Drawbridge Operation Regulations; Saugatuck River, Westport, CT

Federal Register, Volume 78 Issue 78 (Tuesday, April 23, 2013)

Federal Register Volume 78, Number 78 (Tuesday, April 23, 2013)

Rules and Regulations

Pages 23846-23847

From the Federal Register Online via the Government Printing Office www.gpo.gov

FR Doc No: 2013-09555

-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

USCG-2013-0244

Drawbridge Operation Regulations; Saugatuck River, Westport, CT

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Route 136 Bridge across the Saugatuck River, mile 1.3, at Westport, Connecticut. The deviation is necessary to facilitate emergency repairs. Under this temporary deviation, the bridge owner requires a 24 hour advance notice for bridge openings through June 1, 2013.

DATES: This deviation is effective from May 4, 2013 through June 1, 2013.

ADDRESSES: The docket for this deviation, USCG-2013-0244 is available at http://www.regulations.gov. Type the docket number in the ``SEARCH'' box and click ``SEARCH.'' Click on Open Docket Folder on the line associated with this deviation. You may also visit the Docket Management Facility in Room W12-140, on the ground floor of the Department of

Page 23847

Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, call or email Ms. Judy Leung-Yee, Project Officer, First Coast Guard District, judy.k.leung-yee@uscg.mil, or (212) 668-

7165. If you have questions on viewing the docket, call Barbara Hairston, Program Manager, Docket Operations, telephone 202-366-9826.

SUPPLEMENTARY INFORMATION: The Route 136 Bridge has a vertical clearance of 6 feet at mean high water in the closed position. The existing drawbridge operating regulations are found at 33 CFR 117.221(c).

The bridge owner, Connecticut Department of Transportation, requested a 24 hour advance notice requirement for bridge openings to facilitate emergency repairs to the mechanical and electrical components at the bridge.

We previously authorized the above request from March 5, 2013 through May 3, 2013; however, an additional 29 days will be necessary in order to finish storm related repairs from Hurricane Sandy last October. The bridge can operate manually in the event of an emergency situation.

Under this temporary deviation at least a 24 hour advance notice shall be required for bridge openings at the Route 136 Bridge, mile 1.3, across the Saugatuck River at Westport, Connecticut, from May 4, 2013 through June 1, 2013.

The Saugatuck River is predominantly a recreational waterway. During the time period that this temporary deviation will be in effect the impact on navigation will be minimal.

In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated repair period. This deviation from the operating regulations is authorized under 33 CFR 117.35.

Dated: April 10, 2013.

Gary Kassof,

Bridge Program Manager, First Coast Guard District.

FR Doc. 2013-09555 Filed 4-22-13; 8:45 am

BILLING CODE 9110-04-P

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT