped
(percent).
Physical
completion of
health center
facilities
(percent).
Physical
completion of
Outpatient
Departments
(percent).
Physical
completion of the
Botsabelo
facilities
(percent).
Private Sector Debit/smart cards Compact closed.... Compact closed.... Compact closed.... Compact closed.
Development issued.
Project Bonds registered..
Objectives: Change in time for
Stimulate property
investment by transactions
improving access (percent).
to credit, Urban land parcels
reducing regularized and
transaction costs registered.
and increasing Stakeholders
the participation trained.
of women in the Time required to
economy. resolve
commercial
disputes (days).
Cases filed at the
commercial court.
Page 70152
Women holding
titles to land.
People trained....
Water Sector Physical Compact closed.... Compact closed.... Compact closed.... Compact closed.
Project completion of
Objectives: Metolong water
Improve the water treatment works
supply for contract
industrial and (percent).
domestic needs, Households with
and enhance rural provisions to
livelihoods connect to water
through improved networks.
watershed Non-revenue water
management. (percent).
Physical
completion of
Urban Water
supply works
contracts
(percent).
Ventilated
improved pit
latrines built.
Water points
constructed.
Malawi.......................... Natural Resource Value of signed Value of signed Value of signed Value of signed Value of signed
Management weed and sediment weed and sediment weed and sediment weed and sediment weed and sediment
Project management management management management management
Objectives: activity activity activity activity activity
Increase contracts. contracts. contracts. contracts. contracts.
efficiency of Distribution of Distribution of Distribution of Distribution of
hydropower invasive aquatic invasive aquatic invasive aquatic invasive aquatic
generation. species (cubic species (cubic species (cubic species (cubic
kilometers). kilometers). kilometers). kilometers).
Amount of weed Amount of weed Amount of weed Amount of weed ..................
harvested at harvested at harvested at harvested at
Liwonde barrage Liwonde barrage Liwonde barrage Liwonde barrage
(metric tons). (metric tons). (metric tons). (metric tons).
Grant agreements
in place with
civil society and
private sector
service
providers.
Value of signed
Environmental and
Natural Resource
Management &
Social and Gender
Assessment
project
contracts.
Power Project Percent disbursed Percent disbursed Percent disbursed Percent disbursed Percent disbursed
Objectives: of feasibility of feasibility of feasibility of feasibility of feasibility
Improve the and design and design and design and design and design
availability, contracts. contracts. contracts. contracts. contracts.
reliability and Average duration Average duration Average duration Average duration
quality of the of outages/ of outages/ of outages/ of outages/
power supply by interruptions interruptions interruptions interruptions
increasing the (hours). (hours). (hours). (hours).
throughput Average frequency Average frequency Average frequency Average frequency
capacity and of forced outages/ of forced outages/ of forced outages/ of forced outages/
stability of the Interruptions Interruptions Interruptions Interruptions
national (ratio). (ratio). (ratio). (ratio).
electricity grid.
Page 70153
Average frequency Average frequency Average frequency
of forced outages/ of forced outages/ of forced outages/
Interruptions Interruptions Interruptions
(ratio). (ratio). (ratio).
Value of signed
power
infrastructure
construction
contracts.
Power Sector Cost recovery Cost recovery Cost recovery Cost recovery
Reform Project ratio--operating ratio--operating ratio--operating ratio--operating
Objectives: expenses expenses expenses expenses
Create an (percent). (percent). (percent). (percent).
enabling Debt- equity ratio Debt- equity ratio Debt- equity ratio Debt- equity ratio
environment for Average creditor Average Average Average
future expansion days. collections collections collections
by strengthening period (days). period (days). period (days).
sector
institutions and
enhancing
regulation and
governance of the
sector.
Electricity Supply
Corporation of
Malawi
Maintenance
Expenditures
ratio to planned
maintenance
budget.
Bad Debt.
Approved tariff
levels and
schedules
(actual) (U.S.
cents/kilowatt
hour).
Tariff levels and Tariff levels and Tariff levels and Tariff levels and
schedules (U.S. schedules (U.S. schedules (U.S. schedules (U.S.
cents/kilowatt cents/kilowatt cents/kilowatt cents/kilowatt
hour). hour). hour). hour).
Moldova......................... Road Reduced cost for Reduced cost for Reduced cost for Reduced cost for Reduced cost for
Rehabilitation road users. road users. road users. road users. road users.
Project Average annual Average annual Average annual Average annual Average annual
Objectives: daily traffic. daily traffic. daily traffic. daily traffic. daily traffic.
Enhance Road maintenance Road maintenance Road maintenance Road maintenance Road maintenance
transportation expenditure. expenditure. expenditure. expenditure. expenditure.
conditions.
Kilometers of Kilometers of Kilometers of Kilometers of Kilometers of
roads completed. roads completed. roads completed. roads completed. roads completed.
Percent of Percent of Percent of Percent of Percent of
contracted roads contracted roads contracted roads contracted roads contracted roads
works disbursed. works disbursed. works disbursed. works disbursed. works disbursed.
Road safety Road safety Road safety Road safety Road safety
training for training for training for training for training for
children (number children (number children (number children (number children (number
of children). of children). of children). of children). of children).
Date Resettlement Date Resettlement Date Resettlement Date Resettlement Date Resettlement
Action Plan Action Plan Action Plan Action Plan Action Plan
completed. completed. completed. completed. completed.
