Petroleum Refinery Sector Risk and Technology Review and New Source Performance Standards

Federal Register, Volume 80 Issue 230 (Tuesday, December 1, 2015)

Federal Register Volume 80, Number 230 (Tuesday, December 1, 2015)

Rules and Regulations

Pages 75177-75354

From the Federal Register Online via the Government Publishing Office www.gpo.gov

FR Doc No: 2015-26486

Page 75177

Vol. 80

Tuesday,

No. 230

December 1, 2015

Part II

Environmental Protection Agency

-----------------------------------------------------------------------

40 CFR Parts 60 and 63

Petroleum Refinery Sector Risk and Technology Review and New Source Performance Standards; Final Rule

Page 75178

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Parts 60 and 63

EPA-HQ-OAR-2010-0682; FRL-9935-40-OAR

RIN 2060-AQ75

Petroleum Refinery Sector Risk and Technology Review and New Source Performance Standards

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This action finalizes the residual risk and technology review conducted for the Petroleum Refinery source categories regulated under national emission standards for hazardous air pollutants (NESHAP) Refinery MACT 1 and Refinery MACT 2. It also includes revisions to the Refinery MACT 1 and MACT 2 rules in accordance with provisions regarding establishment of MACT standards. This action also finalizes technical corrections and clarifications for the new source performance standards (NSPS) for petroleum refineries to improve consistency and clarity and address issues related to a 2008 industry petition for reconsideration. Implementation of this final rule will result in projected reductions of 5,200 tons per year (tpy) of hazardous air pollutants (HAP) which will reduce cancer risk and chronic health effects.

DATES: This final action is effective on February 1, 2016. The incorporation by reference of certain publications for part 63 listed in the rule is approved by the Director of the Federal Register as of February 1, 2016. The incorporation by reference of certain publications for part 60 listed in the rule were approved by the Director of the Federal Register as of June 24, 2008.

ADDRESSES: The Environmental Protection Agency (EPA) has established a docket for this action under Docket ID No. EPA-HQ-OAR-2010-0682. All documents in the docket are listed on the www.regulations.gov Web site. Although listed in the index, some information is not publicly available, e.g., confidential business information (CBI) or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either electronically through http://www.regulations.gov, or in hard copy at the EPA Docket Center, WJC West Building, Room Number 3334, 1301 Constitution Ave. NW., Washington, DC. The Public Reading Room hours of operation are 8:30 a.m. to 4:30 p.m. Eastern Standard Time (EST), Monday through Friday. The telephone number for the Public Reading Room is (202) 566-1744, and the telephone number for the Air and Radiation Docket and Information Center is (202) 566-1742.

FOR FURTHER INFORMATION CONTACT: For questions about this final action, contact Ms. Brenda Shine, Sector Policies and Programs Division, Refining and Chemicals Group (E143-01), Office of Air Quality Planning and Standards, U.S. Environmental Protection Agency, Research Triangle Park, North Carolina, 27711; telephone number: (919) 541-3608; fax number: (919) 541-0246; and email address: shine.brenda@epa.gov. For specific information regarding the risk modeling methodology, contact Mr. Ted Palma, Health and Environmental Impacts Division (C539-02), Office of Air Quality Planning and Standards, U.S. Environmental Protection Agency, Research Triangle Park, North Carolina 27711; telephone number: (919) 541-5470; fax number: (919) 541-0840; and email address: palma.ted@epa.gov. For information about the applicability of the NESHAP to a particular entity, contact Ms. Maria Malave, Office of Enforcement and Compliance Assurance, U.S. Environmental Protection Agency, William Jefferson Clinton Building, 1200 Pennsylvania Ave. NW., Washington, DC 20460; telephone number: (202) 564-7027; fax number: (202) 564-0050; and email address: malave.maria@epa.gov.

SUPPLEMENTARY INFORMATION: Preamble Acronyms and Abbreviations. We use multiple acronyms and terms in this preamble. While this list may not be exhaustive, to ease the reading of this preamble and for reference purposes, the EPA defines the following terms and acronyms here:

10/25 tpy emissions equal to or greater than 10 tons per year of a single pollutant or 25 tons per year of cumulative pollutants

AEGL acute exposure guideline levels

APCD air pollution control devices

API American Petroleum Institute

BAAQMD Bay Area Air Quality Management District

BDT best demonstrated technology

BLD bag leak detectors

BSER best system of emission reductions

Btu/ft2 British thermal units per square foot

Btu/scf British thermal units per standard cubic foot

CAA Clean Air Act

CBI confidential business information

CCU catalytic cracking units

CDX Central Data Exchange

CEDRI Compliance and Emissions Data Reporting Interface

CEMS continuous emission monitoring system

CFR Code of Federal Regulations

CO carbon monoxide

CO2 carbon dioxide

CO2e carbon dioxide equivalents

COMS continuous opacity monitoring system

COS carbonyl sulfide

CPMS continuous parameter monitoring system

CRA Congressional Review Act

CRU catalytic reforming units

CS2 carbon disulfide

DCU delayed coking units

EPA Environmental Protection Agency

ERPG emergency response and planning guidelines

ERT Electronic Reporting Tool

ESP electrostatic precipitator

FCCU fluid catalytic cracking unit

FGCD fuel gas combustion device

FMP flare management plan

FR Federal Register

FTIR Fourier transform infrared spectroscopy

GC gas chromatograph

GHG greenhouse gases

H2S hydrogen sulfide

HAP hazardous air pollutants

HCl hydrogen chloride

HCN hydrogen cyanide

HF hydrogen fluoride

HFC highest fenceline concentration

HI hazard index

HQ hazard quotient

ICR information collection request

IRIS Integrated Risk Information System

km kilometers

LAER lowest achievable emission rate

lb/day pounds per day

LDAR leak detection and repair

LEL lower explosive limit

LTD long tons per day

MACT maximum achievable control technology

MIR maximum individual risk

mph miles per hour

MPV miscellaneous process vent

NAICS North American Industry Classification System

NESHAP National Emissions Standards for Hazardous Air Pollutants

NFS near-field interfering source

NHVCZ combustion zone net heating value

Ni nickel

NOX nitrogen oxides

NRDC Natural Resources Defense Council

NSPS new source performance standards

NTTAA National Technology Transfer and Advancement Act

OAQPS Office of Air Quality Planning and standards

OECA Office of Enforcement and Compliance Assurance

OEHHA Office of Environmental Health Hazard Assessment

OEL open-ended line

OMB Office of Management and Budget

PM particulate matter

PM2.5 particulate matter 2.5 micrometers in diameter and smaller

ppbv parts per billion by volume

ppm parts per million

Page 75179

ppmv parts per million by volume

PRA Paperwork Reduction Act

PRD pressure relief device \1\

---------------------------------------------------------------------------

\1\ This term is common vernacular to describe the variety of devices regulated as pressure relief valves subject to the requirements in 40 CFR part 63 subpart CC.

---------------------------------------------------------------------------

psia pounds per square inch absolute

psig pounds per square inch gauge

REL reference exposure level

REM Model Refinery Emissions Model

RFA Regulatory Flexibility Act

RTC response to comment

RTR Risk and Technology Review

SAB Science Advisory Board

SBA Small Business Administration

SCAQMD South Coast Air Quality Management District

SCR selective catalytic reduction

SISNOSE significant economic impact on a substantial number of small entities

SO2 sulfur dioxide

SRP sulfur recovery plant

SRU sulfur recovery unit

SSM startup, shutdown and malfunction

TOSHI target organ-specific hazard index

tpy tons per year

UMRA Unfunded Mandates Reform Act

URE unit risk estimate

UV-DOAS ultraviolet differential optical absorption spectroscopy

VCS voluntary consensus standards

VOC volatile organic compounds

degF degrees Fahrenheit

DeltaC the concentration difference between the highest measured concentration and the lowest measured concentration

mug/m\3\ micrograms per cubic meter

Background Information. On June 30, 2014, the EPA proposed revisions to both of the petroleum refinery NESHAP based on our residual risk and technology review (RTR). In that action, we also proposed to revise the NESHAP pursuant to CAA section 112(d)(2) and (3), to revise the SSM provisions in the NESHAP, and to make technical corrections to the NSPS to address issues related to reconsideration of the final NSPS subpart Ja rule in 2008. In this action, we are finalizing decisions and revisions for these rules. We summarize some of the more significant comments received regarding the proposed rule and provide our responses in this preamble. A summary of all other public comments on the proposal and the EPA's responses to those comments is provided in the ``Response to Comment'' document, which is available in Docket ID No. EPA-HQ-OAR-2010-0682. The ``track changes'' version of the regulatory language that incorporates the changes in this final action is also available in the docket for this rulemaking.

Organization of this Document. This preamble is organized as follows:

  1. General Information

    1. Does this action apply to me?

    2. Where can I get a copy of this document and other related information?

    3. Judicial Review and Administrative Reconsideration

  2. Background

    1. What is the statutory authority for this action?

    2. How do the NESHAP and NSPS regulate air pollutant emissions from refineries?

    3. What changes did we propose for the Petroleum Refinery NESHAP and NSPS in our June 30, 2014 RTR proposal?

  3. What is included in this final rule?

    1. What are the final NESHAP amendments based on the risk review for the Petroleum Refinery source categories?

    2. What are the final NESHAP amendments based on the technology review for the Petroleum Refinery source categories?

    3. What are the final NESHAP amendments pursuant to section 112(d)(2) & (3) for the Petroleum Refinery source categories?

    4. What are the final NESHAP amendments addressing emissions during periods of SSM?

    5. What other revisions to the NESHAP and NSPS are being promulgated?

    6. What are the requirements for submission of performance test data to the EPA?

    7. What are the effective and compliance dates of the NESHAP and NSPS?

    8. What materials are being incorporated by reference?

  4. What is the rationale for our final decisions and amendments to the Petroleum Refinery NESHAP and NSPS?

    1. Residual Risk Review for the Petroleum Refinery Source Categories

    2. Technology Review for the Petroleum Refinery Source Categories

    3. Refinery MACT Amendments Pursuant to CAA section 112(d)(2) and (d)(3)

    4. NESHAP Amendments Addressing Emissions During Periods of SSM

    5. Technical Amendments to Refinery MACT 1 and 2

    6. Technical Amendments to Refinery NSPS Subparts J and Ja

  5. Summary of Cost, Environmental, and Economic Impacts and Additional Analyses Conducted

    1. What are the affected facilities, the air quality impacts and cost impacts?

    2. What are the economic impacts?

    3. What are the benefits?

    4. Impacts of This Rulemaking on Environmental Justice Populations

    5. Impacts of This Rulemaking on Children's Health

  6. Statutory and Executive Order Reviews

    1. Executive Orders 12866: Regulatory Planning and Review and Executive Order 13563: Improving Regulation and Regulatory Review

    2. Paperwork Reduction Act (PRA)

    3. Regulatory Flexibility Act (RFA)

    4. Unfunded Mandates Reform Act (UMRA)

    5. Executive Order 13132: Federalism

    6. Executive Order 13175: Consultation and Coordination With Indian Tribal Governments

    7. Executive Order 13045: Protection of Children From Environmental Health Risks and Safety Risks

    8. Executive Order 13211: Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution or Use

  7. National Technology Transfer and Advancement Act (NTTAA) and 1 CFR part 51

    1. Executive Order 12898: Federal Actions To Address Environmental Justice in Minority Populations and Low-Income Populations

    2. Congressional Review Act (CRA)

  8. General Information

    1. Does this action apply to me?

      Regulated Entities. Categories and entities potentially regulated by this action are shown in Table 1 of this preamble.

      Table 1--Industrial Source Categories Affected by This Final Action

      ------------------------------------------------------------------------

      NAICS \a\

      NESHAP and source category Code

      ------------------------------------------------------------------------

      Petroleum Refining Industry................................. 324110

      ------------------------------------------------------------------------

      \a\ North American Industry Classification System.

      Table 1 of this preamble is not intended to be exhaustive, but rather to provide a guide for readers regarding entities likely to be affected by the final action for the source categories listed. To determine whether your facility is affected, you should examine the applicability criteria in the appropriate NESHAP or NSPS. If you have any questions regarding the applicability of any aspect of these NESHAP or NSPS, please contact the appropriate person listed in the preceding FOR FURTHER INFORMATION CONTACT section of this preamble.

    2. Where can I get a copy of this document and other related information?

      In addition to being available in the docket, an electronic copy of this final action will also be available on the Internet through the Technology Transfer Network (TTN) Web site, a forum for information and technology exchange in various areas of air pollution control. Following signature by the EPA Administrator, the EPA will post a copy of this final action at: http://www.epa.gov/ttn/atw/petref.html. Following publication in the Federal Register, the EPA will post the Federal Register version and key technical documents at this same Web site.

      Additional information is available on the RTR Web site at http://www.epa.gov/ttn/atw/rrisk/rtrpg.html. This information includes an overview of the RTR program, links to project Web sites

      Page 75180

      for the RTR source categories, and detailed emissions and other data we used as inputs to the risk assessments.

    3. Judicial Review and Administrative Reconsideration

      Under CAA section 307(b)(1), judicial review of this final action is available only by filing a petition for review in the United States Court of Appeals for the District of Columbia Circuit by February 1, 2016. Under CAA section 307(b)(2), the requirements established by this final rule may not be challenged separately in any civil or criminal proceedings brought by the EPA to enforce the requirements.

      Section 307(d)(7)(B) of the CAA further provides that ``only an objection to a rule or procedure which was raised with reasonable specificity during the period for public comment (including any public hearing) may be raised during judicial review.'' This section also provides a mechanism for the EPA to reconsider the rule ``if the person raising an objection can demonstrate to the Administrator that it was impracticable to raise such objection within the period for public comment or if the grounds for such objection arose after the period for public comment (but within the time specified for judicial review) and if such objection is of central relevance to the outcome of the rule.'' Any person seeking to make such a demonstration should submit a Petition for Reconsideration to the Office of the Administrator, U.S. EPA, Room 3000, WJC Building, 1200 Pennsylvania Ave. NW., Washington, DC 20460, with a copy to both the person(s) listed in the preceding FOR FURTHER INFORMATION CONTACT section, and the Associate General Counsel for the Air and Radiation Law Office, Office of General Counsel (Mail Code 2344A), U.S. EPA, 1200 Pennsylvania Ave. NW., Washington, DC 20460.

  9. Background

    1. What is the statutory authority for this action?

      1. NESHAP

      Section 112 of the CAA establishes a two-stage regulatory process to address emissions of hazardous air pollutants (HAP) from stationary sources. In the first stage, we must identify categories of sources emitting one or more of the HAP listed in CAA section 112(b) and then promulgate technology-based NESHAP for those sources. ``Major sources'' are those that emit, or have the potential to emit, any single HAP at a rate of 10 tons per year (tpy) or more, or 25 tpy or more of any combination of HAP. For major sources, these standards are commonly referred to as maximum achievable control technology (MACT) standards and must reflect the maximum degree of emission reductions of HAP achievable (after considering cost, energy requirements, and non-air quality health and environmental impacts). In developing MACT standards, CAA section 112(d)(2) directs the EPA to consider the application of measures, processes, methods, systems or techniques, including but not limited to those that reduce the volume of or eliminate HAP emissions through process changes, substitution of materials, or other modifications; enclose systems or processes to eliminate emissions; collect, capture, or treat HAP when released from a process, stack, storage, or fugitive emissions point; are design, equipment, work practice, or operational standards; or any combination of the above.

      For these MACT standards, the statute specifies certain minimum stringency requirements, which are referred to as MACT floor requirements, and which may not be based on cost considerations. See CAA section 112(d)(3). For new sources, the MACT floor cannot be less stringent than the emission control achieved in practice by the best-

      controlled similar source. The MACT standards for existing sources can be less stringent than floors for new sources, but they cannot be less stringent than the average emission limitation achieved by the best-

      performing 12-percent of existing sources in the category or subcategory (or the best-performing 5 sources for categories or subcategories with fewer than 30 sources). In developing MACT standards, we must also consider control options that are more stringent than the floor, under CAA section 112(d)(2). We may establish standards more stringent than the floor, based on the consideration of the cost of achieving the emissions reductions, any non-air quality health and environmental impacts, and energy requirements.

      In the second stage of the regulatory process, the CAA requires the EPA to undertake 2 different analyses, which we refer to as the technology review and the residual risk review. Under the technology review, we must review the technology-based standards and revise them ``as necessary (taking into account developments in practices, processes, and control technologies)'' no less frequently than every eight years, pursuant to CAA section 112(d)(6). Under the residual risk review, we must evaluate the risk to public health remaining after application of the technology-based standards and revise the standards, if necessary, to provide an ample margin of safety to protect public health or to prevent, taking into consideration costs, energy, safety and other relevant factors, an adverse environmental effect. The residual risk review is required within eight years after promulgation of the technology-based standards, pursuant to CAA section 112(f). In conducting the residual risk review, if the EPA determines that the current standards provide an ample margin of safety to protect public health, it is not necessary to revise the MACT standards pursuant to CAA section 112(f).\2\ For more information on the statutory authority for this rule, see 79 FR 36879.

      ---------------------------------------------------------------------------

      \2\ The U.S. Court of Appeals has affirmed this approach of implementing CAA section 112(f)(2)(A): NRDC v. EPA, 529 F.3d 1077, 1083 (D.C. Cir. 2008) (``If EPA determines that the existing technology-based standards provide an `ample margin of safety,' then the Agency is free to readopt those standards during the residual risk rulemaking.'').

      ---------------------------------------------------------------------------

      2. NSPS

      Section 111 of the CAA establishes mechanisms for controlling emissions of air pollutants from stationary sources. Section 111(b) of the CAA provides authority for the EPA to promulgate NSPS that apply only to newly constructed, reconstructed and modified sources. Once the EPA has elected to set NSPS for new and modified sources in a given source category, CAA section 111(d) calls for regulation of existing sources, with certain exceptions explained below.

      Specifically, section 111(b) of the CAA requires the EPA to establish emission standards for any category of new and modified stationary sources that the Administrator, in his or her judgment, finds ``causes, or contributes significantly to, air pollution which may reasonably be anticipated to endanger public health or welfare.'' The EPA has previously made endangerment findings under this section of the CAA for more than 60 stationary source categories and subcategories that are now subject to NSPS.

      Section 111 of the CAA gives the EPA significant discretion to identify the affected facilities within a source category that should be regulated. To define the affected facilities, the EPA can use size thresholds for regulation and create subcategories based on source type, class or size. Emission limits also may be established either for equipment within a facility or for an entire facility. For listed source categories, the EPA must establish ``standards of performance'' that apply

      Page 75181

      to sources that are constructed, modified or reconstructed after the EPA proposes the NSPS for the relevant source category.\3\

      ---------------------------------------------------------------------------

      \3\ Specific statutory and regulatory provisions define what constitutes a modification or reconstruction of a facility. 40 CFR 60.14 provides that an existing facility is modified and, therefore, subject to an NSPS, if it undergoes any physical change in the method of operation which increases the amount of any air pollutant emitted by such source or which results in the emission of any air pollutant not previously emitted. 40 CFR 60.15, in turn, provides that a facility is reconstructed if components are replaced at an existing facility to such an extent that the capital cost of the new equipment/components exceed 50-percent of what is believed to be the cost of a completely new facility.

      ---------------------------------------------------------------------------

      The EPA also has significant discretion to determine the appropriate level for the standards. Section 111(a)(1) of the CAA provides that NSPS are to reflect the degree of emission limitation achievable through the application of the best system of emission reduction which (taking into account the cost of achieving such reduction and any non-air quality health and environmental impact and energy requirements) the Administrator determines has been adequately demonstrated. This level of control is commonly referred to as best demonstrated technology (BDT) or the best system of emission reduction (BSER). The standard that the EPA develops, based on the BSER achievable at that source, is commonly a numerical emission limit, expressed as a performance level (i.e., a rate-based standard). Generally, the EPA does not prescribe a particular technological system that must be used to comply with a NSPS. Rather, sources remain free to elect whatever combination of measures will achieve equivalent or greater control of emissions.

      Costs are also considered in evaluating the appropriate standard of performance for each category or subcategory. The EPA generally compares control options and estimated costs and emission impacts of multiple, specific emission standard options under consideration. As part of this analysis, the EPA considers numerous factors relating to the potential cost of the regulation, including industry organization and market structure, control options available to reduce emissions of the regulated pollutant(s) and costs of these controls.

    2. How do the NESHAP and NSPS regulate air pollutant emissions from refineries?

      The EPA promulgated the petroleum refinery NESHAP pursuant to CAA section 112(d)(2) and (3) for refineries located at major sources in two separate rules. On August 18, 1995, the first petroleum refinery MACT standard was promulgated in 40 CFR part 63, subpart CC (60 FR 43620). This rule is known as ``Refinery MACT 1'' and covers the ``Sources Not Distinctly Listed,'' meaning it includes all emissions sources from petroleum refinery process units, except those listed separately under the section 112(c) source category list and expected to be regulated by other MACT standards (for example, boilers and process heaters). Some of the emission sources regulated in Refinery MACT 1 include miscellaneous process vents (MPV), storage vessels, wastewater, equipment leaks, gasoline loading racks, marine tank vessel loading and heat exchange systems.

      On April 11, 2002 (67 FR 17762), EPA promulgated a second MACT standard regulating certain process vents that were listed as a separate source category under CAA section 112(c) and that were not addressed as part of the Refinery MACT 1. This standard, which is referred to as ``Refinery MACT 2'', covers process vents on catalytic cracking units (CCU) (including FCCU), CRU and SRU and is codified as 40 CFR part 63, subpart UUU.

      Finally, on October 28, 2009, we revised Refinery MACT 1 by adding MACT standards for heat exchange systems, which the EPA had not addressed in the original 1995 Refinery MACT 1 rule (74 FR 55686). In this same 2009 action, we updated the cross-references to the General Provisions in 40 CFR part 63. On June 20, 2013 (78 FR 37133), we promulgated minor revisions to the heat exchange provisions of Refinery MACT 1.

      On September 27, 2012, Air Alliance Houston, California Communities Against Toxics and other environmental and public health groups filed a lawsuit alleging that the EPA missed statutory deadlines to review and revise Refinery MACT 1 and 2. The EPA reached an agreement to settle that litigation and entered into a Consent Decree. The Consent Decree provides for the Administrator to sign a final action no later than September 30, 2015.

      Refinery NSPS subparts J and Ja regulated criteria pollutant emissions, including particulate matter (PM), sulfur dioxide (SO2), nitrogen oxides (NOX) and carbon monoxide (CO) from FCCU catalyst regenerators, fuel gas combustion devices (FGCD) and sulfur recovery plants. Refinery NSPS subpart Ja also regulates criteria pollutant emissions from fluid coking units and DCU.

      The NSPS for petroleum refineries (40 CFR part 60, subpart J) were promulgated in 1974, amended in 1976 and amended again in 2008, following a review of the standards. As part of the review that led to the 2008 amendments to the Refinery NSPS subpart J, the EPA developed separate standards of performance for new process units (40 CFR part 60, subpart Ja). However, the EPA received multiple petitions for reconsideration on issues related to those standards. The Administrator granted the petitions for reconsideration. The EPA addressed petition issues related to process heaters and flares by promulgating amendments to the Refinery NSPS subparts J and Ja on September 12, 2012 (77 FR 56422). In this action, we are finalizing technical corrections and clarifications to NSPS subparts J and Ja raised by American Petroleum Institute (API) in their 2008 petition for reconsideration that were not addressed by the final NSPS amendments of 2012.

      The petroleum refining industry consists of facilities that engage in converting crude oil into refined products, including liquefied petroleum gas, gasoline, kerosene, aviation fuel, diesel fuel, fuel oils, lubricating oils and feedstocks for the petrochemical industry. Currently, 142 facilities have emission sources regulated by either or both Refinery MACT 1 and 2.

      Petroleum refinery activities start with the receipt of crude oil for storage at the refinery, include all the petroleum handling and refining operations, and terminate with loading of refined products into pipelines, tank or rail cars, tank trucks, or ships or barges that take products from the refinery to distribution centers. Petroleum-

      specific process units include FCCU and CRU. Other units and processes found at petroleum refineries (as well as at many other types of manufacturing facilities) include storage vessels and wastewater treatment plants. HAP emitted by this industry include organics (e.g., acetaldehyde, benzene, formaldehyde, hexane, phenol, naphthalene, 2-

      methylnaphthalene, dioxins, furans, ethyl benzene, toluene and xylene); reduced sulfur compounds (i.e., carbonyl sulfide (COS), carbon disulfide (CS2))); inorganics (e.g., hydrogen chloride (HCl), hydrogen cyanide (HCN), chlorine, hydrogen fluoride (HF)); and metals (e.g., antimony, arsenic, beryllium, cadmium, chromium, cobalt, lead, mercury, manganese and nickel (Ni)). This industry also emits criteria pollutants and other non-HAP, including NOX, PM, SO2, volatile organic compounds (VOC), CO, greenhouse gases (GHG) and total reduced sulfur.

      Page 75182

    3. What changes did we propose for the Petroleum Refinery NESHAP and NSPS in our June 30, 2014, RTR proposal?

      On June 30, 2014, the EPA published a proposed rule in the Federal Register addressing the RTR for the Petroleum Refinery NESHAP, 40 CFR part 63, subparts CC and UUU. The proposal also included changes pursuant to section 112(d)(2) and (3) and technical revisions to the NSPS. Specifically, we proposed:

      (1) Pursuant to CAA sections 112(d)(2) and (3):

      1. Refinery MACT 1:

        Adding MACT Standards for DCU decoking operations.

        Adding operational requirements for flares used as APCD in Refinery MACT 1 and 2.

        Adding requirements and clarifications for vent control bypasses in Refinery MACT 1.

      2. Refinery MACT 2:

        Revising the CRU purge vent exemption.

        (2) Pursuant to CAA sections 112(d)(6) and 112(f)(2):

        Revising Refinery MACT 1 to cross-reference the corresponding storage vessel requirements in the Generic MACT (40 CFR part 63, subpart WW, as applicable), and revising the definition of Group 1 storage vessels to include smaller capacity storage vessels and to include storage vessels storing materials with lower vapor pressures.

        (3) Pursuant to CAA section 112(d)(6):

      3. Refinery MACT 1:

        Allowing refineries to meet the leak detection and repair (LDAR) requirements in Refinery MACT 1 by monitoring for leaks using optical gas imaging in place of EPA Method 21, once the monitoring protocol set forth in Appendix K is promulgated.

        Amending the Marine Tank Vessel Loading Operations NESHAP, 40 CFR part 63, subpart Y, to delete the exclusion for marine vessel loading operations at petroleum refineries.

        Establishing a fenceline monitoring work practice standard to improve the management of fugitive emissions.

      4. Refinery MACT 2:

        Incorporating requirements consistent with those in Refinery NSPS subpart Ja for FCCU including:

        Requiring the use of 3-hour averages rather than daily averages for parameter operating limits (e.g., depending on the type of control device: Opacity, total power, secondary current, pressure drop, and/or liquid-to-gas ratio).

        Removing the Refinery NSPS subpart J incremental PM emissions allowance for post combustion devices when burning liquid or solid fuels, and removing the 30 percent opacity limit for units complying with NSPS subpart J.

        Adding requirements for FCCU controls to include bag leak detectors (BLD) as an option to continuous opacity monitoring system (COMS).

        Incorporating total power and the secondary current operating limits for electrostatic precipitators (ESP).

        Requiring daily checks of the air or water pressure to the spray nozzles on jet ejector-type wet scrubber or other type of wet scrubber equipped with atomizing spray nozzles.

        Requiring FCCU periodic performance testing on a frequency of once every 5 years, as opposed to the current rule, which only requires an initial performance test.

        Including a correlation equation for the use of oxygen-

        enriched air for SRU.

        Allowing SRU subject to Refinery NSPS subpart Ja with a capacity greater than 20 long tons per day (LTD) to comply with Refinery NSPS subpart Ja as a means of complying with Refinery MACT 2.

        (4) Other proposed changes include:

        Removing exemptions from the rule requirements for periods of SSM in order to ensure that the NESHAP are consistent with the court decision in Sierra Club v. EPA, 551 F. 3d 1019 (D.C. Cir. 2008).

        Clarifying requirements related to open-ended valves or lines.

        Adding electronic reporting requirements.

        Updating the General Provisions cross-reference tables.

        Making technical corrections and clarifications to NSPS subparts J and Ja.

  10. What is included in this final rule?

    This action finalizes the EPA's determinations pursuant to the RTR provisions of CAA section 112 for the Petroleum Refinery source categories and amends the Petroleum Refinery NESHAP based on those determinations. This action also finalizes other changes to the NESHAP including revising Refinery MACT 1 and 2 pursuant to CAA section 112 (d)(2) and (3), including revising requirements for flares and pressure relief devices (PRD). This action finalizes changes to the SSM provisions to ensure that the subparts are consistent with the court decision in Sierra Club v. EPA, 551 F. 3d 1019 (D.C. Cir. 2008), adds electronic reporting requirements in Refinery MACT 1 and 2; and updates the General Provisions cross-reference tables. Finally, this action finalizes technical corrections and clarifications to Refinery NSPS subparts J and Ja to address issues raised in the reconsideration of these rules.

    1. What are the final NESHAP amendments based on the risk review for the Petroleum Refinery source categories?

      The EPA is promulgating final amendments to the Petroleum Refinery NESHAP pursuant to CAA section 112(f) that expand the existing Refinery MACT 1 control requirements and extend these requirements to smaller tanks and tanks with lower vapor pressures. Specifically, consistent with the proposal, the EPA is amending Refinery MACT 1 by revising the definition of Group 1 storage vessels to include storage vessels with capacities greater than or equal to 20,000 gallons but less than 40,000 gallons if the maximum true vapor pressure is 1.0 psia or greater and to include storage tanks greater than 40,000 gallons if the maximum true vapor pressure is 0.75 psia or greater. The EPA is also adding a cross-reference to the storage vessel requirements in the Generic MACT (40 CFR part 63, subpart WW and subpart CC), which include requirements for guide pole controls and other fittings as well as inspection requirements. After considering the public comments, the final amendments include minor changes from our proposed requirements to clarify language and correct typographical and referencing errors.

    2. What are the final NESHAP amendments based on the technology review for the Petroleum Refinery source categories?

      1. Refinery MACT 1

      We determined that there are developments in practices, processes and control technologies that warrant revisions to the MACT standards for this source category. Therefore, to satisfy the requirements of CAA section 112(d)(6), we are revising the MACT standards to amend 40 CFR part 63, subpart Y to delete the exclusion for marine vessel loading operations at petroleum refineries. Removing this exclusion will require small marine vessel loading operations (i.e., operations with HAP emissions less than 10/25 tpy) and offshore marine vessel loading operations to use submerged filling based on the cargo filling line requirements in 46 CFR 153.282, as proposed.

      We are also finalizing a fenceline monitoring work practice standard to improve the management of fugitive emissions and finalizing EPA Methods 325A and 325B to support the work

      Page 75183

      practice, with some changes from proposal to address issues raised by commenters. Key revisions include: New provisions for reduced monitoring for facilities with consistently low fenceline concentrations; requirements for alternatives to passive monitoring; revised placement guidance to allow perimeter monitoring within a facility's property boundary provided all sources are encompassed within the monitoring perimeter; reductions in the number of monitors required for subareas and segregated areas; clarifications on monitor placement for internal roadways or other right-of-ways and marine docks; and revised timelines for submitting periodic reports (quarterly rather than semiannually) and implementing the work practice standard (2 years after promulgation rather than 3 years as proposed). We are also revising Refinery MACT 1 storage vessel requirements as described above under the risk review, as proposed.

      2. Refinery MACT 2

      We determined that there are developments in practices, processes and control technologies that warrant revisions to the MACT standards for this source category. Therefore, to satisfy the requirements of CAA section 112(d)(6), we are revising the Refinery MACT 2 standard for FCCU subject to Refinery NSPS subpart J or those electing to comply with the Refinery NSPS subpart J requirements. As proposed, we are removing the incremental PM limit when burning liquid or solid fuels. We are finalizing a 20-percent opacity operating limit evaluated on a 3-hour average, which differs from the proposal to eliminate the 30-

      percent opacity limit and instead allow only for a site-specific opacity operating limit or control device parameter monitoring. As proposed, we are finalizing requirements to make Refinery MACT 2 consistent with Refinery NSPS subpart Ja for FCCU by including 3-hour averages rather than daily averages for parameter operating limits, and by including 3-hour averages rather than daily averages for the site-

      specific opacity operating limit. We are also finalizing requirements, as proposed, for FCCU controls to include adding BLD as an option to COMS, incorporating total power and the secondary current operating limits for ESP and requiring daily checks of the air or water pressure to the spray nozzles on jet ejector-type wet scrubbers or other types of wet scrubbers equipped with atomizing spray nozzles.

      Finally, we are finalizing, as proposed, requirements for FCCU periodic performance testing at a frequency of once every 5 years rather than the current requirements for a one-time initial performance test. However, for owners or operators complying with the Refinery NSPS subpart J option (with the 20-percent opacity operating limit discussed above), if the PM emissions are within 80-percent of the PM limit during any periodic performance test (i.e., emissions exceed 0.8 lb PM/

      1,000 lbs of coke burn-off), the refinery owner or operator must conduct subsequent performance tests on an annual basis. Based on comments received, we are also adding requirements in the final rule for owners or operators of FCCU to conduct a one-time test for HCN emissions from the FCCU concurrent with their first periodic performance test, which must be conducted on or before August 1, 2017 for all FCCU subject to Refinery MACT 2.

      For SRU, as proposed, we are finalizing a correlation equation for the use of oxygen-enriched air. Additionally, as proposed, we are finalizing requirements to allow sulfur recovery plants subject to Refinery NSPS subpart Ja with a capacity greater than 20 LTD to comply with Refinery NSPS subpart Ja as a means of complying with Refinery MACT 2.

    3. What are the final NESHAP amendments pursuant to section 112(d)(2) & (3) for the Petroleum Refinery source categories?

      1. Refinery MACT 1

      We are finalizing MACT standards for DCU decoking operations that require that each coke drum be depressured to a closed blowdown system until the coke drum pressure is 2 psig with minor revisions from proposal. Specifically, we are finalizing provisions for existing DCU affected sources to average over a 60-cycle (i.e., 60 batch) basis to comply with the 2 psig limit, rather than the proposed requirement to meet the 2 psig limit on a per venting event basis. In addition, we are finalizing requirements for new DCU affected sources to depressure to 2.0 psig on a per-event, not-to-exceed basis, adding one significant digit to the limit for new DCU affected sources. For both new and existing DCU affected sources, we are finalizing specific provisions for DCU with water overflow design and for double quenching.

      We are finalizing operational requirements and the associated monitoring, recordkeeping and reporting requirements for flares used as APCD in Refinery MACT 1 and 2 with revisions to the requirements proposed. Prior to these amendments, Refinery MACT 1 and 2 cross-

      referenced the General Provisions requirements at 40 CFR 63.11(b). As proposed, this final action replaces the cross reference to the General Provisions and incorporates enhanced flare operational requirements directly into the Refinery MACT regulations. As proposed, the final rule amendments require that refinery flares operate with continuously lit pilot flames at all times. Consistent with our proposal, we are finalizing requirements for flares to operate with no visible emissions and comply with consolidated requirements related to flare tip velocity, but in the final rule these direct emissions limits apply when flare vent gas flow is below the smokeless capacity of the flare rather than at all times. Above the smokeless capacity of the flare, we are establishing a work practice standard related to the visible emissions and velocity limits; these work practice standards are described in more detail in section III.D.1 of this preamble.

      We are finalizing new operational requirements related to combustion zone gas properties with revisions from proposal. In response to comments on the proposal, we are finalizing requirements that flares meet a minimum operating limit of 270 BTU/scf NHVcz on a 15-minute average, and are allowing refinery owners or operators to use a corrected heat content of 1,212 BTU/scf for hydrogen to demonstrate compliance with this operating limit. We had proposed two separate sets of limits, one being more stringent if an olefins/hydrogen mixture was present in the waste gas. For each set of limits, we proposed three different alternative combustion zone operating limits: One based on the combustion zone net heat content with no correction for the heat content of hydrogen, one based on the lower flammability limit and one based on the combustibles concentration. We proposed that these limits be determined on a 15-minute ``feed-forward'' block average approach (i.e., compositional data are collected every 15 minutes, after which adjustments are made). We have included an additional option for refiners to comply where more frequent data are collected (using direct net heating value monitoring) to calculate the combustion limit using net heating value data from the same 15-minute block period. We are simplifying the compliance approach to a single operating limit based only on the combustion zone net heating value (with a hydrogen correction). As proposed, we are requiring refinery owners or operators to characterize the composition of waste gas, assist gas and

      Page 75184

      fuel to demonstrate compliance with the operational requirements.

      As proposed, we are also finalizing in this rule a burden reduction option to use grab sampling every 8 hours rather than continuous vent gas composition or heat content monitors. We are also including, based on public comment, provisions to conduct limited initial sampling and process knowledge to characterize flare gas composition for flares in ``dedicated'' service as an alternative to collecting grab samples during each specific event. We are finalizing a requirement for daily visible emissions observations as proposed, but, based on public comment, we are allowing owners or operators to use video surveillance cameras to demonstrate compliance with the visible emissions limit as an alternative to the daily visible emissions observations.

      For PRD, we are finalizing requirements for monitoring systems that are capable of identifying and recording the time and duration of each pressure release to the atmosphere, as proposed. Certain PRD with low set pressures or low emission potential or in liquid service would not be subject to these monitoring requirements. We are finalizing requirements to minimize or prevent atmospheric releases of HAP through PRD. Instead of the proposed prohibition on such releases, we are finalizing work practice requirements that require both preventive measures as well as root cause analysis and corrective action that will incentivize refinery owners or operators to eliminate the causes of the releases.

      We are finalizing requirements for bypass lines with minor revisions from those proposed. Specifically, we are not adopting the proposed requirement to install quantitative flow monitors and thus are leaving in place the requirement to use flow indicators on bypass lines. In addition, we are maintaining the requirements to estimate and report the quantity of organic HAP released. In response to public comment, we are also clarifying changes to remove the proposed reference to air intrusion and specifying that reporting of bypasses is only required when ``regulated material'' is discharged to the atmosphere as a result of a bypass of a control device.

      We are also finalizing revisions to the definition of miscellaneous process vent, as proposed. These revisions include deletion of exclusions associated with episodic releases and vents from in situ sampling systems. As proposed, the final amendments require that these vents must meet the standards applicable to MPV.

      2. Refinery MACT 2

      For CRU vents, we are finalizing the vessel pressure limit exclusion of 5 psig to apply only to passive depressurization, as proposed.

    4. What are the final NESHAP amendments addressing emissions during periods of SSM?

      We are finalizing, as proposed, changes to Refinery MACT 1 and 2 to eliminate the SSM exemption. Consistent with Sierra Club v. EPA, 551 F. 3d 1019 (D.C. Cir. 2008), the EPA has established standards in this rule that apply at all times. EPA is revising Table 6 of subpart CC of 40 CFR part 63 and Table 44 to subpart UUU of 40 CFR part 63 (the General Provisions Applicability Tables) to change several references related to requirements that apply during periods of SSM. We also are eliminating or revising certain recordkeeping and reporting requirements related to the eliminated SSM exemptions. We also are removing or modifying inappropriate, unnecessary or redundant language in the absence of the SSM exemption. Further, for certain emission sources in both MACT 1 and 2, we are establishing standards to address emissions during these periods. These are described below.

      1. Refinery MACT 1

      We are finalizing a work practice standard for PRD that requires refinery owners or operators to establish prevention measures for each PRD in organic HAP service. Under the work practice standard, where a direct release occurs, the refinery is required to perform root cause analysis and implement corrective action. The work practice standard also limits the number of events that a PRD may release to the atmosphere during a 3-year period, as explained further in the section IV.D. of this preamble.

      We are also finalizing a work practice standard for emergency flaring events that requires refinery owners or operators to establish prevention measures, including the development of a flare management plan (FMP), and perform root cause analysis and implement corrective action following flaring events during which the velocity of waste gas going to the flare or visible emissions limits (i.e., opacity) at the flare tip are exceeded, and to limit the number of these events allowed in a 3-year period, as explained further in section IV.D. of this preamble. Both of these work practice standards are consistent with the EPA's goal to improve the effectiveness of the rules. These requirements will provide a strong incentive for facilities, over time, to better operate their processes to prevent PRD and flare releases.

      We are also finalizing requirements for opening process equipment to the atmosphere during maintenance events after draining and purging to a closed system, provided the hydrocarbon content is less than or equal to 10-percent of the lower explosive limit (LEL). For those situations where 10-percent LEL cannot be demonstrated, the equipment may be opened and vented to the atmosphere if the pressure is less than or equal to 5 psig, provided there is no active purging of the equipment to the atmosphere until the LEL criterion is met. This 5 psig allowance is only available during shutdown. We are also providing additional allowances for situations where it is not technically feasible to depressurize a control system where there is no more than 72 lbs VOC per day vented to the atmosphere, consistent with our Group 1 applicability cutoff for control of process vents, or for catalyst changeout activities where hydrotreater pyrophoric catalyst must be purged. Provisions to demonstrate that process equipment is opened only after the LEL, pressure or mass in the vessel requirement is met includes documenting the procedures for equipment openings and procedures for verifying that the openings meet the specific, above-

      discussed requirements using site-specific procedures used to de-

      inventory equipment for safety purposes (i.e., hot work or vessel entry procedures).

      2. Refinery MACT 2

      The Refinery MACT 2 standards regulate all HAP emissions from the three refinery process vents subject to Refinery MACT 2. For FCCU, the standard specifies a CO limit as a surrogate for organic HAP and specifies a PM limit (or Ni limit) as a surrogate for metal HAP. Compliance with the organic HAP emissions limit is demonstrated using a continuous CO monitor; compliance with the metal HAP emissions limit is demonstrated using either COMS or control device parameter monitoring systems (CPMS). At proposal, with the removal of the exemptions in the Refinery MACT 2 rule for periods of startup and shutdown, we recognized the need for alternative standards during some startup and shutdown situations, and we proposed alternative requirements.

      For this final rule, we are including a 1-percent minimum oxygen limit as an alternative to the 500 ppmv hourly CO limit during FCCU startup for partial

      Page 75185

      burn FCCU with CO boilers, as proposed. We are extending that alternative limit to all FCCU and extending it to apply during shutdown.

      We are not finalizing the proposed alternative opacity limit for FCCU during startup. Instead, based on public comments received, we are finalizing an alternative minimum cyclone face velocity limit as a means to demonstrate compliance with the PM limit during both startup and shutdown, regardless of the type of FCCU and its control device. We are finalizing alternative standards for sulfur recovery plant (SRP) incinerator temperature and excess oxygen limits during SRP shutdown, as proposed, and we are extending the proposed alternative standards to startup as well.

    5. What other revisions to the NESHAP and NSPS are being promulgated?

      We are finalizing technical amendments to NSPS subparts J and Ja with limited changes from what we proposed. First, in response to comments, we are revising the NSPS requirements that a flow sensor have a ``measurement sensitivity'' of no more than 5-percent of the flow rate to an ``accuracy'' requirement that the flow sensor have an accuracy of 5-percent of the flow rate. This change will make the requirements more clear and consistent between the flow meter requirements in the NSPS and the MACT standards since it is the same flow meter subject to these requirements. We are also revising flare flow rate accuracy requirements in Refinery NSPS subpart Ja to make them consistent with those we are finalizing in Refinery MACT 1. Finally, we are revising 40 CFR 60.101a(b) to begin as ``Except for flares and delayed coking units . . .'' to correct an inadvertent error. We proposed revisions to this sentence solely to allow sources subject to Refinery NSPS subpart J to comply with the provisions in Refinery NSPS subpart Ja instead. However, the words ``and delayed coking units'' were inadvertently omitted from the initial part of the sentence. Thus, as intended, we are finalizing revisions to this sentence to allow sources subject to Refinery NSPS subpart J to comply with the provisions in Refinery NSPS subpart Ja.

    6. What are the requirements for submission of performance test data to the EPA?

      As proposed, the EPA is taking a step to increase the ease and efficiency of data submittal and data accessibility. Specifically, the EPA is finalizing the requirement for owners or operators of Petroleum Refinery facilities to submit electronic copies of certain required performance test reports through the EPA's Central Data Exchange (CDX) using the Compliance and Emissions Data Reporting Interface (CEDRI). The EPA believes that the electronic submittal of the reports addressed in this rulemaking will increase the usefulness of the data contained in those reports, is in keeping with current trends in data availability, will further assist in the protection of public health and the environment and will ultimately result in less burden on the regulated community. Electronic reporting can also eliminate paper-

      based, manual processes, thereby saving time and resources, simplifying data entry, eliminating redundancies, minimizing data reporting errors and providing data quickly and accurately to the affected facilities, air agencies, the EPA and the public.

      As mentioned in the preamble of the proposal, the EPA Web site that stores the submitted electronic data, WebFIRE, will be easily accessible to everyone and will provide a user-friendly interface that any stakeholder could access. By making the records, data and reports addressed in this rulemaking readily available, the EPA, the regulated community and the public will benefit when the EPA conducts its CAA-

      required technology and risk-based reviews. As a result of having reports readily accessible, our ability to carry out comprehensive reviews will be increased and achieved within a shorter period of time.

      We anticipate fewer or less substantial information collection requests (ICRs) in conjunction with prospective CAA-required technology and risk-based reviews may be needed. We expect this to result in a decrease in time spent by industry to respond to data collection requests. We also expect the ICRs to contain less extensive stack testing provisions, as we will already have stack test data electronically. Reduced testing requirements would be a cost savings to industry. The EPA should also be able to conduct these required reviews more quickly. While the regulated community may benefit from a reduced burden of ICRs, the general public benefits from the agency's ability to provide these required reviews more quickly, resulting in increased public health and environmental protection.

      Air agencies could benefit from more streamlined and automated review of the electronically submitted data. Having reports and associated data in electronic format will facilitate review through the use of software ``search'' options, as well as the downloading and analyzing of data in spreadsheet format. The ability to access and review air emission report information electronically will assist air agencies to more quickly and accurately determine compliance with the applicable regulations, potentially allowing a faster response to violations which could minimize harmful air emissions. This benefits both air agencies and the general public.

      For a more thorough discussion of electronic reporting required by this rule, see the discussion in the preamble of the proposal. In summary, in addition to supporting regulation development, control strategy development, and other air pollution control activities, having an electronic database populated with performance test data will save industry, air agencies, and the EPA significant time, money, and effort while improving the quality of emission inventories, air quality regulations, and enhancing the public's access to this important information.

    7. What are the effective and compliance dates of the NESHAP and NSPS?

      The final amendments to the NESHAP and NSPS in this action are effective on February 1, 2016. As proposed, new sources must comply with these requirements by the effective date of the final rule or upon startup, whichever is later.

      As proposed, existing sources are required to comply with the final DCU and CRU requirements no later than 3 years after the effective date of the final rule. Similarly, as proposed, owners or operators are required to comply with the new operating and monitoring requirements for existing flares no later than 3 years after the effective date of the final rule.

      We proposed to provide 3 years from the effective date of the final rule for refinery owners or operators to install and begin monitoring (collecting samples) around the fenceline of their existing facility. If refinery owners and operators determined that a site-specific monitoring plan was needed, they would also need to submit and receive approval for such a plan during the 3-year compliance period. Based on information submitted during the comment period, we are finalizing requirements that refinery owners or operators begin collecting samples around the fenceline within 2 years of the effective date of the final rule. Based on information submitted during the comment period, 1 year is sufficient time to identify proper monitoring locations and to install the required monitoring stations around the facility

      Page 75186

      fenceline. However, owners or operators may need additional monitoring systems to account for near-field interfering sources (NFS), for which the development and approval of a site-specific fenceline monitoring plan is required. We expect that the site-specific fenceline monitoring plans can take an additional year to develop, submit and obtain approval. Consequently, we are providing 2 years from the effective date of the final rule for refinery owners or operators to install and begin collecting samples around the fenceline of their facility.

      As proposed, we are requiring that existing sources comply with the submerged filling requirement for marine vessel loading on the effective date of the final rule.

      As proposed, we are providing 18 months after the effective date of the final rule to conduct required performance tests and comply with any revised operating limits for FCCU.

      We proposed to require refinery owners or operators to comply with the revisions to the SSM provisions of Refinery MACT 1 and 2 on the effective date of the final rule. As proposed, this final rule requires refinery owners or operators to comply with the limits in Refinery MACT 2 or the alternative limits in this final rule during startup and shutdown for FCCU and SRU on the effective date of the final rule.

      The flare work practice standards for high-load flaring events (events exceeding the smokeless capacity of the flare) require development of FMP (or revision of an existing plan) to specifically consider emergency shutdown and other high load events. In this FMP, refinery owners or operators must consider measures that can be implemented to reduce the frequency and magnitude of these high-load flaring events. This may include installation of a flare gas recovery system. Additionally, the work practice standards will require refinery owners or operators to identify and implement measures that may involve process changes. Therefore, we are establishing a compliance date of 3 years from the effective date of the final rule for refinery owners or operators to comply with the work practice standards for high load flaring events. We also note that this compliance period is consistent with the compliance time provided for the flare operating limits.

      For atmospheric PRD in HAP service we are establishing a work practice standard that requires a process hazard analysis and implementation of a minimum of three redundant measures to prevent atmospheric releases. Alternately, refinery owners or operators may elect to install closed vent systems to route these PRD to a flare, drain (for liquid thermal relief valves) or other control system. We anticipate that sources will need to identify the most appropriate preventive measures or control approach; design, install and test the system; install necessary process instrumentation and safety systems; and may need to time installations with equipment shutdown or maintenance outages. Therefore, we have established a compliance date of 3 years from the effective date of the final rule for refinery owners or operators to comply with the work practice standards for atmospheric PRD.

      As proposed, we are requiring compliance with the electronic reporting provisions for performance tests conducted for Refinery MACT 1 and 2 on the effective date of the final rule.

      Finally, we are finalizing additional requirements for storage vessels under CAA sections 112(d)(6) and (f)(2) with a compliance date 90 days after the effective date of the final rule, as proposed.

    8. What materials are being incorporated by reference?

      In this final rule, the EPA is including regulatory text that includes incorporation by reference. In accordance with requirements of 1 CFR 51.5, the EPA is incorporating by reference the following documents described in the amendments to 40 CFR 63.14:

      ASTM D1945-03 (Reapproved 2010), Standard Test Method for Analysis of Natural Gas by Gas Chromatography, (Approved January 1, 2010).

      ASTM D1945-14, Standard Test Method for Analysis of Natural Gas by Gas Chromatography.

      ASTM D6196-03 (Reapproved 2009), Standard Practice for Selection of Sorbents, Sampling, and Thermal Desorption Analysis Procedures for Volatile Organic Compounds in Air, (Approved March 1, 2009).

      ASTM D6348-03 (Reapproved 2010), Standard Test Method for Determination of Gaseous Compounds by Extractive Direct Interface Fourier Transform Infrared (FTIR) Spectroscopy, including Annexes A1 through A8, (Approved October 1, 2010).

      ASTM D6348-12e1, Standard Test Method for Determination of Gaseous Compounds by Extractive Direct Interface Fourier Transform Infrared (FTIR) Spectroscopy.

      ASTM D6420-99 (Reapproved 2010), Standard Test Method for Determination of Gaseous Organic Compounds by Direct Interface Gas Chromatography-Mass Spectrometry.

      ASTM UOP539-12, Refinery Gas Analysis by GC.

      BS EN 14662-4:2005, Ambient air quality--Standard method for the measurement of benzene concentrations--Part 4: Diffusive sampling followed by thermal desorption and gas chromatography, June 27, 2005.

      EPA-454/B-08-002, Quality Assurance Handbook for Air Pollution Measurement Systems, Volume IV: Meteorological Measurements, Version 2.0 (Final), March 2008.

      EPA-454/R-99-005, Meteorological Monitoring Guidance for Regulatory Modeling Applications, February 2000.

      ISO 16017-2:2003(E): Indoor, ambient and workplace air--

      Sampling and analysis of volatile organic compounds by sorbent tube/

      thermal desorption/capillary gas chromatography--Part 2: Diffusive sampling, May 15, 2003.

      Air Stripping Method (Modified El Paso Method) for Determination of Volatile Organic Compound Emissions from Water Sources'' Revision Number One, dated January 2003, Sampling Procedures Manual, Appendix P: Cooling Tower Monitoring, prepared by Texas Commission on Environmental Quality, January 31, 2003.\4\

      ---------------------------------------------------------------------------

      \4\ The requirements in Sec. 63.655(i)(5)(iii)(G) associated with this incorporation by reference have not changed, but are being modified to properly be incorporated into Sec. 63.14(s).

      ---------------------------------------------------------------------------

      The EPA has made, and will continue to make, these documents available electronically through www.regulations.gov and/or in hard copy at the appropriate EPA office (see the ADDRESSES section of this preamble for more information).

  11. What is the rationale for our final decisions and amendments to the Petroleum Refinery NESHAP and NSPS?

    1. Residual Risk Review for the Petroleum Refinery Source Categories

      1. What did we propose pursuant to CAA section 112(f) for the Petroleum Refinery source categories?

      The results of our residual risk review for the Petroleum Refinery source categories were published in the June 30, 2014 proposal at (79 FR 36934 through 36942), and included assessment of chronic and acute inhalation risk, as well as multipathway and environmental risk, to inform our decisions regarding acceptability and ample margin of safety. The results indicated that both the actual and

      Page 75187

      allowable inhalation cancer risks to the individual most exposed are no greater than approximately 100-in-1 million, which is the presumptive limit of acceptability. In addition, the maximum chronic non-cancer target organ-specific hazard index (TOSHI) due to inhalation exposures was less than 1. The evaluation of acute non-cancer risks, which was conservative, showed acute risks below a level of concern. Based on the results of the refined site-specific multipathway analysis, we also concluded that the ingestion cancer risk to the individual most exposed through ingestion is considerably less than 100-in-1 million. In determining risk acceptability, we also evaluated population impacts because of the large number of people living near facilities in the source category. We estimated that 5-million people are exposed to increased cancer risks of greater than 1-in-1 million and 100,000 people are exposed to increased cancer risks of greater than 10-in-1 million, but, as noted previously, no individual is exposed to increased cancer risks of greater than 100-in-1 million. Considering the above information, we proposed that the risks remaining after implementation of the existing NESHAP for the Refinery MACT 1 and 2 source categories is acceptable. However, we noted that the risks based on allowable emissions are at the presumptive limit of acceptable risk, and that a large number of people are exposed to risks of greater than 1-in-1 million, and we solicited comment on whether EPA should conclude that the risk was unacceptable based on the health information before the Agency. We also proposed that the original Refinery MACT 1 and 2 MACT standards, along with the proposed requirements for storage vessels, provide an ample margin of safety to protect public health. Finally, we proposed that it is not necessary to set a more stringent standard to prevent, taking into consideration costs, energy, safety, and other relevant factors, an adverse environmental effect.

      2. How did the risk review change for the Petroleum Refinery source categories?

      As part of the final risk assessment, we conducted a screening level analysis of how the information we received during the public comment period, along with the changes we are making to the proposed rule, would change our proposed risk estimates (More details can be found in the ``Final Residual Risk Assessment for the Petroleum Refining Source Sector'', Docket ID No. EPA-HQ-OAR-2010-0682).

      First, we received approximately 20 emissions inventory updates for specific facilities. These updates included revised emission estimates, revised release latitude/longitude locations and other release characteristic revisions. The updates provided evidence that the quantity of HAP emitted at these specific facilities is lower than considered in the risk modeling for the proposed rule. Our assessment of the effects of these changes suggests that the cancer maximum individual risk (MIR) based on actual emissions may be closer to 40-in-

      1 million, as opposed to 60-in-1 million, as projected at proposal. We did not quantify the reductions in chronic or acute non-cancer risks from these updates. We calculated allowable emissions using the Refinery Emissions Model (REM), which estimates emissions based on each refinery's capacities and throughputs See discussion at 79 FR 36888, June 30, 2014. The allowable emission estimates for point and fugitive sources were not specific to a particular latitude/longitude location so we assumed them to release from the centroid of the facility. Therefore, the predicted cancer MIR of approximately 100-in-1 million based on allowable emissions and reported in the proposal risk characterization does not change based on the submitted emissions revisions. We did not quantify changes to other actual risk metrics as part of the screening level analysis (i.e., incidence, populations in risk bins, multipathway and ecological analyses), but we would expect some minor reductions from those presented in the proposed risk characterization.

      Second, we are establishing work practice standards in the final rule for PRD releases and emergency flaring events, which under the proposed rule would not have been allowed. Thus, because we did not consider such non-routine emissions under our risk evaluation for the proposed rule, we performed a screening assessment of risk associated with these non-routine events for the final rule. We provide further details on the screening approach in ``Final Residual Risk Assessment for the Petroleum Refining Source Sector'' in Docket ID No. EPA-HQ-OAR-

      2010-0682. We extracted information on these events from the 2011 Petroleum Refinery ICR data that included the process unit identification, mass of emissions, duration of release, and description of the incident. We identified the highest HAP mass releases for both PRDs and flares from these non-routine events. We assumed these HAP emission releases could occur at any facility in the source category. Our analysis suggests that these HAP emissions could increase the MIR based on actual emissions by as much as 2-in-1 million. Because the PRD and flaring events were the worst case HAP mass emission release events reported in the 2011 Refinery ICR for the source category, we are assuming that actual and allowable risks are no different for these events (i.e., a MIR of 2-in-1 million). A MIR increase of 2-in-1 million attributable to these events, added to our previous estimate for allowable risk at proposal will not appreciably change our proposed determination that the MIR based on allowable emissions are approximately 100-in-1 million. We note that the MIR estimate attributable to these non-routine PRD and flaring events was estimated using a conservative, screening-level assessment, while the MIR estimate at proposal was based on a refined risk assessment. By adding a screening estimate to a refined risk estimate, we are merely defining an upper limit that we expect the combined risks from both the routine and non-routine emissions to be. Similarly, we estimate chronic non-

      cancer hazard index (HI) values attributable to the additional exposures resulting from non-routine flaring and PRD HAP emissions to be well below 1 (HIimmune-system of 0.007) such that there is no appreciable change in the maximum chronic non-cancer HI of 0.9 estimated at proposal for routine emissions, which was based on neurological effects.

      The screening analysis projects that the maximum predicted acute non-cancer risk from non-routine PRD and flare emissions results in a hazard quotient (HQ) based on a recommended reference exposure level limit (REL) of up to 14 from benzene emissions. While the analysis shows that there is a potential for HQs exceeding 1 for benzene, because of the many uncertainties and conservative nature of this screening analysis, the likelihood of such exposure and risk are low. At proposal, we projected a HQ based on the REL for benzene of up to 2 from routine emissions. If we conservatively combine the routine and non-routine emissions analyses, we would expect the potential for HQs based on the REL for benzene to have the potential to increase above 2. However, as projected at proposal, we estimate that the acute HQs calculated using acute exposure guideline levels (AEGL) and emergency response and planning guidelines (ERPG) values for all pollutants including benzene would still be well

      Page 75188

      below 1 considering both routine and non-routine emissions.

      Considering all of these factors, we do not project risks to be significantly different from what we proposed. Based on the risk analysis, as informed by the screening level analysis based on information obtained during the comment period, we are finalizing our determination that the risk remaining after promulgation of the NESHAP is acceptable.

      3. What key comments did we receive on the risk review and what are our responses?

      We received numerous comments on the residual risk assessment analyses and results. We summarize the key comments received below, along with our responses. A complete summary of all public comments received and our responses are in the ``Response to Comment'' Document in the public docket (Docket ID No. EPA-HQ-OAR-2010-0682).

      Comment: Several commenters agreed that the EPA has correctly concluded that the proposed rule requirements protect the public with an ample margin of safety from refinery emissions. Other commenters noted that EPA found residual risks remaining after implementation of the MACT standards to be acceptable, and in light of the acceptability determination argued that the proposed changes to the rule are not justified. The commenters noted that the EPA's detailed emissions inventory assessment and risk modeling results demonstrated that, at every U.S. refinery, category-specific risks are below the EPA's presumptive limit of acceptable risk (i.e., cancer risk of less than 100-in-1 million).

      Other commenters stated the EPA's risk estimates are understated and that the EPA should reduce the benchmark of what it considers acceptable lifetime cancer risk instead of the upper limit of 100-in-1 million. One commenter provided an extensive critique of the cancer, chronic and acute affects levels used in the risk assessment and recommended that the EPA use California Office of Environmental Health Hazard Assessment's (OEHHA) new toxicity values for several chemicals. The commenter provided some references for the approaches used to derive the California values. The commenter also asserted that risks would be unacceptable had these more protective values been used in the risk assessment. Some commenters stated the risks from petroleum refinery emissions are underestimated because the EPA did not but should have included interaction of multiple pollutants, accounted for exposure to multiple sources, and assessed the cumulative risks from facility-wide emissions and multiple nearby sources impacting an area.

      Response: The approximately 100-in-1 million benchmark was established in the Benzene NESHAP (54 FR 38044, September 14, 1989), which Congress specifically referenced in CAA section 112(f)(2)(B). While this presumptive level provides a benchmark for judging the acceptability of MIR, it is important to recognize that it does not constitute a rigid line for making that determination. The EPA considers the specific uncertainties of the emissions, health effects and risk information for the source category in question when deciding whether the risk posed by that source category is acceptable. In addition, the source category-specific decision of what constitutes an acceptable level of risk is a holistic one; that is, the EPA considers all potential health impacts--chronic and acute, cancer and non-cancer, and multipathway--along with their uncertainties, when determining whether the source category presents an unacceptable risk.

      Regarding the comment that in light of the acceptability determination the proposed changes to the rule are not justified, we note that we also are required to ensure that the standards provide an ample margin of safety to protect public health. That analysis is separate from the acceptability analysis, and the determination of acceptability does not automatically lead us to conclude that the standards provide an ample margin of safety to protect public health.

      Regarding the comments that the EPA should use the new California OEHHA values, we disagree. The EPA's chemical-specific toxicity values are derived using risk assessment guidelines and approaches that are well established and vetted through the scientific community, and follow rigorous peer review processes.\5\ The RTR program gives preference to the EPA values for use in risk assessments and uses other values, as appropriate, when those values are derived with methods and peer review processes consistent with those followed by the EPA. The approach for selecting appropriate toxicity values for use in the RTR Program has been endorsed by the Science Advisory Board (SAB).\6\

      ---------------------------------------------------------------------------

      \5\ Integrated Risk Information System (IRIS). IRIS Guidance documents available at http://www.epa.gov/iris/backgrd.html.

      \6\ http://yosemite.epa.gov/sab/sabproduct.nsf/0/b031ddf79cffded38525734f00649caf!OpenDocument&TableRow=2.3#2.

      ---------------------------------------------------------------------------

      The EPA scientists reviewed the information provided by the commenter regarding the California values and concluded that further information is needed to evaluate the scientific basis and rationale for the recent changes in California OEHHA risk assessment methods. The EPA will work on gathering the necessary information to conduct an evaluation of the scientific merit and the appropriateness of the use of California OEHHA's new toxicity values in the agency decisions. Until the EPA has completed its evaluation, it is premature to determine what role these values might play in the RTR process. Therefore, the EPA did not use the new California OEHHA toxicity values as part of this current action. For more detailed responses regarding appropriate reference values for specific pollutants, see the ``Response to Comment'' document in the public docket (Docket ID No. EPA-HQ-OAR-2010-0682).

      Concerning comments that we should consider aggregate risks from multiple pollutants and sources, we note that we have done this to the extent it is appropriate to do so. We modeled whole-facility risks for both chronic cancer and non-cancer impacts to understand the risk contribution of the sources within the Petroleum Refinery source categories. The individual cancer risks for the source categories were aggregated for all carcinogens. In assessing non-cancer hazard from chronic exposures to pollutants that have similar modes of action or (where this information is absent) that affect the same target organ, we summed the HQs. This process creates, for each target organ, a TOSHI, defined as the sum of HQs for individual HAP that affect the same organ or organ system. Whole-facility risks were estimated based on the 2011 ICR emissions data obtained from facilities, which included emissions from all sources at the refinery, not just Refinery MACT 1 and 2 emission sources (e.g., emissions were included for combustion units and units subject to the Hazardous Organic NESHAP, if present at the refinery). We disagree with the commenter's assertion that additional quantitative assessment of risks from sources outside the source category is required under the statute. The statute requires the EPA to provide the quantitative risk information necessary to inform RTR regulatory decisions, and to this end, the EPA conducted a comprehensive assessment of the risks associated with exposure to the HAP emitted by the source category and supplemented that with additional

      Page 75189

      information available about other possible concurrent and relevant risks.

      Further, the risk assessment modeling accounts for the effects of multiple facilities that may be in close proximity when estimating concentration and risk impacts at each block centroid. When evaluating the risks associated with a particular source category, we combined the impacts of all facilities within the same source category and assessed chronic exposure and risk for all census blocks with at least one resident (i.e., locations where people may reasonably be assumed to reside). The MIR considers the combined impacts of all sources in the category that may be in close proximity (i.e., cumulative impact of all refineries).

      Comment: Several commenters stated that the EPA underestimated exposure because emissions are underreported and underestimated. The commenters noted that for the risk assessment for the refineries rule, the EPA evaluated (1) the emissions reported to the agency pursuant to the 2011 Petroleum Refinery ICR as sources' ``actual'' emissions, and (2) the emissions the EPA estimates that the existing standards currently allow sources to emit using the REM, which it describes as ``allowable'' emissions. According to the commenters, both the EPA's ``actual'' and ``allowable'' emissions data sets are incomplete and undercount emissions, causing the EPA to significantly underestimate the resulting risk in its risk analysis. For example, the commenters noted that the EPA assumed the flare destruction efficiency to be 98 percent, while the EPA's own estimates suggest flare efficiency is 93.9 percent. The commenters also noted that the EPA has further understated risks by ignoring emissions during unplanned SSM events and by ignoring HAP for which no reference values are established. One commenter cited the TCEQ Emissions Event Database as evidence that SSM emissions are a severe public health problem because data show that nearly 1 million pounds of HAP are reported from Texas refineries between 2009 and 2013. According to these commenters, the EPA needs to adopt standards that provide greater protection, including protection from the risks of accidents.

      Response: We used the best and most robust facility-specific HAP emissions inventory available to us, which was the 2011 ICR, in performing the analysis for the proposed rule. We conducted a thorough and exhaustive review of the data submitted through the ICR and we followed up on source-specific information on a facility-by-facility basis, as documented in the ``Emissions Data Quality Memorandum and Development of the Risk Model Input File'' (see Docket ID No. EPA-HQ-

      OAR-2010-0682-0076). In addition, we took steps ahead of issuing the 2011 ICR to make sure that facilities could, as accurately as practicable, estimate their HAP emissions for purposes of responding to the inventory portion of that ICR. We prepared a Refinery Protocol to provide guidance to refinery owners or operators to use the best available, site-specific data when developing their emissions inventory, to ensure all emission sources are included in the inventory, and to have a consistent set of emission factors that all respondents use if no site-specific emissions data were available. If site-specific emissions data were available, sites were to use these data preferentially over the default factors. We developed the default factors provided in the protocol from the best data available at the time.

      The ICR-submitted information for allowable emissions did not include emission estimates for all HAP and all emission sources. Consequently, we used the REM to estimate allowable emissions. The REM relies on model plants that vary based on throughput capacity. Each model plant contains process-specific default emission factors, adjusted for compliance with the Refinery MACT 1 and 2 emission standards.

      We agree with the commenters that studies have shown that many refinery flares are operating less efficiently than 98 percent. Prior to proposing this rule, we conducted a flare ad hoc peer review to advise the EPA on factors affecting flare performance (see discussion in the June 30, 2014, proposal at 79 FR 36905). However, we disagree with the commenters that the risk analysis should consider this level of performance since the existing MACT standard does not allow it. For purposes of the risk analysis, we evaluate whether it is necessary to tighten the existing MACT standard in order to provide an ample margin of safety. Thus, in reviewing whether the existing standards provide an ample margin of safety, we review the level of emissions the MACT standards allow. In the present case, we considered the level of performance assumed in establishing the MACT standard for purposes of determining whether the MACT standard provides an ample margin of safety. However, we did recognize that facilities were experiencing performance issues with flares and that many flares were not meeting the assumed performance level at the time we promulgated the MACT standard. Thus, we proposed, and are finalizing, revisions to the flare operating requirements to ensure that the flares meet the required performance level. These provisions are consistent with the EPA's goals to improve the effectiveness of our rules.

      Similarly, we do not include startup, shutdown (including maintenance events) and malfunction emissions that are not allowed under the standard as part of our evaluation of whether the standards provide an ample margin of safety. Regarding the HAP emissions from SSM events that the commenter is concerned with, we note that our review of the TCEQ incident database indicates that many of the large reported release events were of SO2 emissions and only a few had significant HAP emissions.

      Because in the final rule we are establishing work practice standards for PRD and emergency flaring events, we performed a screening-level risk analysis to address changes in facility HAP emission releases due to these events. Details on this analysis are presented in the final risk report for the source category (For more details see Appendix 13 of the ``Final Residual Risk Assessment for the Petroleum Refining Source Sector,'' Docket ID No. EPA-HQ-OAR-2010-

      0682).

      As for HAP with no reference value, the SAB addressed this issue in its May 7, 2010, response to the EPA Administrator. In that response, the SAB Panel recommended that, for HAP that do not have dose-response values from the EPA's list, the EPA should consider and use, as appropriate, additional sources for such values that have undergone adequate and rigorous scientific peer review. The SAB panel further recommended that the inclusion of additional sources of dose-response values into the EPA's list should be adequately documented in a transparent manner in any residual risk assessment case study. We agree with this approach and have considered other sources of dose-response data when conducting our risk determinations under RTR. However, in some instances no sources of information beyond the EPA's list are available. Compounds without health benchmarks are typically those without significant health effects compared to compounds with health benchmarks, and in such cases we assume these compounds will have a negligible contribution to the overall health risks from the source category. A tabular summary of HAPs that have dose response values for which an exposure assessment was conducted is presented in Table 3.1-1 of the ``Final Residual Risk Assessment for the Petroleum Refining Source Sector'', Docket ID No. EPA-HQ-OAR-2010-0682.

      Page 75190

      Comment: A few commenters asserted that the EPA should decide that it is unjust and inconsistent with the CAA's health protection purpose to allow the high health risks caused by refineries to fall disproportionately on communities of color and lower income communities who are least equipped to deal with the resulting health effects. Because of that disparity, the commenter stated that the EPA should recognize that the risks found are unacceptable and set stronger national standards for all exposed Americans.

      Response: For this rulemaking, the EPA conducted both pre- and post-control risk-based assessments with analysis of various socio-

      economic factors for populations living near petroleum refineries (see Docket ID Nos. EPA-HQ-OAR-2010-0682-0226 and -0227) and determined that there are more African-Americans, Other and multiracial groups, Hispanics, low-income individuals, and individuals with less than a high school diploma compared to national averages. In determining the need for tighter residual risk standards, the EPA strives to limit to no higher than 100-in-1 million the estimated cancer risk for persons living near a plant if exposed to the maximum pollutant concentration for 70 years and to protect the greatest number of persons to an individual lifetime risk of no higher than 1-in-1 million. Although we consider the risk for all people regardless of racial or socioeconomic status, communities near petroleum refineries will particularly benefit from the risk reductions associated with this rule. In particular, as discussed later, the fenceline monitoring work practice standard will be a further improvement in the way fugitive emissions are managed and will provide an extra measure of protection for surrounding communities.

      4. What is the rationale for our final decisions for the risk review?

      As described in section IV.A.2 of this preamble, we performed a screening-level analysis to assess the risks associated with inventory updates we received for specific facilities and with emissions events that were previously not included in the risk assessment because the proposed rule did not allow them. Because we are finalizing work practice standards to regulate emission events associated with PRD releases and emergency flaring, we considered the effect these work practice standards would have on risks. As discussed in section IV.A.2 of this preamble, we project that accounting for these emergency events in the baseline risks after implementation of the MACT standards does not appreciably change the risks, and at most, could increase the proposed rule estimate of MIR by approximately 2-in-1 million. Therefore, we would project that any controls applied to these emergency events, including the work practice standards for PRDs and emergency flaring in this final rule, would not appreciably change the proposed post-control risks. Although we would anticipate minimal additional risk reductions, we reviewed more stringent alternatives to the work practice standards for PRD releases and emergency flaring events included in this final rule, and we found that the costs of increasing flare capacity to control all PRD releases and to eliminate all visible emissions during emergency flaring were too high. We estimate the capital costs of applying the velocity and visible emissions limit at all times would be approximately $3 billion, and we estimate that the costs of controlling all PRD releases with flares would be approximately $300 million. See the discussion in the ``Flare Control Option Impacts for Final Refinery Sector Rule'', Docket ID No. EPA-HQ-OAR-2010-0682 and the PRD work practice standard discussion in section IV.C of this preamble. Further, we did not receive comments on additional control technologies that we should have considered for other emission sources (e.g., tanks, DCUs) beyond those considered and described at proposal. Consequently, as discussed in section IV.A.2, we conclude that the risks from the Petroleum Refinery source categories are acceptable and that, with the additional requirements for storage vessels that we are finalizing, as proposed, the Refinery MACT 1 and 2 rules provide an ample margin of safety to protect public health. We also maintain, based on the rationale presented in the preamble to the proposed rule, that the current standards prevent, taking into consideration costs, energy, safety and other relevant factors, an adverse environmental effect.