Trafficking in Trafficking in Trafficking in Trafficking in Trafficking in
persons training persons training persons training persons training persons training
participants. participants. participants. participants. participants.
Roughness (meters
per kilometer).
Page 70154
Temporary
employment
generated in road
construction
(number
employed).
Hectares under Hectares under Hectares under Hectares under Hectares under
improved or new improved or new improved or new improved or new improved or new
irrigation. irrigation. irrigation. irrigation. irrigation.
Centralized Centralized Centralized Centralized Centralized
irrigation irrigation irrigation irrigation irrigation
systems systems systems systems systems
rehabilitated. rehabilitated. rehabilitated. rehabilitated. rehabilitated.
Percent disbursed Percent disbursed Percent disbursed Percent disbursed Percent disbursed
of irrigation of irrigation of irrigation of irrigation of irrigation
construction construction construction construction construction
contracts. contracts. contracts. contracts. contracts.
Management Management Management Management Management
transfer transfer transfer transfer transfer
agreements signed. agreements signed. agreements signed. agreements signed. agreements
signed.
New high value New high value New high value New high value New high value
agriculture agriculture agriculture agriculture agriculture
infrastructure in infrastructure in infrastructure in infrastructure in infrastructure in
place (metric place (metric place (metric place (metric place (metric
tons). tons). tons). tons). tons).
Loans past due.... Loans past due.... Loans past due.... Loans past due.... Loans past due.
Value of Value of Value of Value of Value of
agricultural and agricultural and agricultural and agricultural and agricultural and
rural loans. rural loans. rural loans. rural loans. rural loans.
Loan borrowers.... Loan borrowers.... Loan borrowers.... Loan borrowers.... Loan borrowers.
Loan borrowers Loan borrowers Loan borrowers Loan borrowers Loan borrowers
(female). (female). (female). (female). (female).
Value of sales Value of sales Value of sales Value of sales Value of sales
facilitated. facilitated. facilitated. facilitated. facilitated.
Farmers who have Farmers who have Farmers who have Farmers who have Farmers who have
applied improved applied improved applied improved applied improved applied improved
practices as a practices as a practices as a practices as a practices as a
result of result of result of result of result of
training. training. training. training. training.
Farmers trained... Farmers trained... Farmers trained... Farmers trained... Farmers trained.
Farmers trained Farmers trained Farmers trained Farmers trained Farmers trained
(female). (female). (female). (female). (female).
Enterprises Enterprises Enterprises Enterprises Enterprises
assisted. assisted. assisted. assisted. assisted.
Enterprises Enterprises Enterprises Enterprises Enterprises
assisted (female). assisted (female). assisted (female). assisted (female). assisted
(female).
Water user Water user Water user Water user
associations associations associations associations
achieving achieving achieving achieving
financial financial financial financial
sustainability. sustainability. sustainability. sustainability.
Transition To High Value of signed Value of signed Value of signed Value of signed Value of signed
Value Agriculture irrigation irrigation irrigation irrigation irrigation
Project construction construction construction construction construction
Objectives: contracts. contracts. contracts. contracts. contracts.
Increase incomes Date Revised Legal Date Revised Legal Date Revised Legal Date Revised Legal Date Revised Legal
in the Water Management Water Management Water Management Water Management Water Management
agricultural Framework passed. Framework passed. Framework passed. Framework passed. Framework passed.
sector; Create Water user Water user Water user Water user Water user
models for associations with associations with associations with associations with associations with
transition to active and active and active and active and active and
high value representative representative representative representative representative
agriculture (HVA) governance. governance. governance. governance. governance.
in CIS areas and Water user Water user Water user Water user Water user
an enabling associations with associations with associations with associations with associations with
environment gender-balanced gender-balanced gender-balanced gender-balanced gender-balanced
(legal, financial management and management and management and management and management and
and market) for governance. governance. governance. governance. governance.
replication.
Page 70155
Enterprises that Enterprises that Enterprises that Enterprises that Enterprises that
have applied have applied have applied have applied have applied
improved improved improved improved improved
techniques. techniques. techniques. techniques. techniques.
Percent disbursed Percent disbursed Percent disbursed Percent disbursed Percent disbursed
of irrigation of irrigation of irrigation of irrigation of irrigation
feasibility and feasibility and feasibility and feasibility and feasibility and
design contracts. design contracts. design contracts. design contracts. design contracts.
Value of signed Value of signed Value of signed Value of signed Value of signed
irrigation irrigation irrigation irrigation irrigation
feasibility and feasibility and feasibility and feasibility and feasibility and
design contracts. design contracts. design contracts. design contracts. design contracts.
Temporary
employment
generated in
irrigation.
The Central
Phytosanitary Lab
is certified.
Mongolia........................ Energy and Heat-only boilers Compact closed.... Compact closed.... Compact closed.... Compact closed.
Environmental sites upgraded.
Project Subsidized stoves
Objectives: sold..
Increased wealth Power dispatched
and productivity from substation
through greater (millions of
fuel use kilowatt hours)..
efficiency and
decreasing health
costs from air
pollution in
Ulaanbaatar.
Health Project Amount of civil Compact closed.... Compact closed.... Compact closed.... Compact closed.
Objectives: society grants
Reduce the risk (U.S. dollars).
of premature Cervical cancer
death and cases detected
disability from early (percent).
NCDs and traffic Screening for
injuries. hypertension
(percent).
School teachers
trained.
Health staff
trained.
Primary healthcare
facilities with
non-communicable
disease services
(percent).
Property Rights Wells completed...
Project
Objectives:
Increase the
security and
capitalization of
land assets held
by lower-income
Mongolians, and
increase peri-
urban herder
productivity and
incomes.
Page 70156
Stakeholders Compact closed.... Compact closed.... Compact closed.... Compact closed.
trained.
Leases awarded....
Project herder
groups limiting
their livestock
population to the
carrying capacity
of their leases
on farms in 3
central aimags
(Ulaanbaatar,
Darkhan and
Erdenet)
(percent).
Official cost
prescribed for
property
transactions
(first-time)
(U.S. dollars).
Household with
land rights
formalized.
Legal and
regulatory
reforms adopted.
Stakeholders
trained.
Roads Project Kilometers of Compact closed.... Compact closed.... Compact closed.... Compact closed.
Objectives: More roads completed.
efficient Kilometers of
transport for roads under
trade and access design.
to services.
Percent disbursed
of road
construction
contracts.
Technical Students Compact closed.... Compact closed.... Compact closed.... Compact closed.
Vocational participating in
Education Project MCC-supported
Objectives: education
Increase activities.
employment and Public-private
income among partnership
unemployed and funding
underemployed contributed to
Mongolians. Technical
Vocational
Education and
Training (TVET)
schools (percent).
Educational
facilities
constructed or
rehabilitated.
Instructors
trained.
Page 70157
Morocco......................... Artisan and Fez Total receiving Compact closed.... Compact closed.... Compact closed.... Compact closed.
Medina Project literacy training.
Objectives: Graduates of MCC-
Increase revenue supported
from cultural and functional
artisan literacy program
activities, and (female).
improve Graduates of MCC-
educational and supported
professional functional
qualifications of literacy program
compact (male).
beneficiaries. Total receiving
professional
training.
Females receiving
professional
training.
Graduates of
vocational
training program
(residential,
apprenticeship
and continuing
education).
Drop-out rates of
participants of
residential and
apprenticeship
programs
(percent).
Potters trained...
MCC-subsidized gas
kilns bought by
artisans.
Adoption rate of
improved
production
practices
promoted by the
project (percent).
Tourist circuits
improved or
created.
Small and medium
enterprises
(SMEs) that
append the label
on their products.
SMEs participating
in promotion
events.
Sites constructed
or rehabilitated
(4 foundouks,
Place Lalla
Ydouna, Ain
Nokbi).
Beneficiaries of
Ain Nokbi
construction and
artisan
resettlement
program.
Page 70158
Enterprise Support Reduction in SME Compact closed.... Compact closed.... Compact closed.... Compact closed.
Project mortality
Objectives: (treatment firms
Improve the with respect to
outcomes of the control firms)
Moukawalati and one year after
National support
Initiative for completion
Human Development (percent).
programs by Days of individual
increasing the coaching.
viability of Beneficiaries
young enterprises trained.
created through
these programs.
Financial Services Value of loan Compact closed.... Compact closed.... Compact closed.... Compact closed.
Project agreements
Objectives: between
Improve micro- microcredit
enterprise associations and
services and Jaida (millions
remove most of Moroccan
severe dirhams).
constraints to Microfinance
the development institutions'
of the portfolio at risk
microfinance at 30 days
sector based on (percent).
market principals. Value of loans
granted through
mobile branches
(U.S. dollars).
Clients reached
through mobile
branches.
Value of loan
disbursements to
Jaida (U.S.
dollars).
Fruit Tree Area planted and Compact closed.... Compact closed.... Compact closed.... Compact closed.
Productivity delivered to
Project farmers
Objectives: (hectares).
Stimulate growth Area in expansion
in the perimeters for
agricultural which water and
sector and reduce soil conservation
the volatility of measures have
agricultural been implemented
production by (hectares).
restructuring Cumulative area of
farming from irrigated
grains towards perimeters
fruit tree rehabilitated
cultivation. (hectares).
Yield of
rehabilitated
olive trees in
irrigated areas
(metric tons per
hectare).
Average
agricultural
revenue per farm
in oasis areas
(U.S. dollars).
Page 70159
Hectares under
improved
irrigation.
Yield of
rehabilitated
date palms in
oasis areas
(metric tons per
hectare).
In vitro seedlings
successfully
planted.
Farmers trained
(in all areas
targeted by the
project).
Catalyst Fund
proposals
approved.
Disbursements
under the
catalyst fund
(U.S. dollars).
Small-Scale Boats benefitting Compact closed.... Compact closed.... Compact closed.... Compact closed.
Fisheries Project from landing
Objectives: sites and ports.
Supported by Artisan fishers
modern landing- who received a
site training
infrastructure, certificate.
equipment and Average price of
storage fish at auction
facilities, markets (Moroccan
develop value- dirhams per
chain activities kilogram).
related to the Work days created
fishing industry for construction
encouraging jobs in landing
greater access to sites, ports, and
national and wholesale market
international sites.
markets, while Active mobile fish
improving the vendors trained
fish quality and and equipped by
preserving the project.
resources.
Net annual income
of mobile fish
vendors (U.S.
dollars).