    2. Technology Review for the Petroleum Refinery Source Categories

      1. What did we propose pursuant to CAA section 112(d)(6) for the Refinery MACT 1 (40 CFR part 63, subpart CC) source category?

      The results of our technology review for the Petroleum Refinery source categories were published in the June 30, 2014, proposal at (79 FR 36913 through 36928). The technology review was conducted for both MACT source categories as described below.

      1. Refinery MACT 1

        Refinery MACT 1 sources include MPV, storage vessels, equipment leaks, gasoline loading racks, marine vessel loading operations, cooling towers/heat exchange systems and wastewater. Based on technology reviews for the sources described above, we proposed that it was not necessary to revise Refinery MACT 1 requirements for MPV, gasoline loading racks, cooling towers/heat exchange systems, and wastewater. For storage vessels, we proposed revisions pursuant to the technology review. Specifically, we proposed to cross-reference the storage vessel requirements in the Generic MACT (40 CFR part 63, subpart WW) to require controls on floating roof fittings (e.g., guidepoles, ladder wells and access hatches) and to revise the definition of Group 1 storage vessels to include smaller tanks with lower vapor pressures. For equipment leaks, we proposed to allow refineries to meet LDAR requirements in Refinery MACT 1 by monitoring for leaks via optical gas imaging in place of the EPA Method 21, using monitoring requirements to be specified in a not-yet-proposed appendix K to 40 CFR part 60. For marine vessel loading, we proposed to amend the Marine Tank Vessel Loading Operations MACT standards (40 CFR part 63, subpart Y) to require small marine vessel loading operations (i.e., operations with HAP emissions less than 10/25 tpy) and offshore marine vessel loading operations at petroleum refineries to use submerged filling based on the cargo filling line requirements in 46 CFR 153.282.

        We also proposed an additional work practice standard under the technology review to manage fugitive emissions from the entire petroleum refinery through a fenceline monitoring and corrective action standard. As part of the work practice standard, we specified the monitoring technology and approach that must be used, and we developed a fenceline benzene concentration action level above which refinery owners or operators would be required to implement corrective action to reduce their fenceline concentration to below this action level. The action level we proposed was consistent with the emissions projected from fugitive sources compliant with the provisions of the refinery MACT standards as modified by the additional controls proposed for storage vessels.

      2. Refinery MACT 2

        The Refinery MACT 2 source category regulates HAP emissions from FCCU, CRU and SRU process vents. We

        Page 75191

        proposed to revise Refinery MACT 2 to incorporate the developments in monitoring practices and control technologies reflected in Refinery NSPS subpart Ja (73 FR 35838). This included proposing to incorporate the Refinery NSPS subpart Ja PM limit for new FCCU sources and to revise the monitoring provisions in Refinery MACT 2 to require all FCCU sources to meet operating limits consistent with the requirements in Refinery NSPS subpart Ja. The existing MACT standard provided that a refiner could demonstrate compliance with the PM limit in the MACT by meeting the 30-percent opacity limit requirement of Refinery NSPS subpart J; we proposed to eliminate that provision and instead establish control device operating limits or site-specific opacity limits similar to those required in Refinery NSPS subpart Ja. We also proposed to incorporate the use of 3-hour averages rather than daily averages for monitoring data to demonstrate compliance with the FCCU site-specific opacity and Ni operating limits. We proposed additional control device-specific monitoring alternatives for various control devices on FCCU, including BLD monitoring as an option to COMs for owners or operators of FCCU using fabric filter-type control systems, and total power and secondary current operating limits for owners or operators of ESPs. We also proposed to add a requirement to perform daily checks of the air or water pressure to atomizing spray nozzles for owners or operators of FCC wet gas scrubbers. Finally, we proposed to require a performance test once every 5 years for all FCCU in place of the one-time performance test required by the current Refinery MACT 2.

        At proposal, we did not identify any developments in practices, processes and control technologies for CRU process vents based on our technology review. For SRU, we proposed to include the Refinery NSPS subpart Ja allowance for oxygen-enriched air as a development in practice and to allow SRU to comply with Refinery NSPS subpart Ja as a means of complying with Refinery MACT 2.

        2. How did the technology review change for the Petroleum Refinery source categories?

      3. Refinery MACT 1

        We are finalizing most of our technology review decisions for Refinery MACT 1 emissions sources as proposed; however, as described briefly below, we are revising certain proposed requirements.

        We are not taking final action adopting the use of appendix K to 40 CFR part 60 for optical gas imaging for refinery equipment subject to the LDAR requirements in Refinery MACT 1 because we have not yet proposed appendix K.

        After considering the public comments, we are finalizing the proposed fenceline monitoring requirements, with a few revisions. First, we have made numerous clarifications in this final rule to the language for the fenceline monitoring siting method and analytical method (i.e., Methods 325 A and B, respectively). Specific comments on these methods, along with our responses and explanations of the revisions to the regulatory text are discussed in the ``Response to Comment'' document. Second, we are finalizing a revised compliance schedule for fenceline monitoring, which will require refinery owners or operators to have the fenceline monitors in place and collecting benzene concentration data no later than 2 years from the effective date of the final rule, as opposed to 3 years in the proposed rule. Third, we have removed the requirement for refinery owners or operators to obtain the EPA approval for the corrective action plan. Fourth, we are requiring the submittal of the fenceline monitoring data on a quarterly basis, as opposed to on a semiannual basis as proposed. Fifth, we are providing guidelines for operators to use in requesting use of an alternative fenceline monitoring technology to the passive sorbent samplers set forth in Method 325B. Finally, to reduce the burden of monitoring, we are finalizing provisions that would allow refinery owners or operators to reduce the frequency of fenceline monitoring for areas that consistently stay well below the fenceline benzene concentration action level. Specifically, we are allowing refinery owners or operators to monitor every other two weeks (i.e., skip period monitoring) if over a two-year period, each sample collected at a specific monitoring location is at or below 0.9 mug/

        m\3\. If every sample collected from that sampling location during the subsequent 2-years is at or below 0.9 mug/m\3\, the monitoring frequency may be reduced from every other two weeks to quarterly. After an additional two years, the monitoring can be reduced to semiannually and finally to annually, provided the samples continue to be at or below 0.9 mug/m\3\ during all sampling events at that location. If at any time a sample for a monitoring location that is monitored at a reduced frequency returns a concentration greater than 0.9 mug/m\3\, the owner or operator must return to the original sampling requirements for one quarter (monitor every two weeks for the next six monitoring periods for that location); if every sample collected from this quarter is at or below 0.9 ug/m\3\, then the sampling frequency reverts back to the reduced monitoring frequency for that monitoring location; if not then the sampling frequency reverts back to the original biweekly monitoring frequency.

      4. Refinery MACT 2

        We are finalizing, as proposed, our determination that it is not necessary to revise the requirements for CRU pursuant to the technology review and we are finalizing our determination that it is necessary to revise the MACT for SRU and FCCU. For SRU, we are finalizing the revisions as proposed. For FCCU, we are making modifications to the proposed requirements in light of public comment.

        As discussed previously, we proposed to remove the alternative in Refinery MACT 2 for owners or operators to demonstrate compliance with the PM limits on FCCU by meeting a 30-percent opacity standard as provided in Refinery NSPS subpart J and instead make the FCCU operating limits in Refinery MACT 2 consistent with Refinery NSPS subpart Ja. Based on the Refinery NSPS subpart J review in 2008, we determined that a 30-percent opacity limit does not adequately assure compliance with the PM emissions limit (see discussion in the proposed rule at 79 FR 36929, June 30, 2014). Thus, we included other monitoring approaches in Refinery NSPS subpart Ja.

        Comments received on this proposal, along with data available to the Agency, confirmed that the 30-percent opacity standard is not adequate on its own to demonstrate compliance with the PM (or metal HAP) emissions limit in Refinery MACT 2. We also received comments that the site-specific opacity alternative, which is the only compliance option proposed for FCCU with tertiary cyclones, would essentially require owners or operators with these FCCU configurations to meet an opacity limit of 10-percent. According to commenters, opacity increases with decreasing particle size, so that it is common to exceed 10-

        percent opacity during soot blowing or other similar events that produce very fine particulates even though mass emissions have not changed appreciably.

        Based on the available data, we have determined that a 20-percent opacity operating limit is well correlated with

        Page 75192

        facilities meeting a limit of 1.0 lb PM/1,000 lbs coke burn-off. Therefore, we are retaining the option in Refinery MACT 2 to comply with Refinery NSPS subpart J except we are adding a 20-percent opacity operating limit in Refinery MACT 2, evaluated on a 3-hour basis. To ensure that FCCU owners or operators complying with the Refinery NSPS subpart J option can meet the 1.0 lb PM/1,000 lbs emissions limit at all times, we are finalizing requirements that owners or operators conduct the performance test during higher PM periods, such as soot blowing. Where the PM emissions are within 80-percent of the PM limit during any periodic performance test, we are requiring the refinery owner or operator to conduct subsequent performance tests on an annual basis instead of on a 5-year basis.

        We are finalizing our proposed requirement that compliance with the control device operating limits in the other compliance alternatives be demonstrated on a 3-hour basis, instead of the 24-hour basis currently allowed in Refinery MACT 2.

        3. What key comments did we receive on the technology review, and what are our responses?

      5. Refinery MACT 1

        The majority of comments received regarding the proposed amendments to Refinery MACT 1 pursuant to our technology review dealt with the proposed fenceline monitoring requirements. The primary comments on the fenceline monitoring requirements are in this section along with our responses. Comment summaries and the EPA's responses for additional issues raised regarding the proposed requirements resulting from our technology review are in the ``Response to Comment'' document in the public docket (Docket ID No. EPA-HQ-OAR-2010-0682).

      6. Legal Authority and Need for Fenceline Monitoring

        Comment: Numerous commenters claimed that the proposed fenceline monitoring program would unlawfully impose what is effectively an ambient air quality standard for benzene, which is not authorized by CAA section 112, which only authorizes the control of emission sources. The commenters argued it is an ambient standard because sources are required to meet the benzene level set or ``perform injunctive relief which may or may not address the source of the benzene.'' The commenter quoted language from the proposal as support that EPA has described the benzene level as an ambient standard: ``We are proposing a HAP concentration to be measured in the ambient air around a refinery, that if exceeded, would trigger corrective action to minimize fugitive emissions.'' 79 FR at 36920 (June 30, 2014). The commenter further noted that this requirement is not just ``monitoring'' because it establishes a ``not-to-be exceeded'' level. Therefore, the commenters stated, the EPA should not finalize this portion of the proposal.

        Response: We disagree with the comment that the fenceline proposal is an ambient air standard. First, the owner or operator must place the monitors on the facility fenceline to measure emissions from the facility, i.e., on the property of the refiner. While we recognize that we used the term ``ambient air'' in the preamble to the proposal, we note that the placement requirements for the monitors make clear that the monitors are not monitoring ambient air, which EPA has defined at 40 CFR 50.1(e) as ``that portion of the atmosphere, external to buildings, to which the general public has access.'' Second, the proposed EPA Method 325A sets out procedures to subtract background concentrations and contributions to the fenceline benzene concentrations from non-refinery emission sources, so that the benzene concentrations measured are attributable to the refinery. In other words, the fenceline monitoring work practice standard uses a benzene concentration difference, referred to as the DeltaC (essentially an upwind and downwind concentration difference) to isolate the refinery's emissions contribution.

        Furthermore, we disagree that the fact that refiners are required to perform corrective action if the fenceline benzene concentration action level is exceeded makes the benzene action level an ambient standard. As an initial matter sources are not directly responsible for demonstrating that an area is meeting an ambient standard; rather that burden falls on states. See e.g., CAA section 110(a)(2). Moreover, the ``corrective action'' is simply that sources must ensure that fugitive emission sources on the property are not emitting HAP at levels that will result in exceedances of the fenceline benzene concentration action level. In other words, the purpose of the fenceline monitoring work practice is to ensure that sources are limiting HAP emissions at the fenceline, which are solely attributable to emissions from sources within the facility. In fact, the fenceline benzene concentration action level was established using emissions inventories reported by the facilities, assuming compliance with the MACT standards. Finally, monitoring is conducted as part of the work practice standard to identify sources that will require additional controls to reduce their impact on the fenceline benzene concentration. In that sense, the fenceline monitoring work practice standard is not different than, for example, our MACT standard for refinery heat exchangers. If a facility is exceeding the relevant cooling water pollutant concentration ``level'' when it performs a periodic test, it must undertake corrective action to bring the concentration down below the action level.

        Comment: Several commenters noted that EPA's authority under section 112(d) is to set ``emissions standards'' and quoted the CAA definition of that term: ``A requirement . . . which limits the quantity, rate, or concentration of emissions of air pollutants on a continuous basis, including any requirement relating to the operation or maintenance of a source to assure continuous emission reduction, and any design, equipment, work practice or operational standard promulgated under this Act.'' 42 U.S.C. 7602(k). The commenters argued that the proposed fenceline monitoring standard does not meet this definition because it would not ``limit the quantity, rate, or concentration of emissions'' from any given emissions point. Also, the commenters claimed that the EPA did not designate fenceline monitoring as a work practice under CAA section 112(h) since the EPA did not even mention CAA section 112(h), nor did it conduct any analysis to show that fenceline monitoring meets the CAA section 112(h) factors.

        Response: We disagree with the commenters' assertion that the proposed fenceline monitoring work practice standard is not authorized under CAA section 112(d)(6). Contrary to the commenter's claims, we specifically proposed the fenceline monitoring standard under CAA section 112(d)(6) to be a work practice standard that is applied broadly to fugitive emissions sources located at petroleum refineries. As discussed above, the proposed standard does more than impose monitoring as some commenters suggested; it also will limit emissions from refineries because it requires the owner or operator to identify and reduce HAP emissions through a monitoring and repair program, as do many work practice standards authorized under CAA Section 112(h) and 112(d).

        We note that the sources addressed by the fenceline monitoring standard--refinery fugitive emissions sources such as wastewater collection and treatment

        Page 75193

        operations, equipment leaks, heat exchange systems and storage vessels in the Refinery MACT 1 rule--are already subject to work practice standards. Our review of these requirements indicates that this fenceline monitoring work practice standard would be a further improvement in the way fugitive emissions are managed and would provide an extra measure of protection for surrounding communities. The commenter claims EPA did not analyze how the fenceline monitoring requirement meets the criteria in section 112(h). However, that is a misinterpretation of how the criteria apply. The criteria are assessed with regard to whether it is feasible to ``prescribe or enforce an emission standard for a source'', and do not apply to the work practice standard. Consistent with the criteria in section 112(h)(2), we determined and established that work practice standards are appropriate for these Refinery MACT fugitive emissions at the time we established the initial MACT standard. In the proposal, (79 FR at 36919, June 30, 2014), we reaffirmed that it is impracticable to directly measure fugitive emission sources at refineries but did not consider it necessary to reiterate these findings as part of this proposal to revise the existing MACT for these sources under CAA section 112(d)(6). We note that the commenters do not provide any grounds to support a reevaluation of whether these fugitive emission sources are appropriately regulated by a work practice standard.

        Comment: Several commenters questioned the EPA's authority under the CAA to promulgate a rule that amounts to an ongoing information gathering and reporting obligation. The commenters stated that the EPA has not demonstrated that the proposed fenceline monitoring program represents an actual emission reduction technology improvement. A commenter stated that compliance assurance methods, including monitoring, for fugitive emissions and other emission standards are established as part of the emission standard and EPA's authority to gather information that is not directly required for compliance with a specific standard but is related to air emissions is found in CAA section 114. Under CAA section 114, the requirement must be related to one of the stated purposes and must be reasonable. The commenter did not believe that the EPA has demonstrated that the costs of fenceline monitoring are reasonable in light of the information already available to the EPA and in light of many other means by which the EPA could obtain such information.

        Response: We disagree with the commenters' assertion that the authority for the fenceline monitoring requirement falls under CAA section 114 and not CAA section 112(d) because it is an ``ongoing information gathering and reporting obligation.'' The issue here is not whether EPA could have required the fenceline monitoring requirement under CAA section 114, but rather did EPA support that it was a development in processes practices or controls technology under section 112(d)(6).

        As an initial matter, we disagree with the commenters' characterization of the fenceline monitoring standard as ``an information gathering and reporting obligation.'' We have repeatedly stated that we consider the fenceline monitoring requirement to be a work practice standard that will ensure sources take corrective action if monitored benzene levels (as a surrogate for HAP emissions from fugitive emissions sources) exceed the fenceline benzene concentration action level. The standard requires refinery owners or operators to monitor the benzene concentration at the refinery perimeter, to evaluate the refinery's contribution as estimated by taking the concentration difference between the highest and lowest concentrations (DeltaC) in each period, and to conduct root cause analysis and take corrective action to minimize emissions if the concentration difference is higher (on an annual average) than the benzene concentration action level. Thus, the fenceline monitoring requirement goes well beyond ``information gathering and reporting.''

        In addition, the commenters again read section 112(d)(6) too narrowly by suggesting that a program considered as a development must be a ``technology'' improvement. Section 112(d)(6) of the CAA requires the EPA to review and revise the MACT standards, as necessary, taking into account developments in ``practices, processes and control technologies.'' Consistent with our long-standing practice for the technology review of MACT standards, in section III.C of the proposal (see 79 FR 36900, June 30, 2014), we list five types of ``developments'' we consider. Fenceline monitoring fits squarely within two of those five types of developments (emphasis added):

        Any add-on control technology or other equipment that was not identified and considered during development of the original MACT standards.

        Any work practice or operational procedure that was not identified or considered during development of the original MACT standards.

        As used here, ``other equipment'' is clearly separate from and in addition to ``add-on control'' technology and is broad enough to include monitoring equipment. In this case, fenceline monitoring is a type of equipment that we did not identify and consider during development of the original MACT standards. Additionally, the fenceline standard is a work practice standard, involving monitoring, root cause analysis and corrective action not identified at the time of the original MACT standards. Therefore, the fenceline requirements are a development in practices that will improve how facilities manage fugitive emissions and EPA appropriately relied on section 112(d)(6) in requiring this standard.

        Comment: Some commenters contended that because the fenceline monitoring standard is in essence an ambient standard, the only justification that can be used to support it would be under CAA section 112(f)(2). The commenters stated that EPA determined that the MACT standards pose an acceptable level of risk and protect the public health with an ample margin of safety and thus, section 112(f) does not support imposition of the fenceline monitoring requirement. Several commenters stated that the Agency expressly acknowledges that imposition of additional emission standards for fugitive emissions from refinery sources are not warranted under CAA section 112(f). Some commenters suggested that because the existing MACT standards protect public health with an ample margin of safety, the fenceline monitoring requirement imposes an unnecessary burden on industry because it is not necessary to achieve acceptable risk or provide an ample margin of safety.

        Response: EPA is not relying on section 112(f)(2) as the basis for the fenceline monitoring requirement. As provided in a previous response to comment, we disagree with the commenters that the fenceline monitoring requirement is an ambient standard and therefore, we do not need to consider what authority would be appropriate for establishing an ambient standard that would apply to fugitive sources of emissions at refineries. We also disagree with the commenters who suggest that EPA may not require fenceline monitoring pursuant to section 112(d)(6) because EPA has not determined that fenceline monitoring is necessary to ensure an acceptable level of risk or the provide an ample margin of safety. Section 112(d)(6) does not

        Page 75194

        require EPA to factor in the health considerations provided in section 112(f)(2) when making a determination whether it is ``necessary'' to revise the MACT.

        Comment: Commenters stated that the pilot studies undertaken by the EPA and pilot studies undertaken by the refining industry (see the API Fenceline Study in the docket for this rulemaking) demonstrate either that there is no underestimation of emissions and thus, no need for the fenceline monitoring work practice standard, or that fenceline benzene data cannot be used to validate emission estimates. Commenters stated that none of the refineries in the API study of the proposed refinery fenceline standard had study-averaged DeltaC concentrations that exceeded the proposed action level of 9 microg/m\3\ and thus the study provides some evidence that U.S. refineries are not underestimating emissions. Furthermore, the commenter stated that there is significant ambient air monitoring performed that further supports low benzene concentrations in the vicinities of refineries and cited ambient monitoring data collected by the Southeast Texas Regional Planning Commission Air Quality Group and the Texas Commission on Environmental Quality (TCEQ).

        Response: We disagree that the API fenceline study demonstrates that there is no underestimation of emissions. The API report referred to by the commenter actually shows higher DeltaC concentrations than what we expected, when we compare the distribution of DeltaC's presented in the API fenceline study to the distribution of benzene concentrations at the 142 refineries we modeled (see memorandum ``Fenceline Ambient Benzene Concentrations Surrounding Petroleum Refineries'', EPA-HQ-OAR-2010-0682-0208). Note that API did not identify the facilities in their study, so we were not able to perform a one-to-one comparison of the measured DeltaC concentrations with the modeled fenceline concentrations. Furthermore, the API conducted the study primarily during the fall and winter months (October to March) when the ambient temperatures are lower than the annual averages. While this may not impact equipment leak emissions, temperature can have a significant impact on emissions from storage vessels and wastewater treatment systems, so it is likely that the annual average DeltaC for the facilities tested could be higher than the ``winter'' averages measured in the API study. Based on our review of the API study data, we interpret the results to indicate that there may be higher concentrations of benzene on the fenceline attributable to fugitive emissions than anticipated at some facilities. These studies are an indication that the standard we are finalizing will achieve the goal of ensuring that the owners or operators manage fugitive emissions within the refinery.

        This regulatory approach also fits with the EPA's goals to improve the effectiveness of rules. Specifically, in this case, we are improving the effectiveness of the rule in two ways. First, we are establishing a fenceline benzene trigger to manage overall fugitive HAP emissions, rather than establishing further requirements on many individual emission points. Secondly, the rule incentivizes facilities to reduce fugitive HAP emissions below the fenceline benzene trigger by providing regulatory options for reduced monitoring.

        Regarding ambient monitoring data, we note that existing ambient monitors are not located at the fenceline; they are located away from sources, and concentrations typically decrease exponentially with distance from the emissions source. We are encouraged that data referenced by the commenter indicate that ambient levels of benzene are within levels that are protective of human health in communities, but note that analysis of benzene concentrations in communities does not necessarily indicate that refineries located near these communities are adequately managing their fugitive HAP emissions.

        Comment: Several commenters reiterated that they do not believe the proposed fenceline monitoring is a technology development for equipment leaks, storage vessels or wastewater sources. However, if the EPA finalizes the fenceline monitoring requirements, the commenters suggested that there is no longer a need or regulatory basis for imposing both the fenceline monitoring requirements and the existing MACT standards for fugitive HAP emission sources. Thus, the EPA should remove the current MACT requirements for LDAR, storage vessels and wastewater handling and treatment from Refinery MACT 1 if the EPA promulgates fenceline monitoring. Addition of fenceline monitoring on top of the existing MACT requirements, they argue, would violate the Executive Order 12866 mandate to avoid redundant, costly regulatory requirements that provide no emission reductions.

        Response: We disagree that the fenceline monitoring standards we are finalizing in this rule are redundant to MACT emissions standards for fugitive HAP emissions sources. The MACT standards impose requirements on fugitive HAP emissions sources consistent with the requirements in CAA section 112(d)(2) & (3), and the fenceline monitoring requirement is not a replacement for those requirements. Rather, based on our review of these standards, we concluded that fenceline monitoring is a development in practices, processes or control technologies that would improve management of fugitive emissions in a cost-effective manner. In selecting this development as an across-the-board means of improving management of fugitive emissions, we rejected other more costly developments that would have applied independently to each fugitive emissions source. Requiring refineries to establish a fenceline monitoring program that identifies HAP emission sources that cause elevated benzene concentrations at the fenceline and correcting high emissions through a more focused effort augments but does not replace the existing requirements. We found that, through early identification of significant fugitive HAP releases through fenceline monitoring, compliance with the existing MACT standards for these emissions sources could be improved and that it was necessary to revise the existing standards because fenceline monitoring is a cost-effective development in processes, practices, and control technologies.

        We note that the existing MACT requirements are based on the MACT floor (the best performers), and as such, provide a significant degree of emission reductions from the baseline. The action level for the fenceline work practice standard, by contrast, is not based on the best performers but rather on the highest value expected on the fenceline from any refinery, based on the modeling of refinery emission inventories. As such it is not representative of the best performers and could not be justified as meeting the requirements of section 112(d)(2)and (3). If we were to remove the existing standards for fugitive emission sources at the refinery, we would not be able to justify that sources are meeting the level of control we identified as the MACT floor when we first promulgated the MACT. Nor could we justify the fenceline monitoring program we are promulgating as representing the MACT floor because we considered cost (and not the best performers as previously noted) in identifying the components of the program. Although the fenceline monitoring standard on its own cannot be justified as meeting the MACT floor requirement for each of the separate

        Page 75195

        types of fugitive emission sources, that does not mean that it is not an effective enhancement of those MACT requirements. To the contrary, it works in tandem with the existing MACT requirements to provide improved management of fugitive emissions and, in that sense, it is precisely the type of program that we believe Congress had in mind when enacting section 112(d)(6).

        ii. Rule Should Require Real-Time Monitoring Technology for Fenceline Monitoring.

        Comment: Numerous commenters stated that the proposed fenceline standards, which require monitoring using 2-week integrated passive samplers, are flawed and weak for a number of reasons, including that the monitoring method does not provide real-time data, does not provide adequate spatial coverage of the fenceline, and does not provide a mechanism to identify the specific emission source impacting the fenceline to manage fugitive emissions. Several commenters suggested that this monitoring technology is not state of the art. They claimed that there are superior systems in place at refineries that are technically and economically feasible, including at Shell Deer Park, Texas; BP Whiting, Indiana; and Chevron Richmond, California. Further, they claimed that these systems more effectively achieve the objective of reducing fugitive emissions. They claimed several systems are superior to the proposed system, including open-path systems such as ultraviolet differential optical absorption (UV DOAS) and Fourier transform infrared spectroscopy (FTIR), as well as point monitors such as gas chromatographs. A number of commenters suggested that open-path monitors should be required, stating that this technology is capable of providing real-time analysis and data on air pollution, is able to analyze multiple pollutants simultaneously at low, near-ambient concentrations, and is capable of providing more complete geographic coverage.

        The commenters also stated that the benefits of real-time monitors are particularly important in communities close to refineries, where they believe refinery emissions are a major source of toxic pollutants and short-term upset events that can have significant public health impacts. In particular, the commenters stated that open-path monitors promote an individual's right-to-know, in real-time, about harmful pollution events affecting their communities, and will allow refinery owners or operators to immediately identify fugitive emissions and undertake swift corrective action to reduce these emissions. Some commenters suggested that, if the EPA rejects these open-path real-time monitors, then at a minimum the EPA should require the use of active daily monitoring, such as auto-gas chromatograph (GC) systems.

        Finally, a number of commenters recommended that the EPA provide sufficient flexibility in its regulations to allow state and local jurisdictions to develop, demonstrate, and subsequently require the use of alternative monitoring programs, provided these monitoring programs are at least equivalent to those in the final rule.

        Response: We understand that many commenters believe real-time monitoring would not only help refinery owners or operators in identifying emission sources, but also would warn the community of releases in real time.

        Both open-path systems and active sampling systems (such as auto-

        GCs) mentioned by the commenters, are monitoring systems capable of yielding monitoring data quickly--ranging from a few minutes to about a day. However, these ``real-time'' systems have not been demonstrated to be able to achieve all of the goals stated by the commenters--

        specifically, able to provide real-time analysis and data on multiple pollutants simultaneously at low-, near-ambient concentrations, with more complete geographic (or spatial) coverage of the fenceline.

        The real-time open-path systems suggested by the commenters are all limited in that they are not sensitive enough to detect benzene at the levels needed to ensure that fenceline monitoring achieves its intended goal. The fenceline monitoring system needs to be capable of measuring at sub-ppbv levels--well below the 9 mug/m\3\ fenceline benzene concentration action level in the final rule, in order to determine the DeltaC. In the proposal, we discussed two open-path monitoring technologies, FTIR and UV-DOAS. For the proposed rule, we analyzed the feasibility of employing UV-DOAS over FTIR because the UV-DOAS is more sensitive to detection of benzene than FTIR, as we described in the proposal. We reviewed performance data on several UV-DOAS systems in support of the proposed rule, and for this final rule, we considered information submitted during the comment period. We found that the lowest detection limit reported for any commercially-available UV-DOAS system is on the order of 3 ppbv over a 200-meter path length, whereas the fenceline benzene concentration action level is 2.8 ppbv (equivalent concentration to 9 mug/m\3\). This system is being installed at the Shell Deer Park refinery but has not been field validated yet. Thus, we do not yet know the detection capabilities of the system, as installed. Based on the lowest reported detection limit, it cannot achieve the detection levels needed to demonstrate compliance with the fenceline standard in this final rule. This system also will only cover approximately 5 percent of the fenceline at Shell Deer Park, instead of the full fenceline coverage of the passive diffusive tube monitoring system we proposed. Facilities would have to deploy a monitoring system consisting of many open-path monitors to achieve the same spatial coverage as the passive diffusive tube monitoring system.

        For the final rule, we also reviewed other UV-DOAS systems in operation at refineries that commenters identified. However, reported detection limits for these systems are even higher than for the type of system being installed at Shell Deer Park. For example, we reviewed the open-path UV-DOAS system information from BP Whiting and found that they were able to verify a detection limit of 8 ppbv path average concentration for benzene over a 1,500-meter optical path. This is well above the 2.8 ppbv fenceline benzene concentration action level, let alone the sub-ppbv levels necessary to determine the DeltaC. Moreover, this system, though commercially available, was optimized by developing alternative software to improve the detection limit (see memorandum ``Meeting Minutes for April 21, 2015, Meeting Between the U.S. EPA and BP Whiting'' in Docket ID No. EPA-HQ-OAR-2010-0682). Thus, the system, as installed, would not be readily available to other refineries. We reviewed data for the UV-DOAS system at the Chevron Richmond refinery and found that this system, with optical path lengths ranging from 500 to 1,000 meters, has a reported benzene detection limit of 5 ppbv averaged over the path length. Again, this is above the fenceline benzene concentration action level at the fenceline established in this final rule. In addition, we could not find any information to support the reported detection limit. We note that the public Web site operated by the City of Richmond, California indicates that information provided by the system is informational only, not quality assured, and not to be used for emergency response or health purposes.

        We also disagree with the commenter's claim that if the EPA does not finalize requirements for real-time open-path monitors then, at a minimum, the EPA should require active daily monitoring. There are two methods of

        Page 75196

        active monitoring. One method, which we will refer to as the ``auto-GC method,'' uses a dedicated gas chromatograph at each monitoring location and can return ambient air concentration results multiple times a day or even hourly. The other method, which we refer to as ``method 2,'' uses an active pump to collect gas in a sorbent tube or in an evacuated canister over a 1-day period, for later analysis at a central location. While active sampling monitoring networks are capable of measuring multiple pollutants and would likely be able to detect benzene at sub-ppbv levels as necessary to demonstrate compliance with the fenceline requirements in this final rule, they consist of discreet monitors and would not provide any better spatial coverage of the refinery fenceline than a passive diffusive tube monitoring network. Further, as shown in Table 9 of the proposed rule (see 79 FR 36923, June 30, 2014), like open-path systems, an active sampling monitoring network would cost many times that of a passive diffusive tube monitoring network. At proposal, we estimated the costs of active daily sampling based on ``method 2'' to be approximately 10 times higher than for the proposed passive monitoring (see memorandum ``Fenceline Monitoring Technical Support Document'', Docket ID No. EPA-HQ-OAR-2010-

        0682-0210). We note that this type of active daily sampling based on method 2 does not necessarily yield results within 24 hours as the sample analysis would be conducted separately. We did not specifically estimate the costs of an auto-GC alternative, but the capital costs would be at least 20 to 30 times that for the passive diffusive tube system, would require shelters and power supplies at all monitoring locations and would have operating costs similar to the ``method 2'' active monitoring option we considered.

        To date, there are no commercially-available, real-time open-path monitors capable of detecting benzene at the sub-ppbv levels necessary to demonstrate compliance with the fenceline requirements in this final rule. Only a system that can detect such levels will result in effective action by facilities to identify and control fugitive emissions in excess of those contemplated by the MACT standards. Further, active monitoring systems, while potentially capable of detecting benzene at sub-ppbv levels, like open-path systems, become very costly when enough monitors are located around the facility to approach the spatial coverage of the passive diffusive tubes. However, we believe that the state of technology is advancing and that the capabilities of these systems will continue to improve and that the costs will likely decrease. If a refinery owner or operator can demonstrate that a particular technology would be able to comply with the fenceline standards, the owner or operator can request the use of an alternative test method under the provisions of 40 CFR 63.7(f). A discussion of the specific requirements for these requests can be found in the first comment and response summary of Chapter 8.3 of the ``Response to Comment'' document.

        Comment: One commenter stated that the required monitoring should include real-time monitoring of all chemicals released by refineries that pose risks to human health. The commenter stated that the limited scope of monitoring required by the proposed rule appears to be guided by the EPA's judgment that fugitive, or ``unintended'' emissions pose the greatest threat to public health. On the contrary, communities may well suffer from the effects of chemicals released into the air under normal, permitted emissions. A more expansive monitoring strategy would account for both routine and fugitive emissions.

        Several commenters noted that monitoring is limited to benzene as opposed to multiple HAP. One commenter noted that ill health experienced by refinery neighbors is due in large part to the synergistic effects of multiple chemicals. Therefore, the commenter stated that it is essential that the rule require monitoring of the full range of chemicals with health implications. Other commenters recommended that the fenceline monitoring requirement be amended to include additional contaminants, such as VOC, that may negatively impact human health and the environment. Conversely, other commenters stated that the EPA has appropriately selected benzene as a target analyte and surrogate for HAP emissions from petroleum refineries, as benzene is a common constituent in refinery feedstocks and numerous refinery streams, and is present in most HAP-containing streams in a refinery.

        Response: As part of the CAA section 112(d)(6) technology review, the EPA identified the fenceline monitoring standard as a development in practices, processes or control technologies that could improve management of fugitive HAP emissions. Thus, to the extent the commenter is suggesting that the EPA require the fenceline monitoring system to monitor for emissions of non-HAP pollutants, such request goes beyond the scope of our action. Furthermore, to the extent that the commenter is raising health concerns, although we address residual risk remaining after implementation of the MACT standards under CAA section 112(f)(2), we note that the MACT standards themselves, including this requirement, are aimed at protecting public health, especially in surrounding communities. As we explained in the proposal, and as we determine for this final rule, the MACT standards as modified by additional requirements for storage vessels, provide an ample margin of safety to protect public health. We did not propose and are not finalizing a fenceline monitoring requirement as necessary to provide an ample margin of safety under CAA section 112(f)(2).

        Petroleum refining emissions can contain hundreds of different compounds, including many different HAP, and no single method can detect every HAP potentially emitted from refineries. While several HAP are amenable to quantification via passive diffusive tube monitoring using the same adsorbent tubes used for benzene (e.g., toluene, xylenes and ethyl benzene, which have uptake rates in Table 12.1 in Method 325B), we selected benzene as a surrogate because it is present in nearly all refinery fugitive emissions. By selecting a single HAP as a surrogate for all fugitive HAP, we are able to establish a clear action level, which simplifies the determination of compliance for refinery owners or operators and simplifies the ability of regulators and the public to determine whether sources are complying with the work practice standard. As described in the proposal preamble, benzene is ubiquitous at refineries and present in nearly all refinery process streams, including crude oil, gasoline and wastewater. Additionally, benzene is primarily emitted from ground level, fugitive sources that are the focus of the work practice standard. Thus, we conclude that monitoring of benzene is appropriate and sufficient to identify emission events for which the monitoring program is targeting. Consequently, we are not requiring quantification of other pollutants although refinery owners or operators could choose to analyze the diffusive tube samples for additional HAP in conducting root cause analysis and corrective action.

        iii. Fenceline Monitoring Action Level

        Comment: Several commenters stated that the action level for fenceline monitoring (i.e., 9 mug/m\3\ or 2.8 ppbv), was set too high. Some of these commenters noted that the EPA selected 9 mug/m\3\ as the highest modeled benzene

        Page 75197

        concentration at any refinery fenceline. One commenter stated that this was arbitrary and capricious and stated the action threshold level makes little sense because only 2 of the 142 modeled facilities are expected to have fenceline concentrations above 4 mug/m\3\. Several commenters noted that the average modeled benzene concentration is 0.8 mug/m\3\, which is more than an order of magnitude less than the proposed fenceline benzene concentration action level.

        Two commenters argued for a lower action level threshold, citing the proposed California OEHHA rule, which finalized new and revised benzene reference exposure levels (REL) that are more stringent than the ones the EPA used in the residual risk assessment supporting the proposed rule.

        Two commenters stated that while the fenceline benzene concentration action level of 9 mug/m\3\ is relatively protective compared to standards adopted by many states, including Louisiana and Texas, it is still 80-percent higher than the European Union's standard of 5 mug/m\3\. The commenter urged the agency to consider adopting a stricter standard comparable to what other industrialized nations use.

        Several commenters stated that the EPA's 9 mug/m\3\ action level is inconsistent with the statutory text and objectives of CAA sections 112(d) and (f), which direct the EPA to focus on the best-performing, lowest-emitting sources, in order to require the ``maximum achievable'' emission reductions. The commenters stated that the EPA promulgated the 9 mug/m\3\ limit without properly following the statutory requirements for establishing MACT floor limits, pointing out that the EPA made no determination of whether or not these general models were representative of the emissions levels actually achieved by the submitting refinery, and no connection was drawn between the best performing sources and the eventual 9 mug/m\3\ limit.

        On the other hand, several commenters opposed the 9 mug/m\3\ action level suggesting that it was not achievable and that it is arbitrary. Some commenters noted that emission/dispersion models are always very site-specific and do not necessarily yield a result that is reliable or reproducible. Several commenters stated that additional studies are necessary to allow the agency to account for these variables and set a more appropriate concentration corrective action level. Commenters suggested a 2-year data gathering effort at all refineries and data evaluation before determining a specific threshold to use.

        Several commenters recommended action levels ranging from 15 mug/

        m\3\ to 20 mug/m\3\ of benzene to account for the variability expected in monitoring data. The commenters stated that modeling biases have underestimated the necessary action level to achieve the stated goals of the program.

        Response: First, it is important to note that the purpose of the standard has not changed between proposal and promulgation, namely that it is a technology-based standard that is an advancement in practices to manage fugitive emissions. It is not intended to be a separate or new MACT standard promulgated pursuant to CAA sections 112(d)(2) and (3) for which a ``floor'' analysis would be required.\7\ Nor is it a standard that we are promulgating pursuant to CAA section 112(f)(2) as necessary to provide an ample margin of safety to protect public health or prevent an adverse environmental effect.\8\ Thus, claims that a standard should reflect European Union health-based standards or the California OEHHA rule are misplaced. We also disagree with the suggestion that the proposed monitoring requirement will allow for higher emissions. As noted elsewhere, we are retaining all of the source-specific requirements for fugitive emissions sources that exist in Refinery MACT 1.

        ---------------------------------------------------------------------------

        \7\ To the extent that the commenters are suggesting that EPA must re-perform the MACT floor analysis for purposes of setting a standard pursuant to section 112(d)(6), we note that the D.C. Circuit has rejected this argument numerous times, most recently in National Association for Surface Finishing et al. v. EPA No. 12-1459 in the U.S. Court of Appeals for the District of Columbia.

        \8\ Although we did not establish this limit to address residual risk under CAA section 112(f)(2), the limit was derived from the same inventory used for our risk modelling. Thus, based on our current reference concentration for benzene, the 9 mug/m\3\ action level will also ensure that people living near the refinery will not be exposed to cancer risks exceeding 100-in-1 million.

        ---------------------------------------------------------------------------

        We disagree with the commenters that suggest that the proposed action level of 9 mug/m\3\ is too low and may not be achievable even for well-performing facilities. As discussed in the preamble for the proposed rule, we selected the 9 mug/m\3\ benzene action level because it is the highest value on the fenceline predicted by the dispersion modeling and, thus, is a level that we estimate that no refinery should exceed when in full compliance with the MACT standards, as amended by this final rule. All of the results of our pilot study, the API study, and the other ambient monitoring data near refineries clearly indicate that this level is achievable. Furthermore, we expect the fenceline concentration difference measured following the procedures in the final rule to be indicative of refinery source contributions and we have provided procedures to isolate these concentrations from outside sources, as well as background.

        We expect that the fenceline monitoring standard will result in improved fugitive HAP emissions management as it will alert the refinery owners or operators of fugitive sources releasing high levels of HAPs, such as large leaks, faulty tank seals, etc.

        iv. Fenceline Monitoring Root Cause Analysis and Corrective Action Provisions

        Comment: A number of commenters objected to the proposal's ``open-

        ended'' provisions allowing the EPA to direct refinery owners or operators to change their operations in order to achieve the fenceline limit, with no regulatory limits on costs and without consideration of the impact to safe operations or operability of the plant. Another commenter stated that the EPA must properly assess the costs associated with the root cause analysis/corrective action requirements and should establish a cost effectiveness threshold for any required root cause analysis/corrective action to ensure that limited resources are effectively and efficiently applied for the control of emissions.

        One commenter stated the proposed fenceline benzene concentration action level is effectively an ambient air standard, because corrective action to achieve that level is required and that if a facility's initial corrective action is unsuccessful, the rule provides that further action is required and the EPA must approve that further corrective action plan. Thus, the commenter argued, the EPA would essentially be able to dictate corrective actions, with no bounds on what could be required and no consideration of whether any cost-

        effective actions are available to assure the action level is met. The commenter continued that such a requirement converts a work practice program to an emission limitation and such ambient air limits are not authorized by CAA section 112. Several commenters noted that LDAR and current work practice programs have no similar requirement for the EPA approval, and the commenters suggested that the requirement for the EPA approval of any second corrective action should not be included in 40 CFR 63.658(h).

        Another commenter recommended that, if after corrective action, a facility still has an exceedance for the next sampling episode, then the facility should be required to do more than it

        Page 75198

        did after the first root cause analysis, as the prior corrective action clearly did not correct the problem. The commenter stated that one corrective action measure the EPA should include in all such instances is higher-quality monitoring such as UV-DOAS for at least 1 year to monitor, identify, correct and assure ongoing compliance after the exceedance problem is fixed.

        Response: The ``on-going'' requirement to achieve the fenceline benzene concentration action level is no different in concept from the LDAR requirements for equipment or heat exchange systems in the Refinery MACT 1 rule, which requires the refinery owner or operator to repair the source of the emissions regardless of what it takes until compliance with the standard is achieved.

        We disagree with the claim that the EPA must assess the costs associated with the root cause analysis/corrective action requirements and establish a cost effectiveness threshold for any required root cause analysis/corrective action to ensure that limited resources are effectively and efficiently applied for the control of emissions. We did not attempt to project the costs of the root cause analysis/

        corrective action for at least two reasons. First, based on the dispersion modeling of the benzene emissions reported in response to the inventory section of the 2011 ICR, we project that no refinery should exceed that fenceline benzene concentration action level if in full compliance with the MACT standards, as amended by this action. Thus, assuming compliance with the MACT standards, we would expect that there are no costs for root cause analysis/corrective action. To the extent that there are exceedances of the action level, the premise of the fenceline monitoring is to provide the refinery owners or operators with the flexibility to identify the most efficient approaches to reduce the emissions that are impacting the fenceline level. Since the choice of control is a very site-specific decision, we would have no way to know how to estimate the costs. Thus, the source is in the best position to ensure that resources are effectively and efficiently spent to address any exceedance.

        We intended the proposed requirement for refinery owners or operators to submit a corrective action plan for the EPA approval to provide the Administrator with information that they were making a good-faith effort to reduce emissions below the fenceline benzene concentration action level, as expeditiously as practicable. However, we understand the importance for refinery owners or operators to begin corrective action as soon as possible, without having to wait for the EPA approval. Therefore, we are finalizing the requirement for refinery owners or operators to submit such plans but we are not finalizing the requirement that the EPA must approve the plan prior to the corrective action being taken.

        We previously responded to comments regarding UV-DOAS or other open-path monitoring systems in this section, explaining that the current detection limits for these systems exceeds the action level threshold and, thus, these systems would not provide usable data to inform corrective action. Thus, we disagree that the EPA should require these systems for all facilities whose first attempt at corrective action is ineffective.

      7. Fenceline Monitor Siting Requirements

        Comment: Numerous commenters provided suggestions on, or requested clarification of, the monitor siting requirements. Several commenters stated that proposed Method 325A uses the terms ``fenceline or property boundary,'' while it should consistently use the term ``property boundary'' or even ``property line'' as the fenceline location. Several commenters stated that Sections 8.2.2.1.4 and 8.2.2.3 of Draft Method 325A specify that samplers be placed just beyond the intersection where the measured angle intersects the property boundary and this could require placing monitors on other people's property, in a road, in a water body or in a railroad right-of-way. The commenters suggested that facilities should be allowed to place monitors at any vector location that meets other requirements between the property boundary and the source nearest the property boundary. They stated that facilities need this clarification to avoid obstructions (e.g., buildings or trees) that may be at the property line.

        Numerous commenters requested that the rule clarify where monitors need to be placed in special circumstance, such as refineries bisected by a road, railroad or other public right-of-way or a boundary next to a navigable waterway. Several commenters stated that refiners should not need to place monitors on these property boundaries or other property boundaries where there are no residences within 500 feet of the property line. Commenters also asked if areas that had non-refinery operations, but are still inside the property boundary, would be included for purposes of determining where to site monitors.

        A few commenters expressed concern about the approach for determining the number of required monitors at a site based on the acreage, noting that it is unfair to small facilities and will leave gaps in monitoring coverage for very large facilities. Some commenters recommended amending the proposed rule to require the placement of fenceline monitors at fixed distances along facilities' perimeters with no maximum number of monitors. Some commenters stated that the rule should specify an acceptable range on the 2,000-foot spacing requirement or the radial placement requirement as it may be necessary to address accessibility or safety concerns. Several commenters suggested that a lower minimum number of sampling monitors should be required for very small refineries or small ``subareas.'' These commenters noted that refineries often include disconnected parcels that can be very small (e.g., 10 acres or less). If each disconnected parcel must be treated as a separate subarea, then both sampler siting options in Draft Method 325A would result in unnecessarily large numbers of samplers extremely close together. Some commenters recommended that Method 325A specify that samplers need not be placed closer than 500 feet (versus the normal 2,000-foot interval specified in Option 2) along the fenceline from an adjoining sampler, regardless of whether the radial or linear approach is used and should waive the minimum number of samplers specified in Sections 8.2.2.1.1, 8.2.2.2.1, and 8.2.3.1. Another commenter added that the rule should waive the requirement for additional samplers in Sections 8.2.2.1.5 and 8.2.3.5 if the 500-foot minimum spacing criterion is compromised.

        Response: We agree that the Method 325A should provide clear and consistent language. We have revised the language to be consistent in referring to the ``property boundary''. We have also revised the Method to allow placement of monitors at any radial distance along either a vector location or linear location (that meets the other placement requirements) between the property boundary and the source nearest the property boundary. That is, the monitors do not need to be placed exactly on the property boundary or outside of the property boundary. They may be placed within the property closer to the center of the plant as long as the monitor is still external to all potential emission sources. We do note that if the monitors are placed farther in from the property boundary, the owner or operator should take care to ensure, if possible, that the radial distance from the sources to the monitors is at least 50

        Page 75199

        meters. If the perimeter line of the actual placement of the fenceline monitors is closer than 50 meters to one or more sources, then the additional monitor citing requirements will apply. We have revised subparagraphs of Section 8.2.2 to provide this allowance. This clarification should address issues related to obstructions such as tall walls located at the facility boundary.

        We intended that the fenceline monitoring would create a monitoring perimeter capable of detecting emissions from all fugitive emission sources at the refinery facility. We have long established that a road or other right of way that bisects a plant site does not make the plant site two separate facilities, and, thus, would not be considered part of the property boundary. As we agree that monitors need only be placed around the property boundary of the facility, it would not be necessary to place monitors along a road or other right-of-way that bisects a facility. We have clarified this in the final rule and Method 325A.

        If the facility is bounded by a waterway on one or more sides, then the shoreline is the facility boundary and monitors should be placed along this boundary. If the waterway bisects the facility, the waterway would be considered internal to the facility and monitors would only be needed at the facility perimeter.

        Regarding the comment that monitors should not be required where there is no residence within 500 feet of the property line, we disagree. We proposed and are finalizing the fenceline monitoring standards under CAA section 112(d)(6) as a means to improve fugitive HAP emissions management, regardless of whether there are people living near a given boundary of the facility.

        Regarding the clarification requested about monitor placement considering non-refinery operations, the property boundary monitors should be placed outside of all sources at the refinery. This is because moving the monitoring line inward to exclude the non-refinery source could lead to an underestimation of the DeltaC compared to the monitoring external of the entire site. If the non-refinery source is suspected of contributing significantly to the maximum concentration measured at the fenceline, a site-specific monitoring plan and monitoring location specific near-field interfering source (NFS) corrections will be needed to address this situation.

        Section 8.2.3 of Method 325A includes language to provide some flexibility when using the linear placement (10% or 250 feet). We consider it reasonable to provide similar placement allowance criteria for the radial placement option (1 degree). We are not providing requirements that would allow small area refineries to use fewer than 12 monitoring sites. We do not consider that any refinery would be so small as to warrant fewer than 12 monitors; however, we did not necessarily consider very small subareas for irregularly shaped facilities or segregated operations. When considering these subareas, we agree that fewer than 12 monitoring sites should be appropriate. Therefore, we have provided that monitors do not need to be placed closer than 152 meters (500 feet) (or 76 meters (250 feet) if known sources are within 50 meters (162 feet) of the monitoring perimeter, which is likely for these subareas or segregated areas) with a stipulation that a minimum of 3 monitoring locations be used per subarea or segregated area. We note, however, that this distance provision does not obviate the near source extra monitoring siting requirements or the requirement to have a minimum of three monitors per subarea or segregated area.

        If facility owners or operators have questions regarding the required locations of monitors for a specific application, they should contact the EPA (or designated authority) to resolve questions about acceptable monitoring placement.

        vi. Compliance Time for Fenceline Monitoring Requirements

        Comment: Some commenters supported EPA's proposal to provide 3 years to put a fenceline monitoring program in place, but the commenters believe that timing is unclear in the proposed regulatory language, which appears in Table 11 to subpart CC, and requested that the EPA add the initial compliance date to 40 CFR 63.658(a). One commenter stated that instituting this program for all 142 major source U.S. refineries would require considerable time. Based on their experience with their pilot study, one commenter noted that commercially available weather guards meeting the specifications of proposed Method 325A are not available and would need to be fabricated. Additionally, a commenter stated that only a limited number of laboratories in the U.S. are able to perform the necessary analyses. According to the commenter, considerable time and effort will be needed to qualify additional laboratories and to expand the capacity of existing laboratories to handle the samples from 142 refineries.

        Other commenters disagreed with the EPA's proposed compliance time and suggested that the EPA shorten the timeline for implementation at refineries so that possible corrective action occurs much sooner than proposed. The commenters suggested that deployment of passive samplers can proceed more promptly than proposed, especially since the EPA has simultaneously proposed specific ``monitor siting and sample collection requirements as EPA method 325A of 40 CFR part 63, Appendix A, and specific methods analyzing the sorbent tube samples as EPA Method 325B of 40 CFR part 63, Appendix A.'' Moreover, the commenter noted, a principal reason that the EPA selected passive monitors over active monitors was due to the relative ``ease of deployment.'' The commenter claimed this ease of deployment rationale is undermined by a 3-year grace period to deploy passive monitors when the EPA is providing very specific criteria for their use. The commenter suggested that the EPA require full compliance with the passive monitoring requirement within 1 year of the effective date of the rule.

        Response: While we realize that it will take some time for the refinery owners or operators to understand the final rule and develop a compliant monitoring program, we agree that in requiring the passive sampler monitoring system, we recognized the ease of implementation and deployment. Although industry commenters identified issues they faced in the API pilot study while trying to implement the monitoring method, we note that the 12 facilities that participated in the API pilot study installed the fenceline monitors and began sampling in late 2013 with relative ease and within months of obtaining the draft methods. Thus, we disagree with the suggestion that 3 years is insufficient and agree with other commenters that 3 years is in fact too long. However, we also are aware that the API pilot facilities used the direct DeltaC approach proposed and did not attempt to develop site-specific monitoring programs to correct for interfering near-field sources. Although we expect that facilities could complete direct implementation of the proposed fenceline monitoring requirement within 1 year after the effective date of the rule, as suggested by some commenters, facilities that choose to develop a site-specific monitoring plan would need a longer period of time. Therefore, we are finalizing requirements that specify that facilities must begin monitoring for the official

        Page 75200

        determination of DeltaC values no later than 2 years after the effective date of the rule.

        vii. Fenceline Monitoring Recordkeeping and Reporting Requirements

        Comment: Some commenters suggested that facilities should be required to submit the monitoring data via the ERT only if they exceed the fenceline benzene concentration action level and that all remaining data should be kept on-site and available for inspection or upon request of the EPA, citing that this is consistent with EPA's semiannual NESHAP reporting of only exceptions (i.e., deviations). Other commenters requested that the EPA only post the rolling annual average concentration values and not the 2-week monitoring data. These commenters indicated concern that if errors are present in the raw data that are submitted semiannually to the EPA, the data, errors and all, will be released to the public and correcting them will not take place or will not take place in a timely manner. One commenter added that there is very little useful information that can be gleaned from the raw data and posting it simply invites misunderstandings.

        Commenters also stated that the EPA should adopt reporting requirements to ensure that facilities report the monitoring data appropriately. Specifically, commenters recommended that 40 CFR 63.655(h)(8)(i) should be clarified to only require reporting of valid data and cautioned that data should be processed to allow accurate calculations of annual averages to be used for reporting and evaluation. To accomplish this, commenters recommended that the rule provide 75 days from the end of a 6-month sampling period to report to the EPA, rather than the proposed 45-day period, in order to provide adequate time to obtain quality-assured results for all 2-week sampling periods.

        One commenter applauded the proposal's requirements for electronic reporting of the fenceline concentration data and making the resulting information publicly available. However, the commenter recommended that the EPA consider a more truncated data reporting period that is more consistent with the associated milestones of collecting a 14-day sampling episode. As is, the commenter claimed, the proposed rule would have a lag time of up to 7.5 months between data collection and posting. The commenter indicated that data reporting on a more frequent schedule will not only provide transparency, but will provide states and local agencies with information about air quality at refineries at a frequency that could allow informed activities to address leaks much more quickly and protect public health.

        Response: We disagree with the commenters who suggest that facilities only report the rolling annual average or only exceedances of the fenceline benzene concentration action level because the commenters believe there is little information to be gleaned from the raw data. Monitoring data are useful in understanding emissions, testing programs, and in determining and ensuring compliance. We generally require reporting of all test data, not just values calculated from test data and/or where a facility exceeds an emissions or operating limit. For example, when we conduct risk and technology reviews for source categories, we are adding requirements for facilities to submit performance test data into the ERT, not just performance test data that indicates an exceedance of an applicable requirement. In the Mercury and Air Toxics Rule, we require facilities to report direct measurements made with CEMS, such as gas concentrations, and we require hourly reporting of all measured and calculated emissions values (see discussion at 77 FR 9374, February 16, 2012). In particular, for the fenceline monitoring requirements in this final rule, we offer facilities options for delineating background benzene emissions and benzene emissions not attributable to the refinery, and we offer options for reduced monitoring, making it even more necessary that we have all of the data to review to ensure that testing and analyses are being done correctly and in compliance with the requirements set out in the regulations, and that root cause analyses and corrective actions are being performed where necessary. Therefore, as proposed, we are finalizing the requirements that facilities report the individual 2-week sampling period results for each monitor, in addition to the calculated DeltaC values in their quarterly reporting.

        Regarding commenters' concerns that facilities post accurate data and have sufficient time to perform quality assurance on the data, in the final rule, we have established provisions for how sources are to address outliers and data corrections. Additionally, as proposed, we do not require an initial report until facilities have collected 1 year of data so that facilities do not report the data until a rolling annual average value can be determined. This will allow refinery staff and analytical laboratories to iron out any issues that might arise as they implement these methods for the first time. Once this initial data collection period is complete, we anticipate that data quality issues should be infrequent. Therefore, we are providing a 45-day period following each quarterly period before facilities must submit the monitoring results, which should provide facilities adequate time to correct any data errors prior to reporting the data.

        Regarding comments that suggest reporting each 2-week sample result soon after its collection, we disagree. This frequency would put undue burden on the refinery owners or operators in trying to collect, review and quality assure the data prior to reporting. However, we agree with commenters that more frequent reporting of the fenceline monitoring data would be useful. Therefore, we have revised the reporting frequency for the fenceline monitoring data to be quarterly in the final rule rather than semiannually as proposed. Additionally, we understand that there is a lot of interest in how these data will be presented to the public, and we plan to reach out to all stakeholders on appropriate approaches for presenting this information in ways that are helpful and informative.

      8. Refinery MACT 2

        This section provides comment and responses for the key comments received regarding the technology review amendments proposed for Refinery MACT 2. Comment summaries and the EPA's responses for additional issues raised regarding the proposed requirements resulting from our technology review are in the ``Response to Comment'' document in the public docket (Docket ID No. EPA-HQ-OAR-2010-0682).

      9. FCCU

        We received comments on the consideration of developments in pollution controls, the averaging time for FCCU PM limits, and the FCCU opacity limit, as discussed below.

        Comment: One commenter stated that the EPA failed to consider developments in pollution controls for HAP from FCCUs for two reasons. First, the commenter contended that cost is not a valid consideration to evaluate if a ``development'' in pollution control is necessary pursuant to section 7412(d)(2), (3), (6), unless the EPA is setting a ``beyond-the-floor'' requirement.

        Second, the commenter claimed that the EPA's review of developments is nearly 10 years old and misses some important pollution control

        Page 75201

        improvements in the industry. For example, the commenter noted that Valero Benicia installed a combination of controls in 2012 including a scrubber, SCR and CO Boiler that combine exhaust streams from the FCCU and coking and reportedly eliminate HAP emissions entirely from these sources.

        The commenter also asserted that EPA consent decrees impose lower effective limits on PM than the EPA considered under the technology review. The commenter identified the BP Whiting facility as subject to 0.7 lb PM/1,000 lbs coke burn-off at one FCCU and 0.9 lb PM/1,000 lbs coke burn-off at another and claimed these limits are lower than the 1.0 lb PM/1,000 lbs coke burn-off limit currently mandated by Refinery MACT 2.

        Response: We disagree that we cannot consider costs when determining if it is necessary to revise an existing MACT standard based on developments in practices, processes and control technologies. The commenter suggests that we cannot consider costs because of the requirements in CAA section 112(d)(2) and (3) for establishing initial MACT standards and which do not allow for consideration of costs until the second, ``beyond the floor'' phase of the analysis. As discussed previously in this preamble where we respond to comments on the fenceline monitoring requirements, to the extent that the commenters are suggesting that EPA must re-perform the MACT floor analysis for purposes of setting a standard pursuant to section 112(d)(6), we note that the D.C. Circuit has rejected this argument numerous times, most recently in National Association for Surface Finishing et al. v. EPA No. 12-1459 in the U.S. Court of Appeals for the District of Columbia.

        Regarding the claim that the EPA did not consider the types of controls at the Valero and BP facilities, we disagree. The control measures for both of those facilities are controls that existed at the time of the development of the MACT standard. Thus, we did not identify these technologies as developments in control technologies during the technology review. However, we did identify developments in processes or practices that reflect better control by the existing technology and we reviewed modified emission limits that reflect that better level of control. The commenter suggested that we failed to consider a level of zero when the Valero facility was able to achieve zero emissions through a combined SCR, boiler and scrubber. However, the commenter provided no information to support such a claim and we are skeptical that such a result could be achieved. We note that the SCR is designed specifically to reduce NOX emissions, and would not be capable of reducing significantly, much less eliminating completely, HAP emissions. Similarly, based on our long-standing understanding of the processes, neither a boiler nor a scrubber could achieve such a result. Regarding the level of emissions achieved at the BP Whiting facility, we note that we evaluated control systems that can meet 0.5 lb PM/1,000 lb coke burn-off, which is a lower limit than that at BP Whiting. We determined that these were cost-effective to require for new units that are installing a new control system. However, we determined that retrofitting controls designed to meet a PM limit of 1.0 lb PM/1,000 lbs coke burn-off to now meet a limit of 0.5 lb PM/

        1,000 lbs coke burn-off was not cost-effective when considering PM and PM2.5 emissions reductions. We projected the cost of the 0.5 lb PM/1,000 lbs coke burn-off limit in retrofit cases to be $23,000 per ton PM emissions reduced. To meet a limit of 0.7 lb PM/1,000 lbs coke burn-off or 0.9 lb PM/1,000 lbs coke burn-off, as is the case for BP Whiting, the retrofit costs would be similar to this 0.5 lb PM/1,000 lb coke burn-off option, but the reductions would be even less, resulting in costs over $23,000 per ton. As metal HAP content of FCCU PM is approximately 0.1 to 0.2-percent of the total PM, the cost of requiring this lower limit for existing FCCU is over $10 million per ton of metal HAP reduced. Therefore, we determined that it is not necessary to revise the PM standard for existing FCCU sources.

        Comment: Refinery MACT 2 requires the owner or operator to demonstrate compliance with the PM FCCU limits by complying with the operating limits established during the performance test on a daily (i.e., 24-hour) average basis. Several commenters objected to the EPA's proposal to revise this requirement to a 3-hour averaging time. Commenters restated EPA's arguments for 3-hour averaging time as: (1) Daily average could allow FCCUs to exceed limits for short periods while still complying with the daily average, (2) consistency with NSPS subpart Ja and (3) consistency with duration of testing. The commenters stated that the EPA had not provided any data that show that the daily average could allow FCCUs to exceed limits for short periods and, therefore, the EPA is using a hypothetical compliance assurance argument to change emission limits. The commenters stated that a change in emission limits is not authorized by CAA section 112 because the emission limitations in Refinery MACT 2 for FCCUs were established as daily averages following the floor and ample margin of safety requirements in section 112(d)(2) of the CAA.

        The commenters also state that the EPA's additional arguments for the change to a 3-hour average are irrelevant and legally deficient. The commenters stated that the combination of a numerical emission limit and an averaging period frames the stringency of a limitation and that a reduction in either of those factors results in a significant lowering of the operating limit. The commenters conclude that the EPA has proposed to change the stringency of the requirements without justification, and the CAA requires that such a change in stringency be justified pursuant to CAA section 112(d)(6) or (f)(2). The commenters stated that increasing stringency for consistency with NSPS rules is not a criterion for a CAA section 112(d)(6) action. Rather that section requires a change to be due to ``developments.'' The only change in technology since the 2002 promulgation of Refinery MACT 2 is the availability of PM continuous emission monitoring system (CEMS), which is unproven.

        One commenter noted that changing the averaging time is a very significant modification considering that the compliance limits would apply for periods of SSM. This commenter stated that it is unlikely that existing operations can consistently be in compliance with a new 3-hour average since the current daily averaging was put in place to recognize that there will be periods of operating variability that do not represent the longer term performance of an FCCU. The commenters recommended that the EPA retain the daily averaging requirement.

        Response: We disagree with the commenters' statement that reducing the averaging time from a 24-hour basis to a 3-hour basis for demonstrating compliance with the FCCU PM emission limit, using operating limits established during the performance test, is a change to the MACT floor. The emission limit of 1.0 lb PM/1,000 lbs coke burn-

        off is the MACT floor, and we are not changing the PM emissions limit (or alternate Ni limits) in Table 1 to subpart UUU (except to remove the incremental PM limit that did not comport with the MACT floor emissions limitation).

        However, whether or not it is a change from the MACT floor is not relevant. Pursuant to CAA section 112(d)(6), the EPA must revise MACT standards ``as necessary'' considering developments in practices, processes and control technologies. For this

        Page 75202

        exercise, we considered any of the following to be a ``development'':

        Any add-on control technology or other equipment that was not identified and considered during development of the original MACT standards.

        Any improvements in add-on control technology or other equipment (that were identified and considered during development of the original MACT standards) that could result in additional emissions reduction.

        Any work practice or operational procedure that was not identified or considered during development of the original MACT standards.

        Any process change or pollution prevention alternative that could be broadly applied to the industry and that was not identified or considered during development of the original MACT standards.

        Any significant changes in the cost (including cost effectiveness) of applying controls (including controls the EPA considered during the development of the original MACT standards).

        In determining whether there are ``developments,'' we review, among other things, EPA regulations promulgated after adoption of the MACT, such as the NSPS we identified in this instance. We identified the enhanced monitoring requirements for these operating limits as a development in practices that will help ensure FCCU owners or operators are properly operating control devices and, thus, are meeting the PM emission limit at all times. We further determined that this enhanced monitoring was cost effective and proposed that it was necessary to revise the existing standard pursuant to CAA section 112(d)(6).

        While we do not have continuous PM emissions data that show actual deviations of the PM limit, we do not need such data in order to conclude that such deviations could occur when daily averages are used. The Refinery MACT 2 (i.e., subpart UUU) rule requires owners or operators to establish operating limits based on three 1-hour runs during the performance test. As a matter of simple mathematics, a source could demonstrate that it is meeting the operating limit based on a 24-hour average but could be exceeding the 1.0 lb PM/1,000 lbs coke burn-off emission limit based on a 24-hour average or for one or more individual 3-hour periods during that 24-hour average. For example, an owner or operator could operate with a power input 5-

        percent higher than the operating limit for 23 hours, have the ESP off (zero power) for one hour, and still comply with a 24-hour average operating limit. However, it would be difficult for this same unit to meet the 1.0 lb PM/1,000 lbs coke burn-off emissions limit over a 24-

        hour period, and it certainly would not meet the limit for every 3-hour period during that day. As the operating limit can be established to correspond with 1.0 lb PM/1,000 lbs coke burn-off, the 5-percent higher power input would likely correspond with a 0.95 lb PM/1,000 lbs coke burn-off emissions rate (5-percent lower). Uncontrolled emissions are typically 6 to 8 lbs/1,000 lbs coke burn-off. Thus, this unit would have emissions averaging approximately 1.2 lbs PM/1,000 lbs coke burn-

        off during this 24-hour period i.e., (0.95*23+7)/24, but would be in compliance with the 24-hour average operating limit. The unit would obviously also be out of compliance with the 3-hour average over the period when the power was turned off. We also have concerns that the operating limits are not always linear with the emissions, so that the longer averaging times do not effectively ensure compliance with the PM emissions limit. Therefore, as proposed, we are finalizing the requirement for owners or operators to comply with the operating limits on a 3-hour basis, rather than the 24-hour basis currently in the rule.

        Comment: The technology review for FCCUs resulted in the EPA proposing to remove the 30-percent opacity alternative limit for demonstrating compliance with the PM emissions limit that is available for refineries complying with the Refinery NSPS 40 CFR part 63, subpart J. Two commenters supported the EPA's proposed removal of the 30-

        percent opacity limit for FCCUs. Other commenters stated that current technology is good enough for a 10- or 20-percent opacity limit. On the other hand, several commenters stated that the proposed removal of the 30-percent opacity limit must meet the criteria specified in CAA section 112(d)(6) and (f)(2), which requires analysis of the statutory basis, environmental impacts, costs, operational and compliance feasibility and impacts, that the EPA has not conducted. The commenters claimed that had the EPA conducted a proper analysis, the EPA would have determined that the proposed change to remove the 30-percent opacity limit is not necessary or supportable. Additionally, these commenters stated that since the underlying PM emissions limit is unchanged, there is no emission reduction justification for this proposed change, and the change would not meet the CAA section 112(d)(6) requirement of being cost effective. The commenters also noted that processes or practices for existing FCCUs have not changed, as required for a CAA section 112(d)(6) revision.

        Several commenters urged the EPA to maintain the 30-percent opacity limit for these FCCUs. As a practicable and cost-effective alternative to address the EPA's concern as to whether compliance with a 30-percent opacity limit ensures compliance with the PM emissions limit, commenters suggested annual performance tests to confirm that the FCCU is meeting the PM emissions limit, rather than performance tests every 5 years, as proposed.

        One commenter stated that the EPA never intended for the opacity limit in Refinery NSPS subpart J to be used to demonstrate compliance with the PM emissions limit, but instead to assure the PM controls operate properly. The commenter stated that the EPA's conclusion that the 30-percent opacity limit may not be sufficiently stringent to ensure compliance with the underlying PM emissions limit is based on a false premise as to the purpose of the opacity standard because as the EPA states, ``Opacity of emissions is indicative of whether control equipment is properly maintained and operated.''

        Several commenters stated that the proposed elimination of the 30-

        percent opacity limit currently in Refinery MACT 2 leaves existing FCCUs that use cyclones with no viable alternative approach to demonstrate compliance with the PM emissions limit without adding or replacing controls. They stated the other approaches for demonstrating compliance with the PM emissions limit in Refinery MACT 2 (such as development of a site-specific opacity limit) do not work for them. The commenters stated that although they believe that more frequent performance tests would show that the FCCUs are in fact meeting the PM emissions limit, the absence of the 30-percent opacity limit would force FCCUs using cyclones for PM control to install additional, costly PM controls (e.g., ESPs or wet gas scrubbers). They projected that these additional controls would cost tens of millions of dollars per FCCU and would require at least 3 years of compliance time. Additionally, one commenter stated that even FCCUs with additional downstream PM controls would not be able to achieve a site-specific limit at all times and needed the availability of the alternative 30-

        percent opacity limit. One commenter estimated that installing an ESP to meet the proposed 10-percent opacity limit would cost approximately $121,000/ton, assuming a 32 tpy PM emission reduction. The commenter noted that the ESP would also increase GHG emissions and require more energy

        Page 75203

        resources from the facility. The commenter concluded that installing an ESP is neither cost effective nor appropriate considering non-air quality environmental and health impacts and energy requirements, and recommended that the EPA maintain the current NSPS subpart J alternative limits and add additional alternative limits into Refinery MACT 2 only as optional limits for demonstrating compliance with the PM emissions limit.

        Response: In promulgating Refinery MACT 2, the EPA identified the 1.0 lb PM/1,000 lbs coke burn-off limit as the MACT floor but allowed a compliance option for FCCUs subject to Refinery NSPS subpart J to comply with an opacity limit up to 30 percent with one 6-minute allowance to exceed the 30-percent opacity in any 1-hour period. As stated in the proposal, compliance studies have shown that the 30-

        percent opacity limit does not correlate well with the 1.0 lb PM/1,000 lbs coke burn-off limit, and that an FCCU can comply with the 30-

        percent opacity limit while its emissions exceed the PM emissions limit.\9\ Regardless of whether the 30-percent opacity limit in Refinery NSPS subpart J was designed to ``ensure that the control device was operated properly,'' Refinery MACT 2 allows sources subject to NSPS subpart J to use the 30-percent opacity limit to demonstrate continuous compliance with the PM emissions limit. We have determined that the 30-percent opacity limit is inadequate for the purpose of demonstrating continuous compliance with the PM emissions limits in Refinery MACT 2. As such, we proposed to remove this opacity limit and require the owner or operator to either demonstrate compliance with the PM emissions limit by continuously monitoring the control device parameters established during the performance test or establish and monitor a site-specific opacity limit. For clarity, we note that we proposed to allow a site-specific opacity limit, not a 10-percent opacity limit as some commenters suggest. The site-specific opacity limit can be significantly higher than 10 percent, but it cannot be lower than 10 percent.

        ---------------------------------------------------------------------------

        \9\ Compliance Investigations and Enforcement of Existing Air Emission Regulations at Region 5 Petroleum Refineries. U.S. Environmental Protection Agency, Region 5--Air and Radiation, Chicago, Illinois. March 9, 1998.

        ---------------------------------------------------------------------------

        While the compliance study indicates that a 30-percent opacity limit does not correlate well with a 1.0 lb PM/1,000 lbs coke burn-off emissions limit, further review of this same study indicates that a 20-

        percent opacity limit provides a reasonable correlation with units meeting the 1.0 lb PM/1,000 lbs coke burn-off emissions limit. We also reviewed the data submitted by the commenters regarding PM emissions and opacity correlation. While the data suggest that there is variability and uncertainty in the PM/opacity correlation, the data do not support that a 30-percent opacity limit would ensure compliance even when considering the uncertainty associated with the PM/opacity correlation. Based on the variability of the 3-run average opacity limits, we determined that, if the 3-hour average opacity exceeded 20-

        percent, then it was highly likely (98 to 99-percent confidence) that the FCCU emissions from the unit tested would exceed the PM emissions limit.

        After considering the public comments, reviewing the data submitted with those comments, and further review of the compliance study, in this final rule we are adding a 20-percent opacity limit, evaluated on a 3-hour average basis for units subject to NSPS subpart J. As we noted above, a 20-percent opacity limit provides a reasonable correlation with the PM emissions limit, and an exceedance of this 20-percent opacity limit will provide evidence that the PM emissions limit is exceeded. However, it is possible that units could still exceed the PM emissions limit while complying with the 20-percent opacity limit, if those units operate close to the 1 lb PM/1,000 lbs coke burn-off emissions limit. To address this concern, we considered the commenters' suggestion to require a performance test annually rather than once every 5 years. Some commenters suggested that this option specifically apply to FCCUs with cyclones, but this option is applicable to any control system operating very near the PM emissions limit and using an opacity limit to demonstrate continuous compliance. We have determined that the Refinery NSPS subpart J compliance procedures in Refinery MACT 2, in combination with a 20-percent opacity limit demonstrated on a 3-

        hour average basis and with annual performance tests when a test indicates PM emissions are greater than 80-percent of the limit (i.e., 0.80 lb PM/1,000 lbs coke burn-off), will ensure continuous compliance with the PM emissions limit. FCCUs with measured PM emissions during the performance test at or below 0.80 lb PM/1000 lbs of coke burn-off will remain subject to the requirement to conduct performance tests once every 5 years, consistent with the requirements we proposed.