Mozambique...................... Farmer Income Survival rate of Compact closed.... Compact closed.... Compact closed.... Compact closed.
Support Project coconut seedlings
Objectives: To (percent).
protect and Coconut seedlings
restore income planted.
from coconuts and Farmers trained in
their derivatives surveillance and
and expand pest and disease
farmers' control for
productive coconuts.
capacity through Farmers trained in
income planting and post
diversification.. planting
management of
coconuts.
Hectares of
alternative crops
under production.
Page 70160
Farmers trained in
alternative crop
production and
productivity
enhancing
strategies.
Farmers using
alternative crop
production and
productivity
enhancing
strategies
(percent).
Businesses
receiving
Business
Development Fund
grants.
Land Tenure People trained Compact closed.... Compact closed.... Compact closed.... Compact closed.
Project (paralegal
Objectives: courses at Legal
Establish and Judicial
efficient and Training Centre,
secure land general training
access for at National
households, Directorate for
communities, and Land and
investors. Forestry, etc.).
Land
administration
offices
established or
upgraded.
Land tenure
regularization
(LTR) urban
parcels mapped.
LTR land use
property rights
certificates
(DUATs) delivered
to the urban
beneficiaries.
LTR rural hectares
mapped.
LTR DUATs
delivered to the
rural
beneficiaries.
Community Land
Fund rural
hectares
formalized.
Community Land
Fund communities
land areas mapped.
Rehabilitation/ Percent of roads Compact closed.... Compact closed.... Compact closed.... Compact closed.
Construction of works contracts
Roads Project disbursed.
Objectives: To Kilometers of
increase access roads issued take-
to productive over certificates.
resources and
markets while
reducing
associated
transport costs.
Page 70161
Water Supply and Value of municipal Compact closed.... Compact closed.... Compact closed.... Compact closed.
Sanitation sanitation and
Project drainage systems
Objectives: To construction
increase access contracts signed.
to reliable Amount disbursed
sources of for municipal
potable water sanitation and
supply in urban drainage
and rural areas construction
and improved contracts.
sanitation in Value of contracts
urban and peri- signed for
urban areas. construction of
water systems.
Percent of revised
construction
contract
disbursed for
water systems.
Rural water points
constructed.
Percent of rural
population of the
six intervention
districts with
access to
improved water
sources.
Amount disbursed
for rural water
points
construction
contracts (U.S.
dollars).
Persons trained in
hygiene and
sanitary best
practices.
Namibia......................... Agriculture Participating Participating Participating Participating Participating
Project households households households households households
Objectives: registered in the registered in the registered in the registered in the registered in the
Enhance the Community-Based Community-Based Community-Based Community-Based Community-Based
health and Rangeland and Rangeland and Rangeland and Rangeland and Rangeland and
marketing Livestock Livestock Livestock Livestock Livestock
efficiency of Management sub- Management sub- Management sub- Management sub- Management sub-
livestock in the activity. activity. activity. activity. activity.
Northern Communal Grazing areas with Grazing areas with Grazing areas with Grazing areas with Grazing areas with
Areas of Namibia documented documented documented documented documented
and to increase combined combined combined combined combined
income from management plans. management plans. management plans. management plans. management plans.
indigenous Parcels corrected Parcels corrected Parcels corrected Parcels corrected Parcels corrected
natural products or incorporated or incorporated or incorporated or incorporated or incorporated
accruing to the in land system. in land system. in land system. in land system. in land system.
poor nationwide.
Stakeholders Stakeholders Stakeholders Stakeholders Stakeholders
trained. trained. trained. trained. trained.
Cattle tagged with Cattle tagged with Cattle tagged with Cattle tagged with Cattle tagged with
RFID tags. RFID tags. RFID tags. RFID tags. RFID tags.
Value of grant Value of grant Value of grant Value of grant Value of grant
agreements signed agreements signed agreements signed agreements signed agreements signed
under the under the under the under the under the
Livestock Livestock Livestock Livestock Livestock
Efficiency Fund. Efficiency Fund. Efficiency Fund. Efficiency Fund. Efficiency Fund.
Farmers trained... Farmers trained... Farmers trained... Farmers trained... Farmers trained.
Page 70162
Payment to Payment to Payment to Payment to Payment to
producers from producers from producers from producers from producers from
Indigenous Indigenous Indigenous Indigenous Indigenous
Natural Products Natural Products Natural Products Natural Products Natural Products
sales. sales. sales. sales. sales.
Grazing areas Grazing areas Grazing areas Grazing areas Grazing areas
doing combined doing combined doing combined doing combined doing combined
herding. herding. herding. herding. herding.
Legal and Legal and Legal and Legal and Legal and
regulatory regulatory regulatory regulatory regulatory
reforms adopted. reforms adopted. reforms adopted. reforms adopted. reforms adopted.
New state New state New state New state New state
veterinary veterinary veterinary veterinary veterinary
offices offices offices offices offices
operational. operational. operational. operational. operational.
Education Project Learners (any Learners (any Learners (any Learners (any Learners (any
Objectives: level) level) level) level) level)
Improve the participating in participating in participating in participating in participating in
quality of the the 47 schools the 47 schools the 47 schools the 47 schools the 47 schools
workforce in sub-activity. sub-activity. sub-activity. sub-activity. sub-activity.
Namibia by Educational Educational Educational Educational Educational
enhancing the facilities facilities facilities facilities facilities
equity and constructed, constructed, constructed, constructed, constructed,
effectiveness of rehabilitated, rehabilitated, rehabilitated, rehabilitated, rehabilitated,
basic vocational, equipped in the equipped in the equipped in the equipped in the equipped in the
and tertiary 47 schools 47 schools 47 schools 47 schools 47 schools
education and of subhyphenactivi subhyphenactivi subhyphenactivi subhyphenactivi subhyphenactivi
technical skills. ty. ty. ty. ty. ty.
Textbooks Textbooks Textbooks Textbooks Textbooks
delivered. delivered. delivered. delivered. delivered.
Educators trained Educators trained Educators trained Educators trained Educators trained
to be textbook to be textbook to be textbook to be textbook to be textbook
management management management management management
trainers. trainers. trainers. trainers. trainers.
Educators trained Educators trained Educators trained Educators trained Educators trained
to be textbook to be textbook to be textbook to be textbook to be textbook
utilization utilization utilization utilization utilization
trainers. trainers. trainers. trainers. trainers.
Visits to Namibia Visits to Namibia Visits to Namibia Visits to Namibia Visits to Namibia
accountable accountable accountable accountable accountable
entity assisted entity assisted entity assisted entity assisted entity assisted
regional study regional study regional study regional study regional study
and resource and resource and resource and resource and resource
centers. centers. centers. centers. centers.
Compliance rate Compliance rate Compliance rate Compliance rate Compliance rate
for National for National for National for National for National
Training Fund Training Fund Training Fund Training Fund Training Fund
levy. levy. levy. levy. levy.
Graduates from MCC- Graduates from MCC- Graduates from MCC- Graduates from MCC- Graduates from MCC-
supported supported supported supported supported
education education education education education
activities. activities. activities. activities. activities.
Percent of schools Percent of schools Percent of schools Percent of schools Percent of schools
with positions with positions with positions with positions with positions
filled to teach filled to teach filled to teach filled to teach filled to teach
information, information, information, information, information,
communication and communication and communication and communication and communication and
technology technology technology technology technology
literacy. literacy. literacy. literacy. literacy.
Regional study and Regional study and Regional study and Regional study and Regional study and
resource centers resource centers resource centers resource centers resource centers
opened to opened to opened to opened to opened to
visitors. visitors. visitors. visitors. visitors.
Percent of Percent of Percent of Percent of Percent of
positions at positions at positions at positions at positions at
regional study regional study regional study regional study regional study
and resource and resource and resource and resource and resource
centers staffed. centers staffed. centers staffed. centers staffed. centers staffed.
Page 70163
Community skills Community skills Community skills Community skills Community skills
development development development development development
centers and arts centers and arts centers and arts centers and arts centers and arts
and crafts and crafts and crafts and crafts and crafts
centers completed. centers completed. centers completed. centers completed. centers
completed.
Modified National Modified National Modified National Modified National Modified National
Student Financial Student Financial Student Financial Student Financial Student Financial
Assistance Fund Assistance Fund Assistance Fund Assistance Fund Assistance Fund
management management management management management
information information information information information
system completed. system completed. system completed. system completed. system completed.
Tourism Project Tourists to Etosha Tourists to Etosha Tourists to Etosha Tourists to Etosha Tourists to Etosha
Objectives: Grow National Park. National Park. National Park. National Park. National Park
the Namibian Galton Gate Plan Galton Gate Plan Galton Gate Plan Galton Gate Plan Galton Gate Plan
tourism industry implemented. implemented. implemented. implemented. implemented.
with a focus on Unique visits on Unique visits on Unique visits on Unique visits on Unique visits on
increasing income Namibia Tourism Namibia Tourism Namibia Tourism Namibia Tourism Namibia Tourism
to households in Board website. Board website. Board website. Board website. Board website.
communal Leisure tourist Leisure tourist Leisure tourist Leisure tourist Leisure tourist
conservancies. arrivals. arrivals. arrivals. arrivals. arrivals.
North American North American North American North American North American
tourism tourism tourism tourism tourism
businesses businesses businesses businesses businesses
(travel agencies (travel agencies (travel agencies (travel agencies (travel agencies
and tour and tour and tour and tour and tour
operators) that operators) that operators) that operators) that operators) that
offer Namibian offer Namibian offer Namibian offer Namibian offer Namibian
tours or tour tours or tour tours or tour tours or tour tours or tour
packages. packages. packages. packages. packages.
Annual gross Annual gross Annual gross Annual gross Annual gross
revenue to revenue to revenue to revenue to revenue to
conservancies conservancies conservancies conservancies conservancies
receiving receiving receiving receiving receiving
assistance from assistance from assistance from assistance from assistance from
Namibia Namibia Namibia Namibia Namibia
accountable accountable accountable accountable accountable
entity (Namibian entity (Namibian entity (Namibian entity (Namibian entity (Namibian
dollars). dollars). dollars). dollars). dollars).
Amount of new Amount of new Amount of new Amount of new Amount of new
private sector private sector private sector private sector private sector
investment investment investment investment investment
secured by secured by secured by secured by secured by
conservancies conservancies conservancies conservancies conservancies
assisted by assisted by assisted by assisted by assisted by
Namibia Namibia Namibia Namibia Namibia
accountable accountable accountable accountable accountable
entity (Namibian entity (Namibian entity (Namibian entity (Namibian entity (Namibian
dollars). dollars). dollars). dollars). dollars).