        We do not agree with commenters that the proposed opacity revision would add significant cost or compliance burden. The control device-

        specific monitoring parameters that were proposed rely on parameters commonly used to control the operation of the control device, so the monitoring systems should be already available. Further, since we are merely changing the opacity limit, we expect these units will already have opacity monitoring systems needed to demonstrate compliance with the PM emissions limit and would not incur costs for new equipment.

        Comment: Several commenters stated that they agree with the EPA's determination in the proposal that the current CO limits provide adequate control of HCN. Two commenters stated that there are limited HCN emissions data and that more data are needed before the Agency can appropriately determine whether an HCN standard is necessary and justified. One commenter noted that the process undertaken by the EPA to estimate HCN emissions was flawed, and likely overestimates HCN emissions significantly. Another commenter stated that they performed HCN stack testing at three refineries and subsequent modeling at two refineries and concluded that the ambient HCN emissions were well below the applicable health limits.

        In contrast, some commenters expressed concerns about high HCN levels. One commenter stated that the EPA should consider re-evaluating the benefit of low NOX emissions from the FCCU, if that is indeed the cause of higher HCN emissions, because exposing people to HCN is not acceptable. The commenter also noted that the community now also has the increased dangers of storing and transporting aqueous ammonia, which is used in some cases to achieve low NOX emissions from the FCCU.

        One commenter stated that the EPA must set stronger HCN standards on FCCU emissions because of the high release amounts reported, the fact that non-cancer risk is driven by emissions of HCN from FCCU, and the fact that the EPA has never set standards for HCN emissions. The commenter provided a report that they believe shows that the EPA has not shown that CO is a reasonable or lawful surrogate to control HCN and has not shown that the conditions necessary for a surrogate are met with regard to CO and HCN, which is an inorganic nonmetallic HAP. Further, the report indicates that SCR is a reasonable and cost effective method for controlling HCN and that the EPA failed to review and consider other viable methods to control HCN and must do so to satisfy its legal obligations in this rulemaking.

        Page 75204

        Response: At the time we promulgated the MACT, we determined that the control strategy used by the best performing facilities to reduce organic HAP emissions was the use of complete combustion, which occurs when the CO concentration is reduced to 500 ppmv (see the proposal for Refinery MACT 2 at 63 FR 48899, September 11, 1998). We rejected arguments that some facilities operate at CO levels well below 500 ppmv and, thus, the MACT floor should be set at a lower CO concentration because once CO concentrations reached 500 ppmv, there was no longer a correlation between reduced CO concentrations and reduced HAP concentrations. And, in fact, emissions of certain HAP, such as formaldehyde, tended to increase as CO concentrations were reduced below 500 ppmv.\10\

        ---------------------------------------------------------------------------

        \10\ U.S. EPA, 2001. Petroleum Refineries: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units--

        Background Information for Promulgated Standards and Response to Comments. Final Report.EPA-453/R-01-011. June. p. 1-19.

        ---------------------------------------------------------------------------

        In the current rulemaking action, we determined at the time of the proposed rule that this also holds true for HCN emissions. That is, once CO emissions are reduced to below 500 ppmv (i.e., complete combustion is achieved), we no longer see a direct correlation between CO concentrations and HCN emissions.

        All of the HCN emissions data we have were reported from units operating at or below the 500 ppmv CO limit (i.e., in the complete combustion range), so it is not surprising that there is not a strong correlation between CO and HCN from the FCCU ICR source test data. However, catalyst vendor data and combustion kinetic theory support the fact that, in the partial burn mode (with CO concentrations of 2 to 6-

        percent, which is 20,000 to 60,000 ppmv), HCN concentrations exiting the FCCU regenerator are much greater than for units using complete combustion FCCU regenerators or the concentration exiting a post-

        combustion device used in conjunction with a partial burn FCCU regenerator. Therefore, we maintain that complete combustion is the primary control needed to achieve controlled levels of HCN emissions.

        We initially thought the higher levels of HCN emissions that were reported by sources achieving complete combustion might be due to a switch away from platinum-based combustion promoters to palladium-based combustion promoters. However, many of the units that were tested and that had some of the lowest HCN emissions used palladium-based oxygen promoters. Therefore, it appears unlikely that palladium-based catalyst promoters are linked to the higher HCN emissions. We also evaluated one commenter's argument that CO is not a good surrogate for HCN emissions, but that SCR are a reasonable and cost-effective control strategy. We are not aware of any data that suggest that an SCR removes HCN and the commenter did not provide any support for that premise. At proposal, we evaluated HCN control on units using extra oxygen or converting back to platinum-based promoters to oxidize any HCN formed. This would cause more NOX formation, which would then require post-combustion NOX control, such as an SCR. However, if HCN emissions are not a function of CO concentration beyond that required to achieve complete combustion (as noted by the commenter), then more aggressive combustion conditions and the use of an SCR (to remove the NOX formed) may not be a viable control strategy. Therefore, considering all of the data currently available and the comments received regarding HCN emissions and controls, we maintain that the only proven control technique is the use of complete combustion as defined by a CO level of 500 ppmv or less. We are not establishing a more stringent CO level because, once complete combustion is achieved, (i.e., CO concentrations drop below 500 ppmv), no further reduction in HCN emissions are achieved.

        For the purposes of Refinery MACT 2, we consider the emission limits and operating requirements for organic HAP in Tables 8 through 14 to subpart UUU of part 63 adequate to also limit HCN emissions.

        Finally, we understand concerns about the reported HCN emissions being higher than anticipated and the need for more data to better determine HCN emissions levels. To address these concerns, we are finalizing a requirement that facility owners or operators conduct a performance test for HCN from all FCCU at the same time they conduct the first PM performance test on the FCCU following promulgation of this rule. Facility owners or operators that conducted a performance test for HCN from a FCCU in response to the refinery ICR or subsequent to the 2011 Petroleum Refinery ICR following appropriate methods are not required to retest that FCCU.

        4. What is the rationale for our final approach for the technology review?

      10. Refinery MACT 1

        We did not receive substantive comments concerning our proposal that it was not necessary to revise Refinery MACT 1 requirements for MPV, gasoline loading racks and cooling towers/heat exchange systems. Based on the rationale provided in the preamble to the proposed rule, we are taking final action concluding that it is not necessary pursuant to CAA section 112(d)(6) to revise the MACT requirements for MPV, gasoline loading racks and cooling towers/heat exchange systems emission sources at refineries.

        We proposed that the options for additional wastewater controls are not cost effective and thus it was not necessary to revise the MACT for these emission sources. We received public comments suggesting that emissions from wastewater systems are higher than modeled and that we should develop additional technology standards for wastewater treatment systems regardless of cost. As we discussed in the proposal, emissions from wastewater are difficult to measure and emission estimates rely on process data and empirical correlations, which introduces uncertainty into the estimates. Although we do not have evidence, based on the process data we collected, that emissions are higher than modeled at proposal, we note that the fenceline monitoring program effectively ensures that wastewater emissions are not significantly greater than those included in the emissions inventory and modeled in the risk assessment. Furthermore, we believe that cost is a valid consideration in determining whether it is necessary within the meaning of section 112(d)(6) to revise requirements and that we are not required to establish additional controls regardless of cost. Consequently, we conclude that it is not necessary to revise the Refinery MACT 1 requirements for wastewater systems pursuant to CAA section 112(d)(6).

        For storage vessels, we identified a number of options, including requiring tank fitting controls for external and internal floating roof tanks, controlling smaller tanks with lower vapor pressures and requiring additional monitoring to prevent roof landings, liquid level overfills and to identify leaking vents as developments in practices, processes and control technology. We proposed to cross-reference the storage vessel requirements in the Generic MACT (effectively requiring additional control for tank roof fittings) and to revise the

        Page 75205

        definition of Group 1 storage vessels to include smaller tanks with lower vapor pressures. We received comments that we could have required additional controls on tanks and monitoring for landings, overfills and leaking vents described above. We also received comments related to clarifications of specific rule references and overlap provisions. We addressed these comments in the ``Response to Comments'' document, and we maintain that the additional control options described by the commenters (tank roof landing/degassing requirements or use of geodesic domes to retrofit external floating roofs) are not cost-effective. Consequently, based on the rationale provided in the preamble to the proposed rule and our consideration of public comments, we are finalizing the requirements as proposed with minor clarifications of the rule references. However, as with wastewater systems, we note that the fenceline monitoring program will ensure that the owner or operator is effectively managing fugitive emissions sources and should detect landings, overfills, and leaking vents.

        For equipment leaks, we identified specific developments in practices, processes and control technologies that included requiring repair of leaking components at lower leak definitions, requiring monitoring of connectors, and allowing the use of the optical imaging camera as an alternative method of monitoring for leaks. We proposed to establish an alternative method for refineries to meet LDAR requirements in Refinery MACT 1. This alternative would allow refineries to monitor for leaks via optical gas imaging in place of EPA Method 21, using monitoring requirements to be specified in a not yet proposed appendix K to 40 CFR part 60. However, the development of appendix K is taking longer than anticipated. Therefore, we are not finalizing this alternative monitoring method in Refinery MACT 1.

        We received comments suggesting that additional requirements be imposed to further reduce emissions from leaking equipment components, such as requiring ``leakless'' equipment, reducing the leak threshold, and eliminating delay of repair provisions. As provided in the ``Response to Comments'' document, we do not agree that these additional requirements are cost-effective. Based on the rationale provided in the preamble to the proposed rule and our consideration of public comments, we conclude that it is not necessary to revise the Refinery MACT 1 requirements for equipment leaks. Again, however, the fenceline monitoring program is intended to ensure that large leaks from fugitive emissions sources, including equipment leaks, are more quickly identified and repaired, thereby helping to reduce emissions from leaking equipment components.

        For marine vessel loading, we identified control of marine vessel loading operations with HAP emissions of less than 10/25 tpy and the use of lean oil absorption systems as developments that we considered in the technology review. We proposed to amend 40 CFR part 63, subpart Y to require small marine vessel loading operations (i.e., operations with HAP emissions less than 10/25 tpy) and offshore marine vessel loading operations to use submerged filling based on the cargo filling line requirements in 46 CFR 153.282. We received comments that other options considered during the technology review of the standard were cost-effective for small marine vessel loading operations and should be required. As provided in the ``Response to Comments,'' we continue to believe those other controls are not cost-effective because of the high costs of controls for limited additional organic HAP emission reduction. Therefore, we are finalizing these amendments as proposed.

        Finally, we proposed that it was necessary to revise the MACT to require fenceline monitoring as a means to manage fugitive emissions from the entire petroleum refinery, which includes sources such as wastewater collection and treatment operations, equipment leaks and storage vessels. We received numerous comments regarding the proposed requirement to conduct fenceline monitoring, many of which we address above and the remainder of which we respond to in the ``Response to Comments'' document. After considering comments, we maintain that the proposed work practice standard is authorized under section 112 of the CAA and will improve fugitive management at the refinery. Therefore, we are finalizing the key components of fenceline monitoring work practice as proposed. These requirements include the use of passive diffusive tube samplers (although we are providing a mechanism to request approval for alternative monitoring systems provided certain criteria are met), the 9 mug/m3 on a rolling annual average basis action level, and the need to perform corrective action to comply with the action level.

        Based on public comments received, we are making numerous revisions to clarify the fenceline monitor siting requirements. This includes provisions to allow siting of monitors within the property boundary as long as all emissions sources at the refinery are included within the monitoring perimeter. We are also clarifying that we do not consider public roads or public waterways that bisect a refinery to be property boundaries, and owners or operators do not need to place monitors along the internal public right-of-ways. We are also providing provisions to allow fixed placement of monitors at 500 feet intervals (with a minimum of 3 monitors) for subareas or segregated areas. If an emissions source is near the monitoring perimeter, an additional monitor siting requirement would still apply. The 500 feet provision is provided to reduce burden for facilities with irregular shapes or noncontiguous property areas that we did not fully consider at proposal.

        We also received comments on the compliance time and reporting requirements associated with the fenceline monitoring provisions. Upon consideration of public comments, we have revised the compliance period to 2 years after the effective date of the final rule. Thus, beginning no later than 2 years after the effective date of the rule, the source must have a fenceline monitoring system that is collecting samples such that the first rolling annual average DeltaC value would be completed no later than 3 years after the effective date of the final rule. Facilities will have 45 days after the completion of the first year of sampling, as proposed, to submit the initial data set. We are reducing the proposed compliance period from 3 years to 2 years because the passive diffusive tube monitors are easy to deploy and pilot study demonstrations indicate that significant time is not needed to deploy the monitors. However, the reduced compliance period still provides time to resolve site-specific monitor placement issues and to provide time to develop and implement a site-specific monitoring plan, if needed. We are increasing the fenceline monitoring reporting frequency (after the first year of data collection) from semiannually to quarterly to provide more timely dissemination of the data collected via this monitoring program.

      11. Refinery MACT 2

        We proposed to revise Refinery MACT 2 to incorporate the developments in monitoring practices and control technologies reflected in the Refinery NSPS subpart Ja limits and monitoring provisions (73 FR 35838, June 24, 2008). We are finalizing most of these provisions as proposed. Specifically, we are incorporating the

        Page 75206

        Refinery NSPS subpart Ja PM limit for new FCCU sources. We are also finalizing compliance options for FCCU that are not subject to Refinery NSPS subpart J or Ja. These options would allow such sources to elect to comply with the Refinery NSPS subpart Ja monitoring provisions to demonstrate compliance with the emissions PM limit. We are revising the averaging period for the control device operating limits or site-

        specific opacity limits to be on a 3-hour average basis in order to more directly link the operating limit to the duration of the performance test runs, on which they are based, as proposed. We are incorporating additional control device-specific monitoring alternatives for various control devices on FCCU, including BLD monitoring as an option to COMS for owners or operators of FCCU using fabric filter-type control systems and total power and secondary current operating limits for owners or operators of ESPs. We are adding an additional requirement to perform daily checks of the air or water pressure to atomizing spray nozzles for owners or operators of FCCU wet gas scrubbers not subject to the pressure drop operating limit, as proposed. Finally, we finalizing requirements to conduct a performance test at least once every 5 years for all FCCU, as proposed. These requirements are being finalized to ensure that control devices are continuously operated in a manner similar to the operating conditions of the performance test and to ensure that the emissions limits, which are assessed based on the results of three 1-hour test runs, are achieved at all times.

        We also proposed to eliminate the Refinery NSPS subpart J compliance option that allows refineries to meet the 30-percent opacity emissions limit requirement and revise the MACT to include control device operating limits or site-specific opacity limits identical to those required in Refinery NSPS subpart Ja. We received numerous comments, particularly from owners or operators of FCCU that employ tertiary cyclones to control FCCU PM emissions. According to the commenters, opacity is not a direct indicator of PM emissions because finer particles will increase opacity readings without a corresponding mass increase in PM emissions. Additionally, the commenters stated that the site-specific opacity limit generally leads to a site-specific operating limit of 10-percent opacity, which is too stringent and does not adequately account for variability between PM emissions and opacity readings. According to the commenters, FCCU with tertiary cyclones would need to be retrofitted with expensive and costly controls in order to meet the 10-percent opacity limit, even though they are meeting the 1 lb/1000 lbs coke burn PM emissions limit. It was not our intent to require units to retrofit their controls simply to meet the site-specific opacity limit. However, the existing 30-percent opacity limit in the subpart J compliance option is not adequate to ensure compliance with the PM emissions limit at all times. After reviewing the public comments and available data, we determined that, rather than removing the subpart J compliance option altogether, it is sufficient to add an opacity operating limit of 20-percent opacity determined on a 3-hour average basis to the existing subpart J compliance option and to require units complying with this operating limit to conduct annual performance tests (rather than one every 5 years) when the PM emissions measured during the source test are greater than 0.80 lb PM/1,000 lbs coke burn-off. These provisions improve assurance that these units are, in fact, achieving the required PM emissions limitation without requiring units to retrofit controls due to variability in the correlation of PM emissions and opacity.

        We did not propose to revise the organic HAP emissions limits for FCCU to further address HCN emissions. We received numerous comments on this issue. We continue to believe that complete combustion is the appropriate control needed to control HCN emissions. Consequently, for the purposes of Refinery MACT 2, we are not changing the MACT standards to further reduce emissions of HCN. However, we understand that there are uncertainties and high variability in HCN emissions measured from FCCU. In order to address the need for more data to better characterize HCN emissions levels, we are finalizing a requirement for refinery owners or operators to conduct a performance test for HCN from all FCCU (except those units that were tested previously using acceptable methods as outlined in the 2011 Refinery ICR) during the first PM test required as part of the on-going compliance requirements for FCCU metal HAP emissions. These data will be useful to the EPA in understanding HCN emissions from FCU and may help to inform future regulatory reviews for this source category.

        We proposed that there have been no developments in practices, processes, and control technologies for CRU based on our technology review and that therefore it is not necessary to revise these standards. Based on the rationale provided in the preamble to the proposed rule and our consideration of public comments, we are finalizing our conclusion.

        For SRU, we identified the Refinery NSPS subpart Ja allowance for oxygen-enriched air as a development in practice and we proposed that it was necessary to revise the MACT to allow SRU to comply with Refinery subpart Ja as a means of complying with Refinery MACT 2. The key issue identified by commenters was that Refinery NSPS subpart Ja includes a flow monitoring alternative for determining the average oxygen concentration in the enriched air stream and that this was not included in the proposed amendments to Refinery MACT 2. This was an oversight on our part. We are, based on the rationale provided in the preamble to the proposed rule and our consideration of public comments, finalizing the SRU revisions as proposed but with inclusion of the flow monitoring alternative provisions that are in Refinery NSPS subpart Ja for this source.

    3. Refinery MACT Amendments Pursuant to CAA Section 112(d)(2) and (d)(3)

      1. What did we propose pursuant to CAA section 112(d)(2) and (d)(3) for the Petroleum Refinery source categories?

      We proposed the following revisions to the Refinery MACT 1 and 2 standards pursuant to CAA section 112(d)(2) and (3) \11\: (1) Adding MACT standards for DCU decoking operations; (2) revising the CRU purge vent pressure exemption; (3) adding operational requirements for flares used as APCD in Refinery MACT 1 and 2; and (4) adding requirements and clarifications for vent control bypasses in Refinery MACT 1.

      ---------------------------------------------------------------------------

      \11\ The EPA has authority under CAA section 112(d)(2) and (d)(3) to set MACT standards for previously unregulated emission points. EPA also retains the discretion to revise a MACT standard under the authority of section 112(d)(2) and (3), see Portland Cement Ass'n v. EPA, 665 F.3d 177, 189 (D.C. Cir. 2011), such as when it identifies an error in the original standard. See also Medical Waste Institute v. EPA, 645 F. 3d at 426 (upholding EPA action establishing MACT floors, based on post-compliance data, when originally-established floors were improperly established).

      ---------------------------------------------------------------------------

      For DCU, we proposed to require that prior to venting or draining, each coke drum must be depressured to a closed blowdown system until the coke drum vessel pressure is 2 psig or less. As proposed, the 2 psig limit would apply to each vessel opening/venting/draining event at new or existing affected DCU facilities.

      For the CRU, we proposed to require that any emissions during the active

      Page 75207

      purging or depressuring of CRU vessels meet the applicable organic HAP emission limitations in Tables 15 and 16 to subpart UUU regardless of the vessel pressure.

      For flares, we proposed to remove cross references to the General Provisions requirements for flares used as control devices at 40 CFR 63.11(b) and to incorporate enhanced flare operational requirements directly into the Refinery MACT rules. The proposed rule amendments included:

      A ban on flaring of halogenated vent streams.

      A requirement to operate with continuously lit pilot flames at all times and to equip the pilot system with an automated device to relight the pilot if it is extinguished.

      A requirement to operate with no visible emissions except for periods not to exceed a total of 5 minutes during any 2 consecutive hours and to monitor for visible emissions daily.

      A requirement to operate with the flare tip velocity less than 60-feet-per-second or the velocity limit calculated by an equation provided in the proposed rule.

      A requirement to meet one of three combustion zone gas properties operating limits based on the net heating value, lower flammability limit, or combustion concentration. Owners or operators could elect to comply with any one of the three limits at any time. Two separate sets of operating limits were proposed: One for gas streams not meeting all three ``hydrogen-olefin interaction criteria'' specified in the rule and a more stringent set of limits for gas streams meeting all three hydrogen-olefin interaction criteria. The combustion zone net heating value considered steam assist rates but not ``perimeter air'' assist rates.

      For air-assisted flares, a requirement to meet an additional ``dilution parameter'' operating limit determined based on the combustion zone net heating values above, the diameter of the flare and the perimeter air assist rates.

      The proposed amendments for flares also included detailed monitoring requirements to determine these operating parameters either through continuous parameter monitoring systems or grab sampling, detailed calculation instructions for determining these parameters on a 15-minute block average, and detailed recordkeeping and reporting requirements. We also proposed provisions to allow owners or operators to request alternative emissions limitations that would apply in place of the proposed operating limits.

      We proposed to revise the definition of MPV to remove the current exclusion for in situ sampling systems (onstream analyzers). We also proposed to limit the exclusion for gaseous streams routed to a fuel gas system to apply only to those systems for which any flares receiving gas from the fuel gas system are in compliance with the proposed flare monitoring and operating limits. We note that we also proposed revisions related to monitoring of bypass lines, but these revisions were proposed to address concerns related to SSM releases and are described in further detail in section IV.D. of this preamble.

      We proposed that emissions of HAP may not be discharged to the atmosphere from PRD in organic HAP service to address concerns related to SSM releases. To ensure compliance with this proposed amendment, we proposed to require that sources monitor PRD using a system that is capable of identifying and recording the time and duration of each pressure release and of notifying operators that a pressure release has occurred. This proposed requirement was addressed in section IV.A.4. of the preamble for the proposal.

      2. How did the revisions pursuant to CAA section 112(d)(2) and (3) change since proposal?

      We proposed identical standards for existing and new DCU decoking operations, but we are finalizing standards for new and existing sources that are not identical. We are finalizing provisions that will require owners or operators of existing DCU sources to comply with a 2 psig limit averaged over 60 cycles (i.e., 60 venting events), rather than meet the 2 psig limit on a per venting event basis, as proposed. We are finalizing provisions that will require owners or operators of new DCU sources to comply with a 2.0 psig limit on a per event, not-to-

      exceed basis. We are adding one significant digit to the limit for new DCU affected sources because our re-review of permit requirements conducted in response to comments identified that the best performing DCU source is required to comply with a 2.0 psig limit on a per event basis. In response to comments regarding the proposed prohibition on draining prior to achieving the pressure limit, we are finalizing specific provisions for DCU with water overflow design and for double quenching.

      For flares, we are not finalizing the ban that we proposed on halogenated vent streams and we are not finalizing the proposed requirement to equip the flare pilot system with an automated device to relight an extinguished pilot.

      We are revising the MACT to include the proposed no visible emissions limit and the flare tip velocity limit as direct emissions limits only when the flare vent gas flow rate is below the smokeless capacity of the flare. Under the revised standard, when the flare is operating above the smokeless capacity, an exceedance of the no visible emission limit and/or flare tip velocity limit is not a violation of the standard but instead triggers a work practice standard. Flares operate above the smokeless capacity only when there is an emergency release event and thus the work practice standard is intended to address emissions during such emergency release events. (See section IV.D. of this preamble for more details regarding this work practice standard). We are also adding provisions that would allow sources to use video surveillance of the flare as an alternative to daily Method 22 visible emissions observations.

      For flares, we are also simplifying the combustion zone gas property operating limits by finalizing a requirement only for the net heating value of the combustion zone gas. We are finalizing requirements that flares meet a minimum operating limit of 270 BTU/scf NHVcz on a 15-minute average, as proposed, and we are allowing refinery owners or operators to use a corrected heat content of 1212 BTU/scf for hydrogen to demonstrate compliance with this operating limit. We are not finalizing separate combustion zone operating limits for gases meeting the hydrogen-olefin interaction criteria that were proposed. We are also not finalizing the alternative combustion zone operating limits based on lower flammability limit or combustibles concentration.

      We are finalizing ``dilution parameter'' requirements for air-

      assisted flares, but we are providing a limit only for the net heating value dilution parameter. Similar to the requirements we are finalizing for the combustion zone parameters, we are finalizing requirements that flares meet a minimum operating limit of 22 BTU/ft2 NHVdil on a 15-minute average, as proposed, and we are allowing refinery owners or operators to use a corrected heat content of 1,212 BTU/scf for hydrogen to demonstrate compliance with this operating limit. We are not finalizing separate dilution parameter operating limits for gases meeting the hydrogen-olefin interaction criteria that were proposed. We are also not finalizing the alternative dilution parameter operating limits based on lower flammability limit or combustibles concentration.

      Page 75208

      We are providing an alternative to use initial sampling period and process knowledge for flares in dedicated service as an alternative to continuous or on-going grab sample requirements for determining waste gas net heat content.

      We are finalizing revisions to the definition of MPV, as proposed.

      We are establishing work practice standards that apply to PRD releases in place of the proposed prohibition on PRD releases to the atmosphere. The work practice standards that we are finalizing for PRD require refiners to establish proactive, preventative measures for each PRD to identify and correct direct releases of HAP to the atmosphere as a result of pressure release events. Over time, these proactive measures will reduce the occurrence of releases and the magnitude of releases when they occur, while avoiding the environmental disbenefits of having additional flare capacity on standby to control these unpredictable and infrequent events. Refinery owners or operators will be required to perform a root cause analysis/corrective action following such pressure release events. In addition, a second release event in a 3-year period from the same PRD with the same root cause on the same equipment is a deviation of the work practice standard. A third release event in a 3-year period from the same PRD is a deviation of the work practice standard regardless of the root cause. PRD release events related to force majeure events are not considered in these hard limits.

      3. What key comments did we receive on the proposed revisions pursuant to CAA section 112(d)(2) and (3) and what are our responses?

      1. DCU

      Comment: Several commenters argued that the EPA incorrectly set the MACT floor emission limitation for DCU. Commenters noted that CAA section 112(d)(3)(A) states that the MACT limit for existing sources ``shall not be less stringent, and may be more stringent than the average emission limitation achieved by the best performing 12-percent of the existing sources'' excluding those first achieving that level within 18 months prior to proposal or 30 months prior to promulgation, whichever is later. According to the commenters, the EPA failed to follow this procedure in setting the 2 psig vent limit as a MACT floor because the EPA incorrectly considered permit limits and other non-

      performance based criteria instead of basing the MACT floor on the actual performance of sources. Commenters stated that the EPA improperly considered permit limits that should have been excluded from consideration, as well as considering permit limits for closed facilities instead of using more accurate data from operating DCUs at sources that submitted actual emissions data. Specifically, commenters stated that the DCU at the non-operational plant (Hovensa) should not be included. One commenter noted that they operate one of the South Coast DCU listed as subject to a 2 psig limit and asserted that it does not currently meet that emission limitation. The commenter claimed that significant capital investment would be required in order for the DCU to comply with the 2 psig limit. According to one commenter, data for six of the eight DCU they claim the EPA considered for the MACT floor should not be counted in determining the limit that represents the average emission limitation actually achieved 18 months prior to the proposal.

      Response: CAA section 112(d)(3)(A) states that the existing source standard shall not be less stringent than the average emission limitation achieved by the best performing 12-percent of the existing sources (for which the Administrator has emissions information), excluding those sources that have, within 18 months before the emission standard is proposed or within 30 months before such standard is promulgated, whichever is later, first achieved a level of emission rate or emission reduction which complies, or would comply if the source is not subject to such standard, with the lowest achievable emission rate (as defined by section 171) applicable to the source category and prevailing at the time, in the category or subcategory for categories and subcategories with 30 or more sources. We consider a 2 psig emissions limitation to be equivalent to the lowest achievable emission rate (LAER) emission limits. Thus, we agree with the commenter that sources that first meet the 2 psig limit on or after December 30, 2012, should be excluded from the MACT floor analysis. We also agree that under CAA section 112(d)(3)(A), the MACT floor analysis focuses on those sources that are achieving the emission limit (i.e., the emission limitation ``achieved by . . . ''). The EPA has previously determined that the 6th-percentile unit is a reasonable estimate of the average emission limitation achieved by the best performing 12-percent of sources especially when averaging across units with and without control requirements. As noted in our DCU MACT floor analysis memorandum (Docket ID No. EPA-HQ-OAR-2010-0682-0203), the 6th-percentile is represented by the fifth-best performing DCU. If we exclude the two South Coast refineries and the two Marathon Garyville DCU because these sources were not implementing the 2 psig permit limit prior to December 30, 2012, the fifth-best performing DCU would be represented by the Bay Area refineries (4.6 psig). However, based on the 2011 Petroleum Refinery ICR responses, 25 out of 75 (33-percent) DCU have a ``typical coke drum pressure when first vented to the atmosphere'' of 2 psig or less and 10 out of 75 (13-percent) DCU have a ``typical coke drum pressure when first vented to the atmosphere'' of 1 psig or less. While we acknowledge that these data represent ``typical'' operations and not necessarily a never-to-be-exceeded emissions limitation, we conclude that this information is sufficient for us to conclude that the average emission limitation achieved by the best performing 12-percent of sources is consistent with a 2 psig emissions limitation. This is because facility owners or operators commonly target to operate at approximately half the allowable emissions limit to ensure that they can comply with the emissions limit at all times. Therefore, we maintain that an average venting pressure of 2 psig is the MACT floor level for decoking operation at existing sources based on the ICR responses and considering the average performance expected.

      Comment: Four commenters suggested that the 2 psig limit, if finalized, should be based on a rolling 30-day average per DCU rather than a never to be exceeded ``instantaneous'' standard. According to the commenters, an instantaneous standard is unnecessary to address HAPs with chronic health impacts and adds cost and compliance challenges. According to the commenters, chronic health impacts are not materially affected by short-term variability, but instead depend on the average concentration of exposure over a 70-year lifetime; therefore, there is no health based or environmental reason for requiring an instantaneous limit. The commenters noted that there would be additional capital costs to comply with a 2 psig not-to-be-exceeded limit compared to a 30-day average 2 psig limit vent pressure. One commenter specifically requested that the EPA also confirm that a pressure of 2.4 psig is compliant with the 2 psig limit vent pressure. Another commenter also requested clarification that the vent pressure can be rounded to

      Page 75209

      one significant figure when determining compliance.

      Response: For new sources, the MACT floor emission limit for DCU is based on the best-performing source. Based on this and other comments received, we again reviewed existing permit conditions. Based on this review, we found that one of the permit requirements specified the pressure limit as 2.0 psig for each coke drum venting event. Therefore, we are finalizing the new source MACT floor as 2.0 psig on a per coke drum venting event basis.

      As discussed in response to the previous comment, we are basing the MACT floor for existing source DCU on responses we received from the 2011 Petroleum Refinery ICR. Because the ICR requested the ``typical coke drum pressure when first vented to the atmosphere,'' we do not consider the information provided in ICR responses to reflect a ``never-to-be-exceeded'' limit. Therefore, we evaluated whether it is reasonable to allow averaging, and if so, what averaging period should be provided.

      Health risks are not considered in establishing MACT requirements, so we do not consider the argument that chronic effects are evaluated over a 70-year period to be relevant to a determination of the MACT floor. However, a primary consideration regarding averaging periods is how the averaging period was considered in setting the floor and whether the intended reductions will occur under a different averaging period. According to the heat balance method for estimating DCU emissions, DCU decoking operations emissions are directly proportional to the average bed temperature. While the relationship is not exactly linear, the average bed temperature is expected to be a function of the venting pressure. Moreover, the shape of the pressure-temperature correlation curve is such that the emissions at 6 psig are almost exactly but not quite three times the emissions at 2 psig. Given the expected linearity of the emissions with venting pressures, we are not concerned with an occasional venting event above 2 psig because the average emissions from a facility meeting an average 2 psig pressure limit would be identical to the emissions achieved by a facility that vented each time at 2 psig. That is, given the expected linearity in the projected DCU emissions to the venting pressure, we conclude that it is reasonable to allow averaging across events and that the precise averaging period is not a critical concern.

      Most industry commenters requested a 30-day average. However, different facilities have different numbers of DCU, different numbers of drums per DCU and different cycle times. Consequently, basing the averaging period across a given time period would result in significantly different number of venting events included in a 30-day average for different facilities and generally provide more flexibility to larger refineries and less flexibility to smaller refineries. Based on the ICR responses, almost half of all DCU operate with two drums and about 90-percent of DCU have two to four coke drums; however, a few DCU have six or even eight drums. Also, based on the ICR responses, the average complete coke drum cycle time is 32 hours, but can be as short as 18 hours and as long as 48 hours. Reviewing the ICR responses, we found that a 30-day average would include 30 events for some facilities and more than 250 events at other facilities.

      Since the existing source MACT standards apply ``in combination'' to ``all releases associated with decoking operations'' at a given facility, we determined that it was reasonable to consider an averaging period that applies to the number of venting events from all coke drums at the facility rather than to all coke drums for a specific DCU for a specified period of time. This provides a more consistent basis for the averaging period and allows the same operational flexibility for small refineries as large refineries. Based on the ICR responses, the median (typical) DCU has 60 venting events in a 30-day period. Providing an averaging period of 60 venting events provides a more consistent averaging basis for all facilities, regardless of the number of DCU at the facility and the number of drums and cycle times for different DCU. Additionally, it eliminates issues with respect to how to handle operating days versus non-operating days, e.g., in the event of a turn-

      around resulting in a limited number of venting events in a 30-calendar day period. Therefore, we are establishing a 2 psig limit based on a 60-event average considering all coke drum venting events at an existing source and we are finalizing a 2.0 psig limit on a per coke drum venting event for DCU at new sources.

      We have consistently maintained our policy to round to the last digit provided in the emission limit, a pressure of 2.4 psig would round to 2 psig and would be compliant with a requirement to depressure each coke drum to a closed blowdown system until the coke drum vessel pressure is 2 psig or less, but it would not be compliant with the revised new source provision to depressure until the coke drum vessel pressure is 2.0 psig or less. A coke drum pressure of 2.04, however, would be compliant with the revised new source requirement pressure limit of 2.0 psig.

      ii. Refinery Flares

      Comment: Several commenters suggested that the proposed flare operating limits were too complex. The commenters recommended that the EPA eliminate the dual flare combustion zone heat content limits related to the proposed hydrogen-olefin interaction criteria and instead finalize a single combustion zone net heating value of approximately 200 BTU/scf, which would minimize the unnecessary burning of supplemental gas but still ensure good combustion efficiency.

      A few commenters suggested that the EPA based the proposed combustion zone limits on an invalid data analysis, that the 1 minute PFTIR data should not be used to establish combustion efficiency correlations, and that the emission limits should be set so as to provide an equal chance of false positives and negatives. A few commenters suggested that the EPA should assign hydrogen a heating value of 1,212 BTU/scf to more accurately reflect its flammability in a NHV basis and that doing so is consistent with some recent flare consent decrees and would help reduce natural gas supplementation for facilities complying only with the NHVcz metric.

      Several commenters suggested that neither scientific literature nor the available flare test data support the EPA's claim of an adverse hydrogen-olefin interaction on combustion efficiency and that the EPA should not finalize the more restrictive combustion zone operating limits for all flare types. These commenters suggested that the EPA did not provide any evidence the assumed hydrogen-olefin effect actually exists; that statistical analysis demonstrates the EPA developed their limit based on random differences in data; that the PFTIR data analysis method of using the individual minute-by-minute data instead of the test average data is flawed and leads to invalid conclusions; and that proper analysis of the data demonstrates the more stringent operating limits for hydrogen-olefin conditions cannot be supported.

      Some commenters suggested that there is evidence to support more stringent flare combustion zone limits for a narrowly defined high concentration propylene-only condition as outlined in some of the recent flare

      Page 75210

      consent decrees but that the flare test data do not support more stringent operating limits for the proposed hydrogen-olefins criteria by the EPA. Additionally, one commenter suggested that if the EPA decides to proceed with the more restrictive combustion zone limits for the hydrogen-olefins interaction cases then the final rule should not expand beyond an interaction between hydrogen and propylene.

      Several commenters suggested that the proposed 15-minute feed forward averaging time for flares (e.g., combustion zone parameters, air-assist dilution parameters and associated flow rates) is arbitrary, unrealistic and unworkable and that the feed forward compliance determination should not be finalized and, if it is finalized, the averaging time should be extended to 1-hour, 3-hour, or 24-hour. To support these suggested averaging periods, commenters claimed that typical standards for combustion devices are averaged over these suggested timeframes, noting as an example, recent refinery flare consent decrees that contain a 3-hour average. The commenters also asserted that both a GC and calorimeter will be needed to obtain data rapidly enough to try and maintain a 15-minute average; that the feed forward approach requires calculation artifices to attempt to correct for the fact that compliance cannot be determined until the averaging period is over; and that a longer averaging time is needed for instrument and control response time.

      Response: In addressing these comments, we further analyzed the flare emissions test data. First, to address concerns that the minute-

      by-minute analysis produced flawed results, we re-compiled the data into approximate ``15-minute averages'' to the extent practical based on the duration of a given test run (e.g., a 10-minute run was used as 1 run and a 32-minute run was divided into 2 runs of 16 minutes each). We do not find significant differences in the data or that different conclusions would be drawn from the data based on this approach as compared with the minute-by-minute analysis used for the proposed rule.

      Next, we evaluated the 15-minute run data using the normal net heating value for hydrogen of 274 Btu/scf, which is the value we used in the analysis for the proposed rule and also evaluated the data using the 1,212 Btu/scf, the value recommended by some commenters. The 1,212 Btu/scf value is based on a comparison between the lower flammability limit and net heating value of hydrogen compared to light organic compounds and has been used in several consent decrees to which the EPA is a party. Based on our analysis, we determined that using a 1,212 Btu/scf value for hydrogen greatly improves the correlation between combustion efficiency and the combustion zone net heating value over the entire array of data. Using the net heating value of 1,212 Btu/scf for hydrogen also greatly reduced the number of ``type 2 failures'' (instances when the combustion efficiency is high, but the gas does not meet the NHVcz limit). One of the primary motivations for the proposed approach to provide alternative limits based on lower flammability limits and combustibles concentrations was to reduce these type 2 failures. Therefore, we proposed all three of these parameters (i.e., NHVcz, LFL and total combustibles) and allowed flare owners or operators to comply with any of the parameter limits at any time. When using the net heating value of 1,212 Btu/scf for hydrogen, the other two alternatives no longer provide any improvement in the ability to predict good flare performance. Consequently, we are simplifying the operating limits to use only NHVcz.

      Next, we re-evaluated whether to finalize the proposed dual combustion zone operating limits for refinery flares that met certain hydrogen-olefins interactions or to finalize a single combustion zone net heating value limit. The newly re-compiled PFTIR run average flare dataset suggests that higher operating limits may be appropriate for some olefin-hydrogen mixtures. However, the dataset using 15-minute test average runs is much smaller than the set using 1-minute runs and thus creates a greater level of uncertainty. In addition, we cannot definitively conclude that a dual combustion zone limit for refinery flares meeting certain hydrogen-olefins interactions is appropriate given these uncertainties. Thus, in order to minimize these uncertainties and streamline the compliance requirements, we used all of the 15-minute test run average data together as a single dataset in an effort to determine an appropriate, singular combustion zone net heating value operational limit.

      Finally, we conducted a Monte Carlo analysis to help assess the impacts of extending the averaging time on the test average flare dataset of 15-minute runs to 1-hour or 3-hour averaging time alternatives. While we consider it reasonable to provide a longer averaging time for logistical reasons, the Monte Carlo analysis demonstrated, consistent with concerns described in our proposal, that short periods of poor performance can dramatically limit the ability of a flare to achieve the desired control efficiency. Consequently, we find it necessary to finalize the proposed 15-minute averaging period to ensure that the 98-percent control efficiency for flares is achieved at all times. However, we understand that flare vent gas flow and composition are variable. While a short averaging time is needed to ensure adequate control given this variability, we also understand the complications that this variability places on flare process control in efforts to meet the NHVcz limit. Therefore, we are clarifying that the 270 Btu/scf NHVcz value is an operational limit that must be calculated according to the requirements in this rule. We also clarify that compliance with this operational limit must be evaluated using the equations and calculation methods provided in the rule. We proposed a feed forward calculation method to allow refinery owners or operators a means by which to adjust steam (or air) and, if necessary, supplemental natural gas flow, in order to meet the limit. In other words, ``feed forward'' refers to the fact that the rule requires the refinery owners or operators to use the net heating value of the vent gas (NHVvg) going into the flare in one 15-minute period to adjust the assist media (i.e., steam or air) and/or the supplemental gas in the next 15-minute period, as necessary for the equation in the rule to calculate an NHVcz limit of 270 BTU/scf or greater. We recognize that when a subsequent measurement value is determined, the instantaneous NHVcz based on that compositional analysis and the flow rates that exist at the time may not be above 270 Btu/scf. We clarify that this is not a deviation of the operating limit. Rather, the owner or operator is only required to make operational adjustments based on that information to achieve, at a minimum, the net heating value limit for the subsequent 15-minute block average. Failure to make adjustments to assist media or supplemental natural gas using the equation provided for calculating an NHVcz limit of 270 BTU/scf, using the NHVvg from the previous period, would be a deviation of the operating limit.

      Alternatively, if the owner or operator is able to directly measure the NHVvg on a more frequent basis, such as with a calorimeter (and optional hydrogen analyzer), the process control system is able to adjust more quickly, and the owner or operator can make adjustments to assist media or supplemental natural gas more quickly. In this manner, the owner or operator is not limited by

      Page 75211

      relying on NHVvg data that may not represent the current conditions. Therefore, the owner or operator may opt to use the NHVvg from the same period to comply with the operating limit.

      Based on the results of all of our analyses, the EPA is finalizing a single minimum NHVcz operating limit for flares subject to the Petroleum Refinery MACT standards of 270 BTU/scf during any 15-minute period. The agency believes, given the results from the various data analyses conducted, that this operating limit is appropriate, reasonable and will ensure that refinery flares meet 98-percent destruction efficiency at all times when operated in concert with the other suite of requirements refinery flares need to achieve (e.g., flare tip velocity requirements, visible emissions requirements, and continuously lit pilot flame requirements). For more detail regarding our data re-analysis, please see the memorandum titled ``Flare Control Option Impacts for Final Refinery Sector Rule'' in Docket ID No. EPA-

      HQ-OAR-2010-0682.

      Comment: Numerous commenters objected to the proposed requirements to have the velocity and visible emissions limits apply at all times for flares. Commenters suggested that flares are not designed to meet the visible emissions and flare tip velocity requirements when being operated beyond their smokeless capacity and suggested several alternative approaches: remove the visible emissions and flare tip velocity requirements from the rule altogether; exempt flares from these requirements during emergencies; or add a requirement to maintain a visible flame present at all times or include a work practice standard in the rule when flares are operated beyond their smokeless capacity at full hydraulic load. The commenters identified full hydraulic load as the maximum flow the flare can receive based on the piping diameter of the flare header and operating pressure of processes connected to the flare header system. They also specified that full hydraulic load would only occur if all sources connected to the flare header vented at the same time, which might result from an emergency shutdown due to a plant-wide power failure. According to commenters, flares are typically designed to operate in a smokeless manner at 20 to 30-percent of full hydraulic load. Thus, they claimed, flares have two different design capacities: A ``smokeless capacity'' to handle normal operations and typical process variations and a ``hydraulic load capacity'' to handle very large volumes of gases discharged to the flare as a result of an emergency shutdown. According to commenters, this is inherent in all flare designs and it has not previously been an issue because the flare operating limits did not apply during malfunction events. However, if flares are required to operate in a smokeless capacity during emergency releases, the commenters claimed that refineries would have to quadruple the number of flares at each refinery to control an event that may occur once every 2 to 5 years.

      To support their suggestions, commenters pointed out that flaring during emergencies is the optimum way of handling very large releases and that the flare test data clearly demonstrate that visible emissions and/or high flare tip velocity do not suggest poor destruction efficiency during such events. The commenters also argued that operators should not have conflicting safety and environmental considerations to deal with during these times. The commenters stated that refiners are still subject to a civil suit even if the EPA uses its enforcement discretion where such a release would violate the limit and in order to avoid such liability, many new flares would have to be built. Commenters estimated that 500 new large flare systems at a capital cost in excess of $10-20 billion would need to be built because of the amount of smokeless design capacity that would be needed and that this significant investment would take the industry at least a decade to install.

      Response: At the time of the proposed rule, we did not have any information indicating that flares were commonly operated during emergency releases at exit velocities greater than 400 ft/sec (which is 270 miles per hour (mph)). Similarly, we did not have information to indicate that flares were commonly designed to have a smokeless capacity that is only 20 to 30-percent of their ``hydraulic load capacity.'' While we are uncertain that refineries actually would install additional flares to the degree the commenters claim, based on the possibility that there may be an event every 2 to 5 years that would result in a deviation of the smokeless limit, we also recognize that it would be environmentally detrimental to operate hundreds of flares on hot standby in an effort to never have any releases to a flare that exceed the smokeless capacity of that flare. This is because operating hundreds of new flares to prevent smoking during these rare events will generate more ongoing emissions from idling flares than the no visible emissions limit might prevent during one of these events. Therefore, we considered alternative operating limits or alternative standards that could apply during these emergency release events.

      As an alternative to the proposed requirement that flares meet the visible emissions and velocity limits at all times, we considered a work practice standard for the limited times when the flow to the flare exceeds the smokeless capacity of the flare. Owners or operators of flares would establish the smokeless capacity of the flare based on design specification of the flare. Below this smokeless capacity, the velocity and visible emissions standards would apply as proposed. Above the smokeless capacity, flares would be required to perform root cause analysis and take corrective action to prevent the recurrence of a similarly caused event. Multiple events from the same flare in a given time period would be a deviation of the work practice standard. Force majeure events would not be included in the event count for this requirement.

      Based on industry claims that there is a hydraulic load flaring event, on average, every 4.4 years, we assumed the best performers would have no more than one event every 6 years, or a probability of 16.7-percent of having an event in any given year. We found that, over a long period of time such as 20 years, half of these best performers would have 2 events in a 3 year period, which would still result in over half the ``best performing'' flares having a deviation of the work practice standard if it was limited to 2 events in 3 years. Conversely, only 6 percent would have 3 events in 3 years over this same time horizon. Based on this analysis, 3 events in 3 years would appear to be ``achievable'' for the average of the best performing flares.

      Pursuant to CAA section 112(d)(2) and (3), we are finalizing a work practice standard for flares that is based on the best practices of the industry, and considers the rare hydraulic load events that inevitably occur at even the best performing facilities.

      The best performing facilities have flare management plans that include measures to minimize flaring during events that may cause a significant release of material to a flare. Therefore, we are requiring owners or operators of affected flares to develop a flare management plan specifically to identify procedures that will be followed to limit discharges to the flare as a result of process upsets or malfunctions that cause the flare to exceed its smokeless capacity. We are specifically requiring refinery owners or operators to implement appropriate prevention measures applicable to these

      Page 75212

      emergency flaring events (similar to the prevention measures we are requiring in this final rule to minimize the likelihood of a PRD release). Refiners will be required to develop a flare minimization plan that describes these proactive measures and reports smokeless capacity. Refiners will need to conduct a specific root cause analysis and take corrective action for any flare event above smokeless design capacity that also exceeds the velocity and/or visible emissions limit. If the root cause analysis indicates that the exceedance is caused by operator error or poor maintenance, the exceedance is a deviation from the work practice standard. A second event within a rolling 3-year period from the same root cause on the same equipment is a deviation from the standard. Events caused by force majeure, which is defined in this subpart, would be excluded from a determination of whether there has been a second event. Finally, and again excluding force majeure events, a third opacity or velocity limit exceedance occurring from the same flare in a rolling 3-year period is a deviation of the work practice standard, regardless of the cause.

      Comment: Several commenters suggested that the EPA should revise the combustion efficiency requirements to apply only to steam-assisted flares used as Refinery MACT control devices during periods of time that the flares are controlling Refinery MACT regulated streams. One commenter suggested that the EPA misused the TCEQ data in proposing the NHVcz metric and that the proposed limits are overly conservative. The commenter requested that the EPA work with stakeholders to conduct additional testing to determine what, if any, operating parameters are appropriate and necessary to achieve an adequate destruction efficiency for non-steam-assisted flares.

      Response: We disagree with the commenters that the combustion efficiency requirements should apply only to steam-assisted flares. The available data (for runs where steam assist is turned off) as well as the available combustion theories suggest that the combustion zone net heating value minimum limit, which is the vent gas net heating value for unassisted or perimeter air-assisted flares, is necessary to ensure proper flare performance. While we agree that additional data on air-

      assisted flares would allow for a more robust analysis, the data we do have strongly indicate that air-assisted flares can be over-assisted and that the combustion efficiency of air-assisted flares that are over-assisted is below 98-percent control efficiency.

      Comment: A few commenters suggested that the proposed flare regulations should not apply to part 63, subpart R (gasoline loading) and subpart Y (marine vessel loading) facilities, and to part 61, subpart FF (benzene waste) facilities. The commenters recommended that flares associated with gasoline loading, marine vessel loading and wastewater treatment emissions need to comply only with the General Provisions for flares. Some of these commenters argued that these sources are more consistent in flow and composition than other refinery sources, so the new requirements are not necessary to ensure good combustion for these ``dedicated'' flares. Some commenters suggested that operators of flares with consistent flow and composition be allowed to use process knowledge or engineering judgment rather than be required to install continuous monitors or be subject to ongoing grab sampling requirements.

      Some commenters noted that the required control efficiency for some refinery emissions sources subject to subpart CC sources is 95-percent. One commenter also requested that the EPA provide overlap provisions so flares used to control sources from different MACT sources would not have duplicative requirements.

      Response: The regulatory revisions that we are finalizing apply to petroleum refinery sources subject to part 63, subparts CC and UUU. Gasoline loading, marine vessel loading and wastewater treatment operations that are part of the refinery affected source as defined at 40 CFR 63.640 are subject to subpart CC. Gasoline loading, marine vessel loading and wastewater treatment operations located at non-

      refinery source categories are not subject to part 63, subpart CC and, thus, would not be subject to the revisions to subpart CC being finalized in this action. To the extent that the commenters are requesting that the EPA establish flare requirements that would apply to flares that are not part of the refinery affected source, that request is beyond the scope of this rulemaking, which only addresses revisions to Refinery MACT 1 and 2. When we issue rules addressing requirements for other sources with flares, we will consider issues similar to those we considered in this action and determine at that time whether revisions to those other flare requirements are necessary.

      The commenters note that some subpart CC emissions sources have only a control efficiency requirement of 95-percent. While this may be true, where the owner or operator chooses to control these sources through the use of a flare, operation of that flare was subject to operational requirements in the General Provisions at 40 CFR 63.11 and the best performing flares were achieving 98-percent control at the time the General Provisions were promulgated. At the time the General Provisions were promulgated, we received no comments that the EPA should set different operational limits for flares that are controlling emissions from sources where the standard may vary by level of control efficiency and we see no basis to do so now. The purpose of the revisions to the flare operating requirements is to ensure that flares are operating consistent with the MACT floor requirements for any and all sources that may use flares as a control device (79 FR 36905, June 30, 2014). As the MACT floor control requirements of certain refinery sources that allow the use of a flare as a control device is 98-

      percent, we established operational limits to ensure flares used as control devices meet this MACT requirement.

      To the extent that the commenters are requesting that the EPA establish an alternative monitoring approach for flares in dedicated service that have consistent composition and flow, we agree that these types of flares, which have limited flare vent gas streams, do not need to have the same type of on-going monitoring requirements as those with more variable waste streams. Thus, we are establishing an option that refinery owners or operators can use to demonstrate compliance with the operating requirements for flares that are in dedicated service to a specific emission source, such as a wastewater treatment operation. Refinery owners or operators will need to submit an application for the use of this alternative. The application must include a description of the system, characterization of the vent gases that could be routed to the flare based on a minimum of 7 grab samples (14 daily grab samples for continuously operated flares) and specification of the net heating value that will be used for all flaring events (based on the minimum net heating value of the grab samples). We are also allowing engineering estimates to characterize the amount of gas flared and the amount of assist gas introduced into the system. For example, the use of fan curves to estimate air assist rates is acceptable. Flare owners or operators would use the net heating value determined from the initial sampling phase and measured or estimated flare vent gas and assist gas

      Page 75213

      flow rates, if applicable, to demonstrate compliance with the standards.

      Comment: A few commenters suggested that the EPA's proposed work practice and monitoring standards for flares are CAA section 112(d) ``developments'' required by law and supported by the evidence, and reflect best practices at many refineries today. One commenter suggested that the EPA must allow companies with consent decrees to meet their consent decree requirements as an alternative compliance approach and in lieu of the proposed requirements.

      Response: We proposed the enhanced monitoring requirements and operating limits under authority of CAA sections 112(d)(2) and (d)(3) to ensure that flares used to control regulated Refinery MACT 1 or 2 gas streams are meeting the prescribed control efficiencies established at the time the MACT standard was promulgated. And, we continue to believe that these revisions are appropriate under CAA sections 112(d)(2) and (d)(3). The commenter has not suggested, and we do not believe, that the revisions promulgated would differ in substance if they were instead promulgated under CAA section 112(d)(6).

      In general, we expect that the NHVcz monitoring requirements that we are finalizing for flares will be consistent with the requirements in various consent decrees. However, we have not conducted a rigorous evaluation of equivalency between various requirements and therefore we are not at this time providing an allowance for flare owners or operators to comply with the NHVcz operating limits and any provisions for necessary monitoring needed in the consent decree in lieu of the NHVcz limits and monitoring requirements established in this rule. In the event that an owner or operator wishes to continue complying only with the requirements of a consent decree, the rule contains provisions by which owner or operator can seek approval for alternative limits that are at least equivalent to the performance achieved from complying with the operating limits included in the final rule.

      iii. Pressure Relief Devices

      Comment: Several commenters suggested that the EPA develop a work practice approach for atmospheric PRD rather than a prohibition on releases. One commenter recommended that the EPA establish a work practice standard for atmospheric PRDs that requires refiners to implement a base level of preventative measures including: Basic process controls, instrumented alarms, documented and verified routine inspection and maintenance programs, safety-instrumented systems, disposal systems, provide redundant equipment, increase vessel design pressure and systems that reduce fire exposure on equipment. Additionally, the commenter recommended that the EPA require refiners to perform root cause analysis and implement corrective action in the event of a release. The commenter stated these requirements would be similar to the root cause analysis/corrective action requirements recently promulgated for flares under NSPS subpart Ja and provided specific regulatory language for a proposed work practice approach. (See section 2.4.1.8 in Docket item EPA-HQ-OAR-2010-0682-0583.) One commenter requested that the EPA allow a process for companies to submit an application for case-by-case limits to be approved by the agency, either the EPA or a delegated state similar to the alternate NOX limits for process heaters provided in NSPS subpart Ja. This commenter recommended that the EPA establish reasonable work practice standards, specifically suggesting that the EPA develop work practice standards consistent with API 521. The commenter stated that the EPA should provide an implementation period for compliance that goes beyond the timeframe provided under CAA section 112(d). The commenter added that the EPA should adopt specified changes to the definition of an atmospheric pressure relief safety valve and provided suggested regulatory language for a proposed work practice standard for PRDs in EPA-HQ-OAR-2010-0682-0549.

      Another commenter stated that the EPA should require, as the Bay Area Air Quality Management District (BAAQMD) does, that any refinery that has a reportable PRD event must take certain steps to prevent such releases in the future (BAAQMD Rule 8-28-304). In particular, such a refinery must create a Process Hazard Analysis, meet the Prevention Measures Procedures specified in section 8-28-405, and conduct a failure analysis of the incident, to prevent recurrence of similar incidents (Id. Reg. section 8-28-304.1). If a second release occurs, then, within one year, the facility must vent its PRDs to a vapor recovery or disposal system that meets certain requirements (Id. Reg. section 8-28-304.2). The commenter asserted that the EPA's prohibition on releases to the atmosphere from PRD will ensure that refineries take the necessary steps to prevent such releases, or install control devices so that any releases from PRDs that must occur are vented through a control device to reduce the amount of toxic air pollution they emit. At a minimum, the commenter stated, the EPA must prohibit these uncontrolled emissions and require monitoring and reporting to assure compliance and ensure that the emission standards apply at all times, as required by the Act. The commenter argued that the EPA must also, however, consider requiring the additional developments that have been put into place in the BAAQMD and also require control devices to be used for all PRD, as some local air districts require. In addition, the commenter supported the EPA's monitoring and reporting requirements for PRD releases and the proposed electronic reporting requirements, which the EPA recognized are needed to assure compliance and assist with future rulemakings and as that provision requires, the EPA also must make all information reported publicly available online promptly and in an accessible and understandable format.

      Response: We agree that, under the proposal, refineries would consider installing add-on controls to comply with the prohibition on atmospheric releases from PRDs. In addition, they would consider venting these control devices to existing control devices, including flares. However, it may not be feasible to vent some or all of the PRDs to existing flares if the flares are near their hydraulic load capacity based on the processes already connected to the flares. Flares have negative secondary impacts when operated at idle conditions for the vast majority of time, which could be the case if they were installed solely to address PRD releases. These secondary impacts result from GHG, CO and NOX emissions. Some PRDs may vent materials that are not compatible with flare control and would need to be vented to other controls.

      To estimate the impact of the proposed prohibition on venting PRDs to the atmosphere, we estimated that at least one new flare per facility would be required to handle releases from PRDs, based on the number of atmospheric PRDs reported at refineries; that 60-percent of the PRDs could be piped to existing controls at minimal costs and the other 40-percent would have to be piped to new flares; and that, on average, each new flare would service 40 PRDs. Based on these assumptions, 151 new flares would be needed or approximately one new flare per refinery. At a capital cost of $2 million for each new flare, which would not include long pipe runs, if needed, to PRD that are dispersed across the plant, we estimate that the capital cost of the

      Page 75214

      prohibition on venting to the atmosphere would exceed $300 million. Considering the fuel needed (approximately 50,000 scf/day per flare) and a natural gas price of $4.50 per 1,000 scf, we estimate the annual operating cost for these new flares to be $12 million.

      PRDs are unique in that they are designed for the purpose of releasing or ``popping'' as a safety measure to address pressure build-

      up in various systems--pipes, tanks, reactors--at a facility. These pressure build-ups are typically a sign of a malfunction of the underlying equipment. While it would be difficult to regulate most malfunction events because they are unpredictable and can vary widely, in the case of PRDs, they are equipment installed specifically to release during malfunctions and as such, we have information on PRDs in our 2011 Refinery ICR and through the SCAAMD and BAAQ rules to establish standards for them. After reviewing these comments, we thus examined whether it would be feasible to regulate these devices under CAA section 112(d)(2) and (3).

      After reviewing the comments, we agree with the commenters who suggest that the BAAQMD rule, as well as a similar South Coast Air Quality Management District (SCAQMD) rule that address PRD releases (SCAQMD Rule 1173), provide work practice standards that reflect the level of control that applies to the best performers. Consequently, we developed a work practice standard for PRD based on a detailed MACT analysis considering the requirements in these rules. Our rationale for the selected MACT requirements is provided in section IV.C.4 of this preamble. The work practice standards that we are finalizing for PRDs require refiners to establish proactive measures for each affected PRD to prevent direct release of HAP to the atmosphere as a result of pressure release events. In the event of an atmospheric release, we are requiring refinery owners or operators to conduct root cause analysis to determine the cause of a PRD release event. If the root cause was due to operator error or negligence, then the release would be a deviation of the standard. For any other release (not including those caused by force majeure events), the owner or operator would have to implement corrective action. A second release due to the same root cause for the same equipment in a 3-year period would be a deviation of the work practice standard. Finally, a third release in a 3-year period would be a deviation of the work practice standard, regardless of the root cause. Force majeure events would not count in determining whether there has been a second or third event.

      With respect to defining ``atmospheric pressure relief safety valve'' as suggested by the commenter, we note that the June 30, 2014, proposed amendments in 40 CFR 63.648(j) used the term ``relief valve'' because this was a defined term in Refinery MACT 1. However, the proposed amendments included clauses such as ``if the relief valve does not consist of or include a rupture disk.'' Thus, we specifically intended to apply the pressure relief management requirements broadly to ``pressure relief devices'' and not just ``valves.'' To clarify this, we have revised the regulatory language to use the term ``pressure relief device'' rather than ``relief valve'' to clearly include rupture disks or similar types of equipment that may be used for pressure relief.

      4. What is the rationale for our final approach and final decisions for the revisions pursuant to CAA section 112(d)(2) and (3)?

      We revised the MACT floor determination for DCU sources. CAA section 112(d)(3)(A) requires the MACT floor for existing sources to exclude ``. . . those sources that have, within 18 months before the emission standard is proposed or within 30 months before such standard is promulgated, whichever is later, first achieved a level of emission rate or emission reduction which complies, or would comply if the source is not subject to such standard, with the lowest achievable emission rate (as defined by section 171) applicable to the source category and prevailing at the time, in the category or subcategory for categories and subcategories with 30 or more sources.'' Because we have determined that a 2 psig emissions limitation is equivalent with a LAER emission limit for DCU, we revised the MACT floor analysis in order to exclude sources that first met the 2 psig limit on or after December 30, 2012. For existing sources, based on the revised MACT analysis, we concluded that the MACT floor is still 2 psig. However, because the information on which we relied was submitted in response to the 2011 Petroleum Refinery ICR which requested ``typical'' venting pressures and because providing an allowance to average across venting periods does not reduce the emissions reductions achieved, we are providing a 60-event averaging period for existing sources in response to public comments received.

      For new DCU sources, our revised analysis identified one DCU subject to permit emission limitations of 2.0 psig pressure limit prior to venting on a per event basis. Under CAA section 112(d)(3), the MACT standard for new sources cannot be less stringent than the emission control achieved in practice by the best-controlled similar source. Thus, we are finalizing a limit of 2.0 for new DCU sources. We note that as 2.0 psig limit is more stringent than a 2 psig limit because of the rounding convention of rounding to the number of significant digits for which the standard is expressed. For example, a 2.4 psig venting pressure is compliant with a 2 psig limit, while it is not compliant with a 2.0 psig limit.

      We evaluated the costs of requiring existing sources to meet a 2.0 psig limit as a beyond-the-MACT-floor option. We determined the incremental cost of going from a 2 psig limit with an allowance to average over 60 events to a 2.0 psig limit on a per event basis was approximately $70,000 per ton of HAP reduced considering VOC credits. Based on this high incremental cost-effectiveness, we concluded that the MACT floor requirement for existing DCU sources was MACT. As discussed in detail in the proposal, we do not consider it technically feasible to meet a 1 psig pressure limit (effectively a 1.4 psig limit) on a not-to-be-exceeded basis. Thus, we rejected this beyond the floor control option for both existing and new DCU sources. See the memorandum titled ``Reanalysis of MACT for Delayed Coking Unit Decoking Operations'' in Docket ID No. EPA-HQ-OAR-2010-0682 for additional details regarding our re-analysis of MACT for DCU decoking operations.

      In response to comments received on the prohibition of draining prior to achieving the proposed pressure limit (see Section 7.2.1 in the ``National Emission Standards for Hazardous Air Pollutants from Petroleum Refineries--Background Information for Final Amendments: Summary of Public Comments and Responses'' in Docket ID No. EPA-HQ-OAR-

      2010-0682), we are providing specific provisions to allow for draining under special conditions. The specific provision and our rationale for providing them are provided below.

      First, we learned that certain DCU are designed to completely fill the drum with water and allow the water to overflow in the overhead line and drain to a receiving tank in order to more effectively cool the coke bed. Owners or operators of this DCU design were concerned that the water overflow may be considered a drain and also stated that overhead temperature rather than pressure would be a better indicator of effective bed cooling. In reviewing this

      Page 75215

      type of DCU design, we find that this design has some unique advantages to traditional DCU to effect better cooling of the coke drum, and therefore we do not want to preclude its use. Based on saturated steam properties, we determined that an overhead temperature of 220 degF would achieve equivalent or greater emissions reductions than a 2 psig pressure limitation and an overhead temperature of 218 degF would achieve equivalent or greater emissions reductions than a 2.0 psig pressure limitation. Therefore, we are including these temperature limits as alternatives to the 2 or 2.0 psig pressure limitations for existing and new DCU affected sources, respectively. With respect to the overflow ``drain,'' we remain concerned with emissions from draining superheated water. However, if submerged fill is used in the atmospheric tank receiving the overflow water, the superheated water will be cooled by the water within the tank and emissions that occur during the conventional draining of water (from the flashing of superheated water into steam) can be prevented. Therefore, we are allowing the use of water overflow provided the overflow ``drain'' water is hard-piped to the receiving tank via a submerged fill pipe (pipe below the existing liquid level) whenever the overflow water exceeds 220 degF.

      Second, we received comments that, for conventional DCU (those not designed to allow water overflow), there is a limit to the maximum water level in the drum, which limits to some extent how much cooling water can be added to the coke drum. In rare cases, the coke drum does not cool sufficiently using the typical cooling steps. In this case, the common industry practice is to partially drain the coke drum and refill it with additional cooling water. This ``double-quench'' process is needed for safety reasons to sufficiently cool the coke drum contents prior to the decoking operations. Therefore, commenters requested provisions to allow double-quenching of the coke drum. We recognize the safety issues associated with coke blow-out during coke cutting if there is a portion of the coke bed that is not sufficiently cooled and we agree that double-quenching is an effective means to cool the coke drum in those rare instances that the typical cooling cycle does not sufficiently cool the coke drum contents, so we considered granting the commenters' request. As noted previously, the primary concern with early draining of the coke drum is the emissions that are expected to occur as a result of draining superheated water. We recognize, however, that the water temperature near the bottom of the coke drum is typically much lower than at the top of the coke drum. If the temperature of the water drained from the bottom of the coke drum remains below 210 degF, this would minimize steam flashing and associated HAP emissions since the water drained would not be superheated. We conclude that the use of double quenching is appropriate for cases when the coke drum is not sufficiently cooled using the normal cooling procedures provided the temperature of the water drained remains below 210 degF, and it is consistent with the practices of the best performing sources. Consequently, we are finalizing provisions to allow the use of double-quenching for DCU provided the temperature of the water drained remains below 210 degF.

      For the CRU, we are finalizing the proposed revisions to require CRU that employ active purging to meet the MACT emissions limitations in Tables 15 and 16 in subpart UUU at all times regardless of vessel pressure. We received limited comments regarding our proposal; these comments generally concerned the costs associated with the proposed emissions limitations. As discussed in our proposal, and based on data submitted in response to the ICR, emissions using active purging are much higher than those not using active purging. In the original rule, we based the MACT floor on the best performing facilities that used sequential pressurizations and depressurizations rather than active purging. Thus, in the proposal, we concluded that allowing owners or operators to actively purge while at low pressures was inconsistent with the MACT floor emissions limitations achieved by the best performing 12-percent of sources when the MACT floor was originally established. As we are simply requiring these facilities to meet the same emission levels determined to be MACT, we do not consider costs of potential additional controls to be a viable rationale to allow these units to emit several times more HAP than the units upon which the MACT requirements were based and the emissions levels achieved in practice by the vast majority of other CRU sources.

      For flares, we are finalizing proposed revisions to include detailed flare monitoring and operating requirements. We are including the flaring provisions for refineries in the Refinery MACT rules and removing the cross-references to the flaring requirements in the General Provisions. The final regulatory requirements differ from the proposed requirements in several respects. First, we are not finalizing the ban on halogenated vent streams because we did not include sufficient justification or include cost estimates for this proposed provision and we did not include any monitoring requirements to ensure compliance with this ban on halogenated vent streams.

      We are finalizing the proposed no visible emissions limit and the flare tip velocity limit but they will apply only when the flare vent gas flow rate is below the smokeless capacity of the flare. We received a number of comments stating that the no visible emissions limit and the flare tip velocity limit cannot be met during large malfunctions and emergency shutdown events. In response to comments, we are finalizing work practice standards for emergency flaring events using the proposed no visible emission limit and flare tip velocity limit as thresholds in the final rule to trigger root cause analysis when the flare vent gas flow rate is above the smokeless capacity of the flare. The final work practice standard includes requirements to develop a flare management plan, to implement prevention measures, and to perform root cause analysis and implement corrective action following each flaring event that exceeds the smokeless capacity of the flare. There is also a limit on the number of these flaring events that a given flare may have in the 3-year period. We are establishing these provisions because we now recognize that flares have two different design capacities: A smokeless design capacity and a hydraulic load capacity. We determined that the proposed visible emissions limit and the flare tip velocity limit for very large flow events are not the MACT floor for such events. The final work practice standards for flaring events are based on the best performing facilities and will result in emission reductions in a technically feasible manner without any negative secondary impacts.

      We consider it appropriate to establish a work practice standard for flares as provided in CAA section 112(h). While it is possible to monitor gaseous streams going into the flare (as we have required for the flare operating requirements) it is not possible to design and construct a conveyance to capture the emissions from a flare. While knowledge of the composition and flow of gases entering the flare provides a reasonable basis for establishing operating requirements for normal operations, we have no data on flare performance under conditions in the hydraulic load range. While smoke in the flare exhaust is an indication of incomplete combustion, it is uncertain

      Page 75216

      how much deterioration of HAP destruction efficiency occurs during a smoking event. We also consider that the application of a measurement methodology for flare exhaust is not practicable due to technological and economic limitations. Passive FTIR has been used to determine combustion efficiency in flare exhaust, but these are essentially manual tests, and the measurement accuracy is dependent on how well the monitor is aligned with the flare exhaust plume. Changes in wind direction require manual movement of the monitoring system. It is also unclear if these systems can accurately measure combustion efficiency during high smoking events. These systems also require very specialized expertise, and we consider that it is both technologically and economically infeasible to measure flare exhaust emissions, particularly during high load events. Consequently, for emergency flare releases, we conclude that it is appropriate to establish a work practice standard as provided in CAA section 112(h).

      We also received comments that the daily visible emissions observations were burdensome and unnecessary and some commenters suggested that facilities be allowed to use video surveillance cameras. We concluded that video surveillance cameras would be at least as effective as the proposed daily 5-minute visible emissions observations using Method 22. We are finalizing the proposed visible emissions monitoring requirements Method 22 and the alternative of using video surveillance cameras.

      We are simplifying the combustion zone gas property operating limits in response to public comments received. Specifically, we are finalizing requirements that all flares meet a minimum operating limit of 270 BTU/scf NHVcz on a 15-minute average, and we are providing that refiners use a corrected heat content of 1,212 BTU/scf for hydrogen to demonstrate compliance with this operating limit. We determined that a corrected heat content of 1212 BTU/scf for hydrogen provided a better indication of flare performance than without the correction. We also determined that the other combustion zone parameters, which were primarily proposed to provide suitable methods for flares that had high hydrogen concentrations, were no longer necessary when a 1,212 Btu/scf net heating value is used for hydrogen. Therefore, we are not finalizing the alternative combustion zone operating limits based on lower flammability limit or combustibles concentration. We are also not finalizing separate combustion zone operating limits for gases meeting the proposed hydrogen-olefin interaction criteria. In our revised analysis of the data, we analyzed all of the data together and determined the 270 Btu/scf NHVcz operating limit provided in the final rule would adequately ensure that flares achieve the desired 98-percent control efficiency regardless of the composition of gas sent to the flare.

      For air-assisted flares, we are finalizing the additional ``dilution parameter'' operating limit only for the net heating value dilution parameter, NHVdil. Similar to the requirements we are finalizing for the combustion zone parameters, we are finalizing requirements that flares meet a minimum operating limit of 22 BTU/

      ft2 NHVdil on a 15-minute average, and we are providing that refiners use a corrected heat content of 1,212 BTU/scf for hydrogen to demonstrate compliance with this operating limit. For the reasons explained above, we are not finalizing the proposed alternative dilution parameter operating limits based on lower flammability limit or combustibles concentration, and we are not finalizing separate dilution parameter operating limits for gases meeting the proposed hydrogen-olefin interaction criteria.

      For flares in dedicated service, we are establishing an alternative to continuous or on-going grab sample requirements for determining waste gas net heating content to reduce the burden of sampling for flare waste gases that have consistent compositions. Flares in dedicated service can use initial sampling period and process knowledge to determine a fixed net heating value of the flare vent gas to be used in the calculations of NHVcz and, if applicable, NHVdil.

      We are revising the definition of MPV to remove the exemption for in situ sampling systems for the reasons provided in the proposed rule.

      We received comments recommending that a work practice standard be adopted for PRD rather than the proposed prohibition of atmospheric PRD releases. Commenters stated that the prohibition was infeasible due to the proposed immediate timing of the requirement and impractical due to cost considerations. After reviewing these comments as well as the BAAQMD rule (Regulation 8, Rule 8-28-304) and the SCAQMD rule (Rule 1173), we have determined that the work practice standards in these rules reflect the level of control that applies to the best performers. Therefore, we proceeded to evaluate appropriate MACT requirements based on the provisions in these rules.

      The BAAQMD rule requires sources to implement a minimum of three prevention measures to limit the possibility of a release. The BAAQMD uses a ``release event'' threshold of 10 lbs/day of organic or inorganic pollutants; the SCAQMD rule effectively uses a release event threshold of 500 lbs VOC/day. When a release event occurs, both rules require that the refiner perform a root cause analysis and take corrective action (including additional prevention measures). In addition, both rules require piping the PRD to a flare if there are more than two release events (releases above a certain release size threshold) in a 5-year period. Both rules include a number of exemptions for certain types of PRD that are not expected to release significant amounts of pollutants to the air or that are not feasible to control because of pressure considerations. These include PRD associated with storage tanks, vacuum systems and equipment in heavy liquid service as well as liquid thermal relief valves that are vented to process drains.