Value of grants Value of grants Value of grants Value of grants Value of grants
issued by the issued by the issued by the issued by the issued by the
Conservancy Conservancy Conservancy Conservancy Conservancy
Development Development Development Development Development
Support Grant Support Grant Support Grant Support Grant Support Grant
Fund (Namibian Fund (Namibian Fund (Namibian Fund (Namibian Fund (Namibian
dollars). dollars). dollars). dollars). dollars).
Galton Gate Galton Gate Galton Gate Galton Gate Galton Gate
construction: construction: construction: construction: construction:
schedule schedule schedule schedule schedule
performance index. performance index. performance index. performance index. performance
index.
Ombika Gate Ombika Gate Ombika Gate Ombika Gate Ombika Gate
construction: construction: construction: construction: construction:
schedule schedule schedule schedule schedule
performance index. performance index. performance index. performance index. performance
index.
Philippines..................... Community New jobs in New jobs in New jobs in New jobs in New jobs in
Development tourism created tourism created tourism created tourism created tourism created
Grants Project. in conservancies. in conservancies. in conservancies. in conservancies. in conservancies.
Page 70164
Completed KALAHI- Completed KALAHI- Completed KALAHI-
CIDSS (KC) sub- CIDSS (KC) sub- CIDSS (KC) sub-
projects projects projects
implemented in implemented in implemented in
compliance with compliance with compliance with
technical plans technical plans technical plans
and within and within and within
schedule and schedule and schedule and
budget. budget. budget.
Communities and/or Communities and/or Communities and/or Communities and/or
barangays with KC barangays with KC barangays with KC barangays with KC
sub-projects that sub-projects that sub-projects that sub-projects that
have a have a have a have a
sustainability sustainability sustainability sustainability
evaluation rating evaluation rating evaluation rating evaluation rating
of satisfactory of satisfactory of satisfactory of satisfactory
or better or better or better or better
(percent). (percent). (percent). (percent).
KALAHI-CIDSS Municipalities Municipalities Municipalities Percentage of Percentage of
Project that provide that provide that provide municipalities municipalities
Objectives: The their KC local their KC local their KC local that provide that provide
KALAHI-CIDSS (KC) counterpart counterpart counterpart their KC local their KC local
Project expects contributions contributions(LCC contributions counterpart counterpart
to improve the (LCC) based on ) based on their (LCC) based on contributions contributions
responsiveness of their LCC LCC delivery plan their LCC (LCC) based on (LCC) based on
local governments delivery plan (percent). delivery plan their LCC their LCC
to community (percent). (percent). delivery plan. delivery plan.
needs, encourage
communities to
engage in
development
activities, and
deliver benefits
to barangay
residents through
the individual
sub-projects.
Sub-projects Sub-projects
completed with completed with
100 percent 100 percent
physical physical
accomplishment. accomplishment.
Barangays that
have completed
all the trainings
during the social
preparation
stage.
Barangays that
have completed
Thematic
Environment
Management System
TEMS Training.
Barangays that
have completed
gender-related
training.
Page 70165
Roads Project Kilometers of road Kilometers of road Kilometers of road Kilometers of road Value of road
Objectives: The sections sections sections sections construction
Secondary completed. completed. completed. completed. contracts
National Roads Value of road Value of road Value of road Value of road disbursed.
Development construction construction construction construction
Project expects contracts signed. contracts signed. contracts signed. contracts signed.
to lower vehicle Value of road Value of road Value of road Value of road
operating costs construction construction construction construction
and save the time contracts signed. contracts signed. contracts signed. contracts signed.
of those
Filipinos living
near the roads.
Project-affected Project-affected Project-affected Project-affected Project-affected
parties resettled. parties resettled. parties resettled. parties resettled. parties
resettled.
Kilometers of
roads with
vehicle-passable
(lanes).
Project-affected
entities
compensated
(female).
Revenue Successful case Successful case Successful case Successful case Successful case
Administration resolutions. resolutions. resolutions. resolutions. resolutions.
Reform Project
Objectives: The
Revenue
Administration
Reform Project
expects to
increase tax
revenues over
time and support
the Department of
Finance's
initiatives to
detect and deter
corruption within
its revenue
agencies.
Personnel charged Personnel charged Personnel charged Personnel charged Personnel charged
with graft, with graft, with graft, with graft, with graft,
corruption, corruption, corruption, corruption, corruption,
lifestyle and/or lifestyle and/or lifestyle and/or lifestyle and/or lifestyle and/or
criminal cases. criminal cases. criminal cases. criminal cases. criminal cases.
Revenue District Revenue District Revenue District Revenue District Revenue District
Offices using Offices using Offices using Offices using Offices using
electronic tax electronic tax electronic tax electronic tax electronic tax
information information information information information
system (percent). system (percent). system (percent). system (percent). system (percent).
Audit cases Audit cases Audit cases Percentage of Percentage of
performed using performed using performed using audit cases audit cases
automated audit automated audit automated audit performed using performed using
tools (percent). tools (percent). tools (percent). automated audit automated audit
tools. tools.
Average time taken Average time taken Average time taken Average time taken
to complete to complete to complete to complete
investigation investigation investigation investigation
(days). (days). (days). (days).
Audits............ Audits............ Audits............ Percentage of
automatically-
generated audits.
Page 70166
Audits completed Audits completed Audits completed
in compliance in compliance in compliance
with prescribed with prescribed with prescribed
period of 120 period of 120 period of 120
days (percent). days (percent). days (percent).
Percentage of
audits completed
in compliance
with prescribed
period of 180
days.
Revenue collection
per audit
(millions of
Philippine
pesos).
Revenue from new
and existing
business
registrants.
Senegal......................... Irrigation Tons of irrigated Tons of irrigated Rice paddy Rice paddy Rice paddy
Objectives: rice production. rice production. production (tons). production (tons). production
Improve Hectares under Hectares under Hectares under Hectares under (tons).
productivity of production. production. production. production across Hectares under
the agricultural cropping seasons. production across
sector. cropping season.
Percent of Percent of Percent disbursed Percent disbursed Percent disbursed
disbursement on disbursement on of irrigation of irrigation of irrigation
the construction the construction construction construction construction
contracts signed contracts signed contracts. contracts. contracts.
for the for the
irrigation irrigation
infrastructures infrastructures
in the Delta and in the Delta and
the Ngallenka. the Ngallenka.
New conflicts New conflicts Conflicts Conflicts Conflicts
resolved resolved successfully successfully successfully
(percent). (percent). mediated. mediated. mediated.
People trained on People trained on Participants in Participants in Participants in
land security land security the training the training the training
tools. tools. modules on land modules on land modules on land
tenure security tenure security tenure security
tools. tools. tools.
Women trained on Women trained on Participants in Participants in Participants in
land security land security the training the training the training
tools. tools. modules on land modules on land modules on land
tenure security tenure security tenure security
tools (female). tools (female). tools (female).
Cropping intensity Cropping intensity Cropping intensity Cropping intensity Cropping intensity
(hectares under (hectares under (hectares under (hectares under (hectares under
production per production per production per production per production per
year/cultivable year/cultivable year/cultivable year/cultivable year/cultivable
hectares) (Delta hectares) (Delta hectares) (Delta hectares) (Delta hectares) (Delta
Activity). Activity). Activity). Activity). Activity).
Cropping intensity Cropping intensity Cropping intensity Cropping intensity Cropping intensity
(hectares under (hectares under (hectares under (hectares under (hectares under
production per production per production per production per production per
year/cultivable year/cultivable year/cultivable year/cultivable year/cultivable
hectares) (Podor hectares) (Podor hectares) (Podor hectares) (Podor hectares) (Podor
Activity). Activity). Activity). Activity). Activity).
Value of the Value of the Value of the Value of the Value of the
construction construction construction construction construction
contracts signed contracts signed contracts signed contracts signed contracts signed
for the for the for the for the for the
irrigation irrigation irrigation irrigation irrigation
infrastructure in infrastructure in infrastructure in infrastructure in infrastructure in
the Delta. the Delta. the Delta. the Delta. the Delta.
Value of the Value of the Value of the Value of the Value of the
construction construction construction construction construction
contracts signed contracts signed contracts signed contracts signed contracts signed
for the for the for the for the for the
irrigation irrigation irrigation irrigation irrigation
infrastructure in infrastructure in infrastructure in infrastructure in infrastructure in
Ngallenka. Ngallenka. Ngallenka. Ngallenka. Ngallenka.
Page 70167
Potentially Potentially
irrigable lands irrigable lands
area (Delta and area (Delta and
Ngallenka) Ngallenka)
(hectares). (hectares).
Total area with Total area with Total area with
improved improved improved
irrigation irrigation irrigation
infrastructure infrastructure infrastructure
(Delta and (Delta and (Delta and
Ngallenka) Ngallenka) Ngallenka)
(hectares). (hectares). (hectares).
Temporary
employment
generated in
irrigation
(number
employed).
Hectares
formalized
(having a land
allocation title
and registered).
Roads Project Percent of Percent of Percent disbursed Percent disbursed Percent disbursed
Objectives: disbursements for disbursements for of road of road of road
Expand Access to the contract the contract construction construction construction
Markets and signed for the signed for the contracts. contracts. contracts.
Services. constructions of constructions of
the National Road the National Road
(RN) #2 and (RN) #2 and
National Road National Road
(RN) #6. (RN) #6.
Kilometers of Kilometers of Kilometers of Kilometers of Kilometers of
roads roads roads roads roads
rehabilitated on rehabilitated on rehabilitated on rehabilitated on rehabilitated on
the RN#2. the RN#2. the RN#2. the RN#2. the RN#2.
International International Roughness (RN#2).. Roughness (RN#2).. Roughness (RN#2).
Roughness Index Roughness Index
on the RN#2. on the RN#2.
International International Roughness (RN#6).. Roughness (RN#6).. Roughness (RN#6).
Roughness Index Roughness Index
on the RN#6. on the RN#6.
Value of contracts Value of contracts Value of signed Value of signed Value of signed
signed for the signed for the road construction road construction road construction
construction of construction of contracts. contracts. contracts.
the RN#2 and the the RN#2 and the
RN#6. RN#6.
Kilometers of Kilometers of Kilometers of Kilometers of Kilometers of
roads roads rehabilitated rehabilitated rehabilitated
rehabilitated on rehabilitated on roads on RN#6. roads on RN#6. roads on RN#6.
the RN#6. the RN#6.