      There are five refineries subject to the BAAQMD rule and seven refineries subject to the SCAQMD rule, accounting for 8-percent of refineries nationwide and representing the industry's best performers. We consider the BAAQMD rule to be the more stringent of the two because this rule requires sources to implement a minimum of three prevention measures to limit the possibility of a release (the SCAQMD rule has no similar requirement) and uses a lower mass threshold for what is considered a ``release event'' (10 lbs/day of organic or inorganic pollutants versus the 500 lbs VOC release threshold in the SCAQMD rule). Therefore, the BAAQMD rule is considered to be the MACT floor requirement for PRDs associated with new affected sources and the SCAQMD rule is considered to be the MACT floor for PRDs associated with existing affected sources.

      In general, an open PRD is essentially the same as a miscellaneous process vent that is vented directly to the atmosphere. Consistent with our treatment of miscellaneous process vents and consistent with the two California rules, we believe that it is appropriate to exclude certain types of PRD that have very low potential to emit based on their type of service, size and/or pressure. For example, PRD that have a potential to emit less than 72 pounds per day of VOC, considering the size of the valve opening, design release pressure, and equipment contents, would be considered in a similar manner as Group 2 miscellaneous

      Page 75217

      process vents and would not require additional control. The two California rule requirements do not apply to PRD on storage tanks and vacuum systems. Most of these PRD have a design release pressure of 2.5 psig and thus have a very limited potential to emit. It is technically infeasible to pipe these sources to a flare (or other similar control system) because the back pressure in the flare header system generally exceeds 2.5 psig. We note that some storage tanks can operate at elevated pressure (i.e., pressure tanks). Therefore, rather than follow exactly the requirements in the California rules, we determined it more practical to exclude PRD with design release pressure of less than 2.5 psig.

      Any release from a PRD in heavy liquid service would have a visual indication of a leak and any repairs to the valve would have to be further inspected and, if necessary, repaired under the existing equipment leak provisions. Therefore, consistent with the BAAQMD rule, we are exempting PRD in heavy liquid service from the work practice standards we are establishing in this final rule.

      Both the BAAQMD and SCAQMD rules exempt thermal expansion valves that are ``vented to process drains or back to the pipeline.'' We are unclear what is meant by ``vented to process drains''; however, if a liquid is released from a PRD via hard-piping to a drain system that meets the control requirements specified in Refinery MACT 1, we consider that these PRD are controlled and they would not be subject to the work practice standard established in this final rule. Similarly, all PRD in light liquid service that are hard-piped to a controlled drain system (or back to the process or pipeline) are otherwise subject to a MACT requirement and would not be subject to the work practice standard.

      In considering thermal relief valves not vented to process drains or back to the pipeline, we expect that releases from these thermal relief valves will be small and generally under the release event thresholds specified in the California rules. Therefore, the work practice standards do not apply to PRD that are designed solely to release due to liquid thermal expansion.

      The primary goal of the PRD work practice standard is to reduce the size and frequency of releases. The SCAQMD rule is targeted towards fairly large releases (compared to the direct PRD releases reported in response to the Refinery ICR), so it will reduce the frequency of large releases, but it does little to reduce the frequency of smaller releases. To more effectively reduce the size and frequency of all releases, we consider it important to require the implementation of prevention measures (as required in the BAAQMD rule) and require root cause analysis and corrective action for PRD releases from all PRD subject to the work practice standard. While we recognize that if a PRD opens for a short period of time, the release might be below the release thresholds in the SCAQMD rules, we believe the release may be indicative of an important issue or design flaw. Because the potential for large emissions exist from the PRD subject to the work practice standard, we think it is reasonable to require a root cause analysis be conducted and appropriate corrective action implemented to potentially identify this issue and prevent a second release which, if the issue remains uncorrected, could be significant.

      Requiring that prevention measures be implemented on all PRD subject to the work practice standard and not establishing a release threshold for release events is a variation from the SCAQMD rule. However, we also considered the allowable release frequency. We believe that our adoption of this approach is balanced by our not adopting the SCAQMD provisions requiring that PRD be vented to a flare or other control system or that refiners pay a fee if there are multiple releases of a certain size within a specified timeframe.\12\ In place of this system, we are limiting the number of events from each PRD that can occur in a 3 year time period (2, if root causes are different), and in place of a fine, or routing to control, stating that the 3rd release in 3 years for any root cause is a deviation of the standard.

      ---------------------------------------------------------------------------

      \12\ The SCAQMD rule requires PRD to be vented to a flare or other control device if there is a single release in excess of 2,000 pounds of VOC in a 24-hour period or three releases in excess of 500 pounds of VOC in a 5-year period or, alternatively, pay a $350,000 fee. Thus, the SCAQMD rule would allow, for example, two releases of over 500 pounds of VOC each within a 5-year period without any penalty provided a third event did not occur. If a third event did occur, the refinery owner or operator would then have to vent the PRD to a flare or other control system or pay a fee ($350,000) for the third release over 500 pounds of VOC.

      ---------------------------------------------------------------------------

      Because we are not including a size threshold for release events as in the SCAQMD rule, it is natural to assume release events would occur more frequently than release events subject to the SCAQMD rules. Also, based on our Monte Carlo analysis of random rare events, we note that it is quite likely to have two or three events in a 5-year period when a long time horizon (e.g., 20 years) is considered. Therefore, considering our analysis of emergency flaring events and the lack of a 500 lb/day release threshold, we considered it reasonable to use a 3-

      year period rather than a 5-year period as the basis of a deviation of the work practice standard.

      The SCAQMD work practice standards do not apply to releases that are demonstrated to ``result from natural disasters, acts of war or terrorism, or external power curtailment beyond the refinery's control, excluding power curtailment due to an interruptible service agreement.'' These types of events, which we are referring to as ``force majeure'' events, are beyond the control of the refinery owner or operator. We are providing that these events should not be included in the event count, but that they would be subject to the root cause analysis in order to confirm whether the release was caused by a force majeure event.

      Consistent with the requirements in the SCAQMD rule, we are requiring refinery owners or operators to conduct a root cause analysis for a PRD release event. If the root cause was due to operator error or negligence, then the release would be a deviation of the standard. For any other release (not including those caused by force majeure events), the owner or operator would have to implement corrective action. We consider that a second release due to the same root cause for the same equipment in a 3-year period would be a deviation of the work practice standard. This provision will help ensure that root cause/corrective action are conducted effectively. Finally, a third release in a 3-year period (not including those caused by force majeure events) would be a deviation of the work practice standard, regardless of the root cause. While we are using a 3-year interval rather than the 5-year interval provided in the SCAQMD, we consider that the requirements as included in this final rule (i.e., the inclusion of prevention measure requirements and no thresholds for release events) will achieve equivalent if not greater emissions reductions than the SCAQMD rule. We also consider that, given the prevention measure requirements and a 3-

      year period, there is less likelihood of unusual random events that happen over a short period of time that may cause refinery owners or operators to feel compelled to vent the PRD to a flare to eliminate concerns regarding potential non-compliance. Thus, we project that the requirements that we have included in the final rule will achieve emissions reductions commensurate to or exceeding the requirements in the SCAQMD rule (that serves as the MACT floor for existing sources) but will achieve those

      Page 75218

      reductions in a more cost-effective manner.

      We also considered requiring all PRD to be vented through a closed vent system to a control device as an alternative beyond-the-MACT floor requirement. While this requirement would provide additional emission reductions beyond those we are establishing as the MACT floor, these reduction come at significant costs. Capital costs for requiring control of all atmospheric PRD is estimated to be approximately $300 million compared to $11 million for the requirements described above. The total annualized cost for requiring control of all atmospheric PRD is estimated to be approximately $41 million/year compared to $3.3 million/year for the requirements described above. We estimate that the incremental cost-effectiveness of requiring control of all atmospheric PRD compared to the requirements described above exceeds $1 million per ton of HAP reduced. Consequently, we conclude that this is not a cost-

      effective option for existing sources.

      The final requirements that we have developed for PRD achieve equal or greater emission reductions than those achieved by the SCAQMD rule (MACT floor). To the extent those requirements are more stringent that the SCAQMD, they are cost-effective. We could not identify an alternative requirement that provided further emission reductions in a cost-effective manner. Thus, we conclude that the work practice standards described above represent MACT for existing sources.

      The BAAQMD rule, which represents the requirements applicable to the best performing sources, is the basis for new source MACT for PRD. Based on the specific provisions for PRD in the BAAQMD rule, we conclude that the MACT floor requirement is to have all PRD in HAP service associated with a new affected source vented through a closed vent system to a control device. As with existing sources, the PRD WPS would also contain the same exclusions (e.g., heavy liquid service PRDs, thermal expansion valves, liquid PRDs that are hard-piped to controlled drains, PRD with release pressures of less than 2.5 psig, PRD with emission potential of less than 72 lbs/day, and PRD on mobile equipment). These provisions are similar to the applicability provisions of the BAAQMD rule. Thus, we retain the same applicability of the work practice standard for PRDs on new or existing equipment, but all affected PRD on a new source would be required to be controlled. This is essentially equivalent to the proposed requirement of no atmospheric releases. We could not identify a control option more stringent than the BAAQMD rule as applied to new sources. Therefore, we conclude that venting all PRD in HAP service through a closed vent system to a flare or similar control system is MACT for PRD associated with new affected sources.

      We consider it appropriate to establish a work practice standard for PRD as provided in CAA section 112(h). While it may be possible to design and construct a conveyance for PRD releases, we consider that the application of a measurement methodology for PRDs is not practicable due to technological and economic limitations. First, it is not practicable to use a measurement methodology for PRD releases. The venting time can be very short and may vary widely in composition and flow rate. The often-short duration of an event makes it infeasible to collect a grab sample of the gases when a release occurs, and a single grab sample would not account for potential variation in vent gas composition. It would be economically prohibitive to construct an appropriate conveyance and install and operate continuous monitoring systems for each individual PRD in order to attempt to quantitatively measure a release event that may occur only a few times in a 3-year period. Additionally, we have not identified an available, technically feasible continuous emission monitoring systems that can determine a mass VOC or HAP release quantity accurately given the flow, composition and composition variability of potential PRD releases from refineries. Consequently, we conclude that it is appropriate to establish a work practice standard for PRD releases as provided in CAA section 112(h).

    4. NESHAP Amendments Addressing Emissions During Periods of SSM

      1. What amendments did we propose to address emissions during periods of SSM?

      We proposed to eliminate the SSM exemption in 40 CFR part 63, subparts CC and UUU. Consistent with Sierra Club v. EPA, we proposed standards in these rules that apply at all times. We also proposed several revisions to Table 6 of subpart CC of 40 CFR part 63 and to Table 44 to subpart UUU of 40 CFR part 63 (the General Provisions Applicability tables for each subpart), including eliminating the incorporation of the General Provisions' requirement that the source develop an SSM plan, and eliminating and revising certain recordkeeping and reporting requirements related to the SSM exemption.

      For Refinery MACT 1, we proposed that the use of a bypass at any time to divert a Group 1 miscellaneous process vent to the atmosphere is a deviation of the emission standard, and specified that refiners install, maintain and operate a continuous parameter monitoring system (CPMS) for flow that is capable of recording the volume of gas that bypasses the APCD.

      We also proposed to revise the definition of MPV to remove the exclusion for ``Episodic or non-routine releases such as those associated with startup, shutdown, malfunction, maintenance, depressuring and catalyst transfer operations.'' We also proposed that the control requirements for Group 1 MPV apply at all times, including startup and shutdowns.

      For Refinery MACT 2, we proposed alternate standards for three emission sources for periods of startup or shutdown. We proposed PM standards for startup of FCCU controlled with an ESP under Refinery MACT 2 because of safety concerns associated with operating an ESP during an FCCU startup. For FCCU controlled by an ESP, we proposed a 30-percent opacity limit (on a 6-minute rolling average basis) during the period that torch oil is used during FCCU startup. For startup of FCCU without a post-combustion device under Refinery MACT 2, we proposed a CO standard based on an excess oxygen concentration of 1 volume percent (dry basis) based on a 1-hour average. For periods of SRU shutdown, we proposed to allow diverting the SRU purge gases to a flare meeting the design and operating requirements in 40 CFR 63.670 (or, for a limited transitional time period, 40 CFR 63.11) or to a thermal oxidizer operated at a minimum temperature of 1,200emsp14degF and a minimum outlet oxygen concentration of 2 volume percent (dry basis). For other emission sources in Refinery MACT 2, we proposed that the requirements that apply during normal operations should apply during startup and shutdown.

      2. How did the SSM provisions change since proposal?

      1. Refinery MACT 1

        We proposed that when process equipment is opened to the atmosphere (e.g., for maintenance), the existing MPV emissions limits apply. In this final rule, we are instead finalizing startup and shutdown provisions that apply to these venting events. These startup and shutdown provisions are work practice standards that allow refinery owners or operators to open process equipment

        Page 75219

        during startup and shutdown provided that the equipment is drained and purged to a closed system until the hydrocarbon content is less than or equal to 10-percent of the LEL. For those situations where 10-percent LEL cannot be demonstrated (no direct measurement location), the equipment may be opened and vented to the atmosphere if the pressure is less than or equal to 5 psig. Active purging of the equipment is only allowed after the 10-percent LEL level is achieved, regardless of the pressure of the equipment/vessel. We are establishing a separate requirement for very small process equipment, defined as equipment where it is physically impossible to release more than 72 lbs VOC per equipment opening based on the size and contents of the equipment. This definition is consistent with the Group 1 applicability cutoff for control of miscellaneous process vents. We also developed requirements specific to catalyst changeout activities where pyrophoric catalyst (e.g., hydrotreater or hydrocracker catalysts) must be purged using recovered hydrogen. These provisions include: Documenting the procedures for equipment openings and procedures for verifying that events meet the specific conditions above using site procedures used to de-inventory equipment for safety purposes (i.e., hot work or vessel entry procedures) and documenting any deviations from the work practice standard requirements.

      2. Refinery MACT 2

        We are expanding the proposed 1-percent minimum oxygen operating limit alternative for organic HAP to apply for all FCCU startup and shutdown events (rather than only partial burn FCCU with CO boilers during startup). We are replacing the proposed opacity limit alternative to the metal HAP standard with a minimum cyclone face velocity limit and we are extending that alternative limit to all FCCU (regardless of control device) for both startup and shutdown in this final rule.

        We are extending the proposed alternative for SRU to monitor incinerator temperature and excess oxygen limits during SRU shutdowns to also apply during periods of startup.

        3. What key comments did we receive on the SSM revisions and what are our responses?

      3. Refinery MACT 1

        Comment: Many commenters stated that the proposed extension of the MPV definition to episodic maintenance startup and shutdown vents and elimination of the SSM exception for storage tanks would create hundreds or thousands of new vents per refinery per year and generate massive on-going burdens. The commenters argued that the EPA has not included in the record any analysis of the potential environmental benefits, costs or operational and compliance feasibility and impacts associated with this requirement and that many of these requirements will result in delayed and extended equipment and process outages. One commenter asserted that the EPA has articulated no justification for applying emission standards to these events, nor any analysis consistent with CAA section 112 for a determination that MACT standards are appropriately applied to these emission events under the criteria in CAA section 112(d).

        Many commenters stated that every time a vessel is opened for inspection or maintenance each vent point will have to be evaluated as a potential MPV or storage tank vent. If a particular vent point (e.g., bleeder) used for maintenance, startup or shutdown handles material that is initially greater than 20 ppm HAP, then it is a MPV. If there is a potential to emit greater than or equal 72 lbs/day of VOC, then it is a Group 1 MPV and must be controlled. If there is a potential of less than 72 lb/day VOC release, then it is a Group 2 MPV and subject to recordkeeping requirements. Commenters stated that in a refinery there would be tens or more such activities per day associated with normal maintenance and inspection; during turnarounds, there could be hundreds of such MPVs. Commenters added that these MPVs may then need to be individually accounted for and permitted creating an unnecessary permitting and recordkeeping burden for these periodic emissions.

        Commenters recommended a general set of work practice requirements for maintenance, startup and shutdown of vents, based on state requirements, that do not impose the permitting, notice and evaluation requirements associated with identifying these vents individually. Commenters explained that states have dealt with these episodic vents by establishing them as a special class of process vent with limited recordkeeping requirements and subject to a work practice standard, rather than the normal MPV requirements. A key element of these work practices is clear identification of the criteria for releasing these vents to the atmosphere and for routing these vents to control after hydrocarbon is reintroduced, which the commenters asserted the current rule does not provide. Commenters proposed that a work practice standard could include removing process liquids to the extent practical and depressuring smaller volume equipment until a pressure of 2 emissions. However, during startup and shutdown, high sulfur loadings in the SRU tail gas entering the incinerator will cause high SO2 emissions even though sulfur HAP emissions are well controlled. Consequently, the proposed incinerator operating limits provide a better indication of sulfur HAP control during startup and shutdown than SO2 emissions. Owners or operators that use incinerators or thermal oxidizers during normal operations may meet the site-specific temperature and excess oxygen operating limits that were determined based on their performance test during periods of startup and shutdown.

        4. What is the rationale for our final approach and final decisions to address emissions during periods of SSM?

      4. Refinery MACT 1

        We did not receive comments regarding the proposed amendments to Table 6 of subpart CC of 40 CFR part 63; therefore, for the reasons provided in the preamble to the proposed rule, we finalizing these amendments as proposed.

        We determined that it was overly burdensome and in most cases technically infeasible to consider every potential equipment or vessel opening and classify these ``openings'' (newly classified as MPV in the proposal) as either Group 1 or Group 2 MPV. We also determined that it is not always technically feasible, depending on the opening, to demonstrate compliance with the MPV emissions limitations. After considering the public comments, we determined it was appropriate to establish separate startup and shutdown provisions for MPV associated with process equipment openings. We reviewed state and local requirements and based the final rule requirements on the emissions limitations required to be followed by the best performing sources. Therefore, we are finalizing requirements for refinery owners or operators to open process equipment during these startup and shutdown events without directly permitting these ``vents'' as Group 1 or Group 2 MPV provided that the equipment is drained and purged to a closed system until the hydrocarbon content is less than or equal to 10-

        percent of the LEL. As described in further detail previously in this section, we have provided provisions for special cases where the 10-

        percent LEL limit cannot be demonstrated and provisions for less significant equipment openings, consistent with the practices used by the best performing facilities.

      5. Refinery MACT 2

        We did not receive significant comments regarding the proposed amendments to Table 44 to subpart UUU of 40 CFR part 63; therefore, we finalizing these amendments as proposed.

        In response to comments, we determined that the limited provisions that were provided for startup only or for shutdown only were too limited and we have expanded the proposed provisions to both startup and shutdown regardless of control device used. For the FCCU organic HAP emissions limit, we are finalizing an alternative limit for periods of startup of no less than 1-percent oxygen in the exhaust gas as proposed, but we are extending that alternative limit to shutdown and to all FCCU in this final rule.

        For the FCCU metal HAP emissions limit, we proposed a specific startup limit for FCCU controlled be an ESP of 30-percent opacity. We received comments along with limited data suggesting that this limit was not achievable. Commenters suggested that the best performing units maintain a minimum face velocity of at least 20 feet/second to minimize catalyst PM losses during startup and shutdowns. Operators of wet scrubbers also noted that they cannot maintain pressure drops and that one cannot meet the PM emissions limit normalized by coke burn-off rate when the coke burn-off rate approaches zero. Consequently, commenters stated that the alternative limits should be provided for startup and shutdown regardless of control device. Upon consideration of the comments, we determined that it was necessary to revise the proposed

        Page 75222

        alternative to be based on minimum inlet face velocity to the FCCU regenerator internal cyclones and provide the alternative for both startup and shutdown. We also expanded this limit to all FCCU; however, we also required FCCU with wet scrubbers to meet only the liquid to gas ratio operating limit during periods of startup and shutdown to allow wet scrubbers to use a consistent compliance method at all times.

        For SRU, we are finalizing an alternative standard during periods of startup and shutdown to use a flare that meets the operating limits included in the final rule or a thermal oxidizer or incinerator operated at a minimum hourly average temperature of 1,200 degF and a minimum hourly average outlet oxygen concentration of 2 volume percent (dry basis). We proposed these alternatives for periods of shutdown only, but based on comments received regarding startup issues, we determined that high sulfur loadings can occur during periods of startup and that the alternative limit proposed was appropriate for both startup and shutdown.

    5. Technical Amendments to Refinery MACT 1 and 2

      1. What other amendments did we propose for Refinery MACT 1 and 2?

      We proposed a number of amendments to Refinery MACT 1 and 2 to address technical issues such as rule language clarifications and reference corrections. First, we proposed to amend Refinery MACT 1 to clarify what is meant by ``seal'' for open-ended valves and lines that are ``sealed'' by the cap, blind flange, plug, or second valve by stating that sealed means when there are no detectable emissions from the open-ended valve or line at or above an instrument reading of 500 ppm. Second, we also proposed electronic reporting requirements where owners or operators of petroleum refineries must submit electronic copies of required performance test and performance evaluation reports for compliance with Refinery MACT 1 and 2 by direct computer-to-

      computer electronic transfer using EPA-provided software. Third, we proposed to update the General Provisions Tables 6 (for Refinery MACT 1) and 44 (for Refinery MACT 2) to correct cross references and to incorporate additional sections of the General Provisions that are necessary to implement these rules.

      2. How did the other amendments for Refinery MACT 1 and 2 change since proposal?

      We are not finalizing the definition of ``seal'' for open-ended lines as proposed. We are finalizing changes to update the General Provisions cross-reference tables as proposed, with one minor change to provide an option for the administrator to issue guidance on performance test reporting timeframes in order to address issues relating to submittal of data to the ERT.

      3. What key comments did we receive on the other amendments for Refinery MACT 1 and 2 and what are our responses?

      Comment: Numerous commenters objected to the proposal to clarify the meaning of ``seal'' as it relates to open-ended line (OEL) standards. Commenters contend that there is no basis for the EPA to assert that the proposed definition merely ``clarifies'' an established interpretation of the term ``seal'' and stated that the proposed revision constitutes an illegal change in the requirements for OELs, and the clarification should not be finalized.

      One commenter stated that none of the MACT standards in place before this proposal have stated or suggested that a ``sealed'' OEL is one with detectable emissions below 500 ppm. This commenter added this unique interpretation of the requirement to ``seal'' an OEL with a cap or plug is incompatible with the historical interpretation of this requirement by affected facilities and by the EPA, and the EPA has not issued any sort of definitive guidance or interpretation setting out this position. The commenter detailed numerous references to considerations the EPA has made relative to OEL requirements in LDAR programs. In addition to the examples cited, the commenter noted that in 2006, the EPA proposed to add a ``no detectible emissions'' limit and monitoring requirement for OELs to NSPS VV (71 FR 65317, November 7, 2006). Two commenters noted that the proposed monitoring was not finalized in either NSPS VV or VVa (72 FR 64860, November 16, 2007) because it was not considered BDT due to the low emission reductions and the cost effectiveness of the requirement. Another commenter agreed that there is no explanation provided for why this information could now support the need for a new OEL seal standard that requires monitoring to ensure compliance when it was deemed to be unjustified previously.

      In addition, the commenter collected OEL monitoring data and submitted it to the EPA (see Docket Item No. EPA-HQ-OAR-2010-0869-

      0058). Based on these data, the commenter asserted that the existence of leaks from OELs that are not properly sealed is extremely low.

      The commenter noted that the EPA is claiming this change is only a clarification of current requirements, allowing the EPA to bypass the need to cite a CAA authorization for this change to the existing CAA section 112(d)(2) standard or meet the process requirements associated with such a change, including providing emission reduction, cost and burden estimates in the record and the associated PRA Information Collection Request (ICR).

      Several commenters claimed that this clarification would result in retroactive impact and also addressed the implication of the proposed change on other fugitive emissions standards. One commenter stated that the EPA cannot retroactively reinterpret the OEL requirements or define the word ``seal'' and added that the EPA should account for the thousands of additional monitoring events per year per refinery that this new requirement would add to LDAR programs and provide proper cost justification under CAA sections 112(d)(6) or 112(f)(2).

      Several commenters also stated that the proposed definition will effectively change all equipment leak rules in parts 40 CFR parts 60, 61 and 63 and the change should not be finalized. One commenter added that by claiming this change is only a clarification of current requirements, the EPA would set a precedent applicable to all OELs in all industries subject to any similar OEL equipment leak requirement.

      Response: We have decided not to finalize the proposed clarification of the term ``seal'' for OELs at this time. The fenceline monitoring requirements we are finalizing will detect any significant leaks from a cap, blind flange, plug or second valve that does not properly seal an OEL, as well as significant leaks from numerous other types of fugitive emission sources.

      Comment: A few commenters stated that the proposed use of the ERT is not appropriate because the costs and burdens imposed are additive to the costs of producing and submitting the written report, and there is no benefit that justifies the additional cost. One commenter also stated that the EPA has not developed or articulated a reasonable approach to using information that would be uploaded to the ERT. The commenters recommended that the EPA remove this portion of the proposal until the ERT is demonstrated to handle all the information from refinery performance

      Page 75223

      tests (rather than only portions), thereby eliminating the need for both written and electronic reporting and until the Agency demonstrates that it is using the electronic data to develop improved air quality emission factors.

      Other commenters stated that the ERT requirement does not supersede or replace any state reporting requirements and thus the regulated industry will be subject to dual reporting requirements. These commenters disagreed with the preamble claim that eliminating the recordkeeping requirements for performance test reports is a burden savings, and stated that it may duplicate burdens already borne by the regulated community.

      The commenters expressed further concern that duplicative reporting requirements will strain the regulated industry to comply with deadlines established by rule for report submittals. One commenter stated that there is no mechanism for obtaining extensions for special circumstances. Under proposed 40 CFR 63.655(h)(9)(i), all reports are due in 60 days. The commenter claimed that by not referencing reporting requirements to the General Provisions in 40 CFR 63.10(d)(2), there is no allowance for obtaining additional time due to unforeseen circumstances or due to the difficulties involved with completing particularly complex reports.

      One commenter stated that the primary performance test method (Method 18) required for determining compliance is not currently included in the list of methods supported by the ERT. The commenter stated that the regulated community's experience with Method 18 is that it is a very broad methodology and can be exceptionally complex to execute and to report. The commenter stated that the EPA is aware that Method 18 reporting is complex, that it may be difficult to incorporate into the ERT, and that no time schedule has been defined for development or implementation for this method.

      The commenter also stated that without formal notice of changes to the ERT, the regulated community is at risk of non-compliance. The only way for the regulated community to know that changes have occurred in the ERT is to monitor the Web site directly because the EPA does not formally announce changes to the ERT in the Federal Register. As such, it would be possible for a regulated entity to be unaware of changes made such as the incorporation of Method 18. The commenter expressed concern that the proposal language is an open-ended commitment subject to change without notice. The commenter stated that the EPA should clearly indicate when facilities would be required to use the ERT when new test methods are included in the ERT.

      Response: We disagree that use of the ERT for completing stack test reports is an added cost and burden. While the requirement to report the results of stack tests with the ERT does not supersede state reporting requirements, we are aware of several states that already require the use of the ERT, and we are aware of more states that are considering requiring its use. We note that where states will not accept an electronic ERT submittal, the ERT provides an option to print the report, and the printed report can be mailed to the state agency. We have no reason to believe that the time savings in the ability to reuse data elements within reports does not, at a minimum, offset the cost incurred by printing out and mailing a copy of the report and the commenters have provided no support for their cost claims.

      Furthermore, based on the analysis performed for the Electronic Reporting and Recordkeeping Requirements for the New Source Performance Standards Rulemaking (ERRRNSPS) (80 FR 15100), electronic reporting results in an overall cost savings to industry when annualized over a 20-year period. The cost savings is achieved through means such as standardization of data, embedded quality assurance checks, automatic calculation routines and reduced data entry through the ability to reuse data in files instead of starting from scratch with each test. As outlined in the ERRRNSPS, there are many benefits to electronic reporting. These benefits span all users of the data--the EPA, state and local regulators, the regulated entities and the public. We note that in the preamble to this proposed rule we provided a number of reasons why the use of the ERT will provide benefit going forward and that most of the benefits we outlined were longer-term benefits (e.g., reducing burden of future information collection requests). Additionally, we note that in 2011, in response to Executive Order 13563, the EPA developed a plan \13\ to periodically review its regulations to determine if they should be modified, streamlined, expanded or repealed in an effort to make regulations more effective and less burdensome. The plan includes replacing outdated paper reporting with electronic reporting. In keeping with this plan and the White House's Digital Government Strategy, \14\ in 2013 the EPA issued an agency-wide policy specifying that new regulations will require reports to be electronic to the maximum extent possible. By requiring electronic submission of stack test reports in this rule, we are taking steps to implement this policy. We also disagree that we have not developed or articulated a reasonable approach to using information that would be uploaded to the ERT. To the contrary, we have discussed at length our plans for the use of stack test data collected via the ERT. In 2009, we published an advanced notice of proposed rulemaking (74 FR 52723) for the Emissions Factors Program Improvements. In that notice, we first outlined our intended approach for revising our emissions factors development procedures. This approach included using stack test data collected with the ERT. We reiterated this position in our ``Recommended Procedures for the Development of Emissions Factors and Use of the WebFIRE Database'' (http://www.epa.gov/ttn/chief/efpac/procedures/procedures81213.pdf), which was subject to public notice and comment before being finalized in 2013. Finally, we discussed uses of these data in the preamble to the proposed rule and at length in the preamble to the ERRRNSPS.

      ---------------------------------------------------------------------------

      \13\ EPA's ``Final Plan for Periodic Retrospective Reviews,'' August 2011. Available at: http://www.epa.gov/regdarrt/retrospective/documents/eparetroreviewplan-aug2011.pdf.

      \14\ Digital Government: Building a 21st Century Platform to Better Serve the American People, May 2012. Available at: https://www.whitehouse.gov/sites/default/files/omb/egov/digital-government/digital-government-strategy.pdf.

      ---------------------------------------------------------------------------

      We think that it is a circular argument to say that the agency should eliminate the use of the ERT until it demonstrates that it is using the electronic data. It would be impossible for the agency to use data that it does not have. We can only use electronic data once we have electronic data. We do note that we are nearing completion of programming the WebFIRE database with our new emissions factor development procedures and anticipate running the routines on existing data sets in the near future.

      We continue to improve and upgrade the ERT on an ongoing basis. The current version of the ERT supports 41 methods, including EPA Methods 1-4, 5, 5B, 5F, 25A 26, and 26A. We note that the ERT does not currently support EPA Method 18, and for performance tests using Method 18, the source will still have to produce a paper report. However, we are aware of the need to add Method 18 to the ERT, and we are currently looking at developing this capability. As noted in the ERRRNSPS, when new methods are added to the

      Page 75224

      ERT, we will not only post them to the Web site; we will also send out a listserv notice to the Clearinghouse for Inventories and Emissions Factors (CHIEF) listserv. Information on joining the CHIEF listserv can be found at http://www.epa.gov/ttn/chief/listserv.html#chief. We are requiring the use of the ERT if the method is supported by the ERT, as listed on the ERT Web site (http://www.epa.gov/ttn/chief/ert/ert_info.html) at the time of the test. We do not agree that it is overly burdensome to check a Web site for updates prior to conducting a performance test.

      We did revise the MACT 1 and 2 tables referencing reporting requirements to the general provisions (Table 6 for Refinery MACT 1 and Table 44 for Refinery MACT 2) to provide flexibility in the 60-day reporting timeline to accommodate unforeseen circumstances or difficulties involved with completing particularly complex reports.

      4. What is the rationale for our final approach and final decisions for the other amendments for Refinery MACT 1 and 2?

      We are not finalizing the definition of seal, as proposed. The fenceline monitoring work practice standard will detect any significant leaks from a cap, blind flange, plug or second valve that does not properly seal an OEL, as well as significant leaks from numerous other types of fugitive emission sources.

      We are finalizing requirements for electronic reporting, as proposed, with a minor clarification. Specifically, we are revising Tables 6 in subpart CC and 44 in subpart UUU, which cross-reference the applicable provisions in the General Provisions to provide flexibility in the ERT 60-day reporting timeline. Refiners can seek approval from the EPA or a delegated state additional time for submittal of data due to unforeseen circumstances or due to the difficulties involved with completing particularly complex reports.

    6. Technical Amendments to Refinery NSPS Subparts J and Ja

      1. What amendments did we propose for Refinery NSPS Subparts J and Ja?

      We proposed a number of amendments to Refinery NSPS subparts J and Ja to address reconsideration issues and minor technical clarifications. First, we proposed revisions to 40 CFR 60.100a(b) to include a provision that sources subject to Refinery NSPS subpart J could elect to comply instead with the provisions of Refinery NSPS subpart Ja.

      Second, we proposed a series of amendments to the requirements for SRP in 40 CFR 60.102a, to clarify the applicable emission limits for different types of SRP based on whether oxygen enrichment is used. The amendments proposed also clarified that emissions averaging across a group of emission points within a given SRP is allowed for each of the different types of SRP, and that emissions averaging is specific to the SO2 or reduced sulfur standards (and not to the 10 ppmv hydrogen sulfide (H2S) limit). We also proposed a series of corresponding amendments in 40 CFR 60.106a to clarify the monitoring requirements, particularly when oxygen enrichment or emissions averaging is used. We also proposed clarifications in 40 CFR 60.106a to consistently use the term ``reduced sulfur compounds'' when referring to the emission limits and monitoring devices needed to comply with the reduced sulfur compound emission limits for sulfur recovery plants with reduction control systems not followed by incineration.

      Third, we proposed amendments to 40 CFR 60.102a(g)(1) to clarify that CO boilers, while part of the FCCU affected facility, can also be FGCD.

      Fourth, we proposed several revisions to 40 CFR 60.104a to clarify the performance testing requirements. We proposed revision to 40 CFR 60.104a(a) to clarify that an initial compliance demonstration is needed for the H2S concentration limit in 40 CFR 60.103a(h). We proposed revisions to the annual PM testing requirement in 40 CFR 60.104a(b) to clarify that annually means once per calendar year, with an interval of at least 8 months but no more than 16 months between annual tests. We also proposed to amend 40 CFR 60.104a(f) to clarify that the provisions of that paragraph are specific to owners or operators of an FCCU or FCU that use a cyclone to comply with the PM emissions limit in 40 CFR 60.102a(b)(1) and not to facilities electing to comply with the PM emissions limit using a PM CEMS. We also proposed to amend 40 CFR 60.104a(j) to delete the requirements to measure flow for the H2S concentration limit for fuel gas.

      Fifth, we proposed several amendments to clarify the requirements for control device operating parameters in 40 CFR 60.105a. Specifically, we proposed amendments to 40 CFR 60.105a(b)(1)(ii)(A) to require corrective action be completed to repair faulty (leaking or plugged) air or water lines within 12 hours of identification of an abnormal pressure reading during the daily checks. We also proposed revisions to 40 CFR 60.105a(i) to specify that periods when abnormal pressure readings for a jet ejector-type wet scrubber (or other type of wet scrubber equipped with atomizing spray nozzles) are not corrected within 12 hours of identification and periods when a bag leak detection system alarm (for a fabric filter) is not alleviated within the time period specified in the rule are considered to be periods of excess emissions.

      We also proposed amendments to 40 CFR 60.105(b)(1)(iv) and 60.107a(b)(1)(iv) to provide flexibility in span range to accommodate different manufacturers of the length-of-stain tubes. We also proposed to delete the last sentence in 40 CFR 60.105(b)(3)(iii).

      Finally, we proposed clarification to the performance test requirements for the H2S concentration limit for affected flares in 40 CFR 60.107a(e)(1)(ii) and (e)(2)(ii) to remove the distinction between flares with or without routine flow.

      2. How did the amendments to Refinery NSPS Subparts J and Ja change since proposal?

      We are making very few changes to the amendments proposed for Refinery NSPS subparts J and Ja. In response to comments, we are revising the NSPS requirements to replace the ``measurement sensitivity'' requirements with accuracy requirements consistent with those used in Refinery MACT 1 and 2. Specifically, we are revising 40 CFR 60.106a(a)(6)(i)(B) and (7)(i)(B) to require use of a flow sensor meeting an accuracy requirement of 5-percent over the normal range of flow measured or 10-cubic-feet-per-minute, whichever is greater. We are also revising the flare accuracy requirements in 40 CFR 60.107a(f)(1)(ii) to require use of a flow sensor meeting an accuracy requirement of 20-percent of the flow rate at velocities ranging from 0.1 to 1 feet per second and an accuracy of 5-

      percent of the flow rate for velocities greater than 1-feet-per-second.

      Finally, we are revising 40 CFR 60.101a(b) to correct an inadvertent error where the phrase ``and delayed coking units'' was not included in the proposed sentence revision.

      3. What key comments did we receive on the amendments to Refinery NSPS Subparts J and Ja and what are our responses?

      Comment: Two commenters noted concern with the term ``measurement sensitivity'' in proposed 40 CFR 60.106a(a)(6)(i)(B) and (a)(7)(i)(B) for sulfur recovery unit monitoring alternatives and in existing regulations 40 CFR 60.107a(f)(1)(ii) for flares because ``sensitivity'' is not a term

      Page 75225

      found on typical monitoring system data sheets. Typical flow meter characteristics include terms such as accuracy and resolution and the commenters requested that the EPA revise the terminology to match the wording found in 40 CFR part 63, subpart CC, Table 13 for flow meters (i.e., accuracy requirements). Additionally, several commenters suggested that the EPA flow monitor accuracy specifications are inconsistent with those in the SCAQMD Flare Rule and many refinery consent decrees. The commenters recommended revising both the flare flow meter sensitivity specification and accuracy specification in Refinery MACT 1 Table 13 and in Refinery NSPS subpart Ja to be consistent with the accuracy specification from the Shell Deer Park Consent Decree, Appendix 1.10, which specifies the required flare flow meter accuracy as ``20% of reading over the velocity range of 0.1-1 feet per second (ft/s) and 5% of reading over the velocity range of 1-250 ft/s.''

      Response: We proposed the term ``measurement sensitivity'' in proposed 40 CFR 60.106a(a)(6)(i)(B) and (a)(7)(i)(B) to be internally consistent within Refinery NSPS subpart Ja i.e., consistent with the existing language in Sec. 60.107a(f)(1)(ii). However, we agree with the commenters that this term may be unclear. This term is not defined in Refinery NSPS subpart Ja and it is not commonly used in the flow monitoring system's technical specification sheets. Therefore, to be consistent with the terminology used by instrument vendors and used in Refinery MACT 1 and 2, we are revising these sections to replace the term ``measurement sensitivity'' with ``accuracy.'' We are also revising the flow rate accuracy provisions specific for flares to provide an accuracy requirement of 20-percent over the velocity range of 0.1-1 ft/s and 5% for velocities exceeding 1 ft/s in 40 CFR 60.107a(f)(1)(ii) and in Table 13 of subpart CC. We are providing this provision specifically for flares because they commonly operate at high turndown ratios. For other flow measurements, we are retaining the 10-cubic-foot-per-minute accuracy requirement. We are also clarifying that the 5-percent accuracy requirement for the SRU alternatives apply to the ``the normal range of flow measured'' consistent with the requirements in Refinery MACT 1 and 2.

      Comment: One commenter stated that in the proposed revisions to 40 CFR 60.100a, (79 FR 36956), the EPA proposes to remove the phrase ``and delayed coker units'' from 40 CFR 60.100a(b). However, we state the compliance date for both flares and delayed coker units separately in the same paragraph. The commenter believes the EPA should explain the reason for and implications of the removal of this phrase.

      Response: The removal of the phrase ``and delayed coking units'' from the first sentence in 40 CFR 60.100a(b) was an inadvertent error. The only revision that we intended to make in 40 CFR 60.100a was to allow owners or operators subject to subpart J to elect to comply with the requirements in subpart Ja. In the final amendments, we have included the phrase ``and delayed coking units'' in the first sentence in 40 CFR 60.100a(b).

      4. What is the rationale for our final approach and final decisions for the amendments to Refinery NSPS Subparts J and Ja?

      We are finalizing amendments for Refinery NSPS subparts J and Ja as proposed with minor revisions. In response to comments, we are revising the ``measurement sensitivity'' requirements to be an ``accuracy'' requirement. This change will make the requirements more clear and consistent between the flow meter requirements in the NSPS and the MACT standards since the same flow meter will be subject to each of these requirements. We are also providing a dual accuracy requirement for flare flow meters. This accuracy requirement is necessary because flares, which can have large diameters to accommodate high flows, are commonly operated at low flow rates. Together, this makes it technically infeasible for many flares to meet the lower flow 10 cfm accuracy requirement. Therefore, we are providing specific accuracy requirements for flares of 20-percent over the velocity range of 0.1-1 ft/s and 5-percent for velocities exceeding 1 ft/s, consistent with recent consent decrees and equipment vendor specifications.

      Finally, we are revising the introductory phrase in the first sentence in 40 CFR 60.101a(b) to read ``Except for flares and delayed coking units . . .'' to correct an inadvertent error. We intended to revise this sentence only to include the proposed provision to allow sources subject to Refinery NSPS subpart J to comply with Refinery NSPS subpart Ja. The redline text posted on our Web site showed no revisions to this introductory phrase, but the amendatory text did not include the words ``and delayed coking units'' in this phrase. This was an inadvertent error, which we are correcting in the final rule.

  12. Summary of Cost, Environmental and Economic Impacts and Additional Analyses Conducted

    1. What are the affected facilities, the air quality impacts and cost impacts?

      The sources affected by significant amendments to the petroleum refinery standards include flares, storage vessels, pressure relief devices, fugitive emissions and DCU. The amendments for other sources subject to one or more of the petroleum refinery standards are expected to have minimal air quality and cost impacts.

      The total capital investment cost of the final amendments and standards is estimated at $283 million, $112 million from the final amendments for storage vessels, DCU and fenceline monitoring and $171 million from standards to ensure compliance. We estimate annualized costs of the final amendments for storage vessels, DCU and fenceline monitoring to be approximately $13.0 million, which includes an estimated $11.0 million for recovery of lost product and the annualized cost of capital. We also estimated annualized costs of the final standards to ensure compliance to be approximately $50.2 million. The final amendments for storage vessels, DCU and fenceline monitoring would achieve a nationwide HAP emission reduction of 1,323 tpy, with a concurrent reduction in VOC emissions of 16,660 tpy and a reduction in methane emissions of 8,700 metric tonnes per year. Table 2 of this preamble summarizes the cost and emission reduction impacts of the final amendments, and Table 3 of this preamble summarizes the costs of the final standards to ensure compliance.

      Page 75226

      Table 2--Nationwide Impacts of Final Amendments (2010$)

      --------------------------------------------------------------------------------------------------------------------------------------------------------

      Total

      annualized Product Total Methane

      Total cost recovery annualized emission VOC Cost HAP Cost

      Affected source capital without credit costs reductions emission effectiveness emission effectiveness

      investment credit (million $/ (million $/ (metric reductions ($/ton VOC) reductions ($/ton HAP)

      (million $) (million $/ yr) yr) tpy) (tpy) (tpy)

      yr)

      --------------------------------------------------------------------------------------------------------------------------------------------------------

      Storage Vessels................ 18.5 3.13 (8.16) (5.03) ........... 14,600 (345) 910 (5,530)

      Delayed Coking Units........... 81 14.5 (2.80) 11.7 8,700 2,060 5,680 413 28,330

      Fugitive Emissions (Fenceline 12.5 6.36 ........... 6.36 ........... ........... ............. ........... .............

      Monitoring)...................

      ------------------------------------------------------------------------------------------------------------------------

      Total...................... 112 24.0 (11.0) 13.0 8,700 16,660 780 1,323 9,830

      --------------------------------------------------------------------------------------------------------------------------------------------------------

      Table 3--Nationwide Costs of Final Amendments To Ensure Compliance (2010$)

      ----------------------------------------------------------------------------------------------------------------

      Total

      Total capital annualized Product Total

      Affected Source investment cost without recovery annualized

      (million $) credit credit costs (million

      (million $/yr) (million $/yr) $/yr)

      ----------------------------------------------------------------------------------------------------------------

      Relief Device Monitoring........................ 11.1 3.3 .............. 3.3

      Flare Monitoring................................ 160 46.5 .............. 46.5

      FCCU Testing.................................... .............. 0.4 .............. 0.4

      ---------------------------------------------------------------

      Total....................................... 171 50.2 .............. 50.2

      ----------------------------------------------------------------------------------------------------------------

      The impacts shown in Table 2 do not include costs, product recovery credits, or emissions reductions associated with any root cause analysis or corrective action taken in response to the final amendments for fenceline monitoring. The impacts shown in Table 3 do not include (i) the costs or emissions reductions associated with any root cause analysis and corrective action taken in response to the final source performance testing at the FCCUs, or (ii) emissions reductions associated with corrective action taken in response to pressure relief device or (iii) emissions reductions associated with the flare operating and monitoring provisions. The operational and monitoring requirements for flares at refineries have the potential to reduce excess emissions from flares by up to approximately 3,900 tpy of HAP and 33,000 tpy of VOC. The operational and monitoring requirements for flares also have the potential to reduce methane emissions by 25,800 metric tonnes per year while increasing emissions of carbon dioxide (CO2) and nitrous oxide by 267,000 metric tonnes per year and 2 metric tonnes per year, respectively, yielding a net reduction in GHG emissions of 377,000 metric tonnes per year of CO2 equivalents (CO2e).

    2. What are the economic impacts?

      We performed a national economic impact analysis for petroleum product producers. All petroleum product refiners will incur annual compliance costs of less than 1-percent of their sales. For all firms, the minimum cost-to-sales ratio is = R 2S; and

      * * * * *

      (3) * * *

      (iii) If the operation change results in a sulfur content that is outside the range of concentrations included in the original application and the owner or operator chooses not to submit new information to support an exemption, the owner or operator must begin H2S monitoring using daily stain sampling to demonstrate compliance using length-of

      Page 75230

      stain tubes with a maximum span between 200 and 400 ppmv inclusive when 12S concentration limit.

      * * * * *

      Subpart Ja--Standards of Performance for Petroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After May 14, 2007

      0

      3. Section 60.100a is amended by revising the first sentence of paragraph (b) to read as follows:

      Sec. 60.100a Applicability, designation of affected facility, and reconstruction.

      * * * * *

      (b) Except for flares and delayed coking units, the provisions of this subpart apply only to affected facilities under paragraph (a) of this section which either commence construction, modification or reconstruction after May 14, 2007, or elect to comply with the provisions of this subpart in lieu of complying with the provisions in subpart J of this part. * * *

      * * * * *

      0

      4. Section 60.101a is amended by:

      0

      1. Revising the definition of ``Corrective action''; and

        0

      2. Adding, in alphabetical order, a definition for ``Sour water''.

        The revision and addition read as follows:

        Sec. 60.101a Definitions.

        * * * * *

        Corrective action means the design, operation and maintenance changes that one takes consistent with good engineering practice to reduce or eliminate the likelihood of the recurrence of the primary cause and any other contributing cause(s) of an event identified by a root cause analysis as having resulted in a discharge of gases from an affected facility in excess of specified thresholds.

        * * * * *

        Sour water means water that contains sulfur compounds (usually H2S) at concentrations of 10 parts per million by weight or more.

        * * * * *

        0

        5. Section 60.102a is amended by revising paragraphs (b)(1)(i) and (iii), (f), and (g)(1) introductory text to read as follows:

        Sec. 60.102a Emissions limitations.

        * * * * *

        (b) * * *

        (1) * * *

        (i) 1.0 gram per kilogram (g/kg) (1 pound (lb) per 1,000 lb) coke burn-off or, if a PM continuous emission monitoring system (CEMS) is used, 0.040 grain per dry standard cubic feet (gr/dscf) corrected to 0 percent excess air for each modified or reconstructed FCCU.

        * * * * *

        (iii) 1.0 g/kg (1 lb/1,000 lb) coke burn-off or, if a PM CEMS is used, 0.040 grain per dry standard cubic feet (gr/dscf) corrected to 0 percent excess air for each affected FCU.

        * * * * *

        (f) Except as provided in paragraph (f)(3) of this section, each owner or operator of an affected sulfur recovery plant shall comply with the applicable emission limits in paragraph (f)(1) or (2) of this section.

        (1) For a sulfur recovery plant with a design production capacity greater than 20 long tons per day (LTD), the owner or operator shall comply with the applicable emission limit in paragraph (f)(1)(i) or (ii) of this section. If the sulfur recovery plant consists of multiple process trains or release points, the owner or operator shall comply with the applicable emission limit for each process train or release point individually or comply with the applicable emission limit in paragraph (f)(1)(i) or (ii) as a flow rate weighted average for a group of release points from the sulfur recovery plant provided that flow is monitored as specified in Sec. 60.106a(a)(7); if flow is not monitored as specified in Sec. 60.106a(a)(7), the owner or operator shall comply with the applicable emission limit in paragraph (f)(1)(i) or (ii) for each process train or release point individually. For a sulfur recovery plant with a design production capacity greater than 20 long LTD and a reduction control system not followed by incineration, the owner or operator shall also comply with the H2S emission limit in paragraph (f)(1)(iii) of this section for each individual release point.

        (i) For a sulfur recovery plant with an oxidation control system or a reduction control system followed by incineration, the owner or operator shall not discharge or cause the discharge of any gases into the atmosphere (SO2) in excess of the emission limit calculated using Equation 1 of this section. For Claus units that use only ambient air in the Claus burner or that elect not to monitor O2 concentration of the air/oxygen mixture used in the Claus burner or for non-Claus sulfur recovery plants, this SO2 emissions limit is 250 ppmv (dry basis) at zero percent excess air.

        GRAPHIC TIFF OMITTED TR01DE15.000

        Where:

        ELS = Emission limit for large sulfur recovery plant, ppmv (as SO2, dry basis at zero percent excess air);

        k1 = Constant factor for emission limit conversion: k1 = 1 for converting to the SO2 limit for a sulfur recovery plant with an oxidation control system or a reduction control system followed by incineration and k1 = 1.2 for converting to the reduced sulfur compounds limit for a sulfur recovery plant with a reduction control system not followed by incineration; and

        %O2 = O2 concentration of the air/oxygen mixture supplied to the Claus burner, percent by volume (dry basis). If only ambient air is used for the Claus burner or if the owner or operator elects not to monitor O2 concentration of the air/oxygen mixture used in the Claus burner or for non-Claus sulfur recovery plants, use 20.9% for %O2.

        (ii) For a sulfur recovery plant with a reduction control system not followed by incineration, the owner or operator shall not discharge or cause the discharge of any gases into the atmosphere containing reduced sulfur compounds in excess of the emission limit calculated using Equation 1 of this section. For Claus units that use only ambient air in the Claus burner or for non-Claus sulfur recovery plants, this reduced sulfur compounds emission limit is 300 ppmv calculated as ppmv SO2 (dry basis) at 0-percent excess air.

        (iii) For a sulfur recovery plant with a reduction control system not followed by incineration, the owner or operator shall not discharge or cause the discharge of any gases into the atmosphere containing hydrogen sulfide (H2S) in excess of 10 ppmv calculated as ppmv SO2 (dry basis) at zero percent excess air.

        Page 75231

        (2) For a sulfur recovery plant with a design production capacity of 20 LTD or less, the owner or operator shall comply with the applicable emission limit in paragraph (f)(2)(i) or (ii) of this section. If the sulfur recovery plant consists of multiple process trains or release points, the owner or operator may comply with the applicable emission limit for each process train or release point individually or comply with the applicable emission limit in paragraph (f)(2)(i) or (ii) as a flow rate weighted average for a group of release points from the sulfur recovery plant provided that flow is monitored as specified in Sec. 60.106a(a)(7); if flow is not monitored as specified in Sec. 60.106a(a)(7), the owner or operator shall comply with the applicable emission limit in paragraph (f)(2)(i) or (ii) for each process train or release point individually. For a sulfur recovery plant with a design production capacity of 20 LTD or less and a reduction control system not followed by incineration, the owner or operator shall also comply with the H2S emission limit in paragraph (f)(2)(iii) of this section for each individual release point.

        (i) For a sulfur recovery plant with an oxidation control system or a reduction control system followed by incineration, the owner or operator shall not discharge or cause the discharge of any gases into the atmosphere containing SO2 in excess of the emission limit calculated using Equation 2 of this section. For Claus units that use only ambient air in the Claus burner or that elect not to monitor O2 concentration of the air/oxygen mixture used in the Claus burner or for non-Claus sulfur recovery plants, this SO2 emission limit is 2,500 ppmv (dry basis) at zero percent excess air.

        GRAPHIC TIFF OMITTED TR01DE15.001

        Where:

        ESS = Emission limit for small sulfur recovery plant, ppmv (as SO2, dry basis at zero percent excess air);

        k1 = Constant factor for emission limit conversion: k1 = 1 for converting to the SO2 limit for a sulfur recovery plant with an oxidation control system or a reduction control system followed by incineration and k1 = 1.2 for converting to the reduced sulfur compounds limit for a sulfur recovery plant with a reduction control system not followed by incineration; and

        %O2 = O2 concentration of the air/oxygen mixture supplied to the Claus burner, percent by volume (dry basis). If only ambient air is used in the Claus burner or if the owner or operator elects not to monitor O2 concentration of the air/oxygen mixture used in the Claus burner or for non-Claus sulfur recovery plants, use 20.9% for %O2.

        (ii) For a sulfur recovery plant with a reduction control system not followed by incineration, the owner or operator shall not discharge or cause the discharge of any gases into the atmosphere containing reduced sulfur compounds in excess of the emission limit calculated using Equation 2 of this section. For Claus units that use only ambient air in the Claus burner or for non-Claus sulfur recovery plants, this reduced sulfur compounds emission limit is 3,000 ppmv calculated as ppmv SO2 (dry basis) at zero percent excess air.

        (iii) For a sulfur recovery plant with a reduction control system not followed by incineration, the owner or operator shall not discharge or cause the discharge of any gases into the atmosphere containing H2S in excess of 100 ppmv calculated as ppmv SO2 (dry basis) at zero percent excess air.

        (3) The emission limits in paragraphs (f)(1) and (2) of this section shall not apply during periods of maintenance of the sulfur pit, which shall not exceed 240 hours per year. The owner or operator must document the time periods during which the sulfur pit vents were not controlled and measures taken to minimize emissions during these periods. Examples of these measures include not adding fresh sulfur or shutting off vent fans.

        (g) * * *

        (1) Except as provided in (g)(1)(iii) of this section, for each fuel gas combustion device, the owner or operator shall comply with either the emission limit in paragraph (g)(1)(i) of this section or the fuel gas concentration limit in paragraph (g)(1)(ii) of this section. For CO boilers or furnaces that are part of a fluid catalytic cracking unit or fluid coking unit affected facility, the owner or operator shall comply with the fuel gas concentration limit in paragraph (g)(1)(ii) for all fuel gas streams combusted in these units.

        * * * * *

        0

        6. Section 60.104a is amended by:

        0

      3. Revising the first sentence of paragraph (a) and paragraphs (b), (f) introductory text, and (h) introductory text;

        0

      4. Adding paragraph (h)(6); and

        0

      5. Removing and reserving paragraphs (j)(1) through (3).

        The revisions and additions read as follows:

        Sec. 60.104a Performance tests.

        (a) The owner or operator shall conduct a performance test for each FCCU, FCU, sulfur recovery plant and fuel gas combustion device to demonstrate initial compliance with each applicable emissions limit in Sec. 60.102a and conduct a performance test for each flare to demonstrate initial compliance with the H2S concentration requirement in Sec. 60.103a(h) according to the requirements of Sec. 60.8. * * *

        (b) The owner or operator of a FCCU or FCU that elects to monitor control device operating parameters according to the requirements in Sec. 60.105a(b), to use bag leak detectors according to the requirements in Sec. 60.105a(c), or to use COMS according to the requirements in Sec. 60.105a(e) shall conduct a PM performance test at least annually (i.e., once per calendar year, with an interval of at least 8 months but no more than 16 months between annual tests) and furnish the Administrator a written report of the results of each test.

        * * * * *

        (f) The owner or operator of an FCCU or FCU that uses cyclones to comply with the PM per coke burn-off emissions limit in Sec. 60.102a(b)(1) shall establish a site-specific opacity operating limit according to the procedures in paragraphs (f)(1) through (3) of this section.

        * * * * *

        (h) The owner or operator shall determine compliance with the SO2 emissions limits for sulfur recovery plants in Sec. 60.102a(f)(1)(i) and (f)(2)(i) and the reduced sulfur compounds and H2S emissions limits for sulfur recovery plants in Sec. 60.102a(f)(1)(ii), (f)(1)(iii), (f)(2)(ii), and (f)(2)(iii) using the following methods and procedures:

        * * * * *

        (6) If oxygen or oxygen-enriched air is used in the Claus burner and either Equation 1 or 2 of this subpart is used to determine the applicable emissions limit, determine the average O2 concentration of the air/oxygen mixture supplied to the Claus burner, in percent by volume (dry basis), for the performance test using all hourly average O2 concentrations determined

        Page 75232

        during the test runs using the procedures in Sec. 60.106a(a)(5) or (6).

        * * * * *

        0

        7. Section 60.105a is amended by:

        0

      6. Revising paragraphs (b)(1)(i), (b)(1)(ii)(A), (b)(2), (h)(1), (h)(3)(i), and (i)(1);

        0

      7. Redesignating paragraphs (i)(2) through (6) as (i)(3) through (7);

        0

      8. Adding paragraph (i)(2); and

        0

      9. Revising newly redesignated paragraph (i)(7).

        The revisions and additions read as follows:

        Sec. 60.105a Monitoring of emissions and operations for fluid catalytic cracking units (FCCU) and fluid coking units (FCU).

        * * * * *

        (b) * * *

        (1) * * *

        (i) For units controlled using an electrostatic precipitator, the owner or operator shall use CPMS to measure and record the hourly average total power input and secondary current to the entire system.

        (ii) * * *

        (A) As an alternative to pressure drop, the owner or operator of a jet ejector type wet scrubber or other type of wet scrubber equipped with atomizing spray nozzles must conduct a daily check of the air or water pressure to the spray nozzles and record the results of each check. Faulty (e.g., leaking or plugged) air or water lines must be repaired within 12 hours of identification of an abnormal pressure reading.

        * * * * *

        (2) For use in determining the coke burn-off rate for an FCCU or FCU, the owner or operator shall install, operate, calibrate, and maintain an instrument for continuously monitoring the concentrations of CO2, O2 (dry basis), and if needed, CO in the exhaust gases prior to any control or energy recovery system that burns auxiliary fuels. A CO monitor is not required for determining coke burn-off rate when no auxiliary fuel is burned and a continuous CO monitor is not required in accordance with paragraph (h)(3) of this section.

        (i) The owner or operator shall install, operate, and maintain each CO2 and O2 monitor according to Performance Specification 3 of appendix B to this part.

        (ii) The owner or operator shall conduct performance evaluations of each CO2 and O2 monitor according to the requirements in Sec. 60.13(c) and Performance Specification 3 of appendix B to this part. The owner or operator shall use Method 3 of appendix A-3 to this part for conducting the relative accuracy evaluations.

        (iii) If a CO monitor is required, the owner or operator shall install, operate, and maintain each CO monitor according to Performance Specification 4 or 4A of appendix B to this part. If this CO monitor also serves to demonstrate compliance with the CO emissions limit in Sec. 60.102a(b)(4), the span value for this instrument is 1,000 ppm; otherwise, the span value for this instrument should be set at approximately 2 times the typical CO concentration expected in the FCCU of FCU flue gas prior to any emission control or energy recovery system that burns auxiliary fuels.

        (iv) If a CO monitor is required, the owner or operator shall conduct performance evaluations of each CO monitor according to the requirements in Sec. 60.13(c) and Performance Specification 4 of appendix B to this part. The owner or operator shall use Method 10, 10A, or 10B of appendix A-3 to this part for conducting the relative accuracy evaluations.

        (v) The owner or operator shall comply with the quality assurance requirements of procedure 1 of appendix F to this part, including quarterly accuracy determinations for CO2 and CO monitors, annual accuracy determinations for O2 monitors, and daily calibration drift tests.

        * * * * *

        (h) * * *

        (1) The owner or operator shall install, operate, and maintain each CO monitor according to Performance Specification 4 or 4A of appendix B to this part. The span value for this instrument is 1,000 ppmv CO.

        * * * * *

        (3) * * *

        (i) The demonstration shall consist of continuously monitoring CO emissions for 30 days using an instrument that meets the requirements of Performance Specification 4 or 4A of appendix B to this part. The span value shall be 100 ppmv CO instead of 1,000 ppmv, and the relative accuracy limit shall be 10 percent of the average CO emissions or 5 ppmv CO, whichever is greater. For instruments that are identical to Method 10 of appendix A-4 to this part and employ the sample conditioning system of Method 10A of appendix A-4 to this part, the alternative relative accuracy test procedure in section 10.1 of Performance Specification 2 of appendix B to this part may be used in place of the relative accuracy test.

        * * * * *

        (i) * * *

        (1) If a CPMS is used according to paragraph (b)(1) of this section, all 3-hour periods during which the average PM control device operating characteristics, as measured by the continuous monitoring systems under paragraph (b)(1), fall below the levels established during the performance test. If the alternative to pressure drop CPMS is used for the owner or operator of a jet ejector type wet scrubber or other type of wet scrubber equipped with atomizing spray nozzles, each day in which abnormal pressure readings are not corrected within 12 hours of identification.

        (2) If a bag leak detection system is used according to paragraph (c) of this section, each day in which the cause of an alarm is not alleviated within the time period specified in paragraph (c)(3) of this section.

        * * * * *

        (7) All 1-hour periods during which the average CO concentration as measured by the CO continuous monitoring system under paragraph (h) of this section exceeds 500 ppmv or, if applicable, all 1-hour periods during which the average temperature and O2 concentration as measured by the continuous monitoring systems under paragraph (h)(4) of this section fall below the operating limits established during the performance test.

        0

        8. Section 60.106a is amended by:

        0

      10. Revising paragraph (a)(1)(i);

        0

      11. Adding paragraphs (a)(1)(iv) through (vii);

        0

      12. Revising paragraphs (a)(2) introductory text, (a)(2)(i) and (ii), and the first sentence of paragraph (a)(2)(iii);

        0

      13. Removing paragraphs (a)(2)(iv) and (v);

        0

      14. Redesignating paragraphs (a)(2)(vi) through (ix) as (a)(2)(iv) through (vii);

        0

      15. Revising the first sentence of paragraph (a)(3) introductory text and paragraph (a)(3)(i);

        0

      16. Adding paragraphs (a)(4) through (7); and

        0

      17. Revising paragraphs (b)(2) and (3).

        The revisions and additions read as follows:

        Sec. 60.106a Monitoring of emissions and operations for sulfur recovery plants.

        (a) * * *

        (1) * * *

        (i) The span value for the SO2 monitor is two times the applicable SO2 emission limit at the highest O2 concentration in the air/oxygen stream used in the Claus burner, if applicable.

        * * * * *

        (iv) The owner or operator shall install, operate, and maintain each O2 monitor according to Performance Specification 3 of appendix B to this part.

        (v) The span value for the O2 monitor must be selected between 10 and 25 percent, inclusive.

        Page 75233

        (vi) The owner or operator shall conduct performance evaluations for the O2 monitor according to the requirements of Sec. 60.13(c) and Performance Specification 3 of appendix B to this part. The owner or operator shall use Methods 3, 3A, or 3B of appendix A-2 to this part for conducting the relative accuracy evaluations. The method ANSI/ASME PTC 19.10-1981 (incorporated by reference--see Sec. 60.17) is an acceptable alternative to EPA Method 3B of appendix A-2 to this part.

        (vii) The owner or operator shall comply with the applicable quality assurance procedures of appendix F to this part for each monitor, including annual accuracy determinations for each O2 monitor, and daily calibration drift determinations.

        (2) For sulfur recovery plants that are subject to the reduced sulfur compounds emission limit in Sec. 60.102a(f)(1)(ii) or (f)(2)(ii), the owner or operator shall install, operate, calibrate, and maintain an instrument for continuously monitoring and recording the concentration of reduced sulfur compounds and O2 emissions into the atmosphere. The reduced sulfur compounds emissions shall be calculated as SO2 (dry basis, zero percent excess air).

        (i) The span value for the reduced sulfur compounds monitor is two times the applicable reduced sulfur compounds emission limit as SO2 at the highest O2 concentration in the air/

        oxygen stream used in the Claus burner, if applicable.

        (ii) The owner or operator shall install, operate, and maintain each reduced sulfur compounds CEMS according to Performance Specification 5 of appendix B to this part.

        (iii) The owner or operator shall conduct performance evaluations of each reduced sulfur compounds monitor according to the requirements in Sec. 60.13(c) and Performance Specification 5 of appendix B to this part. * * *

        * * * * *

        (3) In place of the reduced sulfur compounds monitor required in paragraph (a)(2) of this section, the owner or operator may install, calibrate, operate, and maintain an instrument using an air or O2 dilution and oxidation system to convert any reduced sulfur to SO2 for continuously monitoring and recording the concentration (dry basis, 0 percent excess air) of the total resultant SO2. * * *

        (i) The span value for this monitor is two times the applicable reduced sulfur compounds emission limit as SO2 at the highest O2 concentration in the air/oxygen stream used in the Claus burner, if applicable.

        * * * * *

        (4) For sulfur recovery plants that are subject to the H2S emission limit in Sec. 60.102a(f)(1)(iii) or (f)(2)(iii), the owner or operator shall install, operate, calibrate, and maintain an instrument for continuously monitoring and recording the concentration of H2S, and O2 emissions into the atmosphere. The H2S emissions shall be calculated as SO2 (dry basis, zero percent excess air).

        (i) The span value for this monitor is two times the applicable H2S emission limit.

        (ii) The owner or operator shall install, operate, and maintain each H2S CEMS according to Performance Specification 7 of appendix B to this part.

        (iii) The owner or operator shall conduct performance evaluations for each H2S monitor according to the requirements of Sec. 60.13(c) and Performance Specification 7 of appendix B to this part. The owner or operator shall use Methods 11 or 15 of appendix A-5 to this part or Method 16 of appendix A-6 to this part for conducting the relative accuracy evaluations. The method ANSI/ASME PTC 19.10-1981 (incorporated by reference--see Sec. 60.17) is an acceptable alternative to EPA Method 15A of appendix A-5 to this part.

        (iv) The owner or operator shall install, operate, and maintain each O2 monitor according to Performance Specification 3 of appendix B to this part.

        (v) The span value for the O2 monitor must be selected between 10 and 25 percent, inclusive.

        (vi) The owner or operator shall conduct performance evaluations for the O2 monitor according to the requirements of Sec. 60.13(c) and Performance Specification 3 of appendix B to this part. The owner or operator shall use Methods 3, 3A, or 3B of appendix A-2 to this part for conducting the relative accuracy evaluations. The method ANSI/ASME PTC 19.10-1981 (incorporated by reference--see Sec. 60.17) is an acceptable alternative to EPA Method 3B of appendix A-2 to this part.

        (vii) The owner or operator shall comply with the applicable quality assurance procedures of appendix F to this part for each monitor, including annual accuracy determinations for each O2 monitor, and daily calibration drift determinations.

        (5) For sulfur recovery plants that use oxygen or oxygen enriched air in the Claus burner and that elects to monitor O2 concentration of the air/oxygen mixture supplied to the Claus burner, the owner or operator shall install, operate, calibrate, and maintain an instrument for continuously monitoring and recording the O2 concentration of the air/oxygen mixture supplied to the Claus burner in order to determine the allowable emissions limit.

        (i) The owner or operator shall install, operate, and maintain each O2 monitor according to Performance Specification 3 of appendix B to this part.

        (ii) The span value for the O2 monitor shall be 100 percent.

        (iii) The owner or operator shall conduct performance evaluations for the O2 monitor according to the requirements of Sec. 60.13(c) and Performance Specification 3 of appendix B to this part. The owner or operator shall use Methods 3, 3A, or 3B of appendix A-2 to this part for conducting the relative accuracy evaluations. The method ANSI/ASME PTC 19.10-1981 (incorporated by reference--see Sec. 60.17) is an acceptable alternative to EPA Method 3B of appendix A-2 to this part.

        (iv) The owner or operator shall comply with the applicable quality assurance procedures of appendix F to this part for each monitor, including annual accuracy determinations for each O2 monitor, and daily calibration drift determinations.

        (v) The owner or operator shall use the hourly average O2 concentration from this monitor for use in Equation 1 or 2 of Sec. 60.102a(f), as applicable, for each hour and determine the allowable emission limit as the arithmetic average of 12 contiguous 1-

        hour averages (i.e., the rolling 12-hour average).

        (6) As an alternative to the O2 monitor required in paragraph (a)(5) of this section, the owner or operator may install, calibrate, operate, and maintain a CPMS to measure and record the volumetric gas flow rate of ambient air and oxygen-enriched gas supplied to the Claus burner and calculate the hourly average O2 concentration of the air/oxygen mixture used in the Claus burner as specified in paragraphs (a)(6)(i) through (iv) of this section in order to determine the allowable emissions limit as specified in paragraphs (a)(6)(v) of this section.

        (i) The owner or operator shall install, calibrate, operate and maintain each flow monitor according to the manufacturer's procedures and specifications and the following requirements.

        (A) Locate the monitor in a position that provides a representative measurement of the total gas flow rate.

        Page 75234

        (B) Use a flow sensor meeting an accuracy requirement of 5 percent over the normal range of flow measured or 10 cubic feet per minute, whichever is greater.

        (C) Use a flow monitor that is maintainable online, is able to continuously correct for temperature, pressure and, for ambient air flow monitor, moisture content, and is able to record dry flow in standard conditions (as defined in Sec. 60.2) over one-minute averages.

        (D) At least quarterly, perform a visual inspection of all components of the monitor for physical and operational integrity and all electrical connections for oxidation and galvanic corrosion if the flow monitor is not equipped with a redundant flow sensor.

        (E) Recalibrate the flow monitor in accordance with the manufacturer's procedures and specifications biennially (every two years) or at the frequency specified by the manufacturer.

        (ii) The owner or operator shall use 20.9 percent as the oxygen content of the ambient air.

        (iii) The owner or operator shall use product specifications (e.g., as reported in material safety data sheets) for percent oxygen for purchased oxygen. For oxygen produced onsite, the percent oxygen shall be determined by periodic measurements or process knowledge.

        (iv) The owner or operator shall calculate the hourly average O2 concentration of the air/oxygen mixture used in the Claus burner using Equation 10 of this section:

        GRAPHIC TIFF OMITTED TR01DE15.002

        Where:

        %O2 = O2 concentration of the air/oxygen mixture used in the Claus burner, percent by volume (dry basis);

        20.9 = O2 concentration in air, percent dry basis;

        Qair = Volumetric flow rate of ambient air used in the Claus burner, dscfm;

        %O2,oxy = O2 concentration in the enriched oxygen stream, percent dry basis; and

        Qoxy = Volumetric flow rate of enriched oxygen stream used in the Claus burner, dscfm.

        (v) The owner or operator shall use the hourly average O2 concentration determined using Equation 8 of Sec. 60.104a(d)(8) for use in Equation 1 or 2 of Sec. 60.102a(f), as applicable, for each hour and determine the allowable emission limit as the arithmetic average of 12 contiguous 1-hour averages (i.e., the rolling 12-hour average).

        (7) Owners or operators of a sulfur recovery plant that elects to comply with the SO2 emission limit in Sec. 60.102a(f)(1)(i) or (f)(2)(i) or the reduced sulfur compounds emission limit in Sec. 60.102a(f)(1)(ii) or (f)(2)(ii) as a flow rate weighted average for a group of release points from the sulfur recovery plant rather than for each process train or release point individually shall install, calibrate, operate, and maintain a CPMS to measure and record the volumetric gas flow rate of each release point within the group of release points from the sulfur recovery plant as specified in paragraphs (a)(7)(i) through (iv) of this section.

        (i) The owner or operator shall install, calibrate, operate and maintain each flow monitor according to the manufacturer's procedures and specifications and the following requirements.

        (A) Locate the monitor in a position that provides a representative measurement of the total gas flow rate.

        (B) Use a flow sensor meeting an accuracy requirement of 5 percent over the normal range of flow measured or 10 cubic feet per minute, whichever is greater.

        (C) Use a flow monitor that is maintainable online, is able to continuously correct for temperature, pressure, and moisture content, and is able to record dry flow in standard conditions (as defined in Sec. 60.2) over one-minute averages.

        (D) At least quarterly, perform a visual inspection of all components of the monitor for physical and operational integrity and all electrical connections for oxidation and galvanic corrosion if the flow monitor is not equipped with a redundant flow sensor.

        (E) Recalibrate the flow monitor in accordance with the manufacturer's procedures and specifications biennially (every two years) or at the frequency specified by the manufacturer.

        (ii) The owner or operator shall correct the flow to 0 percent excess air using Equation 11 of this section:

        GRAPHIC TIFF OMITTED TR01DE15.003

        Where:

        Qadj = Volumetric flow rate adjusted to 0 percent excess air, dry standard cubic feet per minute (dscfm);

        Cmeas = Volumetric flow rate measured by the flow meter corrected to dry standard conditions, dscfm;

        20.9c = 20.9 percent O2-0.0 percent O2 (defined O2 correction basis), percent;

        20.9 = O2 concentration in air, percent; and

        %O2 = O2 concentration measured on a dry basis, percent.

        (iii) The owner or operator shall calculate the flow weighted average SO2 or reduced sulfur compounds concentration for each hour using Equation 12 of this section:

        GRAPHIC TIFF OMITTED TR01DE15.004

        Page 75235

        Where:

        Cave = Flow weighted average concentration of the pollutant, ppmv (dry basis, zero percent excess air). The pollutant is either SO2 (if complying with the SO2 emission limit in Sec. 60.102a(f)(1)(i) or (f)(2)(i)) or reduced sulfur compounds (if complying with the reduced sulfur compounds emission limit in Sec. 60.102a(f)(1)(ii) or (f)(2)(ii));

        N = Number of release points within the group of release points from the sulfur recovery plant for which emissions averaging is elected;

        Cn = Pollutant concentration in the nth release point within the group of release points from the sulfur recovery plant for which emissions averaging is elected, ppmv (dry basis, zero percent excess air);

        Qadj,n = Volumetric flow rate of the nth release point within the group of release points from the sulfur recovery plant for which emissions averaging is elected, dry standard cubic feet per minute (dscfm, adjusted to 0 percent excess air).

        (iv) For sulfur recovery plants that use oxygen or oxygen enriched air in the Claus burner, the owner or operator shall use Equation 10 of this section and the hourly emission limits determined in paragraph (a)(5)(v) or (a)(6)(v) of this section in-place of the pollutant concentration to determine the flow weighted average hourly emission limit for each hour. The allowable emission limit shall be calculated as the arithmetic average of 12 contiguous 1-hour averages (i.e., the rolling 12-hour average).

        (b) * * *

        (2) All 12-hour periods during which the average concentration of reduced sulfur compounds (as SO2) as measured by the reduced sulfur compounds continuous monitoring system required under paragraph (a)(2) or (3) of this section exceeds the applicable emission limit; or

        (3) All 12-hour periods during which the average concentration of H2S as measured by the H2S continuous monitoring system required under paragraph (a)(4) of this section exceeds the applicable emission limit (dry basis, 0 percent excess air).

        0

        9. Section 60.107a is amended by revising paragraphs (a)(1)(i) and (ii), (b)(1)(iv), the first sentence of paragraph (b)(3)(iii), (d)(3), (e)(1) introductory text, (e)(1)(ii), (e)(2) introductory text, (e)(2)(ii), (e)(2)(vi)(C), (e)(3), (f)(1)(ii), and (h)(5) to read as follows:

        Sec. 60.107a Monitoring of emissions and operations for fuel gas combustion devices and flares.

        (a) * * *

        (1) * * *

        (i) The owner or operator shall install, operate, and maintain each SO2 monitor according to Performance Specification 2 of appendix B to this part. The span value for the SO2 monitor is 50 ppmv SO2.

        (ii) The owner or operator shall conduct performance evaluations for the SO2 monitor according to the requirements of Sec. 60.13(c) and Performance Specification 2 of appendix B to this part. The owner or operator shall use Methods 6, 6A, or 6C of appendix A-4 to this part for conducting the relative accuracy evaluations. The method ANSI/ASME PTC 19.10-1981 (incorporated by reference--see Sec. 60.17) is an acceptable alternative to EPA Method 6 or 6A of appendix A-4 to this part. Samples taken by Method 6 of appendix A-4 to this part shall be taken at a flow rate of approximately 2 liters/min for at least 30 minutes. The relative accuracy limit shall be 20 percent or 4 ppmv, whichever is greater, and the calibration drift limit shall be 5 percent of the established span value.

        * * * * *

        (b) * * *

        (1) * * *

        (iv) The supporting test results from sampling the requested fuel gas stream/system demonstrating that the sulfur content is less than 5 ppmv H2S. Sampling data must include, at minimum, 2 weeks of daily monitoring (14 grab samples) for frequently operated fuel gas streams/systems; for infrequently operated fuel gas streams/systems, seven grab samples must be collected unless other additional information would support reduced sampling. The owner or operator shall use detector tubes (``length-of-stain tube'' type measurement) following the ``Gas Processors Association Standard 2377-86 (incorporated by reference--see Sec. 60.17), using tubes with a maximum span between 10 and 40 ppmv inclusive when 12S; and

        * * * * *

        (3) * * *

        (iii) If the operation change results in a sulfur content that is outside the range of concentrations included in the original application and the owner or operator chooses not to submit new information to support an exemption, the owner or operator must begin H2S monitoring using daily stain sampling to demonstrate compliance using length-of-stain tubes with a maximum span between 200 and 400 ppmv inclusive when 1d = F factor on dry basis at 0% excess air, dscf/MMBtu.

        Xi = mole or volume fraction of each component in the fuel gas.

        MEVi = molar exhaust volume, dry standard cubic feet per mole (dscf/mol).

        MHCi = molar heat content, Btu per mole (Btu/mol).

        1,000,000 = unit conversion, Btu per MMBtu.

        * * * * *

        (e) * * *

        (1) Total reduced sulfur monitoring requirements. The owner or operator shall install, operate, calibrate and maintain an instrument or instruments for continuously monitoring and recording the concentration of total reduced sulfur in gas discharged to the flare.

        * * * * *

        (ii) The owner or operator shall conduct performance evaluations of each total reduced sulfur monitor according to the requirements in Sec. 60.13(c) and Performance Specification 5 of appendix B to this part. The owner or operator of each total

        Page 75236

        reduced sulfur monitor shall use EPA Method 15A of appendix A-5 to this part for conducting the relative accuracy evaluations. The method ANSI/

        ASME PTC 19.10-1981 (incorporated by reference-see Sec. 60.17) is an acceptable alternative to EPA Method 15A of appendix A-5 to this part. The alternative relative accuracy procedures described in section 16.0 of Performance Specification 2 of appendix B to this part (cylinder gas audits) may be used for conducting the relative accuracy evaluations, except that it is not necessary to include as much of the sampling probe or sampling line as practical.

        * * * * *

        (2) H2S monitoring requirements. The owner or operator shall install, operate, calibrate, and maintain an instrument or instruments for continuously monitoring and recording the concentration of H2S in gas discharged to the flare according to the requirements in paragraphs (e)(2)(i) through (iii) of this section and shall collect and analyze samples of the gas and calculate total sulfur concentrations as specified in paragraphs (e)(2)(iv) through (ix) of this section.

        * * * * *

        (ii) The owner or operator shall conduct performance evaluations of each H2S monitor according to the requirements in Sec. 60.13(c) and Performance Specification 7 of appendix B to this part. The owner or operator shall use EPA Method 11, 15 or 15A of appendix A-

        5 to this part for conducting the relative accuracy evaluations. The method ANSI/ASME PTC 19.10-1981 (incorporated by reference--see Sec. 60.17) is an acceptable alternative to EPA Method 15A of appendix A-5 to this part. The alternative relative accuracy procedures described in section 16.0 of Performance Specification 2 of appendix B to this part (cylinder gas audits) may be used for conducting the relative accuracy evaluations, except that it is not necessary to include as much of the sampling probe or sampling line as practical.

        * * * * *

        (vi) * * *

        (C) Determine the acceptable range for subsequent weekly samples based on the 95-percent confidence interval for the distribution of daily ratios based on the 10 individual daily ratios using Equation 14 of this section.

        GRAPHIC TIFF OMITTED TR01DE15.006

        Where:

        AR = Acceptable range of subsequent ratio determinations, unitless.

        RatioAvg = 10-day average total sulfur-to-

        H2S concentration ratio, unitless.

        2.262 = t-distribution statistic for 95-percent 2-sided confidence interval for 10 samples (9 degrees of freedom).

        SDev = Standard deviation of the 10 daily average total sulfur-

        to-H2S concentration ratios used to develop the 10-day average total sulfur-to-H2S concentration ratio, unitless.

        * * * * *

        (3) SO2 monitoring requirements. The owner or operator shall install, operate, calibrate, and maintain an instrument for continuously monitoring and recording the concentration of SO2 from a process heater or other fuel gas combustion device that is combusting gas representative of the fuel gas in the flare gas line according to the requirements in paragraph (a)(1) of this section, determine the F factor of the fuel gas at least daily according to the requirements in paragraphs (d)(2) through (4) of this section, determine the higher heating value of the fuel gas at least daily according to the requirements in paragraph (d)(7) of this section, and calculate the total sulfur content (as SO2) in the fuel gas using Equation 15 of this section.

        GRAPHIC TIFF OMITTED TR01DE15.007

        Where:

        TSFG = Total sulfur concentration, as SO2, in the fuel gas, ppmv.

        CSO2 = Concentration of SO2 in the exhaust gas, ppmv (dry basis at 0-percent excess air).

        Fd = F factor gas on dry basis at 0-percent excess air, dscf/MMBtu.

        HHVFG = Higher heating value of the fuel gas, MMBtu/

        scf.

        * * * * *

        (f) * * *

        (1) * * *

        (ii) Use a flow sensor meeting an accuracy requirement of 20 percent of the flow rate at velocities ranging from 0.1 to 1 feet per second and an accuracy of 5 percent of the flow rate for velocities greater than 1 feet per second.

        * * * * *

        (h) * * *

        (5) Daily O2 limits for fuel gas combustion devices. Each day during which the concentration of O2 as measured by the O2 continuous monitoring system required under paragraph (c)(6) or (d)(8) of this section exceeds the O2 operating limit or operating curve determined during the most recent biennial performance test.

        PART 63--NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES

        0

        10. The authority citation for part 63 continues to read as follows:

        Authority: 42 U.S.C. 7401 et se.

        Subpart A--General Provisions

        0

        11. Section 63.14 is amended by:

        0

      18. Revising paragraph (h)(14);

        0

      19. Redesignating paragraphs (h)(82) through (99) as (h)(86) through (103), paragraphs (h)(77) through (81) as (h)(80) through (84), paragraphs (h)(73) through (76) as paragraphs (h)(75) through (78), and paragraphs (h)(15) through (72) as (16) through (73), respectively;

        0

      20. Revising newly redesignated paragraph (h)(78);

        0

      21. Adding paragraphs (h)(15), (74), (79), (85), (104) and (j)(2);

        0

      22. Redesignating paragraph (m)(3) through (21) as (m)(5) through (23), respectively, and paragraph (m)(2) as (m)(3).

        0

      23. Adding paragraphs (m)(2) and (4) and (n)(3); and

        0

      24. Revising paragraph (s)(1).

        The revisions and additions read as follows:

        Sec. 63.14 Incorporation by reference.

        * * * * *

        (h) * * *

        (14) ASTM D1945-03 (Reapproved 2010), Standard Test Method for Analysis of Natural Gas by Gas Chromatography, Approved January 1, 2010, IBR approved for Sec. Sec. 63.670(j), 63.772(h), and 63.1282(g).

        (15) ASTM D1945-14, Standard Test Method for Analysis of Natural Gas by Gas Chromatography, Approved

        Page 75237

        November 1, 2014, IBR approved for Sec. 63.670(j).

        * * * * *

        (74) ASTM D6196-03 (Reapproved 2009), Standard Practice for Selection of Sorbents, Sampling, and Thermal Desorption Analysis Procedures for Volatile Organic Compounds in Air, Approved March 1, 2009, IBR approved for appendix A to this part: Method 325A and Method 325B.

        * * * * *

        (78) ASTM D6348-03 (Reapproved 2010), Standard Test Method for Determination of Gaseous Compounds by Extractive Direct Interface Fourier Transform Infrared (FTIR) Spectroscopy, including Annexes A1 through A8, Approved October 1, 2010, IBR approved for Sec. 63.1571(a), tables 4 and 5 to subpart JJJJJ, tables 4 and 6 to subpart KKKKK, tables 1, 2, and 5 to subpart UUUUU and appendix B to subpart UUUUU.

        * * * * *

        (79) ASTM D6348-12e1, Standard Test Method for Determination of Gaseous Compounds by Extractive Direct Interface Fourier Transform Infrared (FTIR) Spectroscopy, Approved February 1, 2012, IBR approved for Sec. 63.1571(a).

        * * * * *

        (85) ASTM D6420-99 (Reapproved 2010), Standard Test Method for Determination of Gaseous Organic Compounds by Direct Interface Gas Chromatography-Mass Spectrometry, Approved October 1, 2010, IBR approved for Sec. 63.670(j) and appendix A to this part: Method 325B.

        * * * * *

        (104) ASTM UOP539-12, Refinery Gas Analysis by GC, Copyright 2012 (to UOP), IBR approved for Sec. 63.670(j).

        * * * * *

        (j) * * *

        (2) BS EN 14662-4:2005, Ambient air quality standard method for the measurement of benzene concentrations--Part 4: Diffusive sampling followed by thermal desorption and gas chromatography, Published June 27, 2005, IBR approved for appendix A to this part: Method 325A and Method 325B.

        * * * * *

        (m) * * *

        (2) EPA-454/B-08-002, Office of Air Quality Planning and Standards (OAQPS), Quality Assurance Handbook for Air Pollution Measurement Systems, Volume IV: Meteorological Measurements, Version 2.0 (Final), March 24, 2008, IBR approved for Sec. 63.658(d) and appendix A to this part: Method 325A.

        * * * * *

        (4) EPA-454/R-99-005, Office of Air Quality Planning and Standards (OAQPS), Meteorological Monitoring Guidance for Regulatory Modeling Applications, February 2000, IBR approved for appendix A to this part: Method 325A.

        * * * * *

        (n) * * *

        (3) ISO 16017-2:2003(E): Indoor, ambient and workplace air--

        sampling and analysis of volatile organic compounds by sorbent tube/

        thermal desorption/capillary gas chromatography--Part 2: Diffusive sampling, May 15, 2003, IBR approved for appendix A to this part: Method 325A and Method 325B.

        * * * * *

        (s) * * *

        (1) ``Air Stripping Method (Modified El Paso Method) for Determination of Volatile Organic Compound Emissions from Water Sources,'' Revision Number One, dated January 2003, Sampling Procedures Manual, Appendix P: Cooling Tower Monitoring, January 31, 2003, IBR approved for Sec. Sec. 63.654(c) and (g), 63.655(i), and 63.11920.

        * * * * *

        Subpart Y--National Emission Standards for Marine Tank Vessel Loading Operations

        0

        12. Section 63.560 is amended by revising paragraph (a)(4) to read as follows:

        Sec. 63.560 Applicability and designation of affected source.

        (a) * * *

        (4) Existing sources with emissions less than 10 and 25 tons must meet the submerged fill standards of 46 CFR 153.282.

        * * * * *

        Subpart CC--National Emission Standards for Hazardous Air Pollutants From Petroleum Refineries

        0

        13. Section 63.640 is amended by:

        0

      25. Revising paragraphs (a) introductory text and (c) introductory text;

        0

      26. Adding paragraph (c)(9);

        0

      27. Revising paragraphs (d)(5), (h), (k)(1), (l) introductory text, (l)(2) introductory text, (l)(2)(i), (l)(3) introductory text, (m) introductory text, (n) introductory text, (n)(1) through (5), (n)(8) introductory text, and (n)(8)(ii);

        0

      28. Adding paragraphs (n)(8)(vii) and (viii);

        0

      29. Revising paragraph (n)(9)(i);

        0

      30. Adding paragraph (n)(10);

        0

      31. Revising paragraph (o)(2)(i) introductory text;

        0

      32. Adding paragraph (o)(2)(i)(D);

        0

      33. Revising paragraph (o)(2)(ii) introductory text; and

        0

      34. Adding paragraphs (o)(2)(ii)(C) and (s).

        The revisions and additions read as follows:

        Sec. 63.640 Applicability and designation of affected source.

        (a) This subpart applies to petroleum refining process units and to related emissions points that are specified in paragraphs (c)(1) through (9) of this section that are located at a plant site and that meet the criteria in paragraphs (a)(1) and (2) of this section:

        * * * * *

        (c) For the purposes of this subpart, the affected source shall comprise all emissions points, in combination, listed in paragraphs (c)(1) through (9) of this section that are located at a single refinery plant site.

        * * * * *

        (9) All releases associated with the decoking operations of a delayed coking unit, as defined in this subpart.

        (d) * * *

        (5) Emission points routed to a fuel gas system, as defined in Sec. 63.641, provided that on and after January 30, 2019, any flares receiving gas from that fuel gas system are subject to Sec. 63.670. No other testing, monitoring, recordkeeping, or reporting is required for refinery fuel gas systems or emission points routed to refinery fuel gas systems.

        * * * * *

        (h) Sources subject to this subpart are required to achieve compliance on or before the dates specified in table 11 of this subpart, except as provided in paragraphs (h)(1) through (3) of this section.

        (1) Marine tank vessels at existing sources shall be in compliance with this subpart, except for Sec. Sec. 63.657 through 63.660, no later than August 18, 1999, unless the vessels are included in an emissions average to generate emission credits. Marine tank vessels used to generate credits in an emissions average shall be in compliance with this subpart no later than August 18, 1998, unless an extension has been granted by the Administrator as provided in Sec. 63.6(i).

        (2) Existing Group 1 floating roof storage vessels meeting the applicability criteria in item 1 of the definition of Group 1 storage vessel shall be in compliance with Sec. 63.646 at the first degassing and cleaning activity after August 18, 1998, or August 18, 2005, whichever is first.

        Page 75238

        (3) An owner or operator may elect to comply with the provisions of Sec. 63.648(c) through (i) as an alternative to the provisions of Sec. 63.648(a) and (b). In such cases, the owner or operator shall comply no later than the dates specified in paragraphs (h)(3)(i) through (iii) of this section.

        (i) Phase I (see table 2 of this subpart), beginning on August 18, 1998;

        (ii) Phase II (see table 2 of this subpart), beginning no later than August 18, 1999; and

        (iii) Phase III (see table 2 of this subpart), beginning no later than February 18, 2001.

        * * * * *

        (k) * * *

        (1) The reconstructed source, addition, or change shall be in compliance with the new source requirements in item (1), (2), or (3) of table 11 of this subpart, as applicable, upon initial startup of the reconstructed source or by August 18, 1995, whichever is later; and

        * * * * *

        (l) If an additional petroleum refining process unit is added to a plant site or if a miscellaneous process vent, storage vessel, gasoline loading rack, marine tank vessel loading operation, heat exchange system, or decoking operation that meets the criteria in paragraphs (c)(1) through (9) of this section is added to an existing petroleum refinery or if another deliberate operational process change creating an additional Group 1 emissions point(s) (as defined in Sec. 63.641) is made to an existing petroleum refining process unit, and if the addition or process change is not subject to the new source requirements as determined according to paragraph (i) or (j) of this section, the requirements in paragraphs (l)(1) through (4) of this section shall apply. Examples of process changes include, but are not limited to, changes in production capacity, or feed or raw material where the change requires construction or physical alteration of the existing equipment or catalyst type, or whenever there is replacement, removal, or addition of recovery equipment. For purposes of this paragraph (l) and paragraph (m) of this section, process changes do not include: Process upsets, unintentional temporary process changes, and changes that are within the equipment configuration and operating conditions documented in the Notification of Compliance Status report required by Sec. 63.655(f).

        * * * * *

        (2) The added emission point(s) and any emission point(s) within the added or changed petroleum refining process unit shall be in compliance with the applicable requirements in item (4) of table 11 of this subpart by the dates specified in paragraph (l)(2)(i) or (ii) of this section.

        (i) If a petroleum refining process unit is added to a plant site or an emission point(s) is added to any existing petroleum refining process unit, the added emission point(s) shall be in compliance upon initial startup of any added petroleum refining process unit or emission point(s) or by the applicable compliance date in item (4) of table 11 of this subpart, whichever is later.

        * * * * *

        (3) The owner or operator of a petroleum refining process unit or of a storage vessel, miscellaneous process vent, wastewater stream, gasoline loading rack, marine tank vessel loading operation, heat exchange system, or decoking operation meeting the criteria in paragraphs (c)(1) through (9) of this section that is added to a plant site and is subject to the requirements for existing sources shall comply with the reporting and recordkeeping requirements that are applicable to existing sources including, but not limited to, the reports listed in paragraphs (l)(3)(i) through (vii) of this section. A process change to an existing petroleum refining process unit shall be subject to the reporting requirements for existing sources including, but not limited to, the reports listed in paragraphs (l)(3)(i) through (vii) of this section. The applicable reports include, but are not limited to:

        * * * * *

        (m) If a change that does not meet the criteria in paragraph (l) of this section is made to a petroleum refining process unit subject to this subpart, and the change causes a Group 2 emission point to become a Group 1 emission point (as defined in Sec. 63.641), then the owner or operator shall comply with the applicable requirements of this subpart for existing sources, as specified in item (4) of table 11 of this subpart, for the Group 1 emission point as expeditiously as practicable, but in no event later than 3 years after the emission point becomes Group 1.

        * * * * *

        (n) Overlap of this subpart with other regulations for storage vessels. As applicable, paragraphs (n)(1), (3), (4), (6), and (7) of this section apply for Group 2 storage vessels and paragraphs (n)(2) and (5) of this section apply for Group 1 storage vessels.

        (1) After the compliance dates specified in paragraph (h) of this section, a Group 2 storage vessel that is subject to the provisions of 40 CFR part 60, subpart Kb, is required to comply only with the requirements of 40 CFR part 60, subpart Kb, except as provided in paragraph (n)(8) of this section. After the compliance dates specified in paragraph (h) of this section, a Group 2 storage vessel that is subject to the provisions of 40 CFR part 61, subpart Y, is required to comply only with the requirements of 40 CFR part 61, subpart Y, except as provided in paragraph (n)(10) of this section.

        (2) After the compliance dates specified in paragraph (h) of this section, a Group 1 storage vessel that is also subject to 40 CFR part 60, subpart Kb, is required to comply only with either 40 CFR part 60, subpart Kb, except as provided in paragraph (n)(8) of this section or this subpart. After the compliance dates specified in paragraph (h) of this section, a Group 1 storage vessel that is also subject to 40 CFR part 61, subpart Y, is required to comply only with either 40 CFR part 61, subpart Y, except as provided in paragraph (n)(10) of this section or this subpart.

        (3) After the compliance dates specified in paragraph (h) of this section, a Group 2 storage vessel that is part of a new source and is subject to 40 CFR 60.110b, but is not required to apply controls by 40 CFR 60.110b or 60.112b, is required to comply only with this subpart.

        (4) After the compliance dates specified in paragraph (h) of this section, a Group 2 storage vessel that is part of a new source and is subject to 40 CFR 61.270, but is not required to apply controls by 40 CFR 61.271, is required to comply only with this subpart.

        (5) After the compliance dates specified in paragraph (h) of this section, a Group 1 storage vessel that is also subject to the provisions of 40 CFR part 60, subpart K or Ka, is required to only comply with the provisions of this subpart.

        * * * * *

        (8) Storage vessels described by paragraph (n)(1) of this section are to comply with 40 CFR part 60, subpart Kb, except as provided in paragraphs (n)(8)(i) through (vi) of this section. Storage vessels described by paragraph (n)(2) electing to comply with part 60, subpart Kb of this chapter shall comply with subpart Kb except as provided in paragraphs (n)(8)(i) through (viii) of this section.

        * * * * *

        (ii) If the owner or operator determines that it is unsafe to perform the seal gap measurements required in Sec. 60.113b(b) of this chapter or to inspect the vessel to determine compliance with

        Page 75239

        Sec. 60.113b(a) of this chapter because the roof appears to be structurally unsound and poses an imminent danger to inspecting personnel, the owner or operator shall comply with the requirements in either Sec. 63.120(b)(7)(i) or (ii) of subpart G (only up to the compliance date specified in paragraph (h) of this section for compliance with Sec. 63.660, as applicable) or either Sec. 63.1063(c)(2)(iv)(A) or (B) of subpart WW.

        * * * * *

        (vii) To be in compliance with Sec. 60.112b(a)(1)(iv) or (a)(2)(ii) of this chapter, guidepoles in floating roof storage vessels must be equipped with covers and/or controls (e.g., pole float system, pole sleeve system, internal sleeve system or flexible enclosure system) as appropriate to comply with the ``no visible gap'' requirement.

        (viii) If a flare is used as a control device for a storage vessel, on and after January 30, 2019, the owner or operator must meet the requirements of Sec. 63.670 instead of the requirements referenced from part 60, subpart Kb of this chapter for that flare.

        (9) * * *

        (i) If the owner or operator determines that it is unsafe to perform the seal gap measurements required in Sec. 60.113a(a)(1) of this chapter because the floating roof appears to be structurally unsound and poses an imminent danger to inspecting personnel, the owner or operator shall comply with the requirements in either Sec. 63.120(b)(7)(i) or (ii) of subpart G (only up to the compliance date specified in paragraph (h) of this section for compliance with Sec. 63.660, as applicable) or either Sec. 63.1063(c)(2)(iv)(A) or (B) of subpart WW.

        * * * * *

        (10) Storage vessels described by paragraph (n)(1) of this section are to comply with 40 CFR part 61, subpart Y, except as provided in paragraphs (n)(10)(i) through (vi) of this section. Storage vessels described by paragraph (n)(2) electing to comply with 40 CFR part 61, subpart Y, shall comply with subpart Y except as provided for in paragraphs (n)(10)(i) through (viii) of this section.

        (i) Storage vessels that are to comply with Sec. 61.271(b) of this chapter are exempt from the secondary seal requirements of Sec. 61.271(b)(2)(ii) of this chapter during the gap measurements for the primary seal required by Sec. 61.272(b) of this chapter.

        (ii) If the owner or operator determines that it is unsafe to perform the seal gap measurements required in Sec. 61.272(b) of this chapter or to inspect the vessel to determine compliance with Sec. 61.272(a) of this chapter because the roof appears to be structurally unsound and poses an imminent danger to inspecting personnel, the owner or operator shall comply with the requirements in either Sec. 63.120(b)(7)(i) or (ii) of subpart G (only up to the compliance date specified in paragraph (h) of this section for compliance with Sec. 63.660, as applicable) or either Sec. 63.1063(c)(2)(iv)(A) or (B) of subpart WW.

        (iii) If a failure is detected during the inspections required by Sec. 61.272(a)(2) of this chapter or during the seal gap measurements required by Sec. 61.272(b)(1) of this chapter, and the vessel cannot be repaired within 45 days and the vessel cannot be emptied within 45 days, the owner or operator may utilize up to two extensions of up to 30 additional calendar days each. The owner or operator is not required to provide a request for the extension to the Administrator.

        (iv) If an extension is utilized in accordance with paragraph (n)(10)(iii) of this section, the owner or operator shall, in the next periodic report, identify the vessel, provide the information listed in Sec. 61.272(a)(2) or (b)(4)(iii) of this chapter, and describe the nature and date of the repair made or provide the date the storage vessel was emptied.

        (v) Owners and operators of storage vessels complying with 40 CFR part 61, subpart Y, may submit the inspection reports required by Sec. 61.275(a), (b)(1), and (d) of this chapter as part of the periodic reports required by this subpart, rather than within the 60-day period specified in Sec. 61.275(a), (b)(1), and (d) of this chapter.

        (vi) The reports of rim seal inspections specified in Sec. 61.275(d) of this chapter are not required if none of the measured gaps or calculated gap areas exceed the limitations specified in Sec. 61.272(b)(4) of this chapter. Documentation of the inspections shall be recorded as specified in Sec. 61.276(a) of this chapter.

        (vii) To be in compliance with Sec. 61.271(a)(6) or (b)(3) of this chapter, guidepoles in floating roof storage vessels must be equipped with covers and/or controls (e.g., pole float system, pole sleeve system, internal sleeve system or flexible enclosure system) as appropriate to comply with the ``no visible gap'' requirement.

        (viii) If a flare is used as a control device for a storage vessel, on and after January 30, 2019, the owner or operator must meet the requirements of Sec. 63.670 instead of the requirements referenced from part 61, subpart Y of this chapter for that flare.

        (o) * * *

        (2) * * *

        (i) Comply with paragraphs (o)(2)(i)(A) through (D) of this section.

        * * * * *

        (D) If a flare is used as a control device, on and after January 30, 2019, the flare shall meet the requirements of Sec. 63.670. Prior to January 30, 2019, the flare shall meet the applicable requirements of 40 CFR part 61, subpart FF, and subpart G of this part, or the requirements of Sec. 63.670.

        (ii) Comply with paragraphs (o)(2)(ii)(A) through (C) of this section.

        * * * * *

        (C) If a flare is used as a control device, on and after January 30, 2019, the flare shall meet the requirements of Sec. 63.670. Prior to January 30, 2019, the flare shall meet the applicable requirements of 40 CFR part 61, subpart FF, and subpart G of this part, or the requirements of Sec. 63.670.

        * * * * *

        (s) Overlap of this subpart with other regulation for flares. On January 30, 2019, flares that are subject to the provisions of 40 CFR 60.18 or 63.11 and subject to this subpart are required to comply only with the provisions specified in this subpart. Prior to January 30, 2019, flares that are subject to the provisions of 40 CFR 60.18 or 63.11 and elect to comply with the requirements in Sec. Sec. 63.670 and 63.671 are required to comply only with the provisions specified in this subpart.

        0

        14. Section 63.641 is amended by:

        0

      35. Adding, in alphabetical order, definitions of ``Assist air,'' ``Assist steam,'' ``Center steam,'' ``Closed blowdown system,'' ``Combustion zone,'' ``Combustion zone gas,'' ``Decoking operations,'' ``Delayed coking unit,'' ``Flare,'' ``Flare purge gas,'' ``Flare supplemental gas,'' ``Flare sweep gas,'' ``Flare vent gas,'' ``Flexible enclosure device,'' ``Force majeure event,'' ``Lower steam,'' ``Net heating value,'' ``Perimeter assist air,'' ``Pilot gas,'' ``Premix assist air,'' ``Regulated material,'' ``Thermal expansion relief valve,'' ``Total steam,'' and ``Upper steam''; and

        0

      36. Revising the definitions of ``Delayed coker vent,'' ``Emission point,'' ``Group 1 storage vessel,'' ``Miscellaneous process vent,'' ``Periodically discharged,'' and ``Reference control technology for storage vessels.''

        The revisions and additions read as follows:

        Sec. 63.641 Definitions.

        * * * * *

        Assist air means all air that intentionally is introduced prior to or at

        Page 75240

        a flare tip through nozzles or other hardware conveyance for the purposes including, but not limited to, protecting the design of the flare tip, promoting turbulence for mixing or inducing air into the flame. Assist air includes premix assist air and perimeter assist air. Assist air does not include the surrounding ambient air.

        Assist steam means all steam that intentionally is introduced prior to or at a flare tip through nozzles or other hardware conveyance for the purposes including, but not limited to, protecting the design of the flare tip, promoting turbulence for mixing or inducing air into the flame. Assist steam includes, but is not necessarily limited to, center steam, lower steam and upper steam.

        * * * * *

        Center steam means the portion of assist steam introduced into the stack of a flare to reduce burnback.

        Closed blowdown system means a system used for depressuring process vessels that is not open to the atmosphere and is configured of piping, ductwork, connections, accumulators/knockout drums, and, if necessary, flow inducing devices that transport gas or vapor from process vessel to a control device or back into the process.

        * * * * *

        Combustion zone means the area of the flare flame where the combustion zone gas combines for combustion.

        Combustion zone gas means all gases and vapors found just after a flare tip. This gas includes all flare vent gas, total steam, and premix air.

        * * * * *

        Decoking operations means the sequence of steps conducted at the end of the delayed coking unit's cooling cycle to open the coke drum to the atmosphere in order to remove coke from the coke drum. Decoking operations begin at the end of the cooling cycle when steam released from the coke drum is no longer discharged via the unit's blowdown system but instead is vented directly to the atmosphere. Decoking operations include atmospheric depressuring (venting), deheading, draining, and decoking (coke cutting).

        Delayed coker vent means a miscellaneous process vent that contains uncondensed vapors from the delayed coking unit's blowdown system. Venting from the delayed coker vent is typically intermittent in nature, and occurs primarily during the cooling cycle of a delayed coking unit coke drum when vapor from the coke drums cannot be sent to the fractionator column for product recovery. The emissions from the decoking operations, which include direct atmospheric venting, deheading, draining, or decoking (coke cutting), are not considered to be delayed coker vents.

        Delayed coking unit means a refinery process unit in which high molecular weight petroleum derivatives are thermally cracked and petroleum coke is produced in a series of closed, batch system reactors. A delayed coking unit includes, but is not limited to, all of the coke drums associated with a single fractionator; the fractionator, including the bottoms receiver and the overhead condenser; the coke drum cutting water and quench system, including the jet pump and coker quench water tank; and the coke drum blowdown recovery compressor system.

        * * * * *

        Emission point means an individual miscellaneous process vent, storage vessel, wastewater stream, equipment leak, decoking operation or heat exchange system associated with a petroleum refining process unit; an individual storage vessel or equipment leak associated with a bulk gasoline terminal or pipeline breakout station classified under Standard Industrial Classification code 2911; a gasoline loading rack classified under Standard Industrial Classification code 2911; or a marine tank vessel loading operation located at a petroleum refinery.

        * * * * *

        Flare means a combustion device lacking an enclosed combustion chamber that uses an uncontrolled volume of ambient air to burn gases. For the purposes of this rule, the definition of flare includes, but is not necessarily limited to, air-assisted flares, steam-assisted flares and non-assisted flares.

        Flare purge gas means gas introduced between a flare header's water seal and the flare tip to prevent oxygen infiltration (backflow) into the flare tip. For a flare with no water seal, the function of flare purge gas is performed by flare sweep gas and, therefore, by definition, such a flare has no flare purge gas.

        Flare supplemental gas means all gas introduced to the flare in order to improve the combustible characteristics of combustion zone gas.

        Flare sweep gas means, for a flare with a flare gas recovery system, the gas intentionally introduced into the flare header system to maintain a constant flow of gas through the flare header in order to prevent oxygen buildup in the flare header; flare sweep gas in these flares is introduced prior to and recovered by the flare gas recovery system. For a flare without a flare gas recovery system, flare sweep gas means the gas intentionally introduced into the flare header system to maintain a constant flow of gas through the flare header and out the flare tip in order to prevent oxygen buildup in the flare header and to prevent oxygen infiltration (backflow) into the flare tip.

        Flare vent gas means all gas found just prior to the flare tip. This gas includes all flare waste gas (i.e., gas from facility operations that is directed to a flare for the purpose of disposing of the gas), that portion of flare sweep gas that is not recovered, flare purge gas and flare supplemental gas, but does not include pilot gas, total steam or assist air.

        Flexible enclosure device means a seal made of an elastomeric fabric (or other material) which completely encloses a slotted guidepole or ladder and eliminates the vapor emission pathway from inside the storage vessel through the guidepole slots or ladder slots to the outside air.

        * * * * *

        Force majeure event means a release of HAP, either directly to the atmosphere from a relief valve or discharged via a flare, that is demonstrated to the satisfaction of the Administrator to result from an event beyond the refinery owner or operator's control, such as natural disasters; acts of war or terrorism; loss of a utility external to the refinery (e.g., external power curtailment), excluding power curtailment due to an interruptible service agreement; and fire or explosion originating at a near or adjoining facility outside of the refinery owner or operator's control that impacts the refinery's ability to operate.

        * * * * *

        Group 1 storage vessel means:

        (1) Prior to February 1, 2016:

        (i) A storage vessel at an existing source that has a design capacity greater than or equal to 177 cubic meters and stored-liquid maximum true vapor pressure greater than or equal to 10.4 kilopascals and stored-liquid annual average true vapor pressure greater than or equal to 8.3 kilopascals and annual average HAP liquid concentration greater than 4 percent by weight total organic HAP;

        (ii) A storage vessel at a new source that has a design storage capacity greater than or equal to 151 cubic meters and stored-liquid maximum true vapor pressure greater than or equal to 3.4 kilopascals and annual average HAP liquid concentration greater than 2 percent by weight total organic HAP; or

        (iii) A storage vessel at a new source that has a design storage capacity greater than or equal to 76 cubic meters and less than 151 cubic meters and stored-

        Page 75241

        liquid maximum true vapor pressure greater than or equal to 77 kilopascals and annual average HAP liquid concentration greater than 2 percent by weight total organic HAP.

        (2) On and after February 1, 2016:

        (i) A storage vessel at an existing source that has a design capacity greater than or equal to 151 cubic meters (40,000 gallons) and stored-liquid maximum true vapor pressure greater than or equal to 5.2 kilopascals (0.75 pounds per square inch) and annual average HAP liquid concentration greater than 4 percent by weight total organic HAP;

        (ii) A storage vessel at an existing source that has a design storage capacity greater than or equal to 76 cubic meters (20,000 gallons) and less than 151 cubic meters (40,000 gallons) and stored-

        liquid maximum true vapor pressure greater than or equal to 13.1 kilopascals (1.9 pounds per square inch) and annual average HAP liquid concentration greater than 4 percent by weight total organic HAP;

        (iii) A storage vessel at a new source that has a design storage capacity greater than or equal to 151 cubic meters (40,000 gallons) and stored-liquid maximum true vapor pressure greater than or equal to 3.4 kilopascals (0.5 pounds per square inch) and annual average HAP liquid concentration greater than 2 percent by weight total organic HAP; or

        (iv) A storage vessel at a new source that has a design storage capacity greater than or equal to 76 cubic meters (20,000 gallons) and less than 151 cubic meters (40,000 gallons) and stored-liquid maximum true vapor pressure greater than or equal to 13.1 kilopascals (1.9 pounds per square inch) and annual average HAP liquid concentration greater than 2 percent by weight total organic HAP.

        * * * * *

        Lower steam means the portion of assist steam piped to an exterior annular ring near the lower part of a flare tip, which then flows through tubes to the flare tip, and ultimately exits the tubes at the flare tip.

        * * * * *

        Miscellaneous process vent means a gas stream containing greater than 20 parts per million by volume organic HAP that is continuously or periodically discharged from a petroleum refining process unit meeting the criteria specified in Sec. 63.640(a). Miscellaneous process vents include gas streams that are discharged directly to the atmosphere, gas streams that are routed to a control device prior to discharge to the atmosphere, or gas streams that are diverted through a product recovery device prior to control or discharge to the atmosphere. Miscellaneous process vents include vent streams from: Caustic wash accumulators, distillation tower condensers/accumulators, flash/knockout drums, reactor vessels, scrubber overheads, stripper overheads, vacuum pumps, steam ejectors, hot wells, high point bleeds, wash tower overheads, water wash accumulators, blowdown condensers/accumulators, and delayed coker vents. Miscellaneous process vents do not include:

        (1) Gaseous streams routed to a fuel gas system, provided that on and after January 30, 2019, any flares receiving gas from the fuel gas system are in compliance with Sec. 63.670;

        (2) Pressure relief device discharges;

        (3) Leaks from equipment regulated under Sec. 63.648;

        (4) Reserved

        (5) In situ sampling systems (onstream analyzers) until January 30, 2019. After this date, these sampling systems will be included in the definition of miscellaneous process vents;

        (6) Catalytic cracking unit catalyst regeneration vents;

        (7) Catalytic reformer regeneration vents;

        (8) Sulfur plant vents;

        (9) Vents from control devices such as scrubbers, boilers, incinerators, and electrostatic precipitators applied to catalytic cracking unit catalyst regeneration vents, catalytic reformer regeneration vents, and sulfur plant vents;

        (10) Vents from any stripping operations applied to comply with the wastewater provisions of this subpart, subpart G of this part, or 40 CFR part 61, subpart FF;

        (11) Emissions associated with delayed coking unit decoking operations;

        (12) Vents from storage vessels;

        (13) Emissions from wastewater collection and conveyance systems including, but not limited to, wastewater drains, sewer vents, and sump drains; and

        (14) Hydrogen production plant vents through which carbon dioxide is removed from process streams or through which steam condensate produced or treated within the hydrogen plant is degassed or deaerated.

        Net heating value means the energy released as heat when a compound undergoes complete combustion with oxygen to form gaseous carbon dioxide and gaseous water (also referred to as lower heating value).

        * * * * *

        Perimeter assist air means the portion of assist air introduced at the perimeter of the flare tip or above the flare tip. Perimeter assist air includes air intentionally entrained in lower and upper steam. Perimeter assist air includes all assist air except premix assist air.

        Periodically discharged means discharges that are intermittent and associated with routine operations, maintenance activities, startups, shutdowns, malfunctions, or process upsets.

        * * * * *

        Pilot gas means gas introduced into a flare tip that provides a flame to ignite the flare vent gas.

        * * * * *

        Premix assist air means the portion of assist air that is introduced to the flare vent gas, whether injected or induced, prior to the flare tip. Premix assist air also includes any air intentionally entrained in center steam.

        * * * * *

        Reference control technology for storage vessels means either:

        (1) For Group 1 storage vessels complying with Sec. 63.660:

        (i) An internal floating roof, including an external floating roof converted to an internal floating roof, meeting the specifications of Sec. 63.1063(a)(1)(i) and (b);

        (ii) An external floating roof meeting the specifications of Sec. 63.1063(a)(1)(ii), (a)(2), and (b); or

        (iii) Reserved

        (iv) A closed-vent system to a control device that reduces organic HAP emissions by 95 percent, or to an outlet concentration of 20 parts per million by volume (ppmv).

        (v) For purposes of emissions averaging, these four technologies are considered equivalent.

        (2) For all other storage vessels:

        (i) An internal floating roof meeting the specifications of Sec. 63.119(b) of subpart G except for Sec. 63.119(b)(5) and (6);

        (ii) An external floating roof meeting the specifications of Sec. 63.119(c) of subpart G except for Sec. 63.119(c)(2);

        (iii) An external floating roof converted to an internal floating roof meeting the specifications of Sec. 63.119(d) of subpart G except for Sec. 63.119(d)(2); or

        (iv) A closed-vent system to a control device that reduces organic HAP emissions by 95 percent, or to an outlet concentration of 20 parts per million by volume.

        (v) For purposes of emissions averaging, these four technologies are considered equivalent.

        * * * * *

        Regulated material means any stream associated with emission sources listed

        Page 75242

        in Sec. 63.640(c) required to meet control requirements under this subpart as well as any stream for which this subpart or a cross-

        referencing subpart specifies that the requirements for flare control devices in Sec. 63.670 must be met.

        * * * * *

        Thermal expansion relief valve means a pressure relief valve designed to protect equipment from excess pressure due to thermal expansion of blocked liquid-filled equipment or piping due to ambient heating or heat from a heat tracing system. Pressure relief valves designed to protect equipment from excess pressure due to blockage against a pump or compressor or due to fire contingency are not thermal expansion relief valves.

        * * * * *

        Total steam means the total of all steam that is supplied to a flare and includes, but is not limited to, lower steam, center steam and upper steam.

        Upper steam means the portion of assist steam introduced via nozzles located on the exterior perimeter of the upper end of the flare tip.

        * * * * *

        0

        15. Section 63.642 is amended by:

        0

      37. Adding paragraph (b);

        0

      38. Revising paragraphs (d)(3), (e), (i), (k) introductory text, (k)(1), (l) introductory text, and (l)(2); and

        0

      39. Adding paragraph (n).

        The revisions and additions read as follows:

        Sec. 63.642 General standards.

        * * * * *

        (b) The emission standards set forth in this subpart shall apply at all times.

        * * * * *

        (d) * * *

        (3) Performance tests shall be conducted according to the provisions of Sec. 63.7(e) except that performance tests shall be conducted at maximum representative operating capacity for the process. During the performance test, an owner or operator shall operate the control device at either maximum or minimum representative operating conditions for monitored control device parameters, whichever results in lower emission reduction. An owner or operator shall not conduct a performance test during startup, shutdown, periods when the control device is bypassed or periods when the process, monitoring equipment or control device is not operating properly. The owner/operator may not conduct performance tests during periods of malfunction. The owner or operator must record the process information that is necessary to document operating conditions during the test and include in such record an explanation to support that the test was conducted at maximum representative operating capacity. Upon request, the owner or operator shall make available to the Administrator such records as may be necessary to determine the conditions of performance tests.

        * * * * *

        (e) All applicable records shall be maintained as specified in Sec. 63.655(i).

        * * * * *

        (i) The owner or operator of an existing source shall demonstrate compliance with the emission standard in paragraph (g) of this section by following the procedures specified in paragraph (k) of this section for all emission points, or by following the emissions averaging compliance approach specified in paragraph (l) of this section for specified emission points and the procedures specified in paragraph (k)(1) of this section.

        * * * * *

        (k) The owner or operator of an existing source may comply, and the owner or operator of a new source shall comply, with the applicable provisions in Sec. Sec. 63.643 through 63.645, 63.646 or 63.660, 63.647, 63.650, and 63.651, as specified in Sec. 63.640(h).

        (1) The owner or operator using this compliance approach shall also comply with the requirements of Sec. Sec. 63.648 and/or 63.649, 63.654, 63.655, 63.657, 63.658, 63.670 and 63.671, as applicable.

        * * * * *

        (l) The owner or operator of an existing source may elect to control some of the emission points within the source to different levels than specified under Sec. Sec. 63.643 through 63.645, 63.646 or 63.660, 63.647, 63.650, and 63.651, as applicable according to Sec. 63.640(h), by using an emissions averaging compliance approach as long as the overall emissions for the source do not exceed the emission level specified in paragraph (g) of this section. The owner or operator using emissions averaging shall meet the requirements in paragraphs (l)(1) and (2) of this section.

        * * * * *

        (2) Comply with the requirements of Sec. Sec. 63.648 and/or 63.649, 63.654, 63.652, 63.653, 63.655, 63.657, 63.658, 63.670 and 63.671, as applicable.

        * * * * *

        (n) At all times, the owner or operator must operate and maintain any affected source, including associated air pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution control practices for minimizing emissions. The general duty to minimize emissions does not require the owner operator to make any further efforts to reduce emissions if levels required by the applicable standard have been achieved. Determination of whether a source is operating in compliance with operation and maintenance requirements will be based on information available to the Administrator which may include, but is not limited to, monitoring results, review of operation and maintenance procedures, review of operation and maintenance records, and inspection of the source.

        0

        16. Section 63.643 is amended by revising paragraphs (a) introductory text and (a)(1) and adding paragraph (c) to read as follows:

        Sec. 63.643 Miscellaneous process vent provisions.

        (a) The owner or operator of a Group 1 miscellaneous process vent as defined in Sec. 63.641 shall comply with the requirements of either paragraph (a)(1) or (2) of this section or, if applicable, paragraph (c) of this section. The owner or operator of a miscellaneous process vent that meets the conditions in paragraph (c) of this section is only required to comply with the requirements of paragraph (c) of this section and Sec. 63.655(g)(13) and (i)(12) for that vent.

        (1) Reduce emissions of organic HAP's using a flare. On and after January 30, 2019, the flare shall meet the requirements of Sec. 63.670. Prior to January 30, 2019, the flare shall meet the requirements of Sec. 63.11(b) of subpart A or the requirements of Sec. 63.670.

        * * * * *

        (c) An owner or operator may designate a process vent as a maintenance vent if the vent is only used as a result of startup, shutdown, maintenance, or inspection of equipment where equipment is emptied, depressurized, degassed or placed into service. The owner of operator does not need to designate a maintenance vent as a Group 1 or Group 2 miscellaneous process vent. The owner or operator must comply with the applicable requirements in paragraphs (c)(1) through (3) of this section for each maintenance vent.

        (1) Prior to venting to the atmosphere, process liquids are removed from the equipment as much as practical and the equipment is depressured to a control device, fuel gas system, or back to the process until one of the following conditions, as applicable, is met.

        (i) The vapor in the equipment served by the maintenance vent has a lower

        Page 75243

        explosive limit (LEL) of less than 10 percent.

        (ii) If there is no ability to measure the LEL of the vapor in the equipment based on the design of the equipment, the pressure in the equipment served by the maintenance vent is reduced to 5 psig or less. Upon opening the maintenance vent, active purging of the equipment cannot be used until the LEL of the vapors in the maintenance vent (or inside the equipment if the maintenance is a hatch or similar type of opening) equipment is less than 10 percent.

        (iii) The equipment served by the maintenance vent contains less than 72 pounds of VOC.

        (iv) If the maintenance vent is associated with equipment containing pyrophoric catalyst (e.g., hydrotreaters and hydrocrackers) at refineries that do not have a pure hydrogen supply, the LEL of the vapor in the equipment must be less than 20 percent, except for one event per year not to exceed 35 percent.

        (2) Except for maintenance vents complying with the alternative in paragraph (c)(1)(iii) of this section, the owner or operator must determine the LEL or, if applicable, equipment pressure using process instrumentation or portable measurement devices and follow procedures for calibration and maintenance according to manufacturer's specifications.

        (3) For maintenance vents complying with the alternative in paragraph (c)(1)(iii) of this section, the owner or operator shall determine mass of VOC in the equipment served by the maintenance vent based on the equipment size and contents after considering any contents drained or purged from the equipment. Equipment size may be determined from equipment design specifications. Equipment contents may be determined using process knowledge.

        0

        17. Section 63.644 is amended by revising paragraphs (a) introductory text, (a)(2), and (c) to read as follows:

        Sec. 63.644 Monitoring provisions for miscellaneous process vents.

        (a) Except as provided in paragraph (b) of this section, each owner or operator of a Group 1 miscellaneous process vent that uses a combustion device to comply with the requirements in Sec. 63.643(a) shall install the monitoring equipment specified in paragraph (a)(1), (2), (3), or (4) of this section, depending on the type of combustion device used. All monitoring equipment shall be installed, calibrated, maintained, and operated according to manufacturer's specifications or other written procedures that provide adequate assurance that the equipment will monitor accurately and, except for CPMS installed for pilot flame monitoring, must meet the applicable minimum accuracy, calibration and quality control requirements specified in table 13 of this subpart.

        * * * * *

        (2) Where a flare is used prior to January 30, 2019, a device (including but not limited to a thermocouple, an ultraviolet beam sensor, or an infrared sensor) capable of continuously detecting the presence of a pilot flame is required, or the requirements of Sec. 63.670 shall be met. Where a flare is used on and after January 30, 2019, the requirements of Sec. 63.670 shall be met.

        * * * * *

        (c) The owner or operator of a Group 1 miscellaneous process vent using a vent system that contains bypass lines that could divert a vent stream away from the control device used to comply with paragraph (a) of this section either directly to the atmosphere or to a control device that does not comply with the requirements in Sec. 63.643(a) shall comply with either paragraph (c)(1) or (2) of this section. Use of the bypass at any time to divert a Group 1 miscellaneous process vent stream to the atmosphere or to a control device that does not comply with the requirements in Sec. 63.643(a) is an emissions standards violation. Equipment such as low leg drains and equipment subject to Sec. 63.648 are not subject to this paragraph (c).

        (1) Install, calibrate and maintain a flow indicator that determines whether a vent stream flow is present at least once every hour. A manual block valve equipped with a valve position indicator may be used in lieu of a flow indicator, as long as the valve position indicator is monitored continuously. Records shall be generated as specified in Sec. 63.655(h) and (i). The flow indicator shall be installed at the entrance to any bypass line that could divert the vent stream away from the control device to the atmosphere; or

        (2) Secure the bypass line valve in the non-diverting position with a car-seal or a lock-and-key type configuration. A visual inspection of the seal or closure mechanism shall be performed at least once every month to ensure that the valve is maintained in the non-diverting position and that the vent stream is not diverted through the bypass line.

        * * * * *

        0

        18. Section 63.645 is amended by revising paragraphs (e)(1) and (f)(2) to read as follows:

        Sec. 63.645 Test methods and procedures for miscellaneous process vents.

        * * * * *

        (e) * * *

        (1) Methods 1 or 1A of 40 CFR part 60, appendix A-1, as appropriate, shall be used for selection of the sampling site. For vents smaller than 0.10 meter in diameter, sample at the center of the vent.

        * * * * *

        (f) * * *

        (2) The gas volumetric flow rate shall be determined using Methods 2, 2A, 2C, 2D, or 2F of 40 CFR part 60, appendix A-1 or Method 2G of 40 CFR part 60, appendix A-2, as appropriate.

        * * * * *

        0

        19. Section 63.646 is amended by adding introductory text and revising paragraph (b)(2) to read as follows:

        Sec. 63.646 Storage vessel provisions.

        Upon a demonstration of compliance with the standards in Sec. 63.660 by the compliance dates specified in Sec. 63.640(h), the standards in this section shall no longer apply.

        * * * * *

        (b) * * *

        (2) When an owner or operator and the Administrator do not agree on whether the annual average weight percent organic HAP in the stored liquid is above or below 4 percent for a storage vessel at an existing source or above or below 2 percent for a storage vessel at a new source, an appropriate method (based on the type of liquid stored) as published by EPA or a consensus-based standards organization shall be used. Consensus-based standards organizations include, but are not limited to, the following: ASTM International (100 Barr Harbor Drive, P.O. Box CB700, West Conshohocken, Pennsylvania 19428-B2959, (800) 262-

        1373, http://www.astm.org), the American National Standards Institute (ANSI, 1819 L Street NW., 6th floor, Washington, DC 20036, (202) 293-

        8020, http://www.ansi.org), the American Gas Association (AGA, 400 North Capitol Street NW., 4th Floor, Washington, DC 20001, (202) 824-

        7000, http://www.aga.org), the American Society of Mechanical Engineers (ASME, Three Park Avenue, New York, NY 10016-5990, (800) 843-2763, http://www.asme.org), the American Petroleum Institute (API, 1220 L Street NW., Washington, DC 20005-4070, (202) 682-8000, http://www.api.org), and the North American Energy Standards Board (NAESB, 801 Travis Street, Suite 1675, Houston, TX 77002, (713) 356-0060, http://www.naesb.org).

        * * * * *

        Page 75244

        0

        20. Section 63.647 is amended by:

        0

      40. Revising paragraph (a);

        0

      41. Redesignating paragraph (c) as paragraph (d); and

        0

      42. Adding paragraph (c).

        The revisions and additions read as follows:

        Sec. 63.647 Wastewater provisions.

        (a) Except as provided in paragraphs (b) and (c) of this section, each owner or operator of a Group 1 wastewater stream shall comply with the requirements of Sec. Sec. 61.340 through 61.355 of this chapter for each process wastewater stream that meets the definition in Sec. 63.641.

        * * * * *

        (c) If a flare is used as a control device, on and after January 30, 2019, the flare shall meet the requirements of Sec. 63.670. Prior to January 30, 2019, the flare shall meet the applicable requirements of part 61, subpart FF of this chapter, or the requirements of Sec. 63.670.

        * * * * *

        0

        21. Section 63.648 is amended by:

        0

      43. Adding paragraph (a)(3);

        0

      44. Revising paragraph (c) introductory text; and

        0

      45. Adding paragraphs (c)(11) and (12) and (j).

        The revisions and additions read as follows:

        Sec. 63.648 Equipment leak standards.

        (a) * * *

        (3) If a flare is used as a control device, on and after January 30, 2019, the flare shall meet the requirements of Sec. 63.670. Prior to January 30, 2019, the flare shall meet the applicable requirements of part 60, subpart VV of this chapter, or the requirements of Sec. 63.670.

        * * * * *

        (c) In lieu of complying with the existing source provisions of paragraph (a) in this section, an owner or operator may elect to comply with the requirements of Sec. Sec. 63.161 through 63.169, 63.171, 63.172, 63.175, 63.176, 63.177, 63.179, and 63.180 of subpart H except as provided in paragraphs (c)(1) through (12) and (e) through (i) of this section.

        * * * * *

        (11) Reserved

        (12) If a flare is used as a control device, on and after January 30, 2019, the flare shall meet the requirements of Sec. 63.670. Prior to January 30, 2019, the flare shall meet the applicable requirements of Sec. Sec. 63.172 and 63.180, or the requirements of Sec. 63.670.

        * * * * *

        (j) Except as specified in paragraph (j)(4) of this section, the owner or operator must comply with the requirements specified in paragraphs (j)(1) and (2) of this section for pressure relief devices, such as relief valves or rupture disks, in organic HAP gas or vapor service instead of the pressure relief device requirements of Sec. 60.482-4 or Sec. 63.165, as applicable. Except as specified in paragraphs (j)(4) and (5) of this section, the owner or operator must also comply with the requirements specified in paragraph (j)(3) of this section for all pressure relief devices.

        (1) Operating requirements. Except during a pressure release, operate each pressure relief device in organic HAP gas or vapor service with an instrument reading of less than 500 ppm above background as detected by Method 21 of 40 CFR part 60, appendix A-7.

        (2) Pressure release requirements. For pressure relief devices in organic HAP gas or vapor service, the owner or operator must comply with the applicable requirements in paragraphs (j)(2)(i) through (iii) of this section following a pressure release.

        (i) If the pressure relief device does not consist of or include a rupture disk, conduct instrument monitoring, as specified in Sec. 60.485(b) or Sec. 63.180(c), as applicable, no later than 5 calendar days after the pressure relief device returns to organic HAP gas or vapor service following a pressure release to verify that the pressure relief device is operating with an instrument reading of less than 500 ppm.

        (ii) If the pressure relief device includes a rupture disk, either comply with the requirements in paragraph (j)(2)(i) of this section (not replacing the rupture disk) or install a replacement disk as soon as practicable after a pressure release, but no later than 5 calendar days after the pressure release. The owner or operator must conduct instrument monitoring, as specified in Sec. 60.485(b) or Sec. 63.180(c), as applicable, no later than 5 calendar days after the pressure relief device returns to organic HAP gas or vapor service following a pressure release to verify that the pressure relief device is operating with an instrument reading of less than 500 ppm.

        (iii) If the pressure relief device consists only of a rupture disk, install a replacement disk as soon as practicable after a pressure release, but no later than 5 calendar days after the pressure release. The owner or operator may not initiate startup of the equipment served by the rupture disk until the rupture disc is replaced. The owner or operator must conduct instrument monitoring, as specified in Sec. 60.485(b) or Sec. 63.180(c), as applicable, no later than 5 calendar days after the pressure relief device returns to organic HAP gas or vapor service following a pressure release to verify that the pressure relief device is operating with an instrument reading of less than 500 ppm.

        (3) Pressure release management. Except as specified in paragraphs (j)(4) and (5) of this section, the owner or operator shall comply with the requirements specified in paragraphs (j)(3)(i) through (v) of this section for all pressure relief devices in organic HAP service no later than January 30, 2019.

        (i) The owner or operator must equip each affected pressure relief device with a device(s) or use a monitoring system that is capable of:

        (A) Identifying the pressure release;

        (B) Recording the time and duration of each pressure release; and

        (C) Notifying operators immediately that a pressure release is occurring. The device or monitoring system may be either specific to the pressure relief device itself or may be associated with the process system or piping, sufficient to indicate a pressure release to the atmosphere. Examples of these types of devices and systems include, but are not limited to, a rupture disk indicator, magnetic sensor, motion detector on the pressure relief valve stem, flow monitor, or pressure monitor.

        (ii) The owner or operator must apply at least three redundant prevention measures to each affected pressure relief device and document these measures. Examples of prevention measures include:

        (A) Flow, temperature, level and pressure indicators with deadman switches, monitors, or automatic actuators.

        (B) Documented routine inspection and maintenance programs and/or operator training (maintenance programs and operator training may count as only one redundant prevention measure).

        (C) Inherently safer designs or safety instrumentation systems.

        (D) Deluge systems.

        (E) Staged relief system where initial pressure relief valve (with lower set release pressure) discharges to a flare or other closed vent system and control device.

        (iii) If any affected pressure relief device releases to atmosphere as a result of a pressure release event, the owner or operator must perform root cause analysis and corrective action analysis according to the requirement in paragraph (j)(6) of this section and implement corrective actions according to the requirements in paragraph (j)(7) of this section. The owner or operator must also calculate the quantity of organic HAP released during each pressure

        Page 75245

        release event and report this quantity as required in Sec. 63.655(g)(10)(iii). Calculations may be based on data from the pressure relief device monitoring alone or in combination with process parameter monitoring data and process knowledge.

        (iv) The owner or operator shall determine the total number of release events occurred during the calendar year for each affected pressure relief device separately. The owner or operator shall also determine the total number of release events for each pressure relief device for which the root cause analysis concluded that the root cause was a force majeureevent, as defined in this subpart.

        (v) Except for pressure relief devices described in paragraphs (j)(4) and (5) of this section, the following release events are a violation of the pressure release management work practice standards.

        (A) Any release event for which the root cause of the event was determined to be operator error or poor maintenance.

        (B) A second release event not including force majeure events from a single pressure relief device in a 3 calendar year period for the same root cause for the same equipment.

        (C) A third release event not including force majeure events from a single pressure relief device in a 3 calendar year period for any reason.

        (4) Pressure relief devices routed to a control device. If all releases and potential leaks from a pressure relief device are routed through a closed vent system to a control device, back into the process or to the fuel gas system, the owner or operator is not required to comply with paragraph (j)(1), (2), or (3) (if applicable) of this section. Both the closed vent system and control device (if applicable) must meet the requirements of Sec. 63.644. When complying with this paragraph (j)(4), all references to ``Group 1 miscellaneous process vent'' in Sec. 63.644 mean ``pressure relief device.'' If a pressure relief device complying with this paragraph (j)(4) is routed to the fuel gas system, then on and after January 30, 2019, any flares receiving gas from that fuel gas system must be in compliance with Sec. 63.670.

        (5) Pressure relief devices exempted from pressure release management requirements. The following types of pressure relief devices are not subject to the pressure release management requirements in paragraph (j)(3) of this section.

        (i) Pressure relief devices in heavy liquid service, as defined in Sec. 63.641.

        (ii) Pressure relief devices that only release material that is liquid at standard conditions (1 atmosphere and 68 degrees Fahrenheit) and that are hard-piped to a controlled drain system (i.e., a drain system meeting the requirements for Group 1 wastewater streams in Sec. 63.647(a)) or piped back to the process or pipeline.

        (iii) Thermal expansion relief valves.

        (iv) Pressure relief devices designed with a set relief pressure of less than 2.5 psig.

        (v) Pressure relief devices that do not have the potential to emit 72 lbs/day or more of VOC based on the valve diameter, the set release pressure, and the equipment contents.

        (vi) Pressure relief devices on mobile equipment.

        (6) Root cause analysis and corrective action analysis. A root cause analysis and corrective action analysis must be completed as soon as possible, but no later than 45 days after a release event. Special circumstances affecting the number of root cause analyses and/or corrective action analyses are provided in paragraphs (j)(6)(i) through (iv) of this section.

        (i) You may conduct a single root cause analysis and corrective action analysis for a single emergency event that causes two or more pressure relief devices installed on the same equipment to release.

        (ii) You may conduct a single root cause analysis and corrective action analysis for a single emergency event that causes two or more pressure relief devices to release, regardless of the equipment served, if the root cause is reasonably expected to be a force majeure event, as defined in this subpart.

        (iii) Except as provided in paragraphs (j)(6)(i) and (ii) of this section, if more than one pressure relief device has a release during the same time period, an initial root cause analysis shall be conducted separately for each pressure relief device that had a release. If the initial root cause analysis indicates that the release events have the same root cause(s), the initially separate root cause analyses may be recorded as a single root cause analysis and a single corrective action analysis may be conducted.

        (7) Corrective action implementation. Each owner or operator required to conduct a root cause analysis and corrective action analysis as specified in paragraphs (j)(3)(iii) and (j)(6) of this section shall implement the corrective action(s) identified in the corrective action analysis in accordance with the applicable requirements in paragraphs (j)(7)(i) through (iii) of this section.

        (i) All corrective action(s) must be implemented within 45 days of the event for which the root cause and corrective action analyses were required or as soon thereafter as practicable. If an owner or operator concludes that no corrective action should be implemented, the owner or operator shall record and explain the basis for that conclusion no later than 45 days following the event.

        (ii) For corrective actions that cannot be fully implemented within 45 days following the event for which the root cause and corrective action analyses were required, the owner or operator shall develop an implementation schedule to complete the corrective action(s) as soon as practicable.

        (iii) No later than 45 days following the event for which a root cause and corrective action analyses were required, the owner or operator shall record the corrective action(s) completed to date, and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.

        0

        22. Section 63.649 is amended by revising definition of Cc term in the equation in paragraph (c)(6)(i) to read as follows:

        Sec. 63.649 Alternative means of emission limitation: Connectors in gas/vapor service and light liquid service.

        * * * * *

        (c) * * *

        (6) * * *

        (i) * * *

        Cc = Optional credit for removed connectors = 0.67 x net number (i.e., the total number of connectors removed minus the total added) of connectors in organic HAP service removed from the process unit after the applicability date set forth in Sec. 63.640(h)(3)(iii) for existing process units, and after the date of start-up for new process units. If credits are not taken, then Cc = 0.

        * * * * *

        0

        23. Section 63.650 is amended by revising paragraph (a) and adding paragraph (d) to read as follows:

        Sec. 63.650 Gasoline loading rack provisions.

        (a) Except as provided in paragraphs (b) through (d) of this section, each owner or operator of a Group 1 gasoline loading rack classified under Standard Industrial Classification code 2911 located within a contiguous area and under common control with a petroleum refinery shall comply with subpart R of this part, Sec. Sec. 63.421, 63.422(a) through (c) and (e), 63.425(a) through (c) and (e) through (i), 63.427(a) and (b), and 63.428(b), (c), (g)(1), (h)(1) through (3), and (k).

        * * * * *

        Page 75246

        (d) If a flare is used as a control device, on and after January 30, 2019, the flare shall meet the requirements of Sec. 63.670. Prior to January 30, 2019, the flare shall meet the applicable requirements of subpart R of this part, or the requirements of Sec. 63.670.

        0

        24. Section 63.651 is amended by revising paragraphs (a) and (d) and adding paragraph (e) to read as follows:

        Sec. 63.651 Marine tank vessel loading operation provisions.

        (a) Except as provided in paragraphs (b) through (e) of this section, each owner or operator of a marine tank vessel loading operation located at a petroleum refinery shall comply with the requirements of Sec. Sec. 63.560 through 63.568.

        * * * * *

        (d) The compliance time of 4 years after promulgation of 40 CFR part 63, subpart Y, does not apply. The compliance time is specified in Sec. 63.640(h)(1).

        (e) If a flare is used as a control device, on and after January 30, 2019, the flare shall meet the requirements of Sec. 63.670. Prior to January 30, 2019, the flare shall meet the applicable requirements of subpart Y of this part, or the requirements of Sec. 63.670.

        0

        25. Section 63.652 is amended by:

        0

      46. Revising paragraph (a);

        0

      47. Removing and reserving paragraph (f)(2); and

        0

      48. Revising paragraphs (g)(2)(iii)(B)(1), (h)(3), (k) introductory text, and (k)(3).

        The revisions and additions read as follows:

        Sec. 63.652 Emissions averaging provisions.

        (a) This section applies to owners or operators of existing sources who seek to comply with the emission standard in Sec. 63.642(g) by using emissions averaging according to Sec. 63.642(l) rather than following the provisions of Sec. Sec. 63.643 through 63.645, 63.646 or 63.660, 63.647, 63.650, and 63.651. Existing marine tank vessel loading operations located at the Valdez Marine Terminal source may not comply with the standard by using emissions averaging.

        * * * * *

        (g) * * *

        (2) * * *

        (iii) * * *

        (B) * * *

        (1) The percent reduction shall be measured according to the procedures in Sec. 63.116 of subpart G if a combustion control device is used. For a flare meeting the criteria in Sec. 63.116(a) of subpart G or Sec. 63.670, as applicable, or a boiler or process heater meeting the criteria in Sec. 63.645(d) or Sec. 63.116(b) of subpart G, the percentage of reduction shall be 98 percent. If a noncombustion control device is used, percentage of reduction shall be demonstrated by a performance test at the inlet and outlet of the device, or, if testing is not feasible, by a control design evaluation and documented engineering calculations.

        * * * * *

        (h) * * *

        (3) Emissions from storage vessels shall be determined as specified in Sec. 63.150(h)(3) of subpart G, except as follows:

        (i) For storage vessels complying with Sec. 63.646:

        (A) All references to Sec. 63.119(b) in Sec. 63.150(h)(3) of subpart G shall be replaced with: Sec. 63.119(b) or Sec. 63.119(b) except for Sec. 63.119(b)(5) and (6).

        (B) All references to Sec. 63.119(c) in Sec. 63.150(h)(3) of subpart G shall be replaced with: Sec. 63.119(c) or Sec. 63.119(c) except for Sec. 63.119(c)(2).

        (C) All references to Sec. 63.119(d) in Sec. 63.150(h)(3) of subpart G shall be replaced with: Sec. 63.119(d) or Sec. 63.119(d) except for Sec. 63.119(d)(2).

        (ii) For storage vessels complying with Sec. 63.660:

        (A) Section 63.1063(a)(1)(i), (a)(2), and (b) or Sec. 63.1063(a)(1)(i) and (b) shall apply instead of Sec. 63.119(b) in Sec. 63.150(h)(3) of subpart G.

        (B) Section 63.1063(a)(1)(ii), (a)(2), and (b) shall apply instead of Sec. 63.119(c) in Sec. 63.150(h)(3) of subpart G.

        (C) Section 63.1063(a)(1)(i), (a)(2), and (b) or Sec. 63.1063(a)(1)(i) and (b) shall apply instead of Sec. 63.119(d) in Sec. 63.150(h)(3) of subpart G.

        * * * * *

        (k) The owner or operator shall demonstrate that the emissions from the emission points proposed to be included in the average will not result in greater hazard or, at the option of the State or local permitting authority, greater risk to human health or the environment than if the emission points were controlled according to the provisions in Sec. Sec. 63.643 through 63.645, 63.646 or 63.660, 63.647, 63.650, and 63.651, as applicable.

        * * * * *

        (3) An emissions averaging plan that does not demonstrate an equivalent or lower hazard or risk to the satisfaction of the State or local permitting authority shall not be approved. The State or local permitting authority may require such adjustments to the emissions averaging plan as are necessary in order to ensure that the average will not result in greater hazard or risk to human health or the environment than would result if the emission points were controlled according to Sec. Sec. 63.643 through 63.645, 63.646 or 63.660, 63.647, 63.650, and 63.651, as applicable.

        * * * * *

        0

        26. Section 63.653 is amended by revising paragraphs (a) introductory text, (a)(3)(i) and (ii), and (a)(7) to read as follows:

        Sec. 63.653 Monitoring, recordkeeping, and implementation plan for emissions averaging.

        (a) For each emission point included in an emissions average, the owner or operator shall perform testing, monitoring, recordkeeping, and reporting equivalent to that required for Group 1 emission points complying with Sec. Sec. 63.643 through 63.645, 63.646 or 63.660, 63.647, 63.650, and 63.651, as applicable. The specific requirements for miscellaneous process vents, storage vessels, wastewater, gasoline loading racks, and marine tank vessels are identified in paragraphs (a)(1) through (7) of this section.

        * * * * *

        (3) * * *

        (i) Perform the monitoring or inspection procedures in Sec. 63.646 and either Sec. 63.120 of subpart G or Sec. 63.1063 of subpart WW, as applicable; and

        (ii) For closed vent systems with control devices, conduct an initial design evaluation as specified in Sec. 63.646 and either Sec. 63.120(d) of subpart G or Sec. 63.985(b) of subpart SS, as applicable.

        * * * * *

        (7) If an emission point in an emissions average is controlled using a pollution prevention measure or a device or technique for which no monitoring parameters or inspection procedures are specified in Sec. Sec. 63.643 through 63.645, 63.646 or 63.660, 63.647, 63.650, and 63.651, as applicable, the owner or operator shall establish a site-

        specific monitoring parameter and shall submit the information specified in Sec. 63.655(h)(4) in the Implementation Plan.

        * * * * *

        0

        27. Section 63.655 is amended by:

        0

      49. Revising paragraphs (f) introductory text, (f)(1) introductory text, (f)(1)(i)(A) introductory text, (f)(1)(i)(A)(2) and (3), (f)(1)(i)(B) introductory text, (f)(1)(i)(B)(2), (f)(1)(i)(D)(2), (f)(1)(iv) introductory text, and (f)(1)(iv)(A);

        0

      50. Adding paragraphs (f)(1)(vii) and (viii);

        0

      51. Revising paragraphs (f)(2) introductory text, (f)(3) introductory text, the first sentence of (f)(6), (g) introductory text, (g)(1) through (5), (g)(6)(i)(D), (g)(6)(iii), and (g)(7)(i);

        Page 75247

        0

      52. Adding paragraphs (g)(10) through (14);

        0

      53. Removing and reserving paragraph (h)(1);

        0

      54. Revising paragraphs (h)(2) introductory text, (h)(2)(i)(B), (h)(2)(ii), and (h)(5)(iii);

        0

      55. Adding paragraphs (h)(8) and (9) and (i) introductory text;

        0

      56. Revising paragraph (i)(1) introductory text and paragraph (i)(1)(ii);

        0

      57. Adding paragraphs (i)(1)(v) and (vi);

        0

      58. Redesignating paragraphs (i)(4) and (5) as paragraphs (i)(5) and (6), respectively;

        0

      59. Adding paragraph (i)(4);

        0

      60. Revising newly redesignated paragraph (i)(5) introductory text; and

        0

      61. Adding paragraphs (i)(7) through (12).

        The revisions and additions read as follows:

        Sec. 63.655 Reporting and recordkeeping requirements.