Kilometers of Kilometers of Kilometers of Kilometers of
roads covered by roads covered by roads under roads under
the contract for the contract for design of the design of the
the studies, the the studies, the RN#2. RN#2.
supervision and supervision and
management of the management of the
RN#2. RN#2.
Kilometers of Kilometers of Kilometers of Kilometers of
roads covered by roads covered by roads under roads under
the contract for the contract for design of the design of the
the studies, the the studies, the RN#6. RN#6.
supervision and supervision and
management of the management of the
RN#6. RN#6.
Page 70168
Temporary
employment
generated in road
construction
(number
employed).
Tanzania........................ Energy Sector Current power Compact closed.... Compact closed.... Compact closed.... Compact closed.
Project customers
Objectives: (Zanzibar
Increased value Interconnector
added. Activity).
Transmission and
distribution
substations
capacity
(megawatt peak)
(Zanzibar
Interconnector
Activity).
Technical and non-
technical losses
(Zanzibar)
(percent).
Kilometers of 132
kilovolt (kv)
lines constructed.
Percent disbursed
on overhead lines
contract.
Current power
customers
(Malagarsi
Hydropower and
Kigoma
Distribution
Activity).
Capacity of
photovoltaic (PV)
systems installed
(kilowatt peak).
Current power
customers (all
six project
regions in
Mainland).
Kilometers of 33/
11 kV lines
constructed.
Transmission and
distribution
substations
capacity
(megavolt ampere)
(all six project
regions in
Mainland).
Technical and non-
technical losses
(all six project
regions in
Mainland and
Kigoma) (percent).
Cost recovery
ratio.
Page 70169
Transport Sector Percent disbursed Compact closed.... Compact closed.... Compact closed.... Compact closed.
Project on construction
Objectives: contracts.
Increased cash Surfacing
crop revenue; complete: Tunduma-
Increased Sumbawanga
aggregate visitor (percent).
spending.
Surfacing
complete: Tanga-
Horohoro
(percent).
Surfacing
complete:
Namtumbo-Songea
(percent).
Surfacing
complete:
Peramiho-Mbinga
(percent).
Kilometers of
roads completed
(taken over)
(Mainland Roads
Activity).
Pemba: Percent
disbursed on
construction
contract.
Surfacing
complete: Pemba
(percent).
Kilometers of
roads completed
(taken over)
(Zanzibar Rural
Roads Activity).
Road maintenance
expenditures:
Mainland Trunk
Roads (percent).
Road maintenance
expenditures:
Zanzibar Rural
Roads (percent).
Runway surfacing
complete
(percent).
Water Sector Volume of water Compact closed.... Compact closed.... Compact closed.... Compact closed
Project produced
Objectives: (millions of
Increased liters per day)
investment in (Lower Ruvu Plant
human and Expansion
physical capital; Activity).
Reduced Operations and
prevalence of maintenance cost
water-related recovery
diseases. (percent) (Lower
Ruvu Plant
Expansion
Activity).
Page 70170
Volume of water
produced
(millions of
liters per day)
(Morogoro Water
Supply Activity).
Operations and
Maintenance Cost
Recovery
(percent)
(Morogoro Water
Supply Activity).
Zambia.......................... Water Supply, Measures pending.. Measures pending.. Percent disbursed Percent disbursed Percent disbursed
Sanitation and of water and of water and of water and
Drainage Project sanitation sanitation sanitation
Objectives: construction construction construction
Increase access contracts. contracts. contracts.
to clean water to Volume of water Volume of water Volume of water
generate time and produced (cubic produced (cubic produced (cubic
cost savings for meters per day). meters per day). meters per day).
beneficiaries. Proposals received Proposals received Proposals
Grantees.......... Grantees.......... received.
Grantees.
People trained in People trained in People trained in
social and gender social and gender social and gender
integration and integration and integration and
social inclusion. social inclusion. social inclusion.
People trained in People trained in People trained in
social and gender social and gender social and gender
integration and integration and integration and
social inclusion social inclusion social inclusion
(female). (female). (female).
People trained in People trained in People trained in
social and gender social and gender social and gender
integration and integration and integration and
social inclusion social inclusion social inclusion
(male). (male). (male).
Meters installed Meters installed Meters installed
or replaced. or replaced. or replaced.
Value of Value of
compensation for compensation for
displaced displaced
businesses and businesses and
households (U.S. households (U.S.
dollars). dollars).
Value of water, Value of water,
sanitation and sanitation and
drainage drainage
construction construction
contracts signed contracts signed
(U. S. dollars). (U. S. dollars).
Households and Households and
businesses businesses
displaced. displaced.
People trained in
hygiene and
sanitary best
practices.
People trained in
hygiene and
sanitary best
practices
(female).
Page 70171
People trained in
hygiene and
sanitary best
practices (male).
--------------------------------------------------------------------------------------------------------------------------------------------------------
619(b)--Transfer or Allocation of Funds
------------------------------------------------------------------------
United States agency to which
funds were transferred or Amount Description of
allocated program or project
------------------------------------------------------------------------
None.......................... None............. None.
------------------------------------------------------------------------
FR Doc. 2016-24512 Filed 10-7-16; 8:45 am
BILLING CODE 9211-03-P