        * * * * *

        (f) Each owner or operator of a source subject to this subpart shall submit a Notification of Compliance Status report within 150 days after the compliance dates specified in Sec. 63.640(h) with the exception of Notification of Compliance Status reports submitted to comply with Sec. 63.640(l)(3) and for storage vessels subject to the compliance schedule specified in Sec. 63.640(h)(2). Notification of Compliance Status reports required by Sec. 63.640(l)(3) and for storage vessels subject to the compliance dates specified in Sec. 63.640(h)(2) shall be submitted according to paragraph (f)(6) of this section. This information may be submitted in an operating permit application, in an amendment to an operating permit application, in a separate submittal, or in any combination of the three. If the required information has been submitted before the date 150 days after the compliance date specified in Sec. 63.640(h), a separate Notification of Compliance Status report is not required within 150 days after the compliance dates specified in Sec. 63.640(h). If an owner or operator submits the information specified in paragraphs (f)(1) through (5) of this section at different times, and/or in different submittals, later submittals may refer to earlier submittals instead of duplicating and resubmitting the previously submitted information. Each owner or operator of a gasoline loading rack classified under Standard Industrial Classification Code 2911 located within a contiguous area and under common control with a petroleum refinery subject to the standards of this subpart shall submit the Notification of Compliance Status report required by subpart R of this part within 150 days after the compliance dates specified in Sec. 63.640(h).

        (1) The Notification of Compliance Status report shall include the information specified in paragraphs (f)(1)(i) through (viii) of this section.

        (i) * * *

        (A) Identification of each storage vessel subject to this subpart, and for each Group 1 storage vessel subject to this subpart, the information specified in paragraphs (f)(1)(i)(A)(1) through (3) of this section. This information is to be revised each time a Notification of Compliance Status report is submitted for a storage vessel subject to the compliance schedule specified in Sec. 63.640(h)(2) or to comply with Sec. 63.640(l)(3).

        * * * * *

        (2) For storage vessels subject to the compliance schedule specified in Sec. 63.640(h)(2) that are not complying with Sec. 63.646, the anticipated compliance date.

        (3) For storage vessels subject to the compliance schedule specified in Sec. 63.640(h)(2) that are complying with Sec. 63.646 and the Group 1 storage vessels described in Sec. 63.640(l), the actual compliance date.

        (B) If a closed vent system and a control device other than a flare is used to comply with Sec. 63.646 or Sec. 63.660, the owner or operator shall submit:

        * * * * *

        (2) The design evaluation documentation specified in Sec. 63.120(d)(1)(i) of subpart G or Sec. 63.985(b)(1)(i) of subpart SS (as applicable), if the owner or operator elects to prepare a design evaluation; or

        * * * * *

        (D) * * *

        (2) All visible emission readings, heat content determinations, flow rate measurements, and exit velocity determinations made during the compliance determination required by Sec. 63.120(e) of subpart G or Sec. 63.987(b) of subpart SS or Sec. 63.670(h), as applicable; and

        * * * * *

        (iv) For miscellaneous process vents controlled by flares, initial compliance test results including the information in paragraphs (f)(1)(iv)(A) and (B) of this section.

        (A) All visible emission readings, heat content determinations, flow rate measurements, and exit velocity determinations made during the compliance determination required by Sec. Sec. 63.645 and 63.116(a) of subpart G or Sec. 63.670(h), as applicable; and

        * * * * *

        (vii) For pressure relief devices in organic HAP service subject to the requirements in Sec. 63.648(j)(3)(i) and (ii), this report shall include the information specified in paragraphs (f)(1)(vii)(A) and (B) of this section.

        (A) A description of the monitoring system to be implemented, including the relief devices and process parameters to be monitored, and a description of the alarms or other methods by which operators will be notified of a pressure release.

        (B) A description of the prevention measures to be implemented for each affected pressure relief device.

        (viii) For each delayed coking unit, identification of whether the unit is an existing affected source or a new affected source and whether monitoring will be conducted as specified in Sec. 63.657(b) or (c).

        (2) If initial performance tests are required by Sec. Sec. 63.643 through 63.653, the Notification of Compliance Status report shall include one complete test report for each test method used for a particular source. On and after February 1, 2016, performance tests shall be submitted according to paragraph (h)(9) of this section.

        * * * * *

        (3) For each monitored parameter for which a range is required to be established under Sec. 63.120(d) of subpart G or Sec. 63.985(b) of subpart SS for storage vessels or Sec. 63.644 for miscellaneous process vents, the Notification of Compliance Status report shall include the information in paragraphs (f)(3)(i) through (iii) of this section.

        * * * * *

        (6) Notification of Compliance Status reports required by Sec. 63.640(l)(3) and for storage vessels subject to the compliance dates specified in Sec. 63.640(h)(2) shall be submitted no later than 60 days after the end of the 6-month period during which the change or addition was made that resulted in the Group 1 emission point or the existing Group 1 storage vessel was brought into compliance, and may be combined with the periodic report. * * *

        (g) The owner or operator of a source subject to this subpart shall submit Periodic Reports no later than 60 days after the end of each 6-

        month period when any of the information specified in paragraphs (g)(1) through (7) of this section or paragraphs (g)(9) through (14) of this section is collected. The first 6-month period shall begin on the date the Notification of Compliance Status report is required to be submitted. A Periodic Report is not required if none of the events identified in paragraphs (g)(1)

        Page 75248

        through (7) of this section or paragraphs (g)(9) through (14) of this section occurred during the 6-month period unless emissions averaging is utilized. Quarterly reports must be submitted for emission points included in emission averages, as provided in paragraph (g)(8) of this section. An owner or operator may submit reports required by other regulations in place of or as part of the Periodic Report required by this paragraph (g) if the reports contain the information required by paragraphs (g)(1) through (14) of this section.

        (1) For storage vessels, Periodic Reports shall include the information specified for Periodic Reports in paragraphs (g)(2) through (5) of this section. Information related to gaskets, slotted membranes, and sleeve seals is not required for storage vessels that are part of an existing source complying with Sec. 63.646.

        (2) Internal floating roofs. (i) An owner or operator who elects to comply with Sec. 63.646 by using a fixed roof and an internal floating roof or by using an external floating roof converted to an internal floating roof shall submit the results of each inspection conducted in accordance with Sec. 63.120(a) of subpart G in which a failure is detected in the control equipment.

        (A) For vessels for which annual inspections are required under Sec. 63.120(a)(2)(i) or (a)(3)(ii) of subpart G, the specifications and requirements listed in paragraphs (g)(2)(i)(A)(1) through (3) of this section apply.

        (1) A failure is defined as any time in which the internal floating roof is not resting on the surface of the liquid inside the storage vessel and is not resting on the leg supports; or there is liquid on the floating roof; or the seal is detached from the internal floating roof; or there are holes, tears, or other openings in the seal or seal fabric; or there are visible gaps between the seal and the wall of the storage vessel.

        (2) Except as provided in paragraph (g)(2)(i)(A)(3) of this section, each Periodic Report shall include the date of the inspection, identification of each storage vessel in which a failure was detected, and a description of the failure. The Periodic Report shall also describe the nature of and date the repair was made or the date the storage vessel was emptied.

        (3) If an extension is utilized in accordance with Sec. 63.120(a)(4) of subpart G, the owner or operator shall, in the next Periodic Report, identify the vessel; include the documentation specified in Sec. 63.120(a)(4) of subpart G; and describe the date the storage vessel was emptied and the nature of and date the repair was made.

        (B) For vessels for which inspections are required under Sec. 63.120(a)(2)(ii), (a)(3)(i), or (a)(3)(iii) of subpart G (i.e., internal inspections), the specifications and requirements listed in paragraphs (g)(2)(i)(B)(1) and (2) of this section apply.

        (1) A failure is defined as any time in which the internal floating roof has defects; or the primary seal has holes, tears, or other openings in the seal or the seal fabric; or the secondary seal (if one has been installed) has holes, tears, or other openings in the seal or the seal fabric; or, for a storage vessel that is part of a new source, the gaskets no longer close off the liquid surface from the atmosphere; or, for a storage vessel that is part of a new source, the slotted membrane has more than a 10 percent open.

        (2) Each Periodic Report shall include the date of the inspection, identification of each storage vessel in which a failure was detected, and a description of the failure. The Periodic Report shall also describe the nature of and date the repair was made.

        (ii) An owner or operator who elects to comply with Sec. 63.660 by using a fixed roof and an internal floating roof shall submit the results of each inspection conducted in accordance with Sec. 63.1063(c)(1), (d)(1), and (d)(2) of subpart WW in which a failure is detected in the control equipment. For vessels for which inspections are required under Sec. 63.1063(c) and (d), the specifications and requirements listed in paragraphs (g)(2)(ii)(A) through (C) of this section apply.

        (A) A failure is defined in Sec. 63.1063(d)(1) of subpart WW.

        (B) Each Periodic Report shall include a copy of the inspection record required by Sec. 63.1065(b) of subpart WW when a failure occurs.

        (C) An owner or operator who elects to use an extension in accordance with Sec. 63.1063(e)(2) of subpart WW shall, in the next Periodic Report, submit the documentation required by Sec. 63.1063(e)(2).

        (3) External floating roofs. (i) An owner or operator who elects to comply with Sec. 63.646 by using an external floating roof shall meet the periodic reporting requirements specified in paragraphs (g)(3)(i)(A) through (C) of this section.

        (A) The owner or operator shall submit, as part of the Periodic Report, documentation of the results of each seal gap measurement made in accordance with Sec. 63.120(b) of subpart G in which the seal and seal gap requirements of Sec. 63.120(b)(3), (4), (5), or (6) of subpart G are not met. This documentation shall include the information specified in paragraphs (g)(3)(i)(A)(1) through (4) of this section.

        (1) The date of the seal gap measurement.

        (2) The raw data obtained in the seal gap measurement and the calculations described in Sec. 63.120(b)(3) and (4) of subpart G.

        (3) A description of any seal condition specified in Sec. 63.120(b)(5) or (6) of subpart G that is not met.

        (4) A description of the nature of and date the repair was made, or the date the storage vessel was emptied.

        (B) If an extension is utilized in accordance with Sec. 63.120(b)(7)(ii) or (b)(8) of subpart G, the owner or operator shall, in the next Periodic Report, identify the vessel; include the documentation specified in Sec. 63.120(b)(7)(ii) or (b)(8) of subpart G, as applicable; and describe the date the vessel was emptied and the nature of and date the repair was made.

        (C) The owner or operator shall submit, as part of the Periodic Report, documentation of any failures that are identified during visual inspections required by Sec. 63.120(b)(10) of subpart G. This documentation shall meet the specifications and requirements in paragraphs (g)(3)(i)(C)(1) and (2) of this section.

        (1) A failure is defined as any time in which the external floating roof has defects; or the primary seal has holes or other openings in the seal or the seal fabric; or the secondary seal has holes, tears, or other openings in the seal or the seal fabric; or, for a storage vessel that is part of a new source, the gaskets no longer close off the liquid surface from the atmosphere; or, for a storage vessel that is part of a new source, the slotted membrane has more than 10 percent open area.

        (2) Each Periodic Report shall include the date of the inspection, identification of each storage vessel in which a failure was detected, and a description of the failure. The Periodic Report shall also describe the nature of and date the repair was made.

        (ii) An owner or operator who elects to comply with Sec. 63.660 by using an external floating roof shall meet the periodic reporting requirements specified in paragraphs (g)(3)(ii)(A) and (B) of this section.

        (A) For vessels for which inspections are required under Sec. 63.1063(c)(2), (d)(1), and (d)(3) of subpart WW, the owner or operator shall submit, as part of the Periodic Report, a copy of the inspection record required by Sec. 63.1065(b) of subpart WW when a failure occurs. A failure is defined in Sec. 63.1063(d)(1).

        Page 75249

        (B) An owner or operator who elects to use an extension in accordance with Sec. 63.1063(e)(2) or (c)(2)(iv)(B) of subpart WW shall, in the next Periodic Report, submit the documentation required by those paragraphs.

        (4) Reserved

        (5) An owner or operator who elects to comply with Sec. 63.646 or Sec. 63.660 by installing a closed vent system and control device shall submit, as part of the next Periodic Report, the information specified in paragraphs (g)(5)(i) through (v) of this section, as applicable.

        (i) The Periodic Report shall include the information specified in paragraphs (g)(5)(i)(A) and (B) of this section for those planned routine maintenance operations that would require the control device not to meet the requirements of either Sec. 63.119(e)(1) or (2) of subpart G, Sec. 63.985(a) and (b) of subpart SS, or Sec. 63.670, as applicable.

        (A) A description of the planned routine maintenance that is anticipated to be performed for the control device during the next 6 months. This description shall include the type of maintenance necessary, planned frequency of maintenance, and lengths of maintenance periods.

        (B) A description of the planned routine maintenance that was performed for the control device during the previous 6 months. This description shall include the type of maintenance performed and the total number of hours during those 6 months that the control device did not meet the requirements of either Sec. 63.119(e)(1) or (2) of subpart G, Sec. 63.985(a) and (b) of subpart SS, or Sec. 63.670, as applicable, due to planned routine maintenance.

        (ii) If a control device other than a flare is used, the Periodic Report shall describe each occurrence when the monitored parameters were outside of the parameter ranges documented in the Notification of Compliance Status report. The description shall include: Identification of the control device for which the measured parameters were outside of the established ranges, and causes for the measured parameters to be outside of the established ranges.

        (iii) If a flare is used prior to January 30, 2019 and prior to electing to comply with the requirements in Sec. 63.670, the Periodic Report shall describe each occurrence when the flare does not meet the general control device requirements specified in Sec. 63.11(b) of subpart A and shall include: Identification of the flare that does not meet the general requirements specified in Sec. 63.11(b) of subpart A, and reasons the flare did not meet the general requirements specified in Sec. 63.11(b) of subpart A.

        (iv) If a flare is used on or after the date for which compliance with the requirements in Sec. 63.670 is elected, which can be no later than January 30, 2019, the Periodic Report shall include the items specified in paragraph (g)(11) of this section.

        (v) An owner or operator who elects to comply with Sec. 63.660 by installing an alternate control device as described in Sec. 63.1064 of subpart WW shall submit, as part of the next Periodic Report, a written application as described in Sec. 63.1066(b)(3) of subpart WW.

        (6) * * *

        (i) * * *

        (D) For data compression systems under paragraph (h)(5)(iii) of this section, an operating day when the monitor operated for less than 75 percent of the operating hours or a day when less than 18 monitoring values were recorded.

        * * * * *

        (iii) For periods in closed vent systems when a Group 1 miscellaneous process vent stream was detected in the bypass line or diverted from the control device and either directly to the atmosphere or to a control device that does not comply with the requirements in Sec. 63.643(a), report the date, time, duration, estimate of the volume of gas, the concentration of organic HAP in the gas and the resulting mass emissions of organic HAP that bypassed the control device. For periods when the flow indicator is not operating, report the date, time, and duration.

        (7) * * *

        (i) Results of the performance test shall include the identification of the source tested, the date of the test, the percentage of emissions reduction or outlet pollutant concentration reduction (whichever is needed to determine compliance) for each run and for the average of all runs, and the values of the monitored operating parameters.

        * * * * *

        (10) For pressure relief devices subject to the requirements Sec. 63.648(j), Periodic Reports must include the information specified in paragraphs (g)(10)(i) through (iii) of this section.

        (i) For pressure relief devices in organic HAP gas or vapor service, pursuant to Sec. 63.648(j)(1), report any instrument reading of 500 ppm or greater.

        (ii) For pressure relief devices in organic HAP gas or vapor service subject to Sec. 63.648(j)(2), report confirmation that any monitoring required to be done during the reporting period to show compliance was conducted.

        (iii) For pressure relief devices in organic HAP service subject to Sec. 63.648(j)(3), report each pressure release to the atmosphere, including duration of the pressure release and estimate of the mass quantity of each organic HAP released, and the results of any root cause analysis and corrective action analysis completed during the reporting period, including the corrective actions implemented during the reporting period and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.

        (11) For flares subject to Sec. 63.670, Periodic Reports must include the information specified in paragraphs (g)(11)(i) through (iv) of this section.

        (i) Records as specified in paragraph (i)(9)(i) of this section for each 15-minute block during which there was at least one minute when regulated material is routed to a flare and no pilot flame is present.

        (ii) Visible emission records as specified in paragraph (i)(9)(ii)(C) of this section for each period of 2 consecutive hours during which visible emissions exceeded a total of 5 minutes.

        (iii) The 15-minute block periods for which the applicable operating limits specified in Sec. 63.670(d) through (f) are not met. Indicate the date and time for the period, the net heating value operating parameter(s) determined following the methods in Sec. 63.670(k) through (n) as applicable.

        (iv) For flaring events meeting the criteria in Sec. 63.670(o)(3):

        (A) The start and stop time and date of the flaring event.

        (B) The length of time for which emissions were visible from the flare during the event.

        (C) The periods of time that the flare tip velocity exceeds the maximum flare tip velocity determined using the methods in Sec. 63.670(d)(2) and the maximum 15-minute block average flare tip velocity recorded during the event.

        (D) Results of the root cause and corrective actions analysis completed during the reporting period, including the corrective actions implemented during the reporting period and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.

        (12) For delayed coking units, the Periodic Report must include the information specified in paragraphs (g)(12)(i) through (iv) of this section.

        (i) For existing source delayed coking units, any 60-cycle average exceeding the applicable limit in Sec. 63.657(a)(1).

        (ii) For new source delayed coking units, any direct venting event

        Page 75250

        exceeding the applicable limit in Sec. 63.657(a)(2).

        (iii) The total number of double quenching events performed during the reporting period.

        (iv) For each double quenching draining event when the drain water temperature exceeded 210 degF, report the drum, date, time, the coke drum vessel pressure or temperature, as applicable, when pre-vent draining was initiated, and the maximum drain water temperature during the pre-vent draining period.

        (13) For maintenance vents subject to the requirements in Sec. 63.643(c), Periodic Reports must include the information specified in paragraphs (g)(13)(i) through (iv) of this section for any release exceeding the applicable limits in Sec. 63.643(c)(1). For the purposes of this reporting requirement, owners or operators complying with Sec. 63.643(c)(1)(iv) must report each venting event for which the lower explosive limit is 20 percent or greater.

        (i) Identification of the maintenance vent and the equipment served by the maintenance vent.

        (ii) The date and time the maintenance vent was opened to the atmosphere.

        (iii) The lower explosive limit, vessel pressure, or mass of VOC in the equipment, as applicable, at the start of atmospheric venting. If the 5 psig vessel pressure option in Sec. 63.643(c)(1)(ii) was used and active purging was initiated while the lower explosive limit was 10 percent or greater, also include the lower explosive limit of the vapors at the time active purging was initiated.

        (iv) An estimate of the mass of organic HAP released during the entire atmospheric venting event.

        (14) Any changes in the information provided in a previous Notification of Compliance Status report.

        (h) * * *

        (2) For storage vessels, notifications of inspections as specified in paragraphs (h)(2)(i) and (ii) of this section.

        (i) * * *

        (B) Except as provided in paragraph (h)(2)(i)(C) of this section, if the internal inspection required by Sec. 63.120(a)(2), (a)(3), or (b)(10) of subpart G or Sec. 63.1063(d)(1) of subpart WW is not planned and the owner or operator could not have known about the inspection 30 calendar days in advance of refilling the vessel with organic HAP, the owner or operator shall notify the Administrator at least 7 calendar days prior to refilling of the storage vessel. Notification may be made by telephone and immediately followed by written documentation demonstrating why the inspection was unplanned. This notification, including the written documentation, may also be made in writing and sent so that it is received by the Administrator at least 7 calendar days prior to the refilling.

        * * * * *

        (ii) In order to afford the Administrator the opportunity to have an observer present, the owner or operator of a storage vessel equipped with an external floating roof shall notify the Administrator of any seal gap measurements. The notification shall be made in writing at least 30 calendar days in advance of any gap measurements required by Sec. 63.120(b)(1) or (2) of subpart G or Sec. 63.1062(d)(3) of subpart WW. The State or local permitting authority can waive this notification requirement for all or some storage vessels subject to the rule or can allow less than 30 calendar days' notice.

        * * * * *

        (5) * * *

        (iii) An owner or operator may use an automated data compression recording system that does not record monitored operating parameter values at a set frequency (for example, once every hour) but records all values that meet set criteria for variation from previously recorded values.

        (A) The system shall be designed to:

        (1) Measure the operating parameter value at least once every hour.

        (2) Record at least 24 values each day during periods of operation.

        (3) Record the date and time when monitors are turned off or on.

        (4) Recognize unchanging data that may indicate the monitor is not functioning properly, alert the operator, and record the incident.

        (5) Compute daily average values of the monitored operating parameter based on recorded data.

        (B) You must maintain a record of the description of the monitoring system and data compression recording system including the criteria used to determine which monitored values are recorded and retained, the method for calculating daily averages, and a demonstrations that they system meets all criteria of paragraph (h)(5)(iii)(A) of this section.

        * * * * *

        (8) For fenceline monitoring systems subject to Sec. 63.658, within 45 calendar days after the end of each quarterly reporting period covered by the periodic report, each owner or operator shall submit the following information to the EPA's Compliance and Emissions Data Reporting Interface (CEDRI). (CEDRI can be accessed through the EPA's Central Data Exchange (CDX) (https://cdx.epa.gov/). The owner or operator need not transmit this data prior to obtaining 12 months of data.

        (i) Individual sample results for each monitor for each sampling period during the quarterly reporting period. For the first reporting period and for any period in which a passive monitor is added or moved, the owner or operator shall report the coordinates of all of the passive monitor locations. The owner or operator shall determine the coordinates using an instrument with an accuracy of at least 3 meters. Coordinates shall be in decimal degrees with at least five decimal places.

        (ii) The biweekly annual average concentration difference (Deltac) values for benzene for the quarterly reporting period.

        (iii) Notation for each biweekly value that indicates whether background correction was used, all measurements in the sampling period were below detection, or whether an outlier was removed from the sampling period data set.

        (9) On and after February 1, 2016, if required to submit the results of a performance test or CEMS performance evaluation, the owner or operator shall submit the results according to the procedures in paragraphs (h)(9)(i) and (ii) of this section.

        (i) Within 60 days after the date of completing each performance test as required by this subpart, the owner or operator shall submit the results of the performance tests following the procedure specified in either paragraph (h)(9)(i)(A) or (B) of this section.

        (A) For data collected using test methods supported by the EPA's Electronic Reporting Tool (ERT) as listed on the EPA's ERT Web site (http://www.epa.gov/ttn/chief/ert/index.html) at the time of the test, the owner or operator must submit the results of the performance test to the EPA via the CEDRI. (CEDRI can be accessed through the EPA's CDX.) Performance test data must be submitted in a file format generated through the use of the EPA's ERT or an alternate electronic file format consistent with the extensible markup language (XML) schema listed on the EPA's ERT Web site. If an owner or operator claims that some of the performance test information being submitted is confidential business information (CBI), the owner or operator must submit a complete file generated through the use of the EPA's ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT Web site, including information claimed to be CBI, on a compact disc, flash drive or other commonly used electronic storage media to the EPA. The electronic storage media must be clearly marked as CBI and mailed to U.S. EPA/OAQPS/

        Page 75251

        CORE CBI Office, Attention: Group Leader, Measurement Policy Group, MD C404-02, 4930 Old Page Rd., Durham, NC 27703. The same ERT or alternate file with the CBI omitted must be submitted to the EPA via the EPA's CDX as described earlier in this paragraph (h)(9)(i)(A).

        (B) For data collected using test methods that are not supported by the EPA's ERT as listed on the EPA's ERT Web site at the time of the test, the owner or operator must submit the results of the performance test to the Administrator at the appropriate address listed in Sec. 63.13.

        (ii) Within 60 days after the date of completing each CEMS performance evaluation as required by this subpart, the owner or operator must submit the results of the performance evaluation following the procedure specified in either paragraph (h)(9)(ii)(A) or (B) of this section.

        (A) For performance evaluations of continuous monitoring systems measuring relative accuracy test audit (RATA) pollutants that are supported by the EPA's ERT as listed on the EPA's ERT Web site at the time of the evaluation, the owner or operator must submit the results of the performance evaluation to the EPA via the CEDRI. (CEDRI can be accessed through the EPA's CDX.) Performance evaluation data must be submitted in a file format generated through the use of the EPA's ERT or an alternate file format consistent with the XML schema listed on the EPA's ERT Web site. If an owner or operator claims that some of the performance evaluation information being submitted is CBI, the owner or operator must submit a complete file generated through the use of the EPA's ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT Web site, including information claimed to be CBI, on a compact disc, flash drive or other commonly used electronic storage media to the EPA. The electronic storage media must be clearly marked as CBI and mailed to U.S. EPA/OAQPS/CORE CBI Office, Attention: Group Leader, Measurement Policy Group, MD C404-02, 4930 Old Page Rd., Durham, NC 27703. The same ERT or alternate file with the CBI omitted must be submitted to the EPA via the EPA's CDX as described earlier in this paragraph (h)(9)(ii)(A).

        (B) For any performance evaluations of continuous monitoring systems measuring RATA pollutants that are not supported by the EPA's ERT as listed on the EPA's ERT Web site at the time of the evaluation, the owner or operator must submit the results of the performance evaluation to the Administrator at the appropriate address listed in Sec. 63.13.

        (i) Recordkeeping. Each owner or operator of a source subject to this subpart shall keep copies of all applicable reports and records required by this subpart for at least 5 years except as otherwise specified in paragraphs (i)(1) through (12) of this section. All applicable records shall be maintained in such a manner that they can be readily accessed within 24 hours. Records may be maintained in hard copy or computer-readable form including, but not limited to, on paper, microfilm, computer, flash drive, floppy disk, magnetic tape, or microfiche.

        (1) Each owner or operator subject to the storage vessel provisions in Sec. 63.646 shall keep the records specified in Sec. 63.123 of subpart G except as specified in paragraphs (i)(1)(i) through (iv) of this section. Each owner or operator subject to the storage vessel provisions in Sec. 63.660 shall keep records as specified in paragraphs (i)(1)(v) and (vi) of this section.

        * * * * *

        (ii) All references to Sec. 63.122 in Sec. 63.123 of subpart G shall be replaced with Sec. 63.655(e).

        * * * * *

        (v) Each owner or operator of a Group 1 storage vessel subject to the provisions in Sec. 63.660 shall keep records as specified in Sec. 63.1065 or Sec. 63.998, as applicable.

        (vi) Each owner or operator of a Group 2 storage vessel shall keep the records specified in Sec. 63.1065(a) of subpart WW. If a storage vessel is determined to be Group 2 because the weight percent total organic HAP of the stored liquid is less than or equal to 4 percent for existing sources or 2 percent for new sources, a record of any data, assumptions, and procedures used to make this determination shall be retained.

        * * * * *

        (4) For each closed vent system that contains bypass lines that could divert a vent stream away from the control device and either directly to the atmosphere or to a control device that does not comply with the requirements in Sec. 63.643(a), the owner or operator shall keep a record of the information specified in either paragraph (i)(4)(i) or (ii) of this section, as applicable.

        (i) The owner or operator shall maintain records of periods when flow was detected in the bypass line, including the date and time and the duration of the flow in the bypass line. For each flow event, the owner or operator shall maintain records sufficient to determine whether or not the detected flow included flow of a Group 1 miscellaneous process vent stream requiring control. For periods when the Group 1 miscellaneous process vent stream requiring control is diverted from the control device and released either directly to the atmosphere or to a control device that does not comply with the requirements in Sec. 63.643(a), the owner or operator shall include an estimate of the volume of gas, the concentration of organic HAP in the gas and the resulting emissions of organic HAP that bypassed the control device using process knowledge and engineering estimates.

        (ii) Where a seal mechanism is used to comply with Sec. 63.644(c)(2), hourly records of flow are not required. In such cases, the owner or operator shall record the date that the monthly visual inspection of the seals or closure mechanisms is completed. The owner or operator shall also record the occurrence of all periods when the seal or closure mechanism is broken, the bypass line valve position has changed or the key for a lock-and-key type lock has been checked out. The owner or operator shall include an estimate of the volume of gas, the concentration of organic HAP in the gas and the resulting mass emissions of organic HAP from the Group 1 miscellaneous process vent stream requiring control that bypassed the control device or records sufficient to demonstrate that there was no flow of a Group 1 miscellaneous process vent stream requiring control during the period.

        (5) The owner or operator of a heat exchange system subject to this subpart shall comply with the recordkeeping requirements in paragraphs (i)(5)(i) through (v) of this section and retain these records for 5 years.

        * * * * *

        (7) Each owner or operator subject to the delayed coking unit decoking operations provisions in Sec. 63.657 must maintain records specified in paragraphs (i)(7)(i) through (iii) of this section.

        (i) The average pressure or temperature, as applicable, for the 5-

        minute period prior to venting to the atmosphere, draining, or deheading the coke drum for each cooling cycle for each coke drum.

        (ii) If complying with the 60-cycle rolling average, each 60-cycle rolling average pressure or temperature, as applicable, considering all coke drum venting events in the existing affected source.

        (iii) For double-quench cooling cycles:

        Page 75252

        (A) The date, time and duration of each pre-vent draining event.

        (B) The pressure or temperature of the coke drum vessel, as applicable, for the 15 minute period prior to the pre-vent draining.

        (C) The drain water temperature at 1-minute intervals from the start of pre-vent draining to the complete closure of the drain valve.

        (8) For fenceline monitoring systems subject to Sec. 63.658, each owner or operator shall keep the records specified in paragraphs (i)(8)(i) through (x) of this section on an ongoing basis.

        (i) Coordinates of all passive monitors, including replicate samplers and field blanks, and if applicable, the meteorological station. The owner or operator shall determine the coordinates using an instrument with an accuracy of at least 3 meters. The coordinates shall be in decimal degrees with at least five decimal places.

        (ii) The start and stop times and dates for each sample, as well as the tube identifying information.

        (iii) Sampling period average temperature and barometric pressure measurements.

        (iv) For each outlier determined in accordance with Section 9.2 of Method 325A of appendix A of this part, the sampler location of and the concentration of the outlier and the evidence used to conclude that the result is an outlier.

        (v) For samples that will be adjusted for a background, the location of and the concentration measured simultaneously by the background sampler, and the perimeter samplers to which it applies.

        (vi) Individual sample results, the calculated Deltac for benzene for each sampling period and the two samples used to determine it, whether background correction was used, and the annual average Deltac calculated after each sampling period.

        (vii) Method detection limit for each sample, including co-located samples and blanks.

        (viii) Documentation of corrective action taken each time the action level was exceeded.

        (ix) Other records as required by Methods 325A and 325B of appendix A of this part.

        (x) If a near-field source correction is used as provided in Sec. 63.658(i), records of hourly meteorological data, including temperature, barometric pressure, wind speed and wind direction, calculated daily unit vector wind direction and daily sigma theta, and other records specified in the site-specific monitoring plan.

        (9) For each flare subject to Sec. 63.670, each owner or operator shall keep the records specified in paragraphs (i)(9)(i) through (xii) of this section up-to-date and readily accessible, as applicable.

        (i) Retain records of the output of the monitoring device used to detect the presence of a pilot flame as required in Sec. 63.670(b) for a minimum of 2 years. Retain records of each 15-minute block during which there was at least one minute that no pilot flame is present when regulated material is routed to a flare for a minimum of 5 years.

        (ii) Retain records of daily visible emissions observations or video surveillance images required in Sec. 63.670(h) as specified in the paragraphs (i)(9)(ii)(A) through (C), as applicable, for a minimum of 3 years.

        (A) If visible emissions observations are performed using Method 22 at 40 CFR part 60, appendix A-7, the record must identify whether the visible emissions observation was performed, the results of each observation, total duration of observed visible emissions, and whether it was a 5-minute or 2-hour observation. If the owner or operator performs visible emissions observations more than one time during a day, the record must also identify the date and time of day each visible emissions observation was performed.

        (B) If video surveillance camera is used, the record must include all video surveillance images recorded, with time and date stamps.

        (C) For each 2 hour period for which visible emissions are observed for more than 5 minutes in 2 consecutive hours, the record must include the date and time of the 2 hour period and an estimate of the cumulative number of minutes in the 2 hour period for which emissions were visible.

        (iii) The 15-minute block average cumulative flows for flare vent gas and, if applicable, total steam, perimeter assist air, and premix assist air specified to be monitored under Sec. 63.670(i), along with the date and time interval for the 15-minute block. If multiple monitoring locations are used to determine cumulative vent gas flow, total steam, perimeter assist air, and premix assist air, retain records of the 15-minute block average flows for each monitoring location for a minimum of 2 years, and retain the 15-minute block average cumulative flows that are used in subsequent calculations for a minimum of 5 years. If pressure and temperature monitoring is used, retain records of the 15-minute block average temperature, pressure and molecular weight of the flare vent gas or assist gas stream for each measurement location used to determine the 15-minute block average cumulative flows for a minimum of 2 years, and retain the 15-minute block average cumulative flows that are used in subsequent calculations for a minimum of 5 years.

        (iv) The flare vent gas compositions specified to be monitored under Sec. 63.670(j). Retain records of individual component concentrations from each compositional analyses for a minimum of 2 years. If NHVvg analyzer is used, retain records of the 15-minute block average values for a minimum of 5 years.

        (v) Each 15-minute block average operating parameter calculated following the methods specified in Sec. 63.670(k) through (n), as applicable.

        (vi) Reserved

        (vii) All periods during which operating values are outside of the applicable operating limits specified in Sec. 63.670(d) through (f) when regulated material is being routed to the flare.

        (viii) All periods during which the owner or operator does not perform flare monitoring according to the procedures in Sec. 63.670(g) through (j).

        (ix) Records of periods when there is flow of vent gas to the flare, but when there is no flow of regulated material to the flare, including the start and stop time and dates of periods of no regulated material flow.

        (x) Records when the flow of vent gas exceeds the smokeless capacity of the flare, including start and stop time and dates of the flaring event.

        (xi) Records of the root cause analysis and corrective action analysis conducted as required in Sec. 63.670(o)(3), including an identification of the affected facility, the date and duration of the event, a statement noting whether the event resulted from the same root cause(s) identified in a previous analysis and either a description of the recommended corrective action(s) or an explanation of why corrective action is not necessary under Sec. 63.670(o)(5)(i).

        (xii) For any corrective action analysis for which implementation of corrective actions are required in Sec. 63.670(o)(5), a description of the corrective action(s) completed within the first 45 days following the discharge and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.

        (10) Reserved

        (11) For each pressure relief device subject to the pressure release management work practice standards in Sec. 63.648(j)(3), the owner or operator shall keep the records specified in paragraphs (i)(11)(i) through (iii) of this section.

        (i) Records of the prevention measures implemented as required in Sec. 63.648(j)(3)(ii), if applicable.

        Page 75253

        (ii) Records of the number of releases during each calendar year and the number of those releases for which the root cause was determined to be a force majeure event. Keep these records for the current calendar year and the past five calendar years.

        (iii) For each release to the atmosphere, the owner or operator shall keep the records specified in paragraphs (i)(11)(iii)(A) through (D) of this section.

        (A) The start and end time and date of each pressure release to the atmosphere.

        (B) Records of any data, assumptions, and calculations used to estimate of the mass quantity of each organic HAP released during the event.

        (C) Records of the root cause analysis and corrective action analysis conducted as required in Sec. 63.648(j)(3)(iii), including an identification of the affected facility, the date and duration of the event, a statement noting whether the event resulted from the same root cause(s) identified in a previous analysis and either a description of the recommended corrective action(s) or an explanation of why corrective action is not necessary under Sec. 63.648(j)(7)(i).

        (D) For any corrective action analysis for which implementation of corrective actions are required in Sec. 63.648(j)(7), a description of the corrective action(s) completed within the first 45 days following the discharge and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.

        (12) For each maintenance vent opening subject to the requirements in Sec. 63.643(c), the owner or operator shall keep the applicable records specified in (i)(12)(i) through (v) of this section.

        (i) The owner or operator shall maintain standard site procedures used to deinventory equipment for safety purposes (e.g., hot work or vessel entry procedures) to document the procedures used to meet the requirements in Sec. 63.643(c). The current copy of the procedures shall be retained and available on-site at all times. Previous versions of the standard site procedures, is applicable, shall be retained for five years.

        (ii) If complying with the requirements of Sec. 63.643(c)(1)(i) and the lower explosive limit at the time of the vessel opening exceeds 10 percent, identification of the maintenance vent, the process units or equipment associated with the maintenance vent, the date of maintenance vent opening, and the lower explosive limit at the time of the vessel opening.

        (iii) If complying with the requirements of Sec. 63.643(c)(1)(ii) and either the vessel pressure at the time of the vessel opening exceeds 5 psig or the lower explosive limit at the time of the active purging was initiated exceeds 10 percent, identification of the maintenance vent, the process units or equipment associated with the maintenance vent, the date of maintenance vent opening, the pressure of the vessel or equipment at the time of discharge to the atmosphere and, if applicable, the lower explosive limit of the vapors in the equipment when active purging was initiated.

        (iv) If complying with the requirements of Sec. 63.643(c)(1)(iii), identification of the maintenance vent, the process units or equipment associated with the maintenance vent, the date of maintenance vent opening, and records used to estimate the total quantity of VOC in the equipment at the time the maintenance vent was opened to the atmosphere for each applicable maintenance vent opening.

        (v) If complying with the requirements of Sec. 63.643(c)(1)(iv), identification of the maintenance vent, the process units or equipment associated with the maintenance vent, records documenting the lack of a pure hydrogen supply, the date of maintenance vent opening, and the lower explosive limit of the vapors in the equipment at the time of discharge to the atmosphere for each applicable maintenance vent opening.

        0

        28. Section 63.656 is amended by revising paragraph (c)(1) to read as follows:

        Sec. 63.656 Implementation and enforcement.

        * * * * *

        (c) * * *

        (1) Approval of alternatives to the requirements in Sec. Sec. 63.640, 63.642(g) through (l), 63.643, 63.646 through 63.652, 63.654, 63.657 through 63.660, and 63.670. Where these standards reference another subpart, the cited provisions will be delegated according to the delegation provisions of the referenced subpart. Where these standards reference another subpart and modify the requirements, the requirements shall be modified as described in this subpart. Delegation of the modified requirements will also occur according to the delegation provisions of the referenced subpart.

        * * * * *

        0

        29. Section 63.657 is added to read as follows:

        Sec. 63.657 Delayed coking unit decoking operation standards.

        (a) Except as provided in paragraphs (e) and (f) of this section, each owner or operator of a delayed coking unit shall depressure each coke drum to a closed blowdown system until the coke drum vessel pressure or temperature measured at the top of the coke drum or in the overhead line of the coke drum as near as practical to the coke drum meets the applicable limits specified in paragraph (a)(1) or (2) of this section prior to venting to the atmosphere, draining or deheading the coke drum at the end of the cooling cycle.

        (1) For delayed coking units at an existing affected source, meet either:

        (i) An average vessel pressure of 2 psig determined on a rolling 60-event average; or

        (ii) An average vessel temperature of 220 degrees Fahrenheit determined on a rolling 60-event average.

        (2) For delayed coking units at a new affected source, meet either:

        (i) A vessel pressure of 2.0 psig for each decoking event; or

        (ii) A vessel temperature of 218 degrees Fahrenheit for each decoking event.

        (b) Each owner or operator of a delayed coking unit complying with the pressure limits in paragraph (a)(1)(i) or (a)(2)(i) of this section shall install, operate, calibrate, and maintain a monitoring system, as specified in paragraphs (b)(1) through (5) of this section, to determine the coke drum vessel pressure.

        (1) The pressure monitoring system must be in a representative location (at the top of the coke drum or in the overhead line as near as practical to the coke drum) that minimizes or eliminates pulsating pressure, vibration, and, to the extent practical, internal and external corrosion.

        (2) The pressure monitoring system must be capable of measuring a pressure of 2.0 psig within 0.5 psig.

        (3) The pressure monitoring system must be verified annually or at the frequency recommended by the instrument manufacturer. The pressure monitoring system must be verified following any period of more than 24 hours throughout which the pressure exceeded the maximum rated pressure of the sensor, or the data recorder was off scale.

        (4) All components of the pressure monitoring system must be visually inspected for integrity, oxidation and galvanic corrosion every 3 months, unless the system has a redundant pressure sensor.

        (5) The output of the pressure monitoring system must be reviewed

        Page 75254

        daily to ensure that the pressure readings fluctuate as expected between operating and cooling/decoking cycles to verify the pressure taps are not plugged. Plugged pressure taps must be unplugged or otherwise repaired prior to the next operating cycle.

        (c) Each owner or operator of a delayed coking unit complying with the temperature limits in paragraph (a)(1)(ii) or (a)(2)(ii) of this section shall install, operate, calibrate, and maintain a continuous parameter monitoring system to measure the coke drum vessel temperature (at the top of the coke drum or in the overhead line as near as practical to the coke drum) according to the requirements specified in table 13 of this subpart.

        (d) The owner or operator of a delayed coking unit shall determine the coke drum vessel pressure or temperature, as applicable, on a 5-

        minute rolling average basis while the coke drum is vented to the closed blowdown system and shall use the last complete 5-minute rolling average pressure or temperature just prior to initiating steps to isolate the coke drum prior to venting, draining or deheading to demonstrate compliance with the requirements in paragraph (a) of this section. Pressure or temperature readings after initiating steps to isolate the coke drum from the closed blowdown system just prior to atmospheric venting, draining, or deheading the coke drum shall not be used in determining the average coke drum vessel pressure or temperature for the purpose of compliance with the requirements in paragraph (a) of this section.

        (e) The owner or operator of a delayed coking unit using the ``water overflow'' method of coke cooling must hardpipe the overflow water or otherwise prevent exposure of the overflow water to the atmosphere when transferring the overflow water to the overflow water storage tank whenever the coke drum vessel temperature exceeds 220 degrees Fahrenheit. The overflow water storage tank may be an open or fixed-roof tank provided that a submerged fill pipe (pipe outlet below existing liquid level in the tank) is used to transfer overflow water to the tank. The owner or operator of a delayed coking unit using the ``water overflow'' method of coke cooling shall determine the coke drum vessel temperature as specified in paragraphs (c) and (d) of this section regardless of the compliance method used to demonstrate compliance with the requirements in paragraph (a) of this section.

        (f) The owner or operator of a delayed coking unit may partially drain a coke drum prior to achieving the applicable limits in paragraph (a) of this section in order to double-quench a coke drum that did not cool adequately using the normal cooling process steps provided that the owner or operator meets the conditions in paragraphs (f)(1) and (2) of this section.

        (1) The owner or operator shall install, operate, calibrate, and maintain a continuous parameter monitoring system to measure the drain water temperature at the bottom of the coke drum or in the drain line as near as practical to the coke drum according to the requirements specified in table 13 of this subpart.

        (2) The owner or operator must maintain the drain water temperature below 210 degrees Fahrenheit during the partial drain associated with the double-quench event.

        0

        30. Section 63.658 is added to read as follows:

        Sec. 63.658 Fenceline monitoring provisions.

        (a) The owner or operator shall conduct sampling along the facility property boundary and analyze the samples in accordance with Methods 325A and 325B of appendix A of this part and paragraphs (b) through (k) of this section.

        (b) The target analyte is benzene.

        (c) The owner or operator shall determine passive monitor locations in accordance with Section 8.2 of Method 325A of appendix A of this part.

        (1) As it pertains to this subpart, known sources of VOCs, as used in Section 8.2.1.3 in Method 325A of appendix A of this part for siting passive monitors means a wastewater treatment unit, process unit, or any emission source requiring control according to the requirements of this subpart, including marine vessel loading operations. For marine loading operations that are located offshore, one passive monitor should be sited on the shoreline adjacent to the dock.

        (2) The owner or operator may collect one or more background samples if the owner or operator believes that an offsite upwind source or an onsite source excluded under Sec. 63.640(g) may influence the sampler measurements. If the owner or operator elects to collect one or more background samples, the owner of operator must develop and submit a site-specific monitoring plan for approval according to the requirements in paragraph (i) of this section. Upon approval of the site-specific monitoring plan, the background sampler(s) should be operated co-currently with the routine samplers.

        (3) The owner or operator shall collect at least one co-located duplicate sample for every 10 field samples per sampling period and at least two field blanks per sampling period, as described in Section 9.3 in Method 325A of appendix A of this part. The co-located duplicates may be collected at any one of the perimeter sampling locations.

        (4) The owner or operator shall follow the procedure in Section 9.6 of Method 325B of appendix A of this part to determine the detection limit of benzene for each sampler used to collect samples, background samples (if the owner or operator elects to do so), co-located samples and blanks.

        (d) The owner or operator shall collect and record meteorological data according to the applicable requirements in paragraphs (d)(1) through (3) of this section.

        (1) If a near-field source correction is used as provided in paragraph (i)(1) of this section or if an alternative test method is used that provides time-resolved measurements, the owner or operator shall:

        (i) Use an on-site meteorological station in accordance with Section 8.3 of Method 325A of appendix A of this part.

        (ii) Collect and record hourly average meteorological data, including temperature, barometric pressure, wind speed and wind direction and calculate daily unit vector wind direction and daily sigma theta.

        (2) For cases other than those specified in paragraph (d)(1) of this section, the owner or operator shall collect and record sampling period average temperature and barometric pressure using either an on-

        site meteorological station in accordance with Section 8.3 of Method 325A of appendix A of this part or, alternatively, using data from a United States Weather Service (USWS) meteorological station provided the USWS meteorological station is within 40 kilometers (25 miles) of the refinery.

        (3) If an on-site meteorological station is used, the owner or operator shall follow the calibration and standardization procedures for meteorological measurements in EPA-454/B-08-002 (incorporated by reference--see Sec. 63.14).

        (e) The owner of operator shall use a sampling period and sampling frequency as specified in paragraphs (e)(1) through (3) of this section.

        (1) Sampling period. A 14-day sampling period shall be used, unless a shorter sampling period is determined to be necessary under paragraph (g) or (i) of this section. A sampling period is defined as the period during which sampling tube is deployed at a specific sampling location with the diffusive

        Page 75255

        sampling end cap in-place and does not include the time required to analyze the sample. For the purpose of this subpart, a 14-day sampling period may be no shorter than 13 calendar days and no longer than 15 calendar days, but the routine sampling period shall be 14 calendar days.

        (2) Base sampling frequency. Except as provided in paragraph (e)(3) of this section, the frequency of sample collection shall be once each contiguous 14-day sampling period, such that the beginning of the next 14-day sampling period begins immediately upon the completion of the previous 14-day sampling period.

        (3) Alternative sampling frequency for burden reduction. When an individual monitor consistently achieves results at or below 0.9 mug/

        m\3\, the owner or operator may elect to use the applicable minimum sampling frequency specified in paragraphs (e)(3)(i) through (v) of this section for that monitoring site. When calculating Deltac for the monitoring period when using this alternative for burden reduction, zero shall be substituted for the sample result for the monitoring site for any period where a sample is not taken.

        (i) If every sample at a monitoring site is at or below 0.9 mug/

        m3 for 2 years (52 consecutive samples), every other sampling period can be skipped for that monitoring site, i.e., sampling will occur approximately once per month.

        (ii) If every sample at a monitoring site that is monitored at the frequency specified in paragraph (e)(3)(i) of this section is at or below 0.9 mug/m3 for 2 years (i.e., 26 consecutive ``monthly'' samples), five 14-day sampling periods can be skipped for that monitoring site following each period of sampling, i.e., sampling will occur approximately once per quarter.

        (iii) If every sample at a monitoring site that is monitored at the frequency specified in paragraph (e)(3)(ii) of this section is at or below 0.9 mug/m3 for 2 years (i.e., 8 consecutive quarterly samples), twelve 14-day sampling periods can be skipped for that monitoring site following each period of sampling, i.e., sampling will occur twice a year.

        (iv) If every sample at a monitoring site that is monitored at the frequency specified in paragraph (e)(3)(iii) of this section is at or below 0.9 mug/m3 for an 2 years (i.e., 4 consecutive semi-

        annual samples), only one sample per year is required for that monitoring site. For yearly sampling, samples shall occur at least 10 months but no more than 14 months apart.

        (v) If at any time a sample for a monitoring site that is monitored at the frequency specified in paragraphs (e)(3)(i) through (iv) of this section returns a result that is above 0.9 mug/m\3\, the sampling site must return to the original sampling requirements of contiguous 14-day sampling periods with no skip periods for one quarter (six 14-

        day sampling periods). If every sample collected during this quarter is at or below 0.9 mug/m3 , the owner or operator may revert back to the reduced monitoring schedule applicable for that monitoring site prior to the sample reading exceeding 0.9 mug/m3 If any sample collected during this quarter is above 0.9 mug/m\3\, that monitoring site must return to the original sampling requirements of contiguous 14-day sampling periods with no skip periods for a minimum of two years. The burden reduction requirements can be used again for that monitoring site once the requirements of paragraph (e)(3)(i) of this section are met again, i.e., after 52 contiguous 14-day samples with no results above 0.9 mug/m3 .

        (f) Within 45 days of completion of each sampling period, the owner or operator shall determine whether the results are above or below the action level as follows:

        (1) The owner or operator shall determine the facility impact on the benzene concentration (Deltac) for each 14-day sampling period according to either paragraph (f)(1)(i) or (ii) of this section, as applicable.

        (i) Except when near-field source correction is used as provided in paragraph (i) of this section, the owner or operator shall determine the highest and lowest sample results for benzene concentrations from the sample pool and calculate Deltac as the difference in these concentrations. The owner or operator shall adhere to the following procedures when one or more samples for the sampling period are below the method detection limit for benzene:

        (A) If the lowest detected value of benzene is below detection, the owner or operator shall use zero as the lowest sample result when calculating Deltac.

        (B) If all sample results are below the method detection limit, the owner or operator shall use the method detection limit as the highest sample result.

        (ii) When near-field source correction is used as provided in paragraph (i) of this section, the owner or operator shall determine Deltac using the calculation protocols outlined in the approved site-

        specific monitoring plan and in paragraph (i) of this section.

        (2) The owner or operator shall calculate the annual average Deltac based on the average of the 26 most recent 14-day sampling periods. The owner or operator shall update this annual average value after receiving the results of each subsequent 14-day sampling period.

        (3) The action level for benzene is 9 micrograms per cubic meter (mug/m3) on an annual average basis. If the annual average Deltac value for benzene is less than or equal to 9 mug/m\3\, the concentration is below the action level. If the annual average Deltac value for benzene is greater than 9 mug/m\3\, the concentration is above the action level, and the owner or operator shall conduct a root cause analysis and corrective action in accordance with paragraph (g) of this section.

        (g) Within 5 days of determining that the action level has been exceeded for any annual average Deltac and no longer than 50 days after completion of the sampling period, the owner or operator shall initiate a root cause analysis to determine the cause of such exceedance and to determine appropriate corrective action, such as those described in paragraphs (g)(1) through (4) of this section. The root cause analysis and initial corrective action analysis shall be completed and initial corrective actions taken no later than 45 days after determining there is an exceedance. Root cause analysis and corrective action may include, but is not limited to:

        (1) Leak inspection using Method 21 of part 60, appendix A-7 of this chapter and repairing any leaks found.

        (2) Leak inspection using optical gas imaging and repairing any leaks found.

        (3) Visual inspection to determine the cause of the high benzene emissions and implementing repairs to reduce the level of emissions.

        (4) Employing progressively more frequent sampling, analysis and meteorology (e.g., using shorter sampling periods for Methods 325A and 325B of appendix A of this part, or using active sampling techniques).

        (h) If, upon completion of the corrective action analysis and corrective actions such as those described in paragraph (g) of this section, the Deltac value for the next 14-day sampling period for which the sampling start time begins after the completion of the corrective actions is greater than 9 mug/m\3\ or if all corrective action measures identified require more than 45 days to implement, the owner or operator shall develop a corrective action plan that describes the corrective action(s) completed to date, additional measures that the owner or operator proposes to employ to reduce fenceline concentrations below the action level, and a schedule for completion of these measures. The owner or operator shall submit the corrective action plan to the

        Page 75256

        Administrator within 60 days after receiving the analytical results indicating that the Deltac value for the 14-day sampling period following the completion of the initial corrective action is greater than 9 mug/m\3\ or, if no initial corrective actions were identified, no later than 60 days following the completion of the corrective action analysis required in paragraph (g) of this section.

        (i) An owner or operator may request approval from the Administrator for a site-specific monitoring plan to account for offsite upwind sources or onsite sources excluded under Sec. 63.640(g) according to the requirements in paragraphs (i)(1) through (4) of this section.

        (1) The owner or operator shall prepare and submit a site-specific monitoring plan and receive approval of the site-specific monitoring plan prior to using the near-field source alternative calculation for determining Deltac provided in paragraph (i)(2) of this section. The site-specific monitoring plan shall include, at a minimum, the elements specified in paragraphs (i)(1)(i) through (v) of this section. The procedures in Section 12 of Method 325A of appendix A of this part are not required, but may be used, if applicable, when determining near-

        field source contributions.

        (i) Identification of the near-field source or sources. For onsite sources, documentation that the onsite source is excluded under Sec. 63.640(g) and identification of the specific provision in Sec. 63.640(g) that applies to the source.

        (ii) Location of the additional monitoring stations that shall be used to determine the uniform background concentration and the near-

        field source concentration contribution.

        (iii) Identification of the fenceline monitoring locations impacted by the near-field source. If more than one near-field source is present, identify the near-field source or sources that are expected to contribute to the concentration at that monitoring location.

        (iv) A description of (including sample calculations illustrating) the planned data reduction and calculations to determine the near-field source concentration contribution for each monitoring location.

        (v) If more frequent monitoring or a monitoring station other than a passive diffusive tube monitoring station is proposed, provide a detailed description of the measurement methods, measurement frequency, and recording frequency for determining the uniform background or near-

        field source concentration contribution.

        (2) When an approved site-specific monitoring plan is used, the owner or operator shall determine Deltac for comparison with the 9 mug/m\3\ action level using the requirements specified in paragraphs (i)(2)(i) through (iii) of this section.

        (i) For each monitoring location, calculate Deltaci using the following equation.

        Deltaci = MFCi - NFSi - UB

        Where:

        Deltaci = The fenceline concentration, corrected for background, at measurement location i, micrograms per cubic meter (mug/m\3\).

        MFCi = The measured fenceline concentration at measurement location i, mug/m\3\.

        NFSi = The near-field source contributing concentration at measurement location i determined using the additional measurements and calculation procedures included in the site-

        specific monitoring plan, mug/m\3\. For monitoring locations that are not included in the site-specific monitoring plan as impacted by a near-field source, use NFSi = 0 mug/m\3\.

        UB = The uniform background concentration determined using the additional measurements included in the site-specific monitoring plan, mug/m\3\. If no additional measurements are specified in the site-specific monitoring plan for determining the uniform background concentration, use UB = 0 mug/m\3\.

        (ii) When one or more samples for the sampling period are below the method detection limit for benzene, adhere to the following procedures:

        (A) If the benzene concentration at the monitoring location used for the uniform background concentration is below the method detection limit, the owner or operator shall use zero for UB for that monitoring period.

        (B) If the benzene concentration at the monitoring location(s) used to determine the near-field source contributing concentration is below the method detection limit, the owner or operator shall use zero for the monitoring location concentration when calculating NFSi for that monitoring period.

        (C) If a fenceline monitoring location sample result is below the method detection limit, the owner or operator shall use the method detection limit as the sample result.

        (iii) Determine Deltac for the monitoring period as the maximum value of Deltaci from all of the fenceline monitoring locations for that monitoring period.

        (3) The site-specific monitoring plan shall be submitted and approved as described in paragraphs (i)(3)(i) through (iv) of this section.

        (i) The site-specific monitoring plan must be submitted to the Administrator for approval.

        (ii) The site-specific monitoring plan shall also be submitted to the following address: U.S. Environmental Protection Agency, Office of Air Quality Planning and Standards, Sector Policies and Programs Division, U.S. EPA Mailroom (E143-01), Attention: Refinery Sector Lead, 109 T.W. Alexander Drive, Research Triangle Park, NC 27711. Electronic copies in lieu of hard copies may also be submitted to refineryrtr@epa.gov.

        (iii) The Administrator shall approve or disapprove the plan in 90 days. The plan shall be considered approved if the Administrator either approves the plan in writing, or fails to disapprove the plan in writing. The 90-day period shall begin when the Administrator receives the plan.

        (iv) If the Administrator finds any deficiencies in the site-

        specific monitoring plan and disapproves the plan in writing, the owner or operator may revise and resubmit the site-specific monitoring plan following the requirements in paragraphs (i)(3)(i) and (ii) of this section. The 90-day period starts over with the resubmission of the revised monitoring plan.

        (4) The approval by the Administrator of a site-specific monitoring plan will be based on the completeness, accuracy and reasonableness of the request for a site-specific monitoring plan. Factors that the Administrator will consider in reviewing the request for a site-

        specific monitoring plan include, but are not limited to, those described in paragraphs (i)(4)(i) through (v) of this section.

        (i) The identification of the near-field source or sources. For onsite sources, the documentation provided that the onsite source is excluded under Sec. 63.640(g).

        (ii) The monitoring location selected to determine the uniform background concentration or an indication that no uniform background concentration monitor will be used.

        (iii) The location(s) selected for additional monitoring to determine the near-field source concentration contribution.

        (iv) The identification of the fenceline monitoring locations impacted by the near-field source or sources.

        (v) The appropriateness of the planned data reduction and calculations to determine the near-field source concentration contribution for each monitoring location.

        (vi) If more frequent monitoring is proposed, the adequacy of the description of the measurement and

        Page 75257

        recording frequency proposed and the adequacy of the rationale for using the alternative monitoring frequency.

        (j) The owner or operator shall comply with the applicable recordkeeping and reporting requirements in Sec. 63.655(h) and (i).

        (k) As outlined in Sec. 63.7(f), the owner or operator may submit a request for an alternative test method. At a minimum, the request must follow the requirements outlined in paragraphs (k)(1) through (7) of this section.

        (1) The alternative method may be used in lieu of all or a partial number of passive samplers required in Method 325A of appendix A of this part.

        (2) The alternative method must be validated according to Method 301 in appendix A of this part or contain performance based procedures and indicators to ensure self-validation.

        (3) The method detection limit must nominally be at least an order of magnitude below the action level, i.e., 0.9 microg/m3 benzene. The alternate test method must describe the procedures used to provide field verification of the detection limit.

        (4) The spatial coverage must be equal to or better than the spatial coverage provided in Method 325A of appendix A of this part.

        (i) For path average concentration open-path instruments, the physical path length of the measurement shall be no more than a passive sample footprint (the spacing that would be provided by the sorbent traps when following Method 325A). For example, if Method 325A requires spacing monitors A and B 610 meters (2000 feet) apart, then the physical path length limit for the measurement at that portion of the fenceline shall be no more than 610 meters (2000 feet).

        (ii) For range resolved open-path instrument or approach, the instrument or approach must be able to resolve an average concentration over each passive sampler footprint within the path length of the instrument.

        (iii) The extra samplers required in Sections 8.2.1.3 of Method 325A may be omitted when they fall within the path length of an open-

        path instrument.

        (5) At a minimum, non-integrating alternative test methods must provide a minimum of one cycle of operation (sampling, analyzing, and data recording) for each successive 15-minute period.

        (6) For alternative test methods capable of real time measurements (less than a 5 minute sampling and analysis cycle), the alternative test method may allow for elimination of data points corresponding to outside emission sources for purpose of calculation of the high point for the two week average. The alternative test method approach must have wind speed, direction and stability class of the same time resolution and within the footprint of the instrument.

        (7) For purposes of averaging data points to determine the Deltac for the 14-day average high sample result, all results measured under the method detection limit must use the method detection limit. For purposes of averaging data points for the 14-day average low sample result, all results measured under the method detection limit must use zero.

        0

        31. Section 63.660 is added to read as follows:

        Sec. 63.660 Storage vessel provisions.

        On and after the applicable compliance date for a Group 1 storage vessel located at a new or existing source as specified in Sec. 63.640(h), the owner or operator of a Group 1 storage vessel that is part of a new or existing source shall comply with the requirements in subpart WW or SS of this part according to the requirements in paragraphs (a) through (i) of this section.

        (a) As used in this section, all terms not defined in Sec. 63.641 shall have the meaning given them in subpart A, WW, or SS of this part. The definitions of ``Group 1 storage vessel'' (paragraph (2)) and ``Storage vessel'' in Sec. 63.641 shall apply in lieu of the definition of ``Storage vessel'' in Sec. 63.1061.

        (1) An owner or operator may use good engineering judgment or test results to determine the stored liquid weight percent total organic HAP for purposes of group determination. Data, assumptions, and procedures used in the determination shall be documented.

        (2) When an owner or operator and the Administrator do not agree on whether the annual average weight percent organic HAP in the stored liquid is above or below 4 percent for a storage vessel at an existing source or above or below 2 percent for a storage vessel at a new source, an appropriate method (based on the type of liquid stored) as published by EPA or a consensus-based standards organization shall be used. Consensus-based standards organizations include, but are not limited to, the following: ASTM International (100 Barr Harbor Drive, P.O. Box CB700, West Conshohocken, Pennsylvania 19428-B2959, (800) 262-

        1373, http://www.astm.org), the American National Standards Institute (ANSI, 1819 L Street NW., 6th Floor, Washington, DC 20036, (202) 293-

        8020, http://www.ansi.org), the American Gas Association (AGA, 400 North Capitol Street NW., 4th Floor, Washington, DC 20001, (202) 824-

        7000, http://www.aga.org), the American Society of Mechanical Engineers (ASME, Three Park Avenue, New York, NY 10016-5990, (800) 843-2763, http://www.asme.org), the American Petroleum Institute (API, 1220 L Street NW., Washington, DC 20005-4070, (202) 682-8000, http://www.api.org), and the North American Energy Standards Board (NAESB, 801 Travis Street, Suite 1675, Houston, TX 77002, (713) 356-0060, http://www.naesb.org).

        (b) A floating roof storage vessel complying with the requirements of subpart WW of this part may comply with the control option specified in paragraph (b)(1) of this section and, if equipped with a ladder having at least one slotted leg, shall comply with one of the control options as described in paragraph (b)(2) of this section.

        (1) In addition to the options presented in Sec. Sec. 63.1063(a)(2)(viii)(A) and (B) and 63.1064, a floating roof storage vessel may comply with Sec. 63.1063(a)(2)(vii) using a flexible enclosure device and either a gasketed or welded cap on the top of the guidepole.

        (2) Each opening through a floating roof for a ladder having at least one slotted leg shall be equipped with one of the configurations specified in paragraphs (b)(2)(i) through (iii) of this section.

        (i) A pole float in the slotted leg and pole wipers for both legs. The wiper or seal of the pole float must be at or above the height of the pole wiper.

        (ii) A ladder sleeve and pole wipers for both legs of the ladder.

        (iii) A flexible enclosure device and either a gasketed or welded cap on the top of the slotted leg.

        (c) For the purposes of this subpart, references shall apply as specified in paragraphs (c)(1) through (6) of this section.

        (1) All references to ``the proposal date for a referencing subpart'' and ``the proposal date of the referencing subpart'' in subpart WW of this part mean June 30, 2014.

        (2) All references to ``promulgation of the referencing subpart'' and ``the promulgation date of the referencing subpart'' in subpart WW of this part mean February 1, 2016.

        (3) All references to ``promulgation date of standards for an affected source or affected facility under a referencing subpart'' in subpart SS of this part mean February 1, 2016.

        (4) All references to ``the proposal date of the relevant standard established pursuant to CAA section 112(f)'' in

        Page 75258

        subpart SS of this part mean June 30, 2014.

        (5) All references to ``the proposal date of a relevant standard established pursuant to CAA section 112(d)'' in subpart SS of this part mean July 14, 1994.

        (6) All references to the ``required control efficiency'' in subpart SS of this part mean reduction of organic HAP emissions by 95 percent or to an outlet concentration of 20 ppmv.

        (d) For an uncontrolled fixed roof storage vessel that commenced construction on or before June 30, 2014, and that meets the definition of ``Group 1 storage vessel'', paragraph (2), in Sec. 63.641 but not the definition of ``Group 1 storage vessel'', paragraph (1), in Sec. 63.641, the requirements of Sec. 63.982 and/or Sec. 63.1062 do not apply until the next time the storage vessel is completely emptied and degassed, or January 30, 2026, whichever occurs first.

        (e) Failure to perform inspections and monitoring required by this section shall constitute a violation of the applicable standard of this subpart.

        (f) References in Sec. 63.1066(a) to initial startup notification requirements do not apply.

        (g) References to the Notification of Compliance Status in Sec. 63.999(b) mean the Notification of Compliance Status required by Sec. 63.655(f).

        (h) References to the Periodic Reports in Sec. Sec. 63.1066(b) and 63.999(c) mean the Periodic Report required by Sec. 63.655(g).

        (i) Owners or operators electing to comply with the requirements in subpart SS of this part for a Group 1 storage vessel must comply with the requirements in paragraphs (i)(1) through (3) of this section.

        (1) If a flare is used as a control device, the flare shall meet the requirements of Sec. 63.670 instead of the flare requirements in Sec. 63.987.

        (2) If a closed vent system contains a bypass line, the owner or operator shall comply with the provisions of either Sec. 63.983(a)(3)(i) or (ii) for each closed vent system that contains bypass lines that could divert a vent stream either directly to the atmosphere or to a control device that does not comply with the requirements in subpart SS of this part. Except as provided in paragraphs (i)(2)(i) and (ii) of this section, use of the bypass at any time to divert a Group 1 storage vessel to either directly to the atmosphere or to a control device that does not comply with the requirements in subpart SS of this part is an emissions standards violation. Equipment such as low leg drains and equipment subject to Sec. 63.648 are not subject to this paragraph (i)(2).

        (i) If planned routine maintenance of the control device cannot be performed during periods that storage vessel emissions are vented to the control device or when the storage vessel is taken out of service for inspections or other planned maintenance reasons, the owner or operator may bypass the control device.

        (ii) Periods for which storage vessel control device may be bypassed for planned routine maintenance of the control device shall not exceed 240 hours per calendar year.

        (3) If storage vessel emissions are routed to a fuel gas system or process, the fuel gas system or process shall be operating at all times when regulated emissions are routed to it. The exception in Sec. 63.984(a)(1) does not apply.

        0

        32. Section 63.670 is added to read as follows:

        Sec. 63.670 Requirements for flare control devices.

        On or before January 30, 2019, the owner or operator of a flare used as a control device for an emission point subject to this subpart shall meet the applicable requirements for flares as specified in paragraphs (a) through (q) of this section and the applicable requirements in Sec. 63.671. The owner or operator may elect to comply with the requirements of paragraph (r) of this section in lieu of the requirements in paragraphs (d) through (f) of this section, as applicable.

        (a) Reserved

        (b) Pilot flame presence. The owner or operator shall operate each flare with a pilot flame present at all times when regulated material is routed to the flare. Each 15-minute block during which there is at least one minute where no pilot flame is present when regulated material is routed to the flare is a deviation of the standard. Deviations in different 15-minute blocks from the same event are considered separate deviations. The owner or operator shall monitor for the presence of a pilot flame as specified in paragraph (g) of this section.

        (c) Visible emissions. The owner or operator shall specify the smokeless design capacity of each flare and operate with no visible emissions, except for periods not to exceed a total of 5 minutes during any 2 consecutive hours, when regulated material is routed to the flare and the flare vent gas flow rate is less than the smokeless design capacity of the flare. The owner or operator shall monitor for visible emissions from the flare as specified in paragraph (h) of this section.

        (d) Flare tip velocity. For each flare, the owner or operator shall comply with either paragraph (d)(1) or (2) of this section, provided the appropriate monitoring systems are in-place, whenever regulated material is routed to the flare for at least 15-minutes and the flare vent gas flow rate is less than the smokeless design capacity of the flare.

        (1) Except as provided in paragraph (d)(2) of this section, the actual flare tip velocity (Vtip) must be less than 60 feet per second. The owner or operator shall monitor Vtipusing the procedures specified in paragraphs (i) and (k) of this section.

        (2) Vtip must be less than 400 feet per second and also less than the maximum allowed flare tip velocity (Vmax) as calculated according to the following equation. The owner or operator shall monitor Vtip using the procedures specified in paragraphs (i) and (k) of this section and monitor gas composition and determine NHVvg using the procedures specified in paragraphs (j) and (l) of this section.

        GRAPHIC TIFF OMITTED TR01DE15.008

        Where:

        Vmax = Maximum allowed flare tip velocity, ft/sec.

        NHVvg = Net heating value of flare vent gas, as determined by paragraph (l)(4) of this section, Btu/scf.

        1,212 = Constant.

        850 = Constant.

        (e) Combustion zone operating limits. For each flare, the owner or operator shall operate the flare to maintain the net heating value of flare combustion zone gas (NHVcz) at or above 270 British thermal units per standard cubic feet (Btu/scf) determined on a 15-

        minute block period basis when regulated material is routed to the flare for at least 15-minutes. The owner or operator shall monitor and calculate NHVcz as specified in paragraph (m) of this section.

        (f) Dilution operating limits for flares with perimeter assist air. For each flare actively receiving perimeter assist air, the owner or operator shall operate the flare to maintain the net heating value dilution parameter (NHVdil) at or above 22 British thermal units per square foot (Btu/ft2) determined on a 15-minute block period basis when regulated material is being routed to the flare for at least 15-minutes. The owner or operator shall monitor and calculate NHVdil as specified in paragraph (n) of this section.

        Page 75259

        (g) Pilot flame monitoring. The owner or operator shall continuously monitor the presence of the pilot flame(s) using a device (including, but not limited to, a thermocouple, ultraviolet beam sensor, or infrared sensor) capable of detecting that the pilot flame(s) is present.

        (h) Visible emissions monitoring. The owner or operator shall monitor visible emissions while regulated materials are vented to the flare. An initial visible emissions demonstration must be conducted using an observation period of 2 hours using Method 22 at 40 CFR part 60, appendix A-7. Subsequent visible emissions observations must be conducted using either the methods in paragraph (h)(1) of this section or, alternatively, the methods in paragraph (h)(2) of this section. The owner or operator must record and report any instances where visible emissions are observed for more than 5 minutes during any 2 consecutive hours as specified in Sec. 63.655(g)(11)(ii).

        (1) At least once per day, conduct visible emissions observations using an observation period of 5 minutes using Method 22 at 40 CFR part 60, appendix A-7. If at any time the owner or operator sees visible emissions, even if the minimum required daily visible emission monitoring has already been performed, the owner or operator shall immediately begin an observation period of 5 minutes using Method 22 at 40 CFR part 60, appendix A-7. If visible emissions are observed for more than one continuous minute during any 5-minute observation period, the observation period using Method 22 at 40 CFR part 60, appendix A-7 must be extended to 2 hours or until 5-minutes of visible emissions are observed.

        (2) Use a video surveillance camera to continuously record (at least one frame every 15 seconds with time and date stamps) images of the flare flame and a reasonable distance above the flare flame at an angle suitable for visual emissions observations. The owner or operator must provide real-time video surveillance camera output to the control room or other continuously manned location where the camera images may be viewed at any time.

        (i) Flare vent gas, steam assist and air assist flow rate monitoring. The owner or operator shall install, operate, calibrate, and maintain a monitoring system capable of continuously measuring, calculating, and recording the volumetric flow rate in the flare header or headers that feed the flare as well as any supplemental natural gas used. Different flow monitoring methods may be used to measure different gaseous streams that make up the flare vent gas provided that the flow rates of all gas streams that contribute to the flare vent gas are determined. If assist air or assist steam is used, the owner or operator shall install, operate, calibrate, and maintain a monitoring system capable of continuously measuring, calculating, and recording the volumetric flow rate of assist air and/or assist steam used with the flare. If pre-mix assist air and perimeter assist are both used, the owner or operator shall install, operate, calibrate, and maintain a monitoring system capable of separately measuring, calculating, and recording the volumetric flow rate of premix assist air and perimeter assist air used with the flare. Continuously monitoring fan speed or power and using fan curves is an acceptable method for continuously monitoring assist air flow rates.

        (1) The flow rate monitoring systems must be able to correct for the temperature and pressure of the system and output parameters in standard conditions (i.e., a temperature of 20 degC (68emsp14degF) and a pressure of 1 atmosphere).

        (2) Mass flow monitors may be used for determining volumetric flow rate of flare vent gas provided the molecular weight of the flare vent gas is determined using compositional analysis as specified in paragraph (j) of this section so that the mass flow rate can be converted to volumetric flow at standard conditions using the following equation.

        GRAPHIC TIFF OMITTED TR01DE15.009

        Where:

        Qvol = Volumetric flow rate, standard cubic feet per second.

        Qmass = Mass flow rate, pounds per second.

        385.3 = Conversion factor, standard cubic feet per pound-mole.

        MWt = Molecular weight of the gas at the flow monitoring location, pounds per pound-mole.

        (3) Mass flow monitors may be used for determining volumetric flow rate of assist air or assist steam. Use equation in paragraph (i)(2) of this section to convert mass flow rates to volumetric flow rates. Use a molecular weight of 18 pounds per pound-mole for assist steam and use a molecular weight of 29 pounds per pound-mole for assist air.

        (4) Continuous pressure/temperature monitoring system(s) and appropriate engineering calculations may be used in lieu of a continuous volumetric flow monitoring systems provided the molecular weight of the gas is known. For assist steam, use a molecular weight of 18 pounds per pound-mole. For assist air, use a molecular weight of 29 pounds per pound-mole. For flare vent gas, molecular weight must be determined using compositional analysis as specified in paragraph (j) of this section.

        (j) Flare vent gas composition monitoring. The owner or operator shall determine the concentration of individual components in the flare vent gas using either the methods provided in paragraph (j)(1) or (2) of this section, to assess compliance with the operating limits in paragraph (e) of this section and, if applicable, paragraphs (d) and (f) of this section. Alternatively, the owner or operator may elect to directly monitor the net heating value of the flare vent gas following the methods provided in paragraphs (j)(3) of this section and, if desired, may directly measure the hydrogen concentration in the flare vent gas following the methods provided in paragraphs (j)(4) of this section. The owner or operator may elect to use different monitoring methods for different gaseous streams that make up the flare vent gas using different methods provided the composition or net heating value of all gas streams that contribute to the flare vent gas are determined.

        (1) Except as provided in paragraphs (j)(5) and (6) of this section, the owner or operator shall install, operate, calibrate, and maintain a monitoring system capable of continuously measuring (i.e., at least once every 15-minutes), calculating, and recording the individual component concentrations present in the flare vent gas.

        (2) Except as provided in paragraphs (j)(5) and (6) of this section, the owner or operator shall install, operate, and maintain a grab sampling system capable of collecting an evacuated canister sample for subsequent compositional analysis at least once every eight hours while there is flow of regulated material to the flare. Subsequent compositional analysis of the samples must be performed according to Method 18 of 40 CFR part 60, appendix A-6, ASTM D6420-99 (Reapproved 2010), ASTM D1945-03 (Reapproved 2010), ASTM D1945-14 or ASTM UOP539-12 (all incorporated by reference--see Sec. 63.14).

        (3) Except as provided in paragraphs (j)(5) and (6) of this section, the owner or operator shall install, operate, calibrate, and maintain a calorimeter capable of continuously measuring, calculating, and recording NHVvg at standard conditions.

        (4) If the owner or operator uses a continuous net heating value monitor according to paragraph (j)(3) of this section, the owner or operator may, at their discretion, install, operate, calibrate, and maintain a monitoring

        Page 75260

        system capable of continuously measuring, calculating, and recording the hydrogen concentration in the flare vent gas.

        (5) Direct compositional or net heating value monitoring is not required for purchased (``pipeline quality'') natural gas streams. The net heating value of purchased natural gas streams may be determined using annual or more frequent grab sampling at any one representative location. Alternatively, the net heating value of any purchased natural gas stream can be assumed to be 920 Btu/scf.

        (6) Direct compositional or net heating value monitoring is not required for gas streams that have been demonstrated to have consistent composition (or a fixed minimum net heating value) according to the methods in paragraphs (j)(6)(i) through (v) of this section.

        (i) The owner or operator shall submit to the Administrator a written application for an exemption from monitoring. The application must contain the following information:

        (A) A description of the flare gas stream/system to be considered, including submission of a portion of the appropriate piping diagrams indicating the boundaries of the flare gas stream/system and the affected flare(s) to be considered;

        (B) A statement that there are no crossover or entry points to be introduced into the flare gas stream/system (this should be shown in the piping diagrams) prior to the point where the flow rate of the gas streams is measured;

        (C) An explanation of the conditions that ensure that the flare gas net heating value is consistent and, if flare gas net heating value is expected to vary (e.g., due to product loading of different material), the conditions expected to produce the flare gas with the lowest net heating value;

        (D) The supporting test results from sampling the requested flare gas stream/system for the net heating value. Sampling data must include, at minimum, 2 weeks of daily measurement values (14 grab samples) for frequently operated flare gas streams/systems; for infrequently operated flare gas streams/systems, seven grab samples must be collected unless other additional information would support reduced sampling. If the flare gas stream composition can vary, samples must be taken during those conditions expected to result in lowest net heating value identified in paragraph (j)(6)(i)(C) of this section. The owner or operator shall determine net heating value for the gas stream using either gas composition analysis or net heating value monitor (with optional hydrogen concentration analyzer) according to the method provided in paragraph (l) of this section; and

        (E) A description of how the 2 weeks (or seven samples for infrequently operated flare gas streams/systems) of monitoring results compares to the typical range of net heating values expected for the flare gas stream/system going to the affected flare (e.g., ``the samples are representative of typical operating conditions of the flare gas stream going to the loading rack flare'' or ``the samples are representative of conditions expected to yield the lowest net heating value of the flare gas stream going to the loading rack flare'').

        (F) The net heating value to be used for all flows of the flare vent gas from the flare gas stream/system covered in the application. A single net heating value must be assigned to the flare vent gas either by selecting the lowest net heating value measured in the sampling program or by determining the 95th percent confidence interval on the mean value of all samples collected using the t-distribution statistic (which is 1.943 for 7 grab samples or 1.771 for 14 grab samples).

        (ii) The effective date of the exemption is the date of submission of the information required in paragraph (j)(6)(i) of this section.

        (iii) No further action is required unless refinery operating conditions change in such a way that affects the exempt fuel gas stream/system (e.g., the stream composition changes). If such a change occurs, the owner or operator shall follow the procedures in paragraph (j)(6)(iii)(A), (B), or (C) of this section.

        (A) If the operation change results in a flare vent gas net heating value that is still within the range of net heating values included in the original application, the owner or operator shall determine the net heating value on a grab sample and record the results as proof that the net heating value assigned to the vent gas stream in the original application is still appropriate.

        (B) If the operation change results in a flare vent gas net heating value that is lower than the net heating value assigned to the vent gas stream in the original application, the owner or operator may submit new information following the procedures of paragraph (j)(6)(i) of this section within 60 days (or within 30 days after the seventh grab sample is tested for infrequently operated process units).

        (C) If the operation change results in a flare vent gas net heating value has greater variability in the flare gas stream/system such the owner or operator chooses not to submit new information to support an exemption, the owner or operator must begin monitoring the composition or net heat content of the flare vent gas stream using the methods in this section (i.e., grab samples every 8 hours until such time a continuous monitor, if elected, is installed).

        (k) Calculation methods for cumulative flow rates and determining compliance with Vtip operating limits. The owner or operator shall determine Vtip on a 15-minute block average basis according to the following requirements.

        (1) The owner or operator shall use design and engineering principles to determine the unobstructed cross sectional area of the flare tip. The unobstructed cross sectional area of the flare tip is the total tip area that vent gas can pass through. This area does not include any stability tabs, stability rings, and upper steam or air tubes because flare vent gas does not exit through them.

        (2) The owner or operator shall determine the cumulative volumetric flow of flare vent gas for each 15-minute block average period using the data from the continuous flow monitoring system required in paragraph (i) of this section according to the following requirements, as applicable. If desired, the cumulative flow rate for a 15-minute block period only needs to include flow during those periods when regulated material is sent to the flare, but owners or operators may elect to calculate the cumulative flow rates across the entire 15-

        minute block period for any 15-minute block period where there is regulated material flow to the flare.

        (i) Use set 15-minute time periods starting at 12 midnight to 12:15 a.m., 12:15 a.m. to 12:30 a.m. and so on concluding at 11:45 p.m. to midnight when calculating 15-minute block average flow volumes.

        (ii) If continuous pressure/temperature monitoring system(s) and engineering calculations are used as allowed under paragraph (i)(4) of this section, the owner or operator shall, at a minimum, determine the 15-minute block average temperature and pressure from the monitoring system and use those values to perform the engineering calculations to determine the cumulative flow over the 15-minute block average period. Alternatively, the owner or operator may divide the 15-minute block average period into equal duration subperiods (e.g., three 5-minute periods) and determine the average temperature and pressure for each subperiod, perform engineering calculations to determine the flow for each subperiod, then add the volumetric

        Page 75261

        flows for the subperiods to determine the cumulative volumetric flow of vent gas for the 15-minute block average period.

        (3) The 15-minute block average Vtip shall be calculated using the following equation.

        GRAPHIC TIFF OMITTED TR01DE15.010

        Where:

        Vtip = Flare tip velocity, feet per second.

        Qcum = Cumulative volumetric flow over 15-minute block average period, actual cubic feet.

        Area = Unobstructed area of the flare tip, square feet.

        900 = Conversion factor, seconds per 15-minute block average.

        (4) If the owner or operator chooses to comply with paragraph (d)(2) of this section, the owner or operator shall also determine the net heating value of the flare vent gas following the requirements in paragraphs (j) and (l) of this section and calculate Vmax using the equation in paragraph (d)(2) of this section in order to compare Vtip to Vmax on a 15-minute block average basis.

        (l) Calculation methods for determining flare vent gas net heating value. The owner or operator shall determine the net heating value of the flare vent gas (NHVvg) based on the composition monitoring data on a 15-minute block average basis according to the following requirements.

        (1) If compositional analysis data are collected as provided in paragraph (j)(1) or (2) of this section, the owner or operator shall determine NHVvg of a specific sample by using the following equation.

        GRAPHIC TIFF OMITTED TR01DE15.011

        Where:

        NHVvg = Net heating value of flare vent gas, Btu/scf.

        i = Individual component in flare vent gas.

        n = Number of components in flare vent gas.

        xi = Concentration of component i in flare vent gas, volume fraction.

        NHVi = Net heating value of component i according to table 12 of this subpart, Btu/scf. If the component is not specified in table 12 of this subpart, the heats of combustion may be determined using any published values where the net enthalpy per mole of offgas is based on combustion at 25 degC and 1 atmosphere (or constant pressure) with offgas water in the gaseous state, but the standard temperature for determining the volume corresponding to one mole of vent gas is 20 degC.

        (2) If direct net heating value monitoring data are collected as provided in paragraph (j)(3) of this section but a hydrogen concentration monitor is not used, the owner or operator shall use the direct output of the monitoring system(s) (in Btu/scf) to determine the NHVvg for the sample.

        (3) If direct net heating value monitoring data are collected as provided in paragraph (j)(3) of this section and hydrogen concentration monitoring data are collected as provided in paragraph (j)(4) of this section, the owner or operator shall use the following equation to determine NHVvg for each sample measured via the net heating value monitoring system.

        NHVvg = NHVmeasured + 938xH2

        Where:

        NHVvg = Net heating value of flare vent gas, Btu/scf.

        NHVmeasured = Net heating value of flare vent gas stream as measured by the continuous net heating value monitoring system, Btu/scf.

        xH2 = Concentration of hydrogen in flare vent gas at the time the sample was input into the net heating value monitoring system, volume fraction.

        938 = Net correction for the measured heating value of hydrogen (1,212 - 274), Btu/scf.

        (4) Use set 15-minute time periods starting at 12 midnight to 12:15 a.m., 12:15 a.m. to 12:30 a.m. and so on concluding at 11:45 p.m. to midnight when calculating 15-minute block averages.

        (5) When a continuous monitoring system is used as provided in paragraph (j)(1) or (3) of this section and, if applicable, paragraph (j)(4) of this section, the owner or operator may elect to determine the 15-minute block average NHVvg using either the calculation methods in paragraph (l)(5)(i) of this section or the calculation methods in paragraph (l)(5)(ii) of this section. The owner or operator may choose to comply using the calculation methods in paragraph (l)(5)(i) of this section for some flares at the petroleum refinery and comply using the calculation methods (l)(5)(ii) of this section for other flares. However, for each flare, the owner or operator must elect one calculation method that will apply at all times, and use that method for all continuously monitored flare vent streams associated with that flare. If the owner or operator intends to change the calculation method that applies to a flare, the owner or operator must notify the Administrator 30 days in advance of such a change.

        (i) Feed-forward calculation method. When calculating NHVvg for a specific 15-minute block:

        (A) Use the results from the first sample collected during an event, (for periodic flare vent gas flow events) for the first 15-

        minute block associated with that event.

        (B) If the results from the first sample collected during an event (for periodic flare vent gas flow events) are not available until after the second 15-minute block starts, use the results from the first sample collected during an event for the second 15-minute block associated with that event.

        (C) For all other cases, use the results that are available from the most recent sample prior to the 15-minute block period for that 15-

        minute block period for all flare vent gas steams. For the purpose of this requirement, use the time that the results become available rather than the time the sample was collected. For example, if a sample is collected at 12:25 a.m. and the analysis is completed at 12:38 a.m., the results are available at 12:38 a.m. and these results would be used to determine compliance during the 15-minute block period from 12:45 a.m. to 1:00 a.m.

        (ii) Direct calculation method. When calculating NHVvg for a specific 15-minute block:

        (A) If the results from the first sample collected during an event (for periodic flare vent gas flow events) are not available until after the second 15-minute block starts, use the results from the first sample collected during an event for the first 15-minute block associated with that event.

        (B) For all other cases, use the arithmetic average of all NHVvg measurement data results that become available during a 15-minute block to calculate the 15-minute block average for that period. For the purpose of this requirement, use the time that the results become available rather than the time the sample was collected. For example, if a sample is collected at 12:25 a.m. and the analysis is completed at 12:38 a.m., the results are available at 12:38 a.m. and these results would be used to determine compliance during the 15-

        minute block period from 12:30 a.m. to 12:45 a.m.

        (6) When grab samples are used to determine flare vent gas composition:

        (i) Use the analytical results from the first grab sample collected for an event for all 15-minute periods from the start of the event through the 15-minute block prior to the 15-minute block in which a subsequent grab sample is collected.

        (ii) Use the results from subsequent grab sampling events for all 15 minute periods starting with the 15-minute block in which the sample was collected and ending with the 15-minute block prior to the 15-

        minute block in which the next grab sample is collected. For

        Page 75262

        the purpose of this requirement, use the time the sample was collected rather than the time the analytical results become available.

        (7) If the owner or operator monitors separate gas streams that combine to comprise the total flare vent gas flow, the 15-minute block average net heating value shall be determined separately for each measurement location according to the methods in paragraphs (l)(1) through (6) of this section and a flow-weighted average of the gas stream net heating values shall be used to determine the 15-minute block average net heating value of the cumulative flare vent gas.

        (m) Calculation methods for determining combustion zone net heating value. The owner or operator shall determine the net heating value of the combustion zone gas (NHVcz) as specified in paragraph (m)(1) or (2) of this section, as applicable.

        (1) Except as specified in paragraph (m)(2) of this section, determine the 15-minute block average NHVcz based on the 15-

        minute block average vent gas and assist gas flow rates using the following equation. For periods when there is no assist steam flow or premix assist air flow, NHVcz = NHVvg.

        GRAPHIC TIFF OMITTED TR01DE15.012

        Where:

        NHVcz = Net heating value of combustion zone gas, Btu/

        scf.

        NHVvg = Net heating value of flare vent gas for the 15-

        minute block period, Btu/scf.

        Qvg = Cumulative volumetric flow of flare vent gas during the 15-minute block period, scf.

        Qs = Cumulative volumetric flow of total steam during the 15-minute block period, scf.

        Qa,premix = Cumulative volumetric flow of premix assist air during the 15-minute block period, scf.

        (2) Owners or operators of flares that use the feed-forward calculation methodology in paragraph (l)(5)(i) of this section and that monitor gas composition or net heating value in a location representative of the cumulative vent gas stream and that directly monitor supplemental natural gas flow additions to the flare must determine the 15-minute block average NHVcz using the following equation.

        GRAPHIC TIFF OMITTED TR01DE15.013

        Where:

        NHVcz = Net heating value of combustion zone gas, Btu/

        scf.

        NHVvg = Net heating value of flare vent gas for the 15-

        minute block period, Btu/scf.

        Qvg = Cumulative volumetric flow of flare vent gas during the 15-minute block period, scf.

        QNG2 = Cumulative volumetric flow of supplemental natural gas to the flare during the 15-minute block period, scf.

        QNG1 = Cumulative volumetric flow of supplemental natural gas to the flare during the previous 15-minute block period, scf. For the first 15-minute block period of an event, use the volumetric flow value for the current 15-minute block period, i.e., QNG1=QNG2.

        NHVNG = Net heating value of supplemental natural gas to the flare for the 15-minute block period determined according to the requirements in paragraph (j)(5) of this section, Btu/scf.

        Qs = Cumulative volumetric flow of total steam during the 15-minute block period, scf.

        Qa,premix = Cumulative volumetric flow of premix assist air during the 15-minute block period, scf.

        (n) Calculation methods for determining the net heating value dilution parameter. The owner or operator shall determine the net heating value dilution parameter (NHVdil) as specified in paragraph (n)(1) or (2) of this section, as applicable.

        (1) Except as specified in paragraph (n)(2) of this section, determine the 15-minute block average NHVdil based on the 15-minute block average vent gas and perimeter assist air flow rates using the following equation only during periods when perimeter assist air is used. For 15-minute block periods when there is no cumulative volumetric flow of perimeter assist air, the 15-minute block average NHVdil parameter does not need to be calculated.

        GRAPHIC TIFF OMITTED TR01DE15.014

        Where:

        NHVdil = Net heating value dilution parameter, Btu/

        ft2.

        NHVvg = Net heating value of flare vent gas determined for the 15-minute block period, Btu/scf.

        Qvg = Cumulative volumetric flow of flare vent gas during the 15-minute block period, scf.

        Diam = Effective diameter of the unobstructed area of the flare tip for flare vent gas flow, ft. Use the area as determined in paragraph (k)(1) of this section and determine the diameter as

        GRAPHIC TIFF OMITTED TR01DE15.015

        Qs = Cumulative volumetric flow of total steam during the 15-minute block period, scf.

        Qa,premix = Cumulative volumetric flow of premix assist air during the 15-minute block period, scf.

        Qa,perimeter = Cumulative volumetric flow of perimeter assist air during the 15-minute block period, scf.

        (2) Owners or operators of flares that use the feed-forward calculation methodology in paragraph (l)(5)(i) of this section and that monitor gas composition or net heating value in a location representative of the cumulative vent gas stream and that directly monitor supplemental natural gas flow additions to the flare must determine the 15-minute block average NHVdil using the following equation only during periods when perimeter assist air is used. For 15-minute block periods when there is no cumulative

        Page 75263

        volumetric flow of perimeter assist air, the 15-minute block average NHVdil parameter does not need to be calculated.

        GRAPHIC TIFF OMITTED TR01DE15.016

        Where:

        NHVdil = Net heating value dilution parameter, Btu/

        ft2.

        NHVvg = Net heating value of flare vent gas determined for the 15-minute block period, Btu/scf.

        Qvg = Cumulative volumetric flow of flare vent gas during the 15-minute block period, scf.

        QNG2 = Cumulative volumetric flow of supplemental natural gas to the flare during the 15-minute block period, scf.

        QNG1 = Cumulative volumetric flow of supplemental natural gas to the flare during the previous 15-minute block period, scf. For the first 15-minute block period of an event, use the volumetric flow value for the current 15-minute block period, i.e., QNG1 =QNG2.

        NHVNG = Net heating value of supplemental natural gas to the flare for the 15-minute block period determined according to the requirements in paragraph (j)(5) of this section, Btu/scf.

        Diam = Effective diameter of the unobstructed area of the flare tip for flare vent gas flow, ft. Use the area as determined in paragraph (k)(1) of this section and determine the diameter as

        GRAPHIC TIFF OMITTED TR01DE15.017

        Qs = Cumulative volumetric flow of total steam during the 15-minute block period, scf.

        Qa,premix = Cumulative volumetric flow of premix assist air during the 15-minute block period, scf.

        Qa,perimeter = Cumulative volumetric flow of perimeter assist air during the 15-minute block period, scf.

        (o) Emergency flaring provisions. The owner or operator of a flare that has the potential to operate above its smokeless capacity under any circumstance shall comply with the provisions in paragraphs (o)(1) through (8) of this section.

        (1) Develop a flare management plan to minimize flaring during periods of startup, shutdown, or emergency releases. The flare management plan must include the information described in paragraphs (o)(1)(i) through (vii) of this section.

        (i) A listing of all refinery process units, ancillary equipment, and fuel gas systems connected to the flare for each affected flare.

        (ii) An assessment of whether discharges to affected flares from these process units, ancillary equipment and fuel gas systems can be minimized or prevented during periods of startup, shutdown, or emergency releases. The flare minimization assessment must (at a minimum) consider the items in paragraphs (o)(1)(ii)(A) through (C) of this section. The assessment must provide clear rationale in terms of costs (capital and annual operating), natural gas offset credits (if applicable), technical feasibility, secondary environmental impacts and safety considerations for the selected minimization alternative(s) or a statement, with justifications, that flow reduction could not be achieved. Based upon the assessment, each owner or operator of an affected flare shall identify the minimization alternatives that it has implemented by the due date of the flare management plan and shall include a schedule for the prompt implementation of any selected measures that cannot reasonably be completed as of that date.

        (A) Modification in startup and shutdown procedures to reduce the quantity of process gas discharge to the flare.

        (B) Implementation of prevention measures listed for pressure relief devices in Sec. 63.648(j)(5) for each pressure relief valve that can discharge to the flare.

        (C) Installation of a flare gas recovery system or, for facilities that are fuel gas rich, a flare gas recovery system and a co-generation unit or combined heat and power unit.

        (iii) A description of each affected flare containing the information in paragraphs (o)(1)(iii)(A) through (G) of this section.

        (A) A general description of the flare, including whether it is a ground flare or elevated (including height), the type of assist system (e.g., air, steam, pressure, non-assisted), whether the flare is used on a routine basis or if it is only used during periods of startup, shutdown or emergency release, and whether the flare is equipped with a flare gas recovery system.

        (B) The smokeless capacity of the flare based on design conditions. Note: A single value must be provided for the smokeless capacity of the flare.

        (C) The maximum vent gas flow rate (hydraulic load capacity).

        (D) The maximum supplemental gas flow rate.

        (E) For flares that receive assist steam, the minimum total steam rate and the maximum total steam rate.

        (F) For flares that receive assist air, an indication of whether the fan/blower is single speed, multi-fixed speed (e.g., high, medium, and low speeds), or variable speeds. For fans/blowers with fixed speeds, provide the estimated assist air flow rate at each fixed speed. For variable speeds, provide the design fan curve (e.g., air flow rate as a function of power input).

        (G) Simple process flow diagram showing the locations of the flare following components of the flare: Flare tip (date installed, manufacturer, nominal and effective tip diameter, tip drawing); knockout or surge drum(s) or pot(s) (including dimensions and design capacities); flare header(s) and subheader(s); assist system; and ignition system.

        (iv) Description and simple process flow diagram showing all gas lines (including flare waste gas, purge or sweep gas (as applicable), supplemental gas) that are associated with the flare. For purge, sweep, supplemental gas, identify the type of gas used. Designate which lines are exempt from composition or net heating value monitoring and why (e.g., natural gas, gas streams that have been demonstrated to have consistent composition, pilot gas). Designate which lines are monitored and identify on the process flow diagram the location and type of each monitor. Designate the pressure relief devices that are vented to the flare.

        (v) For each flow rate, gas composition, net heating value or hydrogen concentration monitor identified in paragraph (o)(1)(iv) of this section, provide a detailed description of the manufacturer's specifications, including, but not limited to, make, model, type, range, precision, accuracy, calibration, maintenance and quality assurance procedures.

        (vi) For each pressure relief valve vented to the flare identified in paragraph (o)(1)(iv) of this section, provide a detailed description of each pressure release valve, including type of relief device (rupture disc, valve type) diameter of the relief valve, set pressure of the relief valve and listing of the prevention measures implemented. This

        Page 75264

        information may be maintained in an electronic database on-site and does not need to be submitted as part of the flare management plan unless requested to do so by the Administrator.

        (vii) Procedures to minimize or eliminate discharges to the flare during the planned startup and shutdown of the refinery process units and ancillary equipment that are connected to the affected flare, together with a schedule for the prompt implementation of any procedures that cannot reasonably be implemented as of the date of the submission of the flare management plan.

        (2) Each owner or operator required to develop and implement a written flare management plan as described in paragraph (o)(1) of this section must submit the plan to the Administrator as described in paragraphs (o)(2)(i) through (iii) of this section.

        (i) The owner or operator must develop and implement the flare management plan no later than January 30, 2019 or at startup for a new flare that commenced construction on or after February 1, 2016.

        (ii) The owner or operator must comply with the plan as submitted by the date specified in paragraph (o)(2)(i) of this section. The plan should be updated periodically to account for changes in the operation of the flare, such as new connections to the flare or the installation of a flare gas recovery system, but the plan need be re-submitted to the Administrator only if the owner or operator alters the design smokeless capacity of the flare. The owner or operator must comply with the updated plan as submitted.

        (iii) All versions of the plan submitted to the Administrator shall also be submitted to the following address: U.S. Environmental Protection Agency, Office of Air Quality Planning and Standards, Sector Policies and Programs Division, U.S. EPA Mailroom (E143-01), Attention: Refinery Sector Lead, 109 T.W. Alexander Drive, Research Triangle Park, NC 27711. Electronic copies in lieu of hard copies may also be submitted to refineryRTR@epa.gov.

        (3) The owner or operator of a flare subject to this subpart shall conduct a root cause analysis and a corrective action analysis for each flow event that contains regulated material and that meets either the criteria in paragraph (o)(3)(i) or (ii) of this section.

        (i) The vent gas flow rate exceeds the smokeless capacity of the flare and visible emissions are present from the flare for more than 5 minutes during any 2 consecutive hours during the release event.

        (ii) The vent gas flow rate exceeds the smokeless capacity of the flare and the 15-minute block average flare tip velocity exceeds the maximum flare tip velocity determined using the methods in paragraph (d)(2) of this section.

        (4) A root cause analysis and corrective action analysis must be completed as soon as possible, but no later than 45 days after a flare flow event meeting the criteria in paragraph (o)(3)(i) or (ii) of this section. Special circumstances affecting the number of root cause analyses and/or corrective action analyses are provided in paragraphs (o)(4)(i) through (v) of this section.

        (i) You may conduct a single root cause analysis and corrective action analysis for a single continuous flare flow event that meets both of the criteria in paragraphs (o)(3)(i) and (ii) of this section.

        (ii) You may conduct a single root cause analysis and corrective action analysis for a single continuous flare flow event regardless of the number of 15-minute block periods in which the flare tip velocity was exceeded or the number of 2 hour periods that contain more the 5 minutes of visible emissions.

        (iii) You may conduct a single root cause analysis and corrective action analysis for a single event that causes two or more flares that are operated in series (i.e., cascaded flare systems) to have a flow event meeting the criteria in paragraph (o)(3)(i) or (ii) of this section.

        (iv) You may conduct a single root cause analysis and corrective action analysis for a single event that causes two or more flares to have a flow event meeting the criteria in paragraph (o)(3)(i) or (ii) of this section, regardless of the configuration of the flares, if the root cause is reasonably expected to be a force majeure event, as defined in this subpart.

        (v) Except as provided in paragraphs (o)(4)(iii) and (iv) of this section, if more than one flare has a flow event that meets the criteria in paragraph (o)(3)(i) or (ii) of this section during the same time period, an initial root cause analysis shall be conducted separately for each flare that has a flow event meeting the criteria in paragraph (o)(3)(i) or (ii) of this section. If the initial root cause analysis indicates that the flow events have the same root cause(s), the initially separate root cause analyses may be recorded as a single root cause analysis and a single corrective action analysis may be conducted.

        (5) Each owner or operator of a flare required to conduct a root cause analysis and corrective action analysis as specified in paragraphs (o)(3) and (4) of this section shall implement the corrective action(s) identified in the corrective action analysis in accordance with the applicable requirements in paragraphs (o)(5)(i) through (iii) of this section.

        (i) All corrective action(s) must be implemented within 45 days of the event for which the root cause and corrective action analyses were required or as soon thereafter as practicable. If an owner or operator concludes that no corrective action should be implemented, the owner or operator shall record and explain the basis for that conclusion no later than 45 days following the event.

        (ii) For corrective actions that cannot be fully implemented within 45 days following the event for which the root cause and corrective action analyses were required, the owner or operator shall develop an implementation schedule to complete the corrective action(s) as soon as practicable.

        (iii) No later than 45 days following the event for which a root cause and corrective action analyses were required, the owner or operator shall record the corrective action(s) completed to date, and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.

        (6) The owner or operator shall determine the total number of events for which a root cause and corrective action analyses was required during the calendar year for each affected flare separately for events meeting the criteria in paragraph (o)(3)(i) of this section and those meeting the criteria in paragraph (o)(3)(ii) of this section. For the purpose of this requirement, a single root cause analysis conducted for an event that met both of the criteria in paragraphs (o)(3)(i) and (ii) of this section would be counted as an event under each of the separate criteria counts for that flare. Additionally, if a single root cause analysis was conducted for an event that caused multiple flares to meet the criteria in paragraph (o)(3)(i) or (ii) of this section, that event would count as an event for each of the flares for each criteria in paragraph (o)(3) of this section that was met during that event. The owner or operator shall also determine the total number of events for which a root cause and correct action analyses was required and the analyses concluded that the root cause was a force majeure event, as defined in this subpart.

        (7) The following events would be a violation of this emergency flaring work practice standard.

        (i) Any flow event for which a root cause analysis was required and the root

        Page 75265

        cause was determined to be operator error or poor maintenance.

        (ii) Two visible emissions exceedance events meeting the criteria in paragraph (o)(3)(i) of this section that were not caused by a force majeure event from a single flare in a 3 calendar year period for the same root cause for the same equipment.

        (iii) Two flare tip velocity exceedance events meeting the criteria in paragraph (o)(3)(ii) of this section that were not caused by a force majeure event from a single flare in a 3 calendar year period for the same root cause for the same equipment.

        (iv) Three visible emissions exceedance events meeting the criteria in paragraph (o)(3)(i) of this section that were not caused by a force majeure event from a single flare in a 3 calendar year period for any reason.

        (v) Three flare tip velocity exceedance events meeting the criteria in paragraph (o)(3)(ii) of this section that were not caused by a force majeure event from a single flare in a 3 calendar year period for any reason.

        (p) Flare monitoring records. The owner or operator shall keep the records specified in Sec. 63.655(i)(9).

        (q) Reporting. The owner or operator shall comply with the reporting requirements specified in Sec. 63.655(g)(11).

        (r) Alternative means of emissions limitation. An owner or operator may request approval from the Administrator for site-specific operating limits that shall apply specifically to a selected flare. Site-specific operating limits include alternative threshold values for the parameters specified in paragraphs (d) through (f) of this section as well as threshold values for operating parameters other than those specified in paragraphs (d) through (f) of this section. The owner or operator must demonstrate that the flare achieves 96.5 percent combustion efficiency (or 98 percent destruction efficiency) using the site-specific operating limits based on a performance evaluation as described in paragraph (r)(1) of this section. The request shall include information as described in paragraph (r)(2) of this section. The request shall be submitted and followed as described in paragraph (r)(3) of this section.

        (1) The owner or operator shall prepare and submit a site-specific test plan and receive approval of the site-specific performance evaluation plan prior to conducting any flare performance evaluation test runs intended for use in developing site-specific operating limits. The site-specific performance evaluation plan shall include, at a minimum, the elements specified in paragraphs (r)(1)(i) through (ix) of this section. Upon approval of the site-specific performance evaluation plan, the owner or operator shall conduct performance evaluation test runs for the flare following the procedures described in the site-specific performance evaluation plan.

        (i) The design and dimensions of the flare, flare type (air-

        assisted only, steam-assisted only, air- and steam-assisted, pressure-

        assisted, or non-assisted), and description of gas being flared, including quantity of gas flared, frequency of flaring events (if periodic), expected net heating value of flare vent gas, minimum total steam assist rate.

        (ii) The operating conditions (vent gas compositions, vent gas flow rates and assist flow rates, if applicable) likely to be encountered by the flare during normal operations and the operating conditions for the test period.

        (iii) A description of (including sample calculations illustrating) the planned data reduction and calculations to determine the flare combustion or destruction efficiency.

        (iv) Site-specific operating parameters to be monitored continuously during the flare performance evaluation. These parameters may include but are not limited to vent gas flow rate, steam and/or air assist flow rates, and flare vent gas composition. If new operating parameters are proposed for use other than those specified in paragraphs (d) through (f) of this section, an explanation of the relevance of the proposed operating parameter(s) as an indicator of flare combustion performance and why the alternative operating parameter(s) can adequately ensure that the flare achieves the required combustion efficiency.

        (v) A detailed description of the measurement methods, monitored pollutant(s), measurement locations, measurement frequency, and recording frequency proposed for both emission measurements and flare operating parameters.

        (vi) A description of (including sample calculations illustrating) the planned data reduction and calculations to determine the flare operating parameters.

        (vii) The minimum number and length of test runs and range of operating values to be evaluated during the performance evaluation. A sufficient number of test runs shall be conducted to identify the point at which the combustion/destruction efficiency of the flare deteriorates.

        (viii) Reserved

        (ix) Test schedule.

        (2) The request for flare-specific operating limits shall include sufficient and appropriate data, as determined by the Administrator, to allow the Administrator to confirm that the selected site-specific operating limit(s) adequately ensures that the flare destruction efficiency is 98 percent or greater or that the flare combustion efficiency is 96.5 percent or greater at all times. At a minimum, the request shall contain the information described in paragraphs (r)(2)(i) through (iv) of this section.

        (i) The design and dimensions of the flare, flare type (air-

        assisted only, steam-assisted only, air- and steam-assisted, pressure-

        assisted, or non-assisted), and description of gas being flared, including quantity of gas flared, frequency of flaring events (if periodic), expected net heating value of flare vent gas, minimum total steam assist rate.

        (ii) Results of each performance evaluation test run conducted, including, at a minimum:

        (A) The measured combustion/destruction efficiency.

        (B) The measured or calculated operating parameters for each test run. If operating parameters are calculated, the raw data from which the parameters are calculated must be included in the test report.

        (C) Measurement location descriptions for both emission measurements and flare operating parameters.

        (D) Description of sampling and analysis procedures (including number and length of test runs) and any modifications to standard procedures. If there were deviations from the approved test plan, a detailed description of the deviations and rationale why the test results or calculation procedures used are appropriate.

        (E) Operating conditions (e.g., vent gas composition, assist rates, etc.) that occurred during the test.

        (F) Quality assurance procedures.

        (G) Records of calibrations.

        (H) Raw data sheets for field sampling.

        (I) Raw data sheets for field and laboratory analyses.

        (J) Documentation of calculations.

        (iii) The selected flare-specific operating limit values based on the performance evaluation test results, including the averaging time for the operating limit(s), and rationale why the selected values and averaging times are sufficiently stringent to ensure proper flare performance. If new operating parameters or averaging times are proposed for use other than those specified in paragraphs (d) through (f) of this section, an explanation of why the

        Page 75266

        alternative operating parameter(s) or averaging time(s) adequately ensures the flare achieves the required combustion efficiency.

        (iv) The means by which the owner or operator will document on-

        going, continuous compliance with the selected flare-specific operating limit(s), including the specific measurement location and frequencies, calculation procedures, and records to be maintained.

        (3) The request shall be submitted as described in paragraphs (r)(3)(i) through (iv) of this section.

        (i) The owner or operator may request approval from the Administrator at any time upon completion of a performance evaluation conducted following the methods in an approved site-specific performance evaluation plan for an operating limit(s) that shall apply specifically to that flare.

        (ii) The request must be submitted to the Administrator for approval. The owner or operator must continue to comply with the applicable standards for flares in this subpart until the requirements in Sec. 63.6(g)(1) are met and a notice is published in the Federal Register allowing use of such an alternative means of emission limitation.

        (iii) The request shall also be submitted to the following address: U.S. Environmental Protection Agency, Office of Air Quality Planning and Standards, Sector Policies and Programs Division, U.S. EPA Mailroom (E143-01), Attention: Refinery Sector Lead, 109 T.W. Alexander Drive, Research Triangle Park, NC 27711. Electronic copies in lieu of hard copies may also be submitted to refineryrtr@epa.gov.

        (iv) If the Administrator finds any deficiencies in the request, the request must be revised to address the deficiencies and be re-

        submitted for approval within 45 days of receipt of the notice of deficiencies. The owner or operator must comply with the revised request as submitted until it is approved.

        (4) The approval process for a request for a flare-specific operating limit(s) is described in paragraphs (r)(4)(i) through (iii) of this section.

        (i) Approval by the Administrator of a flare-specific operating limit(s) request will be based on the completeness, accuracy and reasonableness of the request. Factors that the EPA will consider in reviewing the request for approval include, but are not limited to, those described in paragraphs (r)(4)(i)(A) through (C) of this section.

        (A) The description of the flare design and operating characteristics.

        (B) If a new operating parameter(s) other than those specified in paragraphs (d) through (f) of this section is proposed, the explanation of how the proposed operating parameter(s) serves a good indicator(s) of flare combustion performance.

        (C) The results of the flare performance evaluation test runs and the establishment of operating limits that ensures that the flare destruction efficiency is 98 percent or greater or that the flare combustion efficiency is 96.5 percent or greater at all times.

        (D) The completeness of the flare performance evaluation test report.

        (ii) If the request is approved by the Administrator, a flare-

        specific operating limit(s) will be established at the level(s) demonstrated in the approved request.

        (iii) If the Administrator finds any deficiencies in the request, the request must be revised to address the deficiencies and be re-

        submitted for approval.

        0

        33. Section 63.671 is added to read as follows:

        Sec. 63.671 Requirements for flare monitoring systems.

        (a) Operation of CPMS. For each CPMS installed to comply with applicable provisions in Sec. 63.670, the owner or operator shall install, operate, calibrate, and maintain the CPMS as specified in paragraphs (a)(1) through (8) of this section.

        (1) Except for CPMS installed for pilot flame monitoring, all monitoring equipment must meet the applicable minimum accuracy, calibration and quality control requirements specified in table 13 of this subpart.

        (2) The owner or operator shall ensure the readout (that portion of the CPMS that provides a visual display or record) or other indication of the monitored operating parameter from any CPMS required for compliance is readily accessible onsite for operational control or inspection by the operator of the source.

        (3) All CPMS must complete a minimum of one cycle of operation (sampling, analyzing and data recording) for each successive 15-minute period.

        (4) Except for periods of monitoring system malfunctions, repairs associated with monitoring system malfunctions and required monitoring system quality assurance or quality control activities (including, as applicable, calibration checks and required zero and span adjustments), the owner or operator shall operate all CPMS and collect data continuously at all times when regulated emissions are routed to the flare.

        (5) The owner or operator shall operate, maintain, and calibrate each CPMS according to the CPMS monitoring plan specified in paragraph (b) of this section.

        (6) For each CPMS except for CPMS installed for pilot flame monitoring, the owner or operator shall comply with the out-of-control procedures described in paragraph (c) of this section.

        (7) The owner or operator shall reduce data from a CPMS as specified in paragraph (d) of this section.

        (8) The CPMS must be capable of measuring the appropriate parameter over the range of values expected for that measurement location. The data recording system associated with each CPMS must have a resolution that is equal to or better than the required system accuracy.

        (b) CPMS monitoring plan. The owner or operator shall develop and implement a CPMS quality control program documented in a CPMS monitoring plan that covers each flare subject to the provisions in Sec. 63.670 and each CPMS installed to comply with applicable provisions in Sec. 63.670. The owner or operator shall have the CPMS monitoring plan readily available on-site at all times and shall submit a copy of the CPMS monitoring plan to the Administrator upon request by the Administrator. The CPMS monitoring plan must contain the information listed in paragraphs (b)(1) through (5) of this section.

        (1) Identification of the specific flare being monitored and the flare type (air-assisted only, steam-assisted only, air- and steam-

        assisted, pressure-assisted, or non-assisted).

        (2) Identification of the parameter to be monitored by the CPMS and the expected parameter range, including worst case and normal operation.

        (3) Description of the monitoring equipment, including the information specified in paragraphs (b)(3)(i) through (vii) of this section.

        (i) Manufacturer and model number for all monitoring equipment components installed to comply with applicable provisions in Sec. 63.670.

        (ii) Performance specifications, as provided by the manufacturer, and any differences expected for this installation and operation.

        (iii) The location of the CPMS sampling probe or other interface and a justification of how the location meets the requirements of paragraph (a)(1) of this section.

        (iv) Placement of the CPMS readout, or other indication of parameter values, indicating how the location meets the requirements of paragraph (a)(2) of this section.

        Page 75267

        (v) Span of the CPMS. The span of the CPMS sensor and analyzer must encompass the full range of all expected values.

        (vi) How data outside of the span of the CPMS will be handled and the corrective action that will be taken to reduce and eliminate such occurrences in the future.

        (vii) Identification of the parameter detected by the parametric signal analyzer and the algorithm used to convert these values into the operating parameter monitored to demonstrate compliance, if the parameter detected is different from the operating parameter monitored.

        (4) Description of the data collection and reduction systems, including the information specified in paragraphs (b)(4)(i) through (iii) of this section.

        (i) A copy of the data acquisition system algorithm used to reduce the measured data into the reportable form of the standard and to calculate the applicable averages.

        (ii) Identification of whether the algorithm excludes data collected during CPMS breakdowns, out-of-control periods, repairs, maintenance periods, instrument adjustments or checks to maintain precision and accuracy, calibration checks, and zero (low-level), mid-

        level (if applicable) and high-level adjustments.

        (iii) If the data acquisition algorithm does not exclude data collected during CPMS breakdowns, out-of-control periods, repairs, maintenance periods, instrument adjustments or checks to maintain precision and accuracy, calibration checks, and zero (low-level), mid-

        level (if applicable) and high-level adjustments, a description of the procedure for excluding this data when the averages calculated as specified in paragraph (e) of this section are determined.

        (5) Routine quality control and assurance procedures, including descriptions of the procedures listed in paragraphs (b)(5)(i) through (vi) of this section and a schedule for conducting these procedures. The routine procedures must provide an assessment of CPMS performance.

        (i) Initial and subsequent calibration of the CPMS and acceptance criteria.

        (ii) Determination and adjustment of the calibration drift of the CPMS.

        (iii) Daily checks for indications that the system is responding. If the CPMS system includes an internal system check, the owner or operator may use the results to verify the system is responding, as long as the system provides an alarm to the owner or operator or the owner or operator checks the internal system results daily for proper operation and the results are recorded.

        (iv) Preventive maintenance of the CPMS, including spare parts inventory.

        (v) Data recording, calculations and reporting.

        (vi) Program of corrective action for a CPMS that is not operating properly.

        (c) Out-of-control periods. For each CPMS installed to comply with applicable provisions in Sec. 63.670 except for CPMS installed for pilot flame monitoring, the owner or operator shall comply with the out-of-control procedures described in paragraphs (c)(1) and (2) of this section.

        (1) A CPMS is out-of-control if the zero (low-level), mid-level (if applicable) or high-level calibration drift exceeds two times the accuracy requirement of table 13 of this subpart.

        (2) When the CPMS is out of control, the owner or operator shall take the necessary corrective action and repeat all necessary tests that indicate the system is out of control. The owner or operator shall take corrective action and conduct retesting until the performance requirements are below the applicable limits. The beginning of the out-

        of-control period is the hour a performance check (e.g., calibration drift) that indicates an exceedance of the performance requirements established in this section is conducted. The end of the out-of-control period is the hour following the completion of corrective action and successful demonstration that the system is within the allowable limits. The owner or operator shall not use data recorded during periods the CPMS is out of control in data averages and calculations, used to report emissions or operating levels, as specified in paragraph (d)(3) of this section.

        (d) CPMS data reduction. The owner or operator shall reduce data from a CPMS installed to comply with applicable provisions in Sec. 63.670 as specified in paragraphs (d)(1) through (3) of this section.

        (1) The owner or operator may round the data to the same number of significant digits used in that operating limit.

        (2) Periods of non-operation of the process unit (or portion thereof) resulting in cessation of the emissions to which the monitoring applies must not be included in the 15-minute block averages.

        (3) Periods when the CPMS is out of control must not be included in the 15-minute block averages.

        (e) Additional requirements for gas chromatographs. For monitors used to determine compositional analysis for net heating value per Sec. 63.670(j)(1), the gas chromatograph must also meet the requirements of paragraphs (e)(1) through (3) of this section.

        (1) The quality assurance requirements are in table 13 of this subpart.

        (2) The calibration gases must meet one of the following options:

        (i) The owner or operator must use a calibration gas or multiple gases that include all of compounds listed in paragraphs (e)(2)(i)(A) through (K) of this section that may be reasonably expected to exist in the flare gas stream and optionally include any of the compounds listed in paragraphs (e)(2)(i)(L) through (O) of this section. All of the calibration gases may be combined in one cylinder. If multiple calibration gases are necessary to cover all compounds, the owner or operator must calibrate the instrument on all of the gases.

        (A) Hydrogen.

        (B) Methane.

        (C) Ethane.

        (D) Ethylene.

        (E) Propane.

        (F) Propylene.

        (G) n-Butane.

        (H) iso-Butane.

        (I) Butene (general). It is not necessary to separately speciate butene isomers, but the net heating value of trans-butene must be used for co-eluting butene isomers.

        (J) 1,3-Butadiene. It is not necessary to separately speciate butadiene isomers, but you must use the response factor and net heating value of 1,3-butadiene for co-eluting butadiene isomers.

        (K) n-Pentane. Use the response factor for n-pentane to quantify all C5+ hydrocarbons.

        (L) Acetylene (optional).

        (M) Carbon monoxide (optional).

        (N) Propadiene (optional).

        (O) Hydrogen sulfide (optional).

        (ii) The owner or operator must use a surrogate calibration gas consisting of hydrogen and C1 through C5 normal hydrocarbons. All of the calibration gases may be combined in one cylinder. If multiple calibration gases are necessary to cover all compounds, the owner or operator must calibrate the instrument on all of the gases.

        (3) If the owner or operator chooses to use a surrogate calibration gas under paragraph (e)(2)(ii) of this section, the owner or operator must comply with paragraphs (e)(3)(i) and (ii) of this section.

        (i) Use the response factor for the nearest normal hydrocarbon (i.e., n-alkane) in the calibration mixture to quantify unknown components detected in the analysis.

        (ii) Use the response factor for n-pentane to quantify unknown

        Page 75268

        components detected in the analysis that elute after n-pentane.

        0

        34. The appendix to subpart CC is amended in table 6 by:

        0

      62. Revising the entries ``63.5(d)(1)(ii)'' and ``63.5(f)'';

        0

      63. Removing the entry ``63.6(e)(1)'';

        0

      64. Adding, in numerical order, the entries ``63.6(e)(1)(i) and (ii)'' and ``63.6(e)(1)(iii)'';

        0

      65. Revising the entries ``63.6(e)(3)(i),'' ``63.6(e)(3)(iii)-

        63.6(e)(3)(ix),'' and ``63.6(f)(1)'';

        0

      66. Removing the entry ``63.6(f)(2) and (3)'';

        0

      67. Adding, in numerical order, the entries ``63.6(f)(2)'' and ``63.6(f)(3)'';

        0

      68. Removing the entry ``63.6(h)(1) and 63.6(h)(2)'';

        0

      69. Adding, in numerical order, the entries ``63.6(h)(1)'' and ``63.6(h)(2)'';

        0

      70. Revising the entries ``63.7(b)'' and ``63.7(e)(1)'';

        0

      71. Removing the entry ``63.8(a)'';

        0

      72. Adding, in numerical order, the entries ``63.8(a)(1) and (2),'' ``63.8(a)(3),'' and ``63.8(a)(4)'';

        0

      73. Revising the entry ``63.8(c)(1)'';

        0

      74. Adding, in numerical order, the entries ``63.8(c)(1)(i)'' and ``63.8(c)(1)(iii)'';

        0

      75. Revising the entries ``63.8(c)(4),'' ``63.8(c)(5)-63.8(c)(8),'' ``63.8(d),'' ``63.8(e),'' ``63.8(g),'' ``63.10(b)(2)(i),'' ``63.10(b)(2)(ii),'' ``63.10(b)(2)(iv),'' ``63.10(b)(2)(v),'' and ``63.10(b)(2)(vii)'';

        0

      76. Removing the entry ``63.10(c)(9)-63.10(c)(15)'';

        0

      77. Adding, in numerical order, the entries ``63.10(c)(9),'' ``63.10(c)(10)-63.10(c)(11),'' and ``63.10(c)(12)-63.10(c)(15)'';

        0

      78. Revising the entry ``63.10(d)(2)'';

        0

      79. Removing the entries ``63.10(d)(5)(i)'' and ``63.10(d)(5)(ii)'';

        0

      80. Adding, in numerical order, the entry ``63.10(d)(5)'';

        0

      81. Removing the entry ``63.11-63.16'';

        0

      82. Adding, in numerical order, the entries ``63.11'' and ``63.12-

        63.16'';

        0

      83. Revising footnote a.

        0

      84. Removing footnote b.

        The revisions and additions read as follows:

        Appendix to Subpart CC of Part 63--Tables

        * * * * *

        Table 6--General Provisions Applicability to Subpart CC \a\

        ------------------------------------------------------------------------

        Applies to subpart

        Reference CC Comment

        ------------------------------------------------------------------------

        * * * * * * *

        63.5(d)(1)(ii).............. Yes................. Except that for

        affected sources

        subject to this

        subpart, emission

        estimates specified

        in Sec.

        63.5(d)(1)(ii)(H)

        are not required,

        and Sec.

        63.5(d)(1)(ii)(G)

        and (I) are

        Reserved and do not

        apply.

        * * * * * * *

        63.5(f)..................... Yes................. Except that the

        cross-reference in

        Sec. 63.5(f)(2)

        to Sec.

        63.9(b)(2) does not

        apply.

        * * * * * * *

        63.6(e)(1)(i) and (ii)...... No.................. See Sec. 63.642(n)

        for general duty

        requirement.

        63.6(e)(1)(iii)............. Yes. ....................

        * * * * * * *

        63.6(e)(3)(i)............... No. ....................

        * * * * * * *

        63.6(e)(3)(iii)-63.6(e)(3)(i No. ....................

        x).

        63.6(f)(1).................. No. ....................

        63.6(f)(2).................. Yes................. Except the phrase

        ``as specified in

        Sec. 63.7(c)'' in

        Sec.

        63.6(f)(2)(iii)(D)

        does not apply

        because this

        subpart does not

        require a site-

        specific test plan.

        63.6(f)(3).................. Yes................. Except the cross-

        references to Sec.

        63.6(f)(1) and

        (e)(1)(i) are

        changed to Sec.

        63.642(n).

        * * * * * * *

        63.6(h)(1).................. No. ....................

        63.6(h)(2).................. Yes................. Except Sec.

        63.6(h)(2)(ii),

        which is reserved.

        * * * * * * *

        63.7(b)..................... Yes................. Except this subpart

        requires

        notification of

        performance test at

        least 30 days

        (rather than 60

        days) prior to the

        performance test.

        * * * * * * *

        63.7(e)(1).................. No.................. See Sec.

        63.642(d)(3).

        * * * * * * *

        63.8(a)(1) and (2).......... Yes. ....................

        63.8(a)(3).................. No.................. Reserved.

        63.8(a)(4).................. Yes................. Except that for a

        flare complying

        with Sec. 63.670,

        the cross-reference

        to Sec. 63.11 in

        this paragraph does

        not include Sec.

        63.11(b).

        * * * * * * *

        63.8(c)(1).................. Yes................. Except Sec.

        63.8(c)(1)(i) and

        (iii).

        63.8(c)(1)(i)............... No.................. See Sec.

        63.642(n).

        63.8(c)(1)(iii)............. No. ....................

        Page 75269

        * * * * * * *

        63.8(c)(4).................. Yes................. Except that for

        sources other than

        flares, this

        subpart specifies

        the monitoring

        cycle frequency

        specified in Sec.

        63.8(c)(4)(ii) is

        ``once every hour''

        rather than ``for

        each successive 15-

        minute period.''

        63.8(c)(5)-63.8(c)(8)....... No.................. This subpart

        specifies

        continuous

        monitoring system

        requirements.

        63.8(d)..................... No.................. This subpart

        specifies quality

        control procedures

        for continuous

        monitoring systems.

        63.8(e)..................... Yes. ....................

        * * * * * * *

        63.8(g)..................... No.................. This subpart

        specifies data

        reduction

        procedures in Sec.

        Sec. 63.655(i)(3)

        and 63.671(d).

        * * * * * * *

        63.10(b)(2)(i).............. No. ....................

        63.10(b)(2)(ii)............. No.................. Sec. 63.655(i)

        specifies the

        records that must

        be kept.

        * * * * * * *

        63.10(b)(2)(iv)............. No. ....................

        63.10(b)(2)(v).............. No. ....................

        * * * * * * *

        63.10(b)(2)(vii)............ No.................. Sec. 63.655(i)

        specifies records

        to be kept for

        parameters measured

        with continuous

        monitors.

        * * * * * * *

        63.10(c)(9)................. No.................. Reserved.

        63.10(c)(10)-63.10(c)(11)... No.................. Sec. 63.655(i)

        specifies the

        records that must

        be kept.

        63.10(c)(12)-63.10(c)(15)... No. ....................

        * * * * * * *

        63.10(d)(2)................. No.................. Although Sec.

        63.655(f) specifies

        performance test

        reporting, EPA may

        approve other

        timeframes for

        submittal of

        performance test

        data.

        * * * * * * *

        63.10(d)(5)................. No.................. Sec. 63.655(g)

        specifies the

        reporting

        requirements.

        * * * * * * *

        63.11....................... Yes................. Except that flares

        complying with Sec.

        63.670 are not

        subject to the

        requirements of

        Sec. 63.11(b).

        63.12-63.16................. Yes.

        ------------------------------------------------------------------------

        \a\ Wherever subpart A of this part specifies ``postmark'' dates,

        submittals may be sent by methods other than the U.S. Mail (e.g., by

        fax or courier). Submittals shall be sent by the specified dates, but

        a postmark is not required.

        0

        35. The appendix to subpart CC is amended in table 10 by:

        0

      85. Redesignating the entry ``Flare'' as ``Flare (if meeting the requirements of Sec. Sec. 63.643 and 63.644)'';

        0

      86. Adding the entry ``Flare (if meeting the requirements of Sec. Sec. 63.670 and 63.671)'' after newly redesignated entry ``Flare (if meeting the requirements of Sec. Sec. 63.643 and 63.644)'';

        0

      87. Revising the entry ``All control devices''; and

        0

      88. Revising footnote i.

        The revisions and additions read as follows:

        Appendix to Subpart CC of Part 63--Tables

        * * * * *

        Table 10--Miscellaneous Process Vents--Monitoring, Recordkeeping and

        Reporting Requirements for Complying With 98 Weight-Percent Reduction of

        Total Organic HAP Emissions or a Limit of 20 Parts per Million by Volume

        ------------------------------------------------------------------------

        Recordkeeping and

        Parameters to be reporting

        Control device monitored \a\ requirements for

        monitored parameters

        ------------------------------------------------------------------------

        * * * * * * *

        Flare (if meeting the The parameters 1. Records as

        requirements of Sec. Sec. specified in specified in Sec.

        63.670 and 63.671). Sec. 63.670. 63.655(i)(9).

        2. Report information

        as specified in Sec.

        63.655(g)(11)--

        PR.\g\

        All control devices........... Presence of flow 1. Hourly records of

        diverted to the whether the flow

        atmosphere from indicator was

        the control operating and

        device (Sec. whether flow was

        63.644(c)(1)) or detected at any time

        during each hour.

        Record and report

        the times and

        durations of all

        periods when the

        vent stream is

        diverted through a

        bypass line or the

        monitor is not

        operating--PR.\g\

        Page 75270

        Monthly 1. Records that

        inspections of monthly inspections

        sealed valves were performed.

        (Sec. 2. Record and report

        63.644(c)(2)). all monthly

        inspections that

        show the valves are

        not closed or the

        seal has been

        changed--PR.\g\

        ------------------------------------------------------------------------

        \a\ Regulatory citations are listed in parentheses.

        * * * * * * *

        \g\ PR = Periodic Reports described in Sec. 63.655(g).

        * * * * * * *

        \i\ Process vents that are routed to refinery fuel gas systems are not

        regulated under this subpart provided that on and after January 30,

        2019, any flares receiving gas from that fuel gas system are in

        compliance with Sec. 63.670. No monitoring, recordkeeping, or

        reporting is required for boilers and process heaters that combust

        refinery fuel gas.

        0

        36. The appendix to subpart CC is amended by adding table 11 to read as follows:

        Appendix to Subpart CC of Part 63--Tables

        * * * * *

        Table 11--Compliance Dates and Requirements

        ----------------------------------------------------------------------------------------------------------------

        Then the owner or And the owner or

        If the construction/reconstruction operator must comply operator must achieve Except as provided in .

        date \a\ is . . . with . . . compliance . . . . .

        ----------------------------------------------------------------------------------------------------------------

        (1) After June 30, 2014.............. (i) Requirements for Upon initial startup or Sec. 63.640(k), (l)

        new sources in Sec. February 1, 2016, and (m).

        Sec. 63.640 through whichever is later.

        63.642, 63.647, 63.650

        through 63.653, and

        63.656 through 63.660.

        (ii) The new source Upon initial startup or Sec. 63.640(k), (l)

        requirements in Sec. October 28, 2009, and (m).

        63.654 for heat whichever is later.

        exchange systems.

        (2) After September 4, 2007 but on or (i) Requirements for Upon initial startup... Sec. 63.640(k), (l)

        before June 30, 2014. new sources in Sec. and (m).

        Sec. 63.640 through

        63.653 and 63.656 \b\

        \c\.

        (ii) Requirements for On or before January Sec. 63.640(k), (l)

        new sources in Sec. 30, 2019. and (m).

        Sec. 63.640 through

        63.645, Sec. Sec.

        63.647 through 63.653,

        and Sec. Sec.

        63.656 and 63.657 \b\.

        (iii) Requirements for On or before January Sec. 63.640(k), (l)

        existing sources in 30, 2018. and (m).

        Sec. 63.658.

        (iv) Requirements for On or before April 29, Sec. 63.640(k), (l)

        new sources in Sec. 2016. and (m).

        63.660 \c\.

        (v) The new source Upon initial startup or Sec. 63.640(k), (l)

        requirements in Sec. October 28, 2009, and (m).

        63.654 for heat whichever is later.

        exchange systems.

        (3) After July 14, 1994 but on or (i) Requirements for Upon initial startup or Sec. 63.640(k), (l)

        before September 4, 2007. new sources in Sec. August 18, 1995, and (m).

        Sec. 63.640 through whichever is later.

        63.653 and 63.656 \d\

        \e\.

        (ii) Requirements for On or before January Sec. 63.640(k), (l)

        new sources in Sec. 30, 2019. and (m).

        Sec. 63.640 through

        63.645, 63.647 through

        63.653, and 63.656 and

        63.657 \d\.

        (iii) Requirements for On or before January Sec. 63.640(k), (l)

        existing sources in 30, 2018. and (m).

        Sec. 63.658.

        (iv) Requirements for On or before April 29, Sec. 63.640(k), (l)

        new sources in Sec. 2016. and (m).

        63.660 \e\.

        (v) The existing source On or before October Sec. 63.640(k), (l)

        requirements in Sec. 29, 2012. and (m).

        63.654 for heat

        exchange systems.

        (4) On or before July 14, 1994....... (i) Requirements for (a) On or before August (1) Sec. 63.640(k),

        existing sources in 18, 1998. (l) and (m).

        Sec. Sec. 63.640 (2) Sec. 63.6(c)(5)

        through 63.653 and of subpart A of this

        63.656 \f\ \g\. part or unless an

        extension has been

        granted by the

        Administrator as

        provided in Sec.

        63.6(i) of subpart A

        of this part.

        (ii) Requirements for On or before January Sec. 63.640(k), (l)

        existing sources in 30, 2019. and (m).

        Sec. Sec. 63.640

        through 63.645, 63.647

        through 63.653, and

        63.656 and 63.657 \f\.

        Page 75271

        (iii) Requirements for On or before January Sec. 63.640(k), (l)

        existing sources in 30, 2018. and (m).

        Sec. 63.658.

        (iv) Requirements for On or before April 29, Sec. 63.640(k), (l)

        existing sources in 2016. and (m).

        Sec. 63.660 \g\.

        (v) The existing source requirements On or before October Sec. 63.640(k), (l)

        in Sec. 63.654 for heat exchange 29, 2012. and (m).

        systems

        ----------------------------------------------------------------------------------------------------------------

        \a\ For purposes of this table, the construction/reconstruction date means the date of construction or

        reconstruction of an entire affected source or the date of a process unit addition or change meeting the

        criteria in Sec. 63.640(i) or (j). If a process unit addition or change does not meet the criteria in Sec.

        63.640(i) or (j), the process unit shall comply with the applicable requirements for existing sources.

        \b\ Between the compliance dates in items (2)(i) and (2)(ii) of this table, the owner or operator may elect to

        comply with either the requirements in item (2)(i) or item (2)(ii) of this table. The requirements in item

        (2)(i) of this table no longer apply after demonstrated compliance with the requirements in item (2)(ii) of

        this table.

        \c\ Between the compliance dates in items (2)(i) and (2)(iv) of this table, the owner or operator may elect to

        comply with either the requirements in item (2)(i) or item (2)(iv) of this table. The requirements in item

        (2)(i) of this table no longer apply after demonstrated compliance with the requirements in item (2)(iv) of

        this table.

        \d\ Between the compliance dates in items (3)(i) and (3)(ii) of this table, the owner or operator may elect to

        comply with either the requirements in item (3)(i) or item (3)(ii) of this table. The requirements in item

        (3)(i) of this table no longer apply after demonstrated compliance with the requirements in item (3)(ii) of

        this table.

        \e\ Between the compliance dates in items (3)(i) and (3)(iv) of this table, the owner or operator may elect to

        comply with either the requirements in item (3)(i) or item (3)(iv) of this table. The requirements in item

        (3)(i) of this table no longer apply after demonstrated compliance with the requirements in item (3)(iv) of

        this table.

        \f\ Between the compliance dates in items (4)(i) and (4)(ii) of this table, the owner or operator may elect to

        comply with either the requirements in item (4)(i) or item (4)(ii) of this table. The requirements in item

        (4)(i) of this table no longer apply after demonstrated compliance with the requirements in item (4)(ii) of

        this table.

        \g\ Between the compliance dates in items (4)(i) and (4)(iv) of this table, the owner or operator may elect to

        comply with either the requirements in item (4)(i) or item (4)(iv) of this table. The requirements in item

        (4)(i) of this table no longer apply after demonstrated compliance with the requirements in item (4)(iv) of

        this table.

        0

        37. The appendix to subpart CC is amended by adding table 12 to read as follows:

        Appendix to Subpart CC of Part 63--Tables

        * * * * *

        Table 12--Individual Component Properties

        ----------------------------------------------------------------------------------------------------------------

        NHVi (British

        MWi (pounds CMNi (mole thermal units LFLi (volume

        Component Molecular formula per pound- per mole) per standard %)

        mole) cubic foot)

        ----------------------------------------------------------------------------------------------------------------

        Acetylene................... C2H2.............. 26.04 2 1,404 2.5

        Benzene..................... C6H6.............. 78.11 6 3,591 1.3

        1,2-Butadiene............... C4H6.............. 54.09 4 2,794 2.0

        1,3-Butadiene............... C4H6.............. 54.09 4 2,690 2.0

        iso-Butane.................. C4H10............. 58.12 4 2,957 1.8

        n-Butane.................... C4H10............. 58.12 4 2,968 1.8

        cis-Butene.................. C4H8.............. 56.11 4 2,830 1.6

        iso-Butene.................. C4H8.............. 56.11 4 2,928 1.8

        trans-Butene................ C4H8.............. 56.11 4 2,826 1.7

        Carbon Dioxide.............. CO2............... 44.01 1 0 infin

        Carbon Monoxide............. CO................ 28.01 1 316 12.5

        Cyclopropane................ C3H6.............. 42.08 3 2,185 2.4

        Ethane...................... C2H6.............. 30.07 2 1,595 3.0

        Ethylene.................... C2H4.............. 28.05 2 1,477 2.7

        Hydrogen.................... H2................ 2.02 0 1,212\a\ 4.0

        Hydrogen Sulfide............ H2S............... 34.08 0 587 4.0

        Methane..................... CH4............... 16.04 1 896 5.0

        Methyl-Acetylene............ C3H4.............. 40.06 3 2,088 1.7

        Nitrogen.................... N2................ 28.01 0 0 infin

        Oxygen...................... O2................ 32.00 0 0 infin

        Pentane+ (C5+).............. C5H12............. 72.15 5 3,655 1.4

        Propadiene.................. C3H4.............. 40.06 3 2,066 2.16

        Propane..................... C3H8.............. 44.10 3 2,281 2.1

        Propylene................... C3H6.............. 42.08 3 2,150 2.4

        Water....................... H2O............... 18.02 0 0 infin

        ----------------------------------------------------------------------------------------------------------------

        \a\ The theoretical net heating value for hydrogen is 274 Btu/scf, but for the purposes of the flare requirement

        in this subpart, a net heating value of 1,212 Btu/scf shall be used.

        Page 75272

        0

        38. The appendix to subpart CC is amended by adding table 13 to read as follows:

        Appendix to Subpart CC of Part 63--Tables

        * * * * *

        Table 13--Calibration and Quality Control Requirements for CPMS

        ------------------------------------------------------------------------

        Minimum accuracy Calibration

        Parameter requirements requirements

        ------------------------------------------------------------------------

        Temperature................... 1 Conduct calibration

        percent over the checks at least

        normal range of annually; conduct

        temperature calibration checks

        measured, following any period

        expressed in of more than 24

        degrees Celsius hours throughout

        (C), or 2.8 which the

        degrees C, temperature exceeded

        whichever is the manufacturer's

        greater. specified maximum

        rated temperature or

        install a new

        temperature sensor.

        At least quarterly,

        inspect all

        components for

        integrity and all

        electrical

        connections for

        continuity,

        oxidation, and

        galvanic corrosion,

        unless the CPMS has

        a redundant

        temperature sensor.

        Record the results of

        each calibration

        check and

        inspection.

        Locate the

        temperature sensor

        in a position that

        provides a

        representative

        temperature; shield

        the temperature

        sensor system from

        electromagnetic

        interference and

        chemical

        contaminants.

        Flow Rate for All Flows Other 5 Conduct a flow sensor

        Than Flare Vent Gas. percent over the calibration check at

        normal range of least biennially

        flow measured or (every two years);

        1.9 liters per conduct a

        minute (0.5 calibration check

        gallons per following any period

        minute), of more than 24

        whichever is hours throughout

        greater, for which the flow rate

        liquid flow. exceeded the

        manufacturer's

        specified maximum

        rated flow rate or

        install a new flow

        sensor.

        5 At least quarterly,

        percent over the inspect all

        normal range of components for

        flow measured or leakage, unless the

        280 liters per CPMS has a redundant

        minute (10 cubic flow sensor.

        feet per

        minute),

        whichever is

        greater, for gas

        flow.

        5 Record the results of

        percent over the each calibration

        normal range check and

        measured for inspection.

        mass flow. Locate the flow

        sensor(s) and other

        necessary equipment

        (such as

        straightening vanes)

        in a position that

        provides

        representative flow;

        reduce swirling flow

        or abnormal velocity

        distributions due to

        upstream and

        downstream

        disturbances.

        Flare Vent Gas Flow Rate...... 20 Conduct a flow sensor

        percent of flow calibration check at

        rate at least biennially

        velocities (every two years);

        ranging from conduct a

        0.03 to 0.3 calibration check

        meters per following any period

        second (0.1 to 1 of more than 24

        feet per second). hours throughout

        5 which the flow rate

        percent of flow exceeded the

        rate at manufacturer's

        velocities specified maximum

        greater than 0.3 rated flow rate or

        meters per install a new flow

        second (1 feet sensor.

        per second). At least quarterly,

        inspect all

        components for

        leakage, unless the

        CPMS has a redundant

        flow sensor.

        Record the results of

        each calibration

        check and

        inspection.

        Locate the flow

        sensor(s) and other

        necessary equipment

        (such as

        straightening vanes)

        in a position that

        provides

        representative flow;

        reduce swirling flow

        or abnormal velocity

        distributions due to

        upstream and

        downstream

        disturbances.

        Pressure...................... 5 Review pressure

        percent over the sensor readings at

        normal operating least once a week

        range or 0.12 for straightline

        kilopascals (0.5 (unchanging)

        inches of water pressure and perform

        column), corrective action to

        whichever is ensure proper

        greater. pressure sensor

        operation if

        blockage is

        indicated.

        Using an instrument

        recommended by the

        sensor's

        manufacturer, check

        gauge calibration

        and transducer

        calibration

        annually; conduct

        calibration checks

        following any period

        of more than 24

        hours throughout

        which the pressure

        exceeded the

        manufacturer's

        specified maximum

        rated pressure or

        install a new

        pressure sensor.

        At least quarterly,

        inspect all

        components for

        integrity, all

        electrical

        connections for

        continuity, and all

        mechanical

        connections for

        leakage, unless the

        CPMS has a redundant

        pressure sensor.

        Record the results of

        each calibration

        check and

        inspection.

        Locate the pressure

        sensor(s) in a

        position that

        provides a

        representative

        measurement of the

        pressure and

        minimizes or

        eliminates pulsating

        pressure, vibration,

        and internal and

        external corrosion.

        Net Heating Value by 2 Specify calibration

        Calorimeter. percent of span. requirements in your

        site specific CPMS

        monitoring plan.

        Calibration

        requirements should

        follow

        manufacturer's

        recommendations at a

        minimum.

        Temperature control

        (heated and/or

        cooled as necessary)

        the sampling system

        to ensure proper

        year-round

        operation.

        Where feasible,

        select a sampling

        location at least

        two equivalent

        diameters downstream

        from and 0.5

        equivalent diameters

        upstream from the

        nearest disturbance.

        Select the sampling

        location at least

        two equivalent duct

        diameters from the

        nearest control

        device, point of

        pollutant

        generation, air in-

        leakages, or other

        point at which a

        change in the

        pollutant

        concentration or

        emission rate

        occurs.

        Page 75273

        Net Heating Value by Gas As specified in Follow the procedure

        Chromatograph. Performance in Performance

        Specification 9 Specification 9 of

        of 40 CFR part 40 CFR part 60,

        60, appendix B appendix B, except

        that a single daily

        mid-level

        calibration check

        can be used (rather

        than triplicate

        analysis), the multi-

        point calibration

        can be conducted

        quarterly (rather

        than monthly), and

        the sampling line

        temperature must be

        maintained at a

        minimum temperature

        of 60 degC (rather

        than 120 degC).

        Hydrogen analyzer............. 2 Specify calibration

        percent over the requirements in your

        concentration site specific CPMS

        measured or 0.1 monitoring plan.

        volume percent, Calibration

        whichever is requirements should

        greater. follow

        manufacturer's

        recommendations at a

        minimum.

        Select the sampling

        location at least

        two equivalent duct

        diameters from the

        nearest control

        device, point of

        pollutant

        generation, air in-

        leakages, or other

        point at which a

        change in the

        pollutant

        concentration

        occurs.

        ------------------------------------------------------------------------

        Subpart UUU---National Emission Standards for Hazardous Air Pollutants for Petroleum Refineries: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units

        0

        39. Section 63.1562 is amended by revising paragraphs (b)(3) and (f)(5) to read as follows:

        Sec. 63.1562 What parts of my plant are covered by this subpart?

        * * * * *

        (b) * * *

        (3) The process vent or group of process vents on Claus or other types of sulfur recovery plant units or the tail gas treatment units serving sulfur recovery plants that are associated with sulfur recovery.

        * * * * *

        (f) * * *

        (5) Gaseous streams routed to a fuel gas system, provided that on and after January 30, 2019, any flares receiving gas from the fuel gas system are subject to Sec. 63.670.

        0

        40. Section 63.1564 is amended by:

        0

      89. Revising paragraphs (a)(1) and (2);

        0

      90. Adding paragraph (a)(5);

        0

      91. Removing the equation following paragraph (b)(4)(ii) and adding it after paragraph (b)(4)(iii) introductory text;

        0

      92. Revising paragraphs (b)(2), (b)(4)(i) and (ii), and (b)(4)(iv); and

        0

      93. Adding paragraph (c)(5).

        The revisions and additions read as follows:

        Sec. 63.1564 What are my requirements for metal HAP emissions from catalytic cracking units?

        (a) * * *

        (1) Except as provided in paragraph (a)(5) of this section, meet each emission limitation in Table 1 of this subpart that applies to you. If your catalytic cracking unit is subject to the NSPS for PM in Sec. 60.102 of this chapter or is subject to Sec. 60.102a(b)(1) of this chapter, you must meet the emission limitations for NSPS units. If your catalytic cracking unit is not subject to the NSPS for PM, you can choose from the four options in paragraphs (a)(1)(i) through (vi) of this section:

        (i) You can elect to comply with the NSPS for PM in Sec. 60.102 of this chapter (Option 1a);

        (ii) You can elect to comply with the NSPS for PM coke burn-off emission limit in Sec. 60.102a(b)(1) of this chapter (Option 1b);

        (iii) You can elect to comply with the NSPS for PM concentration limit in Sec. 60.102a(b)(1) of this chapter (Option 1c);

        (iv) You can elect to comply with the PM per coke burn-off emission limit in Sec. 60.102a(b)(1) of this chapter (Option 2);

        (v) You can elect to comply with the Nickel (Ni) lb/hr emission limit (Option 3); or

        (vi) You can elect to comply with the Ni per coke burn-off emission limit (Option 4).

        (2) Comply with each operating limit in Table 2 of this subpart that applies to you. When a specific control device may be monitored using more than one continuous parameter monitoring system, you may select the parameter with which you will comply. You must provide notice to the Administrator (or other designated authority) if you elect to change the monitoring option.

        * * * * *

        (5) During periods of startup, shutdown and hot standby, you can choose from the two options in paragraphs (a)(5)(i) and (ii) of this section:

        (i) You can elect to comply with the requirements in paragraphs (a)(1) and (2) of this section, except catalytic cracking units controlled using a wet scrubber must maintain only the liquid to gas ratio operating limit (the pressure drop operating limit does not apply); or

        (ii) You can elect to maintain the inlet velocity to the primary internal cyclones of the catalytic cracking unit catalyst regenerator at or above 20 feet per second.

        (b) * * *

        (2) Conduct a performance test for each catalytic cracking unit according to the requirements in Sec. 63.1571 and under the conditions specified in Table 4 of this subpart.

        * * * * *

        (4) * * *

        (i) If you elect Option 1b or Option 2 in paragraph (a)(1)(ii) or (iv) of this section, compute the PM emission rate (lb/1,000 lb of coke burn-off) for each run using Equations 1, 2, and 3 (if applicable) of this section and the site-specific opacity limit, if applicable, using Equation 4 of this section as follows:

        GRAPHIC TIFF OMITTED TR01DE15.018

        Where:

        Rc = Coke burn-off rate, kg/hr (lb/hr);

        Qr = Volumetric flow rate of exhaust gas from catalyst regenerator before adding air or gas streams. Example: You may measure upstream or downstream of an

        Page 75274

        electrostatic precipitator, but you must measure upstream of a carbon monoxide boiler, dscm/min (dscf/min). You may use the alternative in either Sec. 63.1573(a)(1) or (2), as applicable, to calculate Qr;

        Qa = Volumetric flow rate of air to catalytic cracking unit catalyst regenerator, as determined from instruments in the catalytic cracking unit control room, dscm/min (dscf/min);

        %CO2 = Carbon dioxide concentration in regenerator exhaust, percent by volume (dry basis);

        %CO = Carbon monoxide concentration in regenerator exhaust, percent by volume (dry basis);

        %O2 = Oxygen concentration in regenerator exhaust, percent by volume (dry basis);

        K1 = Material balance and conversion factor, 0.2982 (kg-

        min)/(hr-dscm-%) (0.0186 (lb-min)/(hr-dscf-%));

        K2 = Material balance and conversion factor, 2.088 (kg-

        min)/(hr-dscm) (0.1303 (lb-min)/(hr-dscf));

        K3 = Material balance and conversion factor, 0.0994 (kg-

        min)/(hr-dscm-%) (0.0062 (lb-min)/(hr-dscf-%));

        Qoxy = Volumetric flow rate of oxygen-enriched air stream to regenerator, as determined from instruments in the catalytic cracking unit control room, dscm/min (dscf/min); and

        %Oxy = Oxygen concentration in oxygen-enriched air stream, percent by volume (dry basis).

        GRAPHIC TIFF OMITTED TR01DE15.019

        Where:

        E = Emission rate of PM, kg/1,000 kg (lb/1,000 lb) of coke burn-off;

        Cs = Concentration of PM, g/dscm (lb/dscf);

        Qsd = Volumetric flow rate of the catalytic cracking unit catalyst regenerator flue gas as measured by Method 2 in appendix A-

        1 to part 60 of this chapter, dscm/hr (dscf/hr);

        Rc = Coke burn-off rate, kg coke/hr (1,000 lb coke/hr); and

        K = Conversion factor, 1.0 (kg2/g)/(1,000 kg) (1,000 lb/

        (1,000 lb)).

        GRAPHIC TIFF OMITTED TR01DE15.020

        Where:

        Es = Emission rate of PM allowed, kg/1,000 kg (1b/1,000 lb) of coke burn-off in catalyst regenerator;

        1.0 = Emission limitation, kg coke/1,000 kg (lb coke/1,000 lb);

        A = Allowable incremental rate of PM emissions. Before August 1, 2017, A = 0.18 g/million cal (0.10 lb/million Btu). On or after August 1, 2017, A = 0 g/million cal (0 lb/million Btu);

        H = Heat input rate from solid or liquid fossil fuel, million cal/hr (million Btu/hr). Make sure your permitting authority approves procedures for determining the heat input rate;

        Rc = Coke burn-off rate, kg coke/hr (1,000 lb coke/hr) determined using Equation 1 of this section; and

        K' = Conversion factor to units to standard, 1.0 (kg2/g)/

        (1,000 kg) (103 lb/(1,000 lb)).

        GRAPHIC TIFF OMITTED TR01DE15.021

        Where:

        Opacity Limit = Maximum permissible hourly average opacity, percent, or 10 percent, whichever is greater;

        Opacityst = Hourly average opacity measured during the source test, percent; and

        PMEmRst = PM emission rate measured during the source test, lb/1,000 lb coke burn.

        (ii) If you elect Option 1c in paragraph (a)(1)(iii) of this section, the PM concentration emission limit, determine the average PM concentration from the initial performance test used to certify your PM CEMS.

        * * * * *

        (iv) If you elect Option 4 in paragraph (a)(1)(vi) of this section, the Ni per coke burn-off emission limit, compute your Ni emission rate using Equations 1 and 8 of this section and your site-specific Ni operating limit (if you use a continuous opacity monitoring system) using Equations 9 and 10 of this section as follows:

        GRAPHIC TIFF OMITTED TR01DE15.022

        Where:

        ENi2 = Normalized mass emission rate of Ni, mg/kg coke (lb/1,000 lb coke).

        GRAPHIC TIFF OMITTED TR01DE15.023

        Page 75275

        Where:

        Opacity2 = Opacity value for use in Equation 10 of this section, percent, or 10 percent, whichever is greater; and

        NiEmR2st = Average Ni emission rate calculated as the arithmetic average Ni emission rate using Equation 8 of this section for each of the performance test runs, mg/kg coke.

        GRAPHIC TIFF OMITTED TR01DE15.024

        Where:

        Ni Operating Limit2 = Maximum permissible hourly average Ni operating limit, percent-ppmw-acfm-hr/kg coke, i.e., your site-

        specific Ni operating limit; and

        Rc,st = Coke burn rate from Equation 1 of this section, as measured during the initial performance test, kg coke/hr.

        * * * * *

        (c) * * *

        (5) If you elect to comply with the alternative limit in paragraph (a)(5)(ii) of this section during periods of startup, shutdown, and hot standby, demonstrate continuous compliance by:

        (i) Collecting the volumetric flow rate from the catalyst regenerator (in acfm) and determining the average flow rate for each hour. For events lasting less than one hour, determine the average flow rate during the event.

        (ii) Determining the cumulative cross-sectional area of the primary internal cyclone inlets in square feet (ft2) using design drawings of the primary (first-stage) internal cyclones to determine the inlet cross-sectional area of each primary internal cyclone and summing the cross-sectional areas for all primary internal cyclones in the catalyst regenerator or, if primary cyclones. If all primary internal cyclones are identical, you may alternatively determine the inlet cross-sectional area of one primary internal cyclone using design drawings and multiply that area by the total number of primary internal cyclones in the catalyst regenerator.

        (iii) Calculating the inlet velocity to the primary internal cyclones in square feet per second (ft2/sec) by dividing the average volumetric flow rate (acfm) by the cumulative cross-sectional area of the primary internal cyclone inlets (ft2) and by 60 seconds/minute (for unit conversion).

        (iv) Maintaining the inlet velocity to the primary internal cyclones at or above 20 feet per second for each hour during the startup, shutdown, or hot standby event or, for events lasting less than 1 hour, for the duration of the event.

        0

        41. Section 63.1565 is amended by revising paragraph (a)(1) introductory text and adding paragraph (a)(5) to read as follows:

        Sec. 63.1565 What are my requirements for organic HAP emissions from catalytic cracking units?

        (a) * * *

        (1) Except as provided in paragraph (a)(5) of this section, meet each emission limitation in Table 8 of this subpart that applies to you. If your catalytic cracking unit is subject to the NSPS for carbon monoxide (CO) in Sec. 60.103 of this chapter or is subject to Sec. 60.102a(b)(4) of this chapter, you must meet the emission limitations for NSPS units. If your catalytic cracking unit is not subject to the NSPS for CO, you can choose from the two options in paragraphs (a)(1)(i) through (ii) of this section:

        * * * * *

        (5) During periods of startup, shutdown and hot standby, you can choose from the two options in paragraphs (a)(5)(i) and (ii) of this section:

        (i) You can elect to comply with the requirements in paragraphs (a)(1) and (2) of this section; or

        (ii) You can elect to maintain the oxygen (O2) concentration in the exhaust gas from your catalyst regenerator at or above 1 volume percent (dry basis).

        * * * * *

        0

        42. Section 63.1566 is amended by revising paragraphs (a)(1) introductory text, (a)(1)(i), and (a)(4) to read as follows:

        Sec. 63.1566 What are my requirements for organic HAP emissions from catalytic reforming units?

        (a) * * *

        (1) Meet each emission limitation in Table 15 of this subpart that applies to you. You can choose from the two options in paragraphs (a)(1)(i) and (ii) of this section.

        (i) You can elect to vent emissions of total organic compounds (TOC) to a flare (Option 1). On and after January 30, 2019, the flare must meet the requirements of Sec. 63.670. Prior to January 30, 2019, the flare must meet the control device requirements in Sec. 63.11(b) or the requirements of Sec. 63.670.

        * * * * *

        (4) The emission limitations in Tables 15 and 16 of this subpart do not apply to emissions from process vents during passive depressuring when the reactor vent pressure is 5 pounds per square inch gauge (psig) or less. The emission limitations in Tables 15 and 16 of this subpart do apply to emissions from process vents during active purging operations (when nitrogen or other purge gas is actively introduced to the reactor vessel) or active depressuring (using a vacuum pump, ejector system, or similar device) regardless of the reactor vent pressure.

        * * * * *

        0

        43. Section 63.1568 is amended by revising paragraphs (a)(1) introductory text and (a)(1)(i) and adding paragraph (a)(4) to read as follows:

        Sec. 63.1568 What are my requirements for HAP emissions from sulfur recovery units?

        (a) * * *

        (1) Meet each emission limitation in Table 29 of this subpart that applies to you. If your sulfur recovery unit is subject to the NSPS for sulfur oxides in Sec. 60.104 or Sec. 60.102a(f)(1) of this chapter, you must meet the emission limitations for NSPS units. If your sulfur recovery unit is not subject to one of these NSPS for sulfur oxides, you can choose from the options in paragraphs (a)(1)(i) through (ii) of this section:

        (i) You can elect to meet the NSPS requirements in Sec. 60.104(a)(2) or Sec. 60.102a(f)(1) of this chapter (Option 1); or

        * * * * *

        (4) During periods of startup and shutdown, you can choose from the three options in paragraphs (a)(4)(i) through (iii) of this section.

        (i) You can elect to comply with the requirements in paragraphs (a)(1) and (2) of this section.

        (ii) You can elect to send any startup or shutdown purge gases to a flare. On and after January 30, 2019, the flare must meet the requirements of Sec. 63.670. Prior to January 30, 2019, the flare must meet the design and operating requirements in Sec. 63.11(b) or the requirements of Sec. 63.670.

        (iii) You can elect to send any startup or shutdown purge gases to a thermal oxidizer or incinerator operated at a

        Page 75276

        minimum hourly average temperature of 1,200 degrees Fahrenheit in the firebox and a minimum hourly average outlet oxygen (O2) concentration of 2 volume percent (dry basis).

        * * * * *

        0

        44. Section 63.1570 is amended by revising paragraphs (a) through (d) and removing paragraph (g) to read as follows:

        Sec. 63.1570 What are my general requirements for complying with this subpart?

        (a) You must be in compliance with all of the non-opacity standards in this subpart at all times.

        (b) You must be in compliance with the opacity and visible emission limits in this subpart at all times.

        (c) At all times, you must operate and maintain any affected source, including associated air pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution control practices for minimizing emissions. The general duty to minimize emissions does not require you to make any further efforts to reduce emissions if levels required by the applicable standard have been achieved. Determination of whether a source is operating in compliance with operation and maintenance requirements will be based on information available to the Administrator which may include, but is not limited to, monitoring results, review of operation and maintenance procedures, review of operation and maintenance records, and inspection of the source.

        (d) During the period between the compliance date specified for your affected source and the date upon which continuous monitoring systems have been installed and validated and any applicable operating limits have been set, you must maintain a log that documents the procedures used to minimize emissions from process and emissions control equipment according to the general duty in paragraph (c) of this section.

        * * * * *

        0

        45. Section 63.1571 is amended by:

        0

      94. Adding paragraphs (a)(5) and (6);

        0

      95. Revising paragraph (b)(1);

        0

      96. Removing paragraph (b)(4);

        0

      97. Redesignating paragraph (b)(5) as paragraph (b)(4); and

        0

      98. Revising the first sentence of paragraph (d)(2) and paragraph (d)(4).

        The revisions and additions read as follows:

        Sec. 63.1571 How and when do I conduct a performance test or other initial compliance demonstration?

        (a) * * *

        (5) Periodic performance testing for PM or Ni. Except as provided in paragraphs (a)(5)(i) and (ii) of this section, conduct a periodic performance test for PM or Ni for each catalytic cracking unit at least once every 5 years according to the requirements in Table 4 of this subpart. You must conduct the first periodic performance test no later than August 1, 2017.

        (i) Catalytic cracking units monitoring PM concentration with a PM CEMS are not required to conduct a periodic PM performance test.

        (ii) Conduct a performance test annually if you comply with the emission limits in Item 1 (NSPS subpart J) or Item 4 (Option 1a) in Table 1 of this subpart and the PM emissions measured during the most recent performance source test are greater than 0.80 g/kg coke burn-

        off.

        (6) One-time performance testing for HCN. Conduct a performance test for HCN from each catalytic cracking unit no later than August 1, 2017 according to the applicable requirements in paragraphs (a)(6)(i) and (ii) of this section.

        (i) If you conducted a performance test for HCN for a specific catalytic cracking unit between March 31, 2011 and February 1, 2016, you may submit a request to the Administrator to use the previously conducted performance test results to fulfill the one-time performance test requirement for HCN for each of the catalytic cracking units tested according to the requirements in paragraphs (a)(6)(i)(A) through (D) of this section.

        (A) The request must include a copy of the complete source test report, the date(s) of the performance test and the test methods used. If available, you must also indicate whether the catalytic cracking unit catalyst regenerator was operated in partial or complete combustion mode during the test, the control device configuration, including whether platinum or palladium combustion promoters were used during the test, and the CO concentration (measured using CO CEMS or manual test method) for each test run.

        (B) You must submit a separate request for each catalytic cracking unit tested and you must submit each request to the Administrator no later than March 30, 2016.

        (C) The Administrator will evaluate each request with respect to the completeness of the request, the completeness of the submitted test report and the appropriateness of the test methods used. The Administrator will notify the facility within 60 days of receipt of the request if it is approved or denied. If the Administrator fails to respond to the facility within 60 days of receipt of the request, the request will be automatically approved.

        (D) If the request is approved, you do not need to conduct an additional HCN performance test. If the request is denied, you must conduct an additional HCN performance test following the requirements in (a)(6)(ii) of this section.

        (ii) Unless you receive approval to use a previously conducted performance test to fulfill the one-time performance test requirement for HCN for your catalytic cracking unit as provided in paragraph (a)(6)(i) of this section, conduct a performance test for HCN for each catalytic cracking unit no later than August 1, 2017 according to following requirements:

        (A) Select sampling port location, determine volumetric flow rate, conduct gas molecular weight analysis and measure moisture content as specified in either Item 1 of Table 4 of this subpart or Item 1 of Table 11 of this subpart.

        (B) Measure HCN concentration using Method 320 of appendix A of this part. The method ASTM D6348-03 (Reapproved 2010) including Annexes A1 through A8 (incorporated by reference--see Sec. 63.14) is an acceptable alternative to EPA Method 320 of appendix A of this part. The method ASTM D6348-12e1 (incorporated by reference--see Sec. 63.14) is an acceptable alternative to EPA Method 320 of appendix A of this part with the following two caveats:

        (1) The test plan preparation and implementation in the Annexes to ASTM D6348-03 (Reapproved 2010), Sections A1 through A8 are mandatory; and

        (2) In ASTM D6348-03 (Reapproved 2010) Annex A5 (Analyte Spiking Technique), the percent (%) R must be determined for each target analyte (Equation A5.5). In order for the test data to be acceptable for a compound, %R must be 70% >= R 10 percent.

        2. pH meter................ Locate the pH sensor in a position that

        provides a representative measurement of

        pH; ensure the sample is properly mixed

        and representative of the fluid to be

        measured.

        Use a pH sensor with an accuracy of at

        least 0.2 pH units.

        Check the pH meter's calibration on at

        least one point at least once daily; check

        the pH meter's calibration on at least two

        points at least once quarterly; at least

        monthly, inspect all components for

        integrity and all electrical components

        for continuity; record the results of each

        calibration check and inspection.

        3. Colormetric tube Use a colormetric tube sampling system with

        sampling system. a printed numerical scale in ppmv, a

        standard measurement range of 1 to 10 ppmv

        (or 1 to 30 ppmv if applicable), and a

        standard deviation for measured values of

        no more than 15 percent.

        System must include a gas detection pump

        and hot air probe if needed for the

        measurement range.

        4. CO2, O2, and CO monitors a. Locate the concentration sensor so that

        for coke burn-off rate. it provides a representative measurement

        of the content of the exit gas stream;

        ensure the sample is properly mixed and

        representative of the gas to be measured.

        Use a sensor with an accuracy of at least

        1 percent of the range of the

        sensor or to a nominal gas concentration

        of 0.5 percent, whichever is

        greater.

        Use a monitor that is able to measure

        concentration on a dry basis or is able to

        correct for moisture content and record on

        a dry basis.

        Conduct calibration checks at least

        annually; conduct calibration checks

        following any period of more than 24 hours

        throughout which the sensor reading

        exceeds the manufacturer's specified

        maximum operating range or install a new

        sensor; at least quarterly, inspect all

        components for integrity and all

        electrical connections for continuity;

        record the results of each calibration and

        inspection.

      99. As an alternative, the requirements in

        40 CFR 60.105a(b)(2) may be used.

        5. BLD..................... Follow the requirements in 40 CFR

        60.105a(c).

        6. Voltage, secondary Use meters with an accuracy of at least

        current, or total power 5 percent over the operating

        input sensors. range.

        Page 75319

        Each time that the unit is not operating,

        confirm that the meters read zero. Conduct

        a calibration check at least annually;

        conduct calibration checks following any

        period of more than 24 hours throughout

        which the meter reading exceeds the

        manufacturer's specified maximum operating

        range; at least monthly, inspect all

        components of the continuous parameter

        monitoring system for integrity and all

        electrical connections for continuity;

        record the results of each calibration

        check and inspection.

        7. Pressure/Pressure Locate the pressure sensor(s) in a position

        drop\1\ sensors. that provides a representative measurement

        of the pressure and minimizes or

        eliminates pulsating pressure, vibration,

        and internal and external corrosion.

        Use a gauge with an accuracy of at least

        5 percent over the normal

        operating range or 0.12 kilopascals (0.5

        inches of water column), whichever is

        greater.

        Review pressure sensor readings at least

        once a week for straightline (unchanging)

        pressure and perform corrective action to

        ensure proper pressure sensor operation if

        blockage is indicated; using an instrument

        recommended by the sensor's manufacturer,

        check gauge calibration and transducer

        calibration annually; conduct calibration

        checks following any period of more than

        24 hours throughout which the pressure

        exceeded the manufacturer's specified

        maximum rated pressure or install a new

        pressure sensor; at least quarterly,

        inspect all components for integrity, all

        electrical connections for continuity, and

        all mechanical connections for leakage,

        unless the CPMS has a redundant pressure

        sensor; record the results of each

        calibration check and inspection.

        8. Air flow rate, gas flow Locate the flow sensor(s) and other

        rate, or total water (or necessary equipment (such as straightening

        scrubbing liquid) flow vanes) in a position that provides

        rate sensors. representative flow; reduce swirling flow

        or abnormal velocity distributions due to

        upstream and downstream disturbances. If

        you elect to comply with Option 3 (Ni lb/

        hr) or Option 4 (Ni lb/1,000 lb of coke

        burn-off) for the HAP metal emission

        limitations in Sec. 63.1564, install the

        continuous parameter monitoring system for

        gas flow rate as close as practical to the

        continuous opacity monitoring system; and

        if you don't use a continuous opacity

        monitoring system, install the continuous

        parameter monitoring system for gas flow

        rate as close as practical to the control

        device.

        Use a flow rate sensor with an accuracy of

        at least 5 percent over the

        normal range of flow measured, or 1.9

        liter per minute (0.5 gallons per minute),

        whichever is greater, for liquid flow.

        Use a flow rate sensor with an accuracy of

        at least 5 percent over the

        normal range of flow measured, or 280

        liters per minute (10 cubic feet per

        minute), whichever is greater, for gas

        flow.

        Conduct a flow sensor calibration check at

        least biennially (every two years);

        conduct a calibration check following any

        period of more than 24 hours throughout

        which the flow rate exceeded the

        manufacturer's specified maximum rated

        flow rate or install a new flow sensor; at

        least quarterly, inspect all components

        for leakage, unless the CPMS has a

        redundant flow sensor; record the results

        of each calibration check and inspection.

        9. Temperature sensors..... Locate the temperature sensor in the

        combustion zone, or in the ductwork

        immediately downstream of the combustion

        zone before any substantial heat exchange

        occurs or in the ductwork immediately

        downstream of the regenerator; locate the

        temperature sensor in a position that

        provides a representative temperature;

        shield the temperature sensor system from

        electromagnetic interference and chemical

        contaminants.

        Use a temperature sensor with an accuracy

        of at least 1 percent over the

        normal range of temperature measured,

        expressed in degrees Celsius (C), or 2.8

        degrees C, whichever is greater.

        Conduct calibration checks at least

        annually; conduct calibration checks

        following any period of more than 24 hours

        throughout which the temperature exceeded

        the manufacturer's specified maximum rated

        temperature or install a new temperature

        sensor; at least quarterly, inspect all

        components for integrity and all

        electrical connections for continuity,

        oxidation, and galvanic corrosion, unless

        the CPMS has a redundant temperature

        sensor; record the results of each

        calibration check and inspection.

        10. Oxygen content sensors Locate the oxygen sensor so that it

        \2\. provides a representative measurement of

        the oxygen content of the exit gas stream;

        ensure the sample is properly mixed and

        representative of the gas to be measured.

        Use an oxygen sensor with an accuracy of at

        least 1 percent of the range

        of the sensor or to a nominal gas

        concentration of 0.5 percent,

        whichever is greater.

        Conduct calibration checks at least

        annually; conduct calibration checks

        following any period of more than 24 hours

        throughout which the sensor reading

        exceeds the manufacturer's specified

        maximum operating range or install a new

        oxygen sensor; at least quarterly, inspect

        all components for integrity and all

        electrical connections for continuity;

        record the results of each calibration and

        inspection.

        ------------------------------------------------------------------------

        \1\ Not applicable to non-venturi wet scrubbers of the jet-ejector

        design.

        \2\ This does not replace the requirements for oxygen monitors that are

        required to use continuous emissions monitoring systems. The

        requirements in this table apply to oxygen sensors that are continuous

        parameter monitors, such as those that monitor combustion zone oxygen

        concentration and regenerator exit oxygen concentration.

        0

        86. Table 43 to subpart UUU is revised to read as follows:

        As stated in Sec. 63.1575(a), you shall meet each requirement in the following table that applies to you.

        Page 75320

        Table 43 to Subpart UUU of Part 63--Requirements for Reports

        ------------------------------------------------------------------------

        You shall submit

        You must submit . . . The report must the report . . .

        contain . . .

        ------------------------------------------------------------------------

        1. A compliance report........ If there are no Semiannually

        deviations from any according to

        emission limitation the

        or work practice requirements in

        standard that applies Sec.

        to you, a statement 63.1575(b).

        that there were no

        deviations from the

        standards during the

        reporting period and

        that no continuous

        opacity monitoring

        system or continuous

        emission monitoring

        system was

        inoperative,

        inactive, out-of-

        control, repaired, or

        adjusted; if you have

        a deviation from any

        emission limitation

        or work practice

        standard during the

        reporting period, the

        report must contain

        the information in

        Sec. 63.1575(c)

        through (e).

        2. Performance test and CEMS On and after January Within 60 days

        performance evaluation data. 30, 2019, the after the date

        information specified of completing

        in Sec. each test

        63.1575(k)(1). according to

        the

        requirements in

        Sec.

        63.1575(k).

        ------------------------------------------------------------------------

        0

        87. Table 44 to subpart UUU of part 63 is revised to read as follows:

        As stated in Sec. 63.1577, you shall meet each requirement in the following table that applies to you.

        Table 44 to Subpart UUU of Part 63--Applicability of NESHAP General Provisions to Subpart UUU

        ----------------------------------------------------------------------------------------------------------------

        Applies to subpart

        Citation Subject UUU Explanation

        ----------------------------------------------------------------------------------------------------------------

        Sec. 63.1(a)(1)-(4)............. General Applicability..... Yes.................. .........................

        Sec. 63.1(a)(5)................. Reserved................ Not applicable....... .........................

        Sec. 63.1(a)(6)................. .......................... Yes.................. Except the correct mail

        drop (MD) number is C404-

        04.

        Sec. 63.1(a)(7)-(9)............. Reserved................ Not applicable....... .........................

        Sec. 63.1(a)(10)-(12)........... .......................... Yes.................. Except that this subpart

        specifies calendar or

        operating day.

        Sec. 63.1(b)(1)................. Initial Applicability Yes.................. .........................

        Determination for this

        part.

        Sec. 63.1(b)(2)................. Reserved................ Not applicable....... .........................

        Sec. 63.1(b)(3)................. .......................... Yes.................. .........................

        Sec. 63.1(c)(1)................. Applicability of this part Yes.................. .........................

        after a Relevant Standard

        has been set under this

        part.

        Sec. 63.1(c)(2)................. .......................... No................... Area sources are not

        subject to this subpart.

        Sec. 63.1(c)(3)-(4)............. Reserved................ Not applicable....... .........................

        Sec. 63.1(c)(5)................. .......................... Yes.................. .........................

        Sec. 63.1(d).................... Reserved................ Not applicable....... .........................

        Sec. 63.1(e).................... Applicability of Permit Yes.................. .........................

        Program.

        Sec. 63.2....................... Definitions............... Yes.................. Sec. 63.1579 specifies

        that if the same term is

        defined in subparts A

        and UUU of this part, it

        shall have the meaning

        given in this subpart.

        Sec. 63.3....................... Units and Abbreviations... Yes.................. .........................

        Sec. 63.4(a)(1)-(2)............. Prohibited Activities..... Yes.................. .........................

        Sec. 63.4(a)(3)-(5)............. Reserved................ Not applicable....... .........................

        Sec. 63.4(b)-(c)................ Circumvention and Yes.................. .........................

        Fragmentation.

        Sec. 63.5(a).................... Construction and Yes.................. .........................

        Reconstruction.

        Sec. 63.5(b)(1)................. .......................... Yes.................. .........................

        Sec. 63.5(b)(2)................. Reserved................ Not applicable....... .........................

        Sec. 63.5(b)(3)-(4)............. .......................... Yes.................. In Sec. 63.5(b)(4),

        replace the reference to

        Sec. 63.9(b) with Sec.

        63.9(b)(4) and (5).

        Sec. 63.5(b)(5)................. Reserved................ Not applicable....... .........................

        Sec. 63.5(b)(6)................. .......................... Yes.................. .........................

        Sec. 63.5(c).................... Reserved................ Not applicable....... .........................

        Sec. 63.5(d)(1)(i).............. Application for Approval Yes.................. Except this subpart

        of Construction or specifies the

        Reconstruction--General application is submitted

        Application Requirements. as soon as practicable

        before startup but not

        later than 90 days after

        the promulgation date if

        construction or

        reconstruction had

        commenced and initial

        startup had not occurred

        before promulgation.

        Page 75321

        Sec. 63.5(d)(1)(ii)............. .......................... Yes.................. Except that emission

        estimates specified in

        Sec. 63.5(d)(1)(ii)(H)

        are not required, and

        Sec. 63.5(d)(1)(ii)(G)

        and (I) are Reserved and

        do not apply.

        Sec. 63.5(d)(1)(iii)............ .......................... No................... This subpart specifies

        submission of

        notification of

        compliance status.

        Sec. 63.5(d)(2)................. .......................... Yes.................. .........................

        Sec. 63.5(d)(3)................. .......................... Yes.................. .........................

        Sec. 63.5(d)(4)................. .......................... Yes.................. .........................

        Sec. 63.5(e).................... Approval of Construction Yes.................. .........................

        or Reconstruction.

        Sec. 63.5(f)(1)................. Approval of Construction Yes.................. .........................

        or Reconstruction Based

        on State Review.

        Sec. 63.5(f)(2)................. .......................... Yes.................. Except that the cross-

        reference to Sec.

        63.9(b)(2) does not

        apply.

        Sec. 63.6(a).................... Compliance with Standards Yes.................. .........................

        and Maintenance--

        Applicability.

        Sec. 63.6(b)(1)-(4)............. Compliance Dates for New Yes.................. .........................

        and Reconstructed Sources.

        Sec. 63.6(b)(5)................. .......................... Yes.................. Except that this subpart

        specifies different

        compliance dates for

        sources.

        Sec. 63.6(b)(6)................. Reserved................ Not applicable....... .........................

        Sec. 63.6(b)(7)................. Compliance Dates for New Yes.................. .........................

        and Reconstructed Area

        Sources That Become Major.

        Sec. 63.6(c)(1)-(2)............. Compliance Dates for Yes.................. Except that this subpart

        Existing Sources. specifies different

        compliance dates for

        sources subject to Tier

        II gasoline sulfur

        control requirements.

        Sec. 63.6(c)(3)-(4)............. Reserved................ Not applicable....... .........................

        Sec. 63.6(c)(5)................. Compliance Dates for Yes.................. .........................

        Existing Area Sources

        That Become Major.

        Sec. 63.6(d).................... Reserved................ Not applicable....... .........................

        Sec. 63.6(e)(1)(i).............. General Duty to Minimize No................... See Sec. 63.1570(c) for

        Emissions. general duty

        requirement.

        Sec. 63.6(e)(1)(ii)............. Requirement to Correct No................... .........................

        Malfunctions as Soon as

        Possible.

        Sec. 63.6(e)(1)(iii)............ Compliance with Standards Yes.................. .........................

        and Maintenance

        Requirements.

        Sec. 63.6(e)(2)................. Reserved................ Not Applicable....... .........................

        Sec. 63.6(e)(3)(i).............. Startup, Shutdown, and No................... .........................

        Malfunction Plan

        Requirements.

        Sec. 63.6(e)(3)(ii)............. Reserved................ Not applicable....... .........................

        Sec. 63.6(e)(3)(iii)-(ix)....... .......................... No................... .........................

        Sec. 63.6(f)(1)................. SSM Exemption............. No................... .........................

        Sec. 63.6(f)(2)(i)-(iii)(C)..... Compliance with Standards Yes.................. .........................

        and Maintenance

        Requirements.

        Sec. 63.6(f)(2)(iii)(D)......... .......................... Yes.................. .........................

        Sec. 63.6(f)(2)(iv)-(v)......... .......................... Yes.................. .........................

        Sec. 63.6(f)(3)................. .......................... Yes.................. Except the cross-

        references to Sec.

        63.6(f)(1) and (e)(1)(i)

        are changed to Sec.

        63.1570(c).

        Sec. 63.6(g).................... Alternative Standard...... Yes.................. .........................

        Sec. 63.6(h)(1)................. SSM Exemption for Opacity/ No................... .........................

        VE Standards.

        Sec. 63.6(h)(2)(i).............. Determining Compliance No................... This subpart specifies

        with Opacity/VE Standards. methods.

        Sec. 63.6(h)(2)(ii)............. Reserved................ Not applicable....... .........................

        Sec. 63.6(h)(2)(iii)............ .......................... Yes.................. .........................

        Sec. 63.6(h)(3)................. Reserved................ Not applicable....... .........................

        Sec. 63.6(h)(4)................. Notification of Opacity/VE Yes.................. Applies to Method 22 (40

        Observation Date. CFR part 60, appendix A-

        7) tests.

        Sec. 63.6(h)(5)................. Conducting Opacity/VE No................... .........................

        Observations.

        Sec. 63.6(h)(6)................. Records of Conditions Yes.................. Applies to Method 22 (40

        During Opacity/VE CFR part 60, appendix A-

        Observations. 7) observations.

        Sec. 63.6(h)(7)(i).............. Report COM Monitoring Data Yes.................. .........................

        from Performance Test.

        Sec. 63.6(h)(7)(ii)............. Using COM Instead of No................... .........................

        Method 9.

        Page 75322

        Sec. 63.6(h)(7)(iii)............ Averaging Time for COM Yes.................. .........................

        during Performance Test.

        Sec. 63.6(h)(7)(iv)............. COM Requirements.......... Yes.................. .........................

        Sec. 63.6(h)(7)(v).............. COMS Results and Visual Yes.................. .........................

        Observations.

        Sec. 63.6(h)(8)................. Determining Compliance Yes.................. .........................

        with Opacity/VE Standards.

        Sec. 63.6(h)(9)................. Adjusted Opacity Standard. Yes.................. .........................

        Sec. 63.6(i)(1)-(14)............ Extension of Compliance... Yes.................. Extension of compliance

        under Sec. 63.6(i)(4)

        not applicable to a

        facility that installs

        catalytic cracking feed

        hydrotreating and

        receives an extended

        compliance date under

        Sec. 63.1563(c).

        Sec. 63.6(i)(15)................ Reserved................ Not applicable....... .........................

        Sec. 63.6(i)(16)................ .......................... Yes.................. .........................

        Sec. 63.6(j).................... Presidential Compliance Yes.................. .........................

        Exemption.

        Sec. 63.7(a)(1)................. Performance Test Yes.................. Except that this subpart

        Requirements specifies the applicable

        Applicability. test and demonstration

        procedures.

        Sec. 63.7(a)(2)................. Performance Test Dates.... Yes.................. Except test results must

        be submitted in the

        Notification of

        Compliance Status report

        due 150 days after the

        compliance date.

        Sec. 63.7(a)(3)................. Section 114 Authority..... Yes.................. .........................

        Sec. 63.7(a)(4)................. Force Majeure............. Yes.................. .........................

        Sec. 63.7(b).................... Notifications............. Yes.................. Except that this subpart

        specifies notification

        at least 30 days prior

        to the scheduled test

        date rather than 60

        days.

        Sec. 63.7(c).................... Quality Assurance Program/ Yes.................. Except that when this

        Site-Specific Test Plan. subpart specifies to use

        40 CFR part 60, appendix

        F, out of control

        periods are to be

        defined as specified in

        part 60, appendix F.

        Sec. 63.7(d).................... Performance Test Yes.................. .........................

        Facilities.

        Sec. 63.7(e)(1)................. Performance Testing....... No................... See Sec. 63.1571(b)(1).

        Sec. 63.7(e)(2)-(4)............. Conduct of Tests.......... Yes.................. .........................

        Sec. 63.7(f).................... Alternative Test Method... Yes.................. .........................

        Sec. 63.7(g).................... Data Analysis, Yes.................. Except performance test

        Recordkeeping, Reporting. reports must be

        submitted with

        notification of

        compliance status due

        150 days after the

        compliance date, and

        Sec. 63.7(g)(2) is

        reserved and does not

        apply.

        Sec. 63.7(h).................... Waiver of Tests........... Yes.................. .........................

        Sec. 63.8(a)(1)................. Monitoring Requirements- Yes.................. .........................

        Applicability.

        Sec. 63.8(a)(2)................. Performance Specifications Yes.................. .........................

        Sec. 63.8(a)(3)................. Reserved................ Not applicable....... .........................

        Sec. 63.8(a)(4)................. Monitoring with Flares.... Yes.................. Except that for a flare

        complying with Sec.

        63.670, the cross-

        reference to Sec.

        63.11 in this paragraph

        does not include Sec.

        63.11(b).

        Sec. 63.8(b)(1)................. Conduct of Monitoring..... Yes.................. .........................

        Sec. 63.8(b)(2)-(3)............. Multiple Effluents and Yes.................. This subpart specifies

        Multiple Monitoring the required monitoring

        Systems. locations.

        Sec. 63.8(c)(1)................. Monitoring System Yes.................. .........................

        Operation and Maintenance.

        Sec. 63.8(c)(1)(i).............. General Duty to Minimize No................... See Sec. 63.1570(c).

        Emissions and CMS

        Operation.

        Sec. 63.8(c)(1)(ii)............. Keep Necessary Parts for Yes.................. .........................

        CMS.

        Sec. 63.8(c)(1)(iii)............ Requirement to Develop SSM No................... .........................

        Plan for CMS.

        Page 75323

        Sec. 63.8(c)(2)-(3)............. Monitoring System Yes.................. Except that this subpart

        Installation. specifies that for

        continuous parameter

        monitoring systems,

        operational status

        verification includes

        completion of

        manufacturer written

        specifications or

        installation, operation,

        and calibration of the

        system or other written

        procedures that provide

        adequate assurance that

        the equipment will

        monitor accurately.

        Sec. 63.8(c)(4)................. Continuous Monitoring Yes.................. .........................

        System Requirements.

        Sec. 63.8(c)(5)................. COMS Minimum Procedures... Yes.................. .........................

        Sec. 63.8(c)(6)................. CMS Requirements.......... Yes.................. .........................

        Sec. 63.8(c)(7)-(8)............. CMS Requirements.......... Yes.................. .........................

        Sec. 63.8(d)(1)-(2)............. Quality Control Program Yes.................. .........................

        for CMS.

        Sec. 63.8(d)(3)................. Written Procedures for CMS No................... .........................

        Sec. 63.8(e).................... CMS Performance Evaluation Yes.................. Except that results are

        to be submitted as part

        of the Notification

        Compliance Status due

        150 days after the

        compliance date.

        Sec. 63.8(f)(1)-(5)............. Alternative Monitoring Yes.................. Except that this subpart

        Methods. specifies procedures for

        requesting alternative

        monitoring systems and

        alternative parameters.

        Sec. 63.8(f)(6)................. Alternative to Relative Yes.................. Applicable to continuous

        Accuracy Test. emission monitoring

        systems if performance

        specification requires a

        relative accuracy test

        audit.

        Sec. 63.8(g)(1)-(4)............. Reduction of Monitoring Yes.................. Applies to continuous

        Data. opacity monitoring

        system or continuous

        emission monitoring

        system.

        Sec. 63.8(g)(5)................. Data Reduction............ No................... This subpart specifies

        requirements.

        Sec. 63.9(a).................... Notification Requirements-- Yes.................. Duplicate Notification of

        Applicability. Compliance Status report

        to the Regional

        Administrator may be

        required.

        Sec. 63.9(b)(1)-(2)............. Initial Notifications..... Yes.................. Except that notification

        of construction or

        reconstruction is to be

        submitted as soon as

        practicable before

        startup but no later

        than 30 days after the

        effective date if

        construction or

        reconstruction had

        commenced but startup

        had not occurred before

        the effective date.

        Sec. 63.9(b)(3)................. Reserved................ Not applicable....... .........................

        Sec. 63.9(b)(4)-(5)............. Initial Notification Yes.................. Except Sec.

        Information. 63.9(b)(4)(ii)-(iv),

        which are reserved and

        do not apply.

        Sec. 63.9(c).................... Request for Extension of Yes.................. .........................

        Compliance.

        Sec. 63.9(d).................... New Source Notification Yes.................. .........................

        for Special Compliance

        Requirements.

        Sec. 63.9(e).................... Notification of Yes.................. Except that notification

        Performance Test. is required at least 30

        days before test.

        Sec. 63.9(f).................... Notification of VE/Opacity Yes.................. .........................

        Test.

        Sec. 63.9(g).................... Additional Notification Yes.................. .........................

        Requirements for Sources

        with Continuous

        Monitoring Systems.

        Sec. 63.9(h).................... Notification of Compliance Yes.................. Except that this subpart

        Status. specifies the

        notification is due no

        later than 150 days

        after compliance date,

        and except that the

        reference to Sec.

        63.5(d)(1)(ii)(H) in

        Sec. 63.9(h)(5) does

        not apply.

        Sec. 63.9(i).................... Adjustment of Deadlines... Yes.................. .........................

        Sec. 63.9(j).................... Change in Previous Yes.................. .........................

        Information.

        63.10(a).......................... Recordkeeping and Yes.................. .........................

        Reporting Applicability.

        Sec. 63.10(b)(1)................ General Recordkeeping Yes.................. .........................

        Requirements.

        Page 75324

        Sec. 63.10(b)(2)(i)............. Recordkeeping of No................... .........................

        Occurrence and Duration

        of Startups and Shutdowns.

        Sec. 63.10(b)(2)(ii)............ Recordkeeping of No................... See Sec. 63.1576(a)(2)

        Malfunctions. for recordkeeping of (1)

        date, time and duration;

        (2) listing of affected

        source or equipment, and

        an estimate of the

        volume of each regulated

        pollutant emitted over

        the standard; and (3)

        actions taken to

        minimize emissions and

        correct the failure.

        Sec. 63.10(b)(2)(iii)........... Maintenance Records....... Yes.................. .........................

        Sec. 63.10(b)(2)(iv)-(v)........ Actions Taken to Minimize No................... .........................

        Emissions During SSM.

        Sec. 63.10(b)(2)(vi)............ Recordkeeping for CMS Yes.................. .........................

        Malfunctions.

        Sec. 63.10(b)(2)(vii)-(xiv)..... Other CMS Requirements.... Yes.................. .........................

        Sec. 63.10(b)(3)................ Recordkeeping for Yes.................. .........................

        Applicability

        Determinations..

        Sec. 63.10(c)(1)-(6)............ Additional Records for Yes.................. Except Sec. 63.10(c)(2)-

        Continuous Monitoring (4), which are Reserved

        Systems. and do not apply.

        Sec. 63.10(c)(7)-(8)............ Additional Recordkeeping Yes.................. .........................

        Requirements for CMS--

        Identifying Exceedances

        and Excess Emissions.

        Sec. 63.10(c)(9)................ Reserved................ Not applicable....... .........................

        Sec. 63.10(c)(10)............... Recording Nature and Cause No................... See Sec. 63.1576(a)(2)

        of Malfunctions. for malfunctions

        recordkeeping

        requirements.

        Sec. 63.10(c)(11)............... Recording Corrective No................... See Sec. 63.1576(a)(2)

        Actions. for malfunctions

        recordkeeping

        requirements.

        Sec. 63.10(c)(12)-(14).......... Additional CMS Yes.................. .........................

        Recordkeeping

        Requirements.

        Sec. 63.10(c)(15)............... Use of SSM Plan........... No................... .........................

        Sec. 63.10(d)(1)................ General Reporting Yes.................. .........................

        Requirements.

        Sec. 63.10(d)(2)................ Performance Test Results.. No................... This subpart requires

        performance test results

        to be reported as part

        of the Notification of

        Compliance Status due

        150 days after the

        compliance date.

        Sec. 63.10(d)(3)................ Opacity or VE Observations Yes.................. .........................

        Sec. 63.10(d)(4)................ Progress Reports.......... Yes.................. .........................

        Sec. 63.10(d)(5)................ SSM Reports............... No................... See Sec. 63.1575(d) for

        CPMS malfunction

        reporting and Sec.

        63.1575(e) for COMS and

        CEMS malfunction

        reporting.

        Sec. 63.10(e)(1)-(2)............ Additional CMS Reports.... Yes.................. Except that reports of

        performance evaluations

        must be submitted in

        Notification of

        Compliance Status.

        Sec. 63.10(e)(3)................ Excess Emissions/CMS No................... This subpart specifies

        Performance Reports. the applicable

        requirements.

        Sec. 63.10(e)(4)................ COMS Data Reports......... Yes.................. .........................

        Sec. 63.10(f)................... Recordkeeping/Reporting Yes.................. .........................

        Waiver.

        Sec. 63.11(a)................... Control Device and Work Yes.................. .........................

        Practice Requirements

        Applicability.

        Sec. 63.11(b)................... Flares.................... Yes.................. Except that flares

        complying with Sec.

        63.670 are not subject

        to the requirements of

        Sec. 63.11(b).

        Sec. 63.11(c)-(e)............... Alternative Work Practice Yes.................. .........................

        for Monitoring Equipment

        for Leaks.

        Sec. 63.12...................... State Authority and Yes.................. .........................

        Delegations.

        Sec. 63.13...................... Addresses................. Yes.................. .........................

        Sec. 63.14...................... Incorporation by Reference Yes.................. .........................

        Sec. 63.15...................... Availability of Yes.................. .........................

        Information and

        Confidentiality.

        Sec. 63.16...................... Performance Track Yes.................. .........................

        Provisions.

        ----------------------------------------------------------------------------------------------------------------

        Page 75325

        0

        88. Appendix A to subpart UUU of part 63 is amended by revising the first sentence of section 2.1 and section 7.1.3 to read as follows:

        Appendix A to Subpart UUU of Part 63--Determination of Metal Concentration on Catalyst Particles (Instrumental Analyzer Procedure)

        * * * * *

        2.1 A representative sample of catalyst particles is collected, prepared, and analyzed for analyte concentration using either energy or wavelength dispersive X-ray fluorescent (XRF) spectrometry instrumental analyzers. * * *

        * * * * *

        7.1.3 Low-Range Calibration Standard. Concentration equivalent to 1 to 20 percent of the span. The concentration of the low-range calibration standard should be selected so that it is less than either one-fourth of the applicable concentration limit or of the lowest concentration anticipated in the catalyst samples.

        * * * * *

        0

        89. Appendix A to part 63 is amended by adding Method 325A and Method 325B in numerical order to read as follows:

        Appendix A to Part 63--Test Methods Pollutant Measurement Methods From Various Waste Media

        * * * * *

        Method 325A--Volatile Organic Compounds from Fugitive and Area Sources:

        Sampler Deployment and VOC Sample Collection

        1.0 Scope and Application

        1.1 This method describes collection of volatile organic compounds (VOCs) at or inside a facility property boundary or from fugitive and area emission sources using passive (diffusive) tube samplers (PS). The concentration of airborne VOCs at or near these potential fugitive- or area-emission sources may be determined using this method in combination with Method 325B. Companion Method 325B (Sampler Preparation and Analysis) describes preparation of sampling tubes, shipment and storage of exposed sampling tubes, and analysis of sampling tubes collected using either this passive sampling procedure or alternative active (pumped) sampling methods.

        1.2 This method may be used to determine the average concentration of the select VOCs using the corresponding uptake rates listed in Method 325B, Table 12.1. Additional compounds or alternative sorbents must be evaluated as described in Addendum A of Method 325B or by one of the following national/international standard methods: ISO 16017-2:2003(E), ASTM D6196-03 (Reapproved 2009), or BS EN 14662-4:2005 (all incorporated by reference--see Sec. 63.14), or reported in the peer-reviewed open literature.

        1.3 Methods 325A and 325B are valid for the measurement of benzene. Supporting literature (References 1-8) indicates that benzene can be measured by flame ionization detection or mass spectrometry over a concentration range of approximately 0.5 micrograms per cubic meter (microg/m3) to at least 500 microg/m\3\ when industry standard (3.5 inch long x 0.25 inch outside diameter (o.d.) x 5 mm inner diameter (i.d.)) inert-coated stainless steel sorbent tubes packed with CarbographTM 1 TD, CarbopackTM B, or CarbopackTM X or equivalent are used and when samples are accumulated over a period of 14 days.

        1.4 This method may be applied to screening average airborne VOC concentrations at facility property boundaries or monitoring perimeters over an extended period of time using multiple sampling periods (e.g., 26 x 14-day sampling periods). The duration of each sampling period is normally 14 days.

        1.5 This method requires the collection of local meteorological data (wind speed and direction, temperature, and barometric pressure). Although local meteorology is a component of this method, non-regulatory applications of this method may use regional meteorological data. Such applications risk that the results may not identify the precise source of the emissions.

        2.0 Summary of the Method

        2.1 Principle of the Method

        The diffusive passive sampler collects VOC from air for a measured time period at a rate that is proportional to the concentration of vapor in the air at that location.

        2.1.1 This method describes the deployment of prepared passive samplers, including determination of the number of passive samplers needed for each survey and placement of samplers along or inside the facility property boundary depending on the size and shape of the site or linear length of the boundary.

        2.1.2 The rate of sampling is specific to each compound and depends on the diffusion constants of that VOC and the sampler dimensions/characteristics as determined by prior calibration in a standard atmosphere (Reference 1).

        2.1.3 The gaseous VOC target compounds migrate through a constant diffusion barrier (e.g., an air gap of fixed dimensions) at the sampling end of the diffusion sampling tube and adsorb onto the sorbent.

        2.1.4 Heat and a flow of inert carrier gas are then used to extract (desorb) the retained VOCs back from the sampling end of the tube and transport/transfer them to a gas chromatograph (GC) equipped with a chromatographic column to separate the VOCs and a detector to determine the quantity of target VOCs.

        2.1.5 Gaseous or liquid calibration standards loaded onto the sampling ends of clean sorbent tubes must be used to calibrate the analytical equipment.

        2.1.6 This method requires the use of field blanks to ensure sample integrity associated with shipment, collection, and storage of the passive samples. It also requires the use of field duplicates to validate the sampling process.

        2.1.7 At the end of each sampling period, the passive samples are collected, sealed, and shipped to a laboratory for analysis of target VOCs by thermal desorption gas chromatography, as described in Method 325B.

        2.2 Application of Diffusive Sampling

        2.2.1 This method requires deployment of passive sampling tubes on a monitoring perimeter encompassing all known emission sources at a facility and collection of local meteorological data. It may be used to determine average concentration of VOC at a facility's ``fenceline'' using time integrated passive sampling (Reference 2).

        2.2.2 Collecting samples and meteorological data at progressively higher frequencies may be employed to resolve shorter term concentration fluctuations and wind conditions that could introduce interfering emissions from other sources.

        2.2.3 This passive sampling method provides a low cost approach to screening of fugitive or area emissions compared to active sampling methods that are based on pumped sorbent tubes or time weighted average canister sampling.

        2.2.3.1 Additional passive sampling tubes may be deployed at different distances from the facility property boundary or from the geometric center of the fugitive emission source.

        2.2.3.2 Additional meteorological measurements may also be collected as needed to perform preliminary gradient-based assessment of the extent of the pollution plume at ground level and the effect of ``background'' sources contributing to airborne VOC concentrations at the location.

        2.2.4 Time-resolved concentration measurements coupled with time-resolved meteorological monitoring may be used to generate data needed for source apportionment procedures and mass flux calculations.

        3.0 Definitions

        (See also Section 3.0 of Method 325B.)

        3.1 Fenceline means the property boundary of a facility or internal monitoring perimeter established in accordance with the requirements in Section 8.2 of this method.

        3.2 Passive sampler (PS) means a specific type of sorbent tube (defined in this method) that has a fixed dimension air (diffusion) gap at the sampling end and is sealed at the other end.

        3.3 Passive sampling refers to the activity of quantitatively collecting VOC on sorbent tubes using the process of diffusion.

        3.4 PSi is the annual average for all PS concentration results from location i.

        3.5 PSi3 is the set of annual average concentration results for PSi and two sorbent tubes nearest to the PS location i.

        3.6 PSip is the concentration from the sorbent tube at location i for the test period or episode p.

        3.7 Sampling period is the length of time each passive sampler is exposed during field monitoring. The sampling period for this method is 14 days.

        3.8 Sorbent tube (Also referred to as tube, PS tube, adsorbent tube, and sampling tube) is an inert coated stainless steel tube. Standard PS tube dimensions for this method

        Page 75326

        are 3.5-inch (89 mm) long x 0.25-inch (6.4 mm) o.d. with an i.d. of 5 mm, a cross-sectional area of 19.6 mm2 and an air gap of 15 mm. The central portion of the tube is packed with solid adsorbent material contained between 2 x 100-mesh stainless steel gauzes and terminated with a diffusion cap at the sampling end of the tube. These axial passive samplers are installed under a protective hood during field deployment.

        Note: Glass and glass- (or fused silica-) lined stainless steel sorbent tubes (typically 4 mm i.d.) are also available in various lengths to suit different makes of thermal desorption equipment, but these are rarely used for passive sampling because it is more difficult to adequately define the diffusive air gap in glass or glass-line tubing. Such tubes are not recommended for this method.

        4.0 Sampling Interferences

        4.1 General Interferences

        Passive tube samplers should be sited at a distance beyond the influence of possible obstructions such as trees, walls, or buildings at the monitoring site. Complex topography and physical site obstructions, such as bodies of water, hills, buildings, and other structures that may prevent access to a planned PS location must be taken into consideration. You must document and report siting interference with the results of this method.

        4.2 Background Interference

        Nearby or upwind sources of target emissions outside the facility being tested can contribute to background concentrations. Moreover, because passive samplers measure continuously, changes in wind direction can cause variation in the level of background concentrations from interfering sources during the monitoring period. This is why local meteorological information, particularly wind direction and speed, is required to be collected throughout the monitoring period. Interfering sources can include neighboring industrial facilities, transportation facilities, fueling operations, combustion sources, short-term transient sources, residential sources, and nearby highways or roads. As PS data are evaluated, the location of potential interferences with respect to PS locations and local wind conditions should be considered, especially when high PS concentration values are observed.

        4.3 Tube Handling

        You must protect the PS tubes from gross external contamination during field sampling. Analytical thermal desorption equipment used to analyze PS tubes must desorb organic compounds from the interior of PS tubes and exclude contamination from external sampler surfaces in the analytical/sample flow path. If the analytical equipment does not comply with this requirement, you must wear clean, white, cotton or powder-free nitrile gloves to handle sampling tubes to prevent contamination of the external sampler surfaces. Sampling tubes must be capped with two-piece, brass, 0.25 inch, long-term storage caps fitted with combined polytetrafluoroethylene ferrules (see Section 6.1 and Method 325B) to prevent ingress of airborne contaminants outside the sampling period. When not being used for field monitoring, the capped tubes must be stored in a clean, air-tight, shipping container to prevent the collection of VOCs (see Section 6.4.2 of Method 325B).

        4.4 Local Weather Conditions and Airborne Particulates

        Although air speeds are a constraint for many forms of passive samplers, axial tube PS devices have such a slow inherent uptake rate that they are largely immune to these effects (References 4,5). Passive samplers must nevertheless be deployed under non-emitting weatherproof hoods to moderate the effect of local weather conditions such as solar heating and rain. The cover must not impede the ingress of ambient air. Sampling tubes should also be orientated vertically and pointing downwards, to minimize accumulation of particulates.

        4.5 Temperature

        The normal working range for field sampling for sorbent packing is 0-40 degC (References 6,7). Note that most published passive uptake rate data for sorbent tubes is quoted at 20 degC. Note also that, as a rough guide, an increase in temperature of 10 degC will reduce the collection capacity for a given analyte on a given sorbent packing by a factor of 2, but the uptake rate will not change significantly (Reference 4).

        5.0 Safety

        This method does not purport to include all safety issues or procedures needed when deploying or collecting passive sampling tubes. Precautions typical of field air sampling projects are required. Tripping, falling, electrical, and weather safety considerations must all be included in plans to deploy and collect passive sampling tubes.

        6.0 Sampling Equipment and Supplies, and Pre-Deployment Planning

        This section describes the equipment and supplies needed to deploy passive sampling monitoring equipment at a facility property boundary. Details of the passive sampling tubes themselves and equipment required for subsequent analysis are described in Method 325B.

        6.1 Passive Sampling Tubes

        The industry standard PS tubes used in this method must meet the specific configuration and preparation requirements described in Section 3.0 of this method and Section 6.1 of Method 325B.

        Note: The use of PS tubes packed with various sorbent materials for monitoring a wide variety of organic compounds in ambient air has been documented in the literature (References 4-10). Other sorbents may be used in standard passive sampling tubes for monitoring additional target compound(s) once their uptake rate and performance has been demonstrated following procedures in Addendum A to Method 325B. Guidance on sorbent selection can also be obtained from relevant national and international standard methods such as ASTM D6196-03 (Reapproved 2009) (Reference 14) and ISO 16017-

        2:2003(E) (Reference 13) (both incorporated by reference--see Sec. 63.14).

        6.2 Passive or Diffusive Sampling Cap

        One diffusive sampling cap is required per PS tube. The cap fits onto the sampling end of the tube during air monitoring. The other end of the tube remains sealed with the long-term storage cap. Each diffusive sampling cap is fitted with a stainless steel gauze, which defines the outer limit of the diffusion air gap.

        6.3 Sorbent Tube Protection Cover

        A simple weatherproof hood, suitable for protecting passive sampling tubes from the worst of the weather (see Section 4.4) consists of an inverted cone/funnel constructed of an inert, non-

        outgassing material that fits over the diffusive tube, with the open (sampling) end of the tube projecting just below the cone opening. An example is shown in Figure 6.1 (Adapted from Reference 13).

        Page 75327

        GRAPHIC TIFF OMITTED TR01DE15.025

        6.4 Thermal Desorption Apparatus

        If the analytical thermal desorber that will subsequently be used to analyze the passive sampling tubes does not meet the requirement to exclude outer surface contaminants from the sample flow path (see Section 6.6 of Method 325B), then clean, white, cotton or powder-free nitrile gloves must be used for handling the passive sampling tubes during field deployment.

        6.5 Sorbent Selection

        Sorbent tube configurations, sorbents or other VOC not listed in this method must be evaluated according to Method 325B, Addendum A or ISO 16017-2:2003(E) (Reference 13) (incorporated by reference--

        see Sec. 63.14). The supporting evaluation and verification data described in Method 325B, Addendum A for configurations or compounds different from the ones described in this method must meet the performance requirements of Method 325A/B and must be submitted with the test plan for your measurement program.

        7.0 Reagents and Standards

        No reagents or standards are needed for the field deployment and collection of passive sampling tubes. Specifications for sorbents, gas and liquid phase standards, preloaded standard tubes, and carrier gases are covered in Section 7 of Method 325B.

        8.0 Sample Deployment, Recovery, and Storage

        Pre-deployment and planning steps are required before field deployment of passive sampling tubes. These activities include but are not limited to conducting a site visit, determining suitable and required monitoring locations, and determining the monitoring frequency to be used.

        8.1 Conducting the Site Visit

        8.1.1 Determine the size and shape of the facility footprint in order to determine the required number of monitoring locations.

        8.1.2 Identify obstacles or obstructions (buildings, roads, fences), hills and other terrain issues (e.g., bodies of water or swamp land) that could interfere with air parcel flow to the sampler or that prevent reasonable access to the location. You may use the general guidance in Section 4.1 of this method during the site visit to identify sampling locations. You must evaluate the placement of each passive sampler to determine if the conditions in this section are met.

        8.1.3 Identify to the extent possible and record potential off-

        site source interferences (e.g., neighboring industrial facilities, transportation facilities, fueling operations, combustion sources, short-term transient sources, residential sources, nearby highways).

        8.1.4 Identify the closest available meteorological station. Identify potential locations for one or more on-site or near-site meteorological station(s) following the guidance in EPA-454/B-08-002 (Reference 11) (incorporated by reference--see Sec. 63.14).

        8.2 Determining Sampling Locations (References 2, 3)

        8.2.1 The number and placement of the passive samplers depends on the size, the shape of the facility footprint or the linear distance around the facility, and the proximity of emission sources near the property boundaries. Aerial photographs or site maps may be used to determine the size (acreage) and shape of the facility or the length of the monitoring perimeter. Place passive samplers on an internal monitoring perimeter on or inside the facility boundary encompassing all emission sources at the facility at different angles circling the geometric center of the facility or at different distances based on the monitoring perimeter length of the facility.

        Note: In some instances, permanent air monitoring stations may already be located in close proximity to the facility. These stations may be operated and maintained by the site, or local or state regulatory agencies. If access to the station is possible, a PS may be deployed adjacent to other air monitoring instrumentation. A comparison of the pollutant concentrations measured with the PS to concentrations measured by site instrumentation may be used as an optional data quality indicator to assess the accuracy of PS results.

        8.2.1.1 The monitoring perimeter may be located between the property boundary and any potential emission source near the property boundary, as long as the distance from the source to the monitoring perimeter is at least 50 meters (162 feet). If a potential emissions source is within 50 meters (162 feet) of the property boundary, the property boundary shall be used as the monitoring perimeter near that source.

        8.2.1.2 Samplers need only be placed around the monitoring perimeter and not along internal roads or other right of ways that may bisect the facility.

        8.2.1.3 Extra samplers must be placed near known sources of VOCs if the potential emission source is within 50 meters (162 feet) of the boundary and the source location is between two monitors. Measure the distance (x) between the two monitors and place another monitor halfway between (x/2) the two monitors. For example, in Figure 8.1, the facility added three additional monitors (i.e., light shaded sampler locations) and in Figure 8.2, the facility added two additional monitors to provide sufficient coverage of all area sources.

        BILLING CODE 6560-50-P

        Page 75328

        GRAPHIC TIFF OMITTED TR01DE15.026

        8.2.2 Option 1 for Determining Sampling Locations.

        8.2.2.1 For facilities with a regular (circular, triangular, rectangular, or square) shape, determine the geographic center of the facility.

        Page 75329

        8.2.2.1.1 For facilities with an area of less than or equal to 750 acres, measure angles of 30 degrees from the center point for a total of twelve 30 degree measurements evenly spaced (1 degree).

        8.2.2.1.2 For facilities covering an area greater than 750 acres but less than or equal to 1,500 acres, measure angles of 20 degrees from the center point for a total of eighteen 20 degree measurements evenly spaced (1 degree). Figure 8.1 shows the monitor placement around the property boundary of a facility with an area between 750 and 1,500 acres. Monitor placements are represented with black dots along the property boundary.

        8.2.2.1.3 For facilities covering an area greater than 1,500 acres, measure angles of 15 degrees from the center point for a total of twenty-four 15 degree measurements evenly spaced (1 degree).

        8.2.2.1.4 Locate each sampling point where the measured angle intersects the outer monitoring perimeter.

        8.2.2.2 For irregularly shaped facilities, divide the area into a set of connecting subarea circles, triangles or rectangles to determine sampling locations. The subareas must be defined such that a circle can reasonably encompass the subarea. Then determine the geometric center point of each of the subareas.

        8.2.2.2.1 If a subarea is less than or equal to 750 acres (e.g., Figure 8.3), measure angles of 30 degrees from the center point for a total of twelve 30 degree measurements (1 degree).

        GRAPHIC TIFF OMITTED TR01DE15.027

        8.2.2.2.2 If a subarea is greater than 750 acres but less than or equal to 1,500 acres (e.g., Figure 8.4), measure angles of 20 degrees from the center point for a total of eighteen 20 degree measurements (1 degree).

        8.2.2.2.3 If a subarea is greater than 1,500 acres, measure angles of 15 degrees from the center for a total of twenty-four 15 degree measurements (1 degree).

        8.2.2.2.4 Locate each sampling point where the measured angle intersects the outer monitoring perimeter. Sampling points need not be placed closer than 152 meters (500 feet) apart (or 76 meters (250 feet) if known sources are within 50 meters (162 feet) of the monitoring perimeter), as long as a minimum of 3 monitoring locations are used for each subarea.

        8.2.2.2.5 Sampling sites are not needed at the intersection of an inner boundary with an adjacent subarea. The sampling location must be sited where the measured angle intersects the subarea's outer monitoring perimeter.

        Page 75330

        GRAPHIC TIFF OMITTED TR01DE15.028

        8.2.3 Option 2 for Determining Sampling Locations.

        8.2.3.1 For facilities with a monitoring perimeter length of less than 7,315 meters (24,000 feet), a minimum of twelve sampling locations evenly spaced 10 percent of the location interval is required.

        8.2.3.2 For facilities with a monitoring perimeter length greater than 7,315 meters (24,000 feet), sampling locations are spaced 610 76 meters (2,000 250 feet) apart.

        8.3 Siting a Meteorological Station

        A meteorological station is required at or near the facility you are monitoring. A number of commercially available meteorological stations can be used. Information on meteorological instruments can be found in EPA-454/R-99-005 (Reference 11) (incorporated by reference--see Sec. 63.14). Some important considerations for siting of meteorological stations are detailed below.

        8.3.1 Place meteorological stations in locations that represent conditions affecting the transport and dispersion of pollutants in the area of interest. Complex terrain may require the use of more than one meteorological station.

        8.3.2 Deploy wind instruments over level, open terrain at a height of 10 meters (33 feet). If possible, locate wind instruments at a distance away from nearby structures that is equal to at least 10 times the height of the structure.

        8.3.3 Protect meteorological instruments from thermal radiation and adequately ventilate them using aspirated shields. The temperature sensor must be located at a distance away from any nearby structures that is equal to at least four times the height of the structure. Temperature sensors must be located at least 30 meters (98 feet) from large paved areas.

        8.3.4 Collect and record meteorological data, including wind speed, wind direction, temperature and barometric pressure on an hourly basis. Calculate average unit vector wind direction, sigma theta, temperature and barometric pressure per sampling period to enable calculation of concentrations at standard conditions. Supply this information to the laboratory.

        8.3.5 Identify and record the location of the meteorological station by its GPS coordinate.

        8.4 Monitoring Frequency

        8.4.1 Sample collection may be performed for periods up to 14 days.

        8.4.2 A site screening protocol that meets method requirements may be performed by collecting samples for a year where each PS accumulates VOC for a 14-day sampling period. Study results are accumulated for the sampling periods (typically 26) over the course of one calendar year. To the extent practical, sampling tubes should be changed at approximately the same time of day at each of the monitoring sites.

        8.5 Passive Sampler Deployment

        8.5.1 Clean (conditioned) sorbent tubes must be prepared and packaged by the laboratory as described in Method 325B and must be deployed for sampling within 30 days of conditioning.

        8.5.2 Allow the tubes to equilibrate with ambient temperature (approximately 30 minutes to 1 hour) at the monitoring location before removing them from their storage/shipping container for sample collection.

        8.5.3 If there is any risk that the analytical equipment will not meet the requirement to exclude contamination on outer tube surfaces from the sample flow path (see Section 6.6 of Method 325B), sample handlers must wear clean, white, cotton or powder-free nitrile gloves during PS deployment and collection and throughout any other tube handling operations.

        8.5.4 Inspect the sampling tubes immediately prior to deployment. Ensure that they are intact, securely capped, and in good condition. Any suspect tubes (e.g., tubes that appear to have leaked sorbent) should be removed from the sampling set.

        8.5.5 Secure passive samplers so the bottom of the diffusive sampling cap is 1.5 to 3 meters (4.9 to 9.8 feet) above ground using a pole or other secure structure at each sampling location. Orient the PS vertically and with the sampling end pointing downward to avoid ingress of particulates.

        Note: Duplicate sampling assemblies must be deployed in at least one monitoring location for every 10 monitoring locations during each field monitoring period.

        8.5.6 Protect the PS from rain and excessive wind velocity by placing them under the type of protective hood described in Section 6.1.3 or equivalent.

        8.5.7 Remove the storage cap on the sampling end of the tube and replace it with a diffusive sampling cap at the start of the sampling period. Make sure the diffusion cap is properly seated and store the removed storage caps in the empty tube shipping container.

        8.5.8 Record the start time and location details for each sampler on the field sample data sheet (see example in Section 17.0.).

        Page 75331

        8.5.9 Expose the sampling tubes for the required sampling period-normally 14-days.

        8.5.10 Field blank tubes (see Section 9.3 of Method 325B) are stored outside the shipping container at representative sampling locations around the site, but with both long-term storage caps kept in place throughout the monitoring exercise. Collect at least two field blanks sorbent samples per sampling period to ensure sample integrity associated with shipment, collection, and storage.

        8.6 Sorbent Tube Recovery and Meteorological Data Collection

        Recover deployed sampling tubes and field blanks as follows:

        8.6.1 After the sampling period is complete, immediately replace the diffusion end cap on each sampled tube with a long-term storage end cap. Tighten the seal securely by hand and then tighten an additional quarter turn with an appropriate tool. Record the stop date and time and any additional relevant information on the sample data sheet.

        8.6.2 Place the sampled tubes, together with the field blanks, in the storage/shipping container. Label the storage container, but do not use paints, markers, or adhesive labels to identify the tubes. TD-compatible electronic (radio frequency identification (RFID)) tube labels are available commercially and are compatible with some brands of thermal desorber. If used, these may be programmed with relevant tube and sample information, which can be read and automatically transcribed into the sequence report by the TD system.

        Note: Sampled tubes must not be placed in the same shipping container as clean conditioned sampling tubes.

        8.6.3 Sampled tubes may be shipped at ambient temperature to a laboratory for sample analysis.

        8.6.4 Specify whether the tubes are field blanks or were used for sampling and document relevant information for each tube using a Chain of Custody form (see example in Section 17.0) that accompanies the samples from preparation of the tubes through receipt for analysis, including the following information: Unique tube identification numbers for each sampled tube; the date, time, and location code for each PS placement; the date, time, and location code for each PS recovery; the GPS reference for each sampling location; the unique identification number of the duplicate sample (if applicable); and problems or anomalies encountered.

        8.6.5 If the sorbent tubes are supplied with electronic (e.g., RFID) tags, it is also possible to allocate a sample identifier to each PS tube. In this case, the recommended format for the identification number of each sampled tube is AA-BB-CC-DD-VOC, where:

        AA = Sequence number of placement on route (01, 02, 03 . . .)

        BB = Sampling location code (01, 02, 03 . . .)

        CC = 14-day sample period number (01 to 26)

        DD = Sample code (SA = sample, DU = duplicate, FB = field blank)

        VOC = 3-letter code for target compound(s) (e.g., BNZ for benzene or BTX for benzene, toluene, and xylenes)

        Note: Sampling start and end times/dates can also be logged using RFID tube tags.

        9.0 Quality Control

        9.1 Most quality control checks are carried out by the laboratory and associated requirements are in Section 9.0 of Method 325B, including requirements for laboratory blanks, field blanks, and duplicate samples.

        9.2 Evaluate for potential outliers the laboratory results for neighboring sampling tubes collected over the same time period. A potential outlier is a result for which one or more PS tube does not agree with the trend in results shown by neighboring PS tubes--

        particularly when data from those locations have been more consistent during previous sampling periods. Accidental contamination by the sample handler must be documented before any result can be eliminated as an outlier. Rare but possible examples of contamination include loose or missing storage caps or contaminated storage/shipping containers. Review data from the same and neighboring monitoring locations for the subsequent sampling periods. If the anomalous result is not repeated for that monitoring location, the episode can be ascribed to transient contamination and the data in question must be flagged for potential elimination from the dataset.

        9.3 Duplicates and Field Blanks

        9.3.1 Collect at least one co-located/duplicate sample for every 10 field samples to determine precision of the measurements.

        9.3.2 Collect at least two field blanks sorbent samples per sampling period to ensure sample integrity associated with shipment, collection, and storage. You must use the entire sampling apparatus for field blanks including unopened sorbent tubes mounted in protective sampling hoods. The tube closures must not be removed. Field blanks must be placed in two different quadrants (e.g., 90deg and 270deg) and remain at the sampling location for the sampling period.

        10.0 Calibration and Standardization

        Follow the calibration and standardization procedures for meteorological measurements in EPA-454/B-08-002 March 2008 (Reference 11) (incorporated by reference--see Sec. 63.14). Refer to Method 325B for calibration and standardization procedures for analysis of the passive sampling tubes.

        11.0 Analytical Procedures

        Refer to Method 325B, which provides details for the preparation and analysis of sampled passive monitoring tubes (preparation of sampling tubes, shipment and storage of exposed sampling tubes, and analysis of sampling tubes).

        12.0 Data Analysis, Calculations and Documentation

        12.1 Calculate Annual Average Fenceline Concentration.

        After a year's worth of sampling at the facility fenceline (for example, 26 14-day samples), the average (PSi) may be calculated for any specified period at each PS location using Equation 12.1.

        GRAPHIC TIFF OMITTED TR01DE15.029

        Where:

        PSi = Annual average for location i.

        PSip = Sampling period specific concentration from Method 325B.

        i = Location of passive sampler (0 to 360deg).

        p = The sampling period.

        N = The number of sampling periods in the year (e.g., for 14-day sampling periods, from 1 to 26).

        Note: PSip is a function of sampling location-

        specific factors such as the contribution from facility sources, unusual localized meteorological conditions, contribution from nearby interfering sources, the background caused by integrated far-

        field sources and measurement error due to deployment, handling, siting, or analytical errors.

        12.2 Identify Sampling Locations of Interest

        If data from neighboring sampling locations are significantly different, then you may add extra sampling points to isolate background contributions or identify facility-specific ``hot spots.''

        12.3 Evaluate Trends

        You may evaluate trends and patterns in the PS data over multiple sampling periods to determine if elevated concentrations of target compounds are due to operations on the facility or if contributions from background sources are significant.

        12.3.1 Obtain meteorological data including wind speed and wind direction or unit vector wind data from the on-site meteorological station. Use this meteorological data to determine the prevailing wind direction and speed during the periods of elevated concentrations.

        12.3.2 As an option you may perform preliminary back trajectory calculations (http://ready.arl.noaa.gov/HYSPLIT.php) to aid in identifying the source of the background contribution to elevated target compound concentrations.

        Page 75332

        12.3.3 Information on published or documented events on- and off-site may also be included in the associated sampling period report to explain elevated concentrations if relevant. For example, you would describe if there was a chemical spill on site, or an accident on an adjacent road.

        12.3.4 Additional monitoring for shorter periods (See section 8.4) may be necessary to allow better discrimination/resolution of contributing emission sources if the measured trends and associated meteorology do not provide a clear assessment of facility contribution to the measured fenceline concentration.

        12.3.5 Additional records necessary to calculate sampling period average target compound concentration can be found in Section 12.1 of Method 325B.

        13.0 Method Performance

        Method performance requirements are described in Method 325B.

        14.0 Pollution Prevention

        Reserved

        15.0 Waste Management

        Reserved

        16.0 References

        1. Ambient air quality--Standard method for measurement of benzene concentrations--Part 4: Diffusive sampling followed by thermal desorption and gas chromatography, BS EN 14662-4:2005.

        2. Thoma, E.D., Miller, C.M., Chung, K.C., Parsons, N.L. and Shine, B.C. Facility Fence Line Monitoring using Passive Samplers, J. Air & Waste Mange. Assoc. 2011, 61:834-842.

        3. Quality Assurance Handbook for Air Pollution C Systems, Volume II: Ambient Air Quality Monitoring Program, EPA-454/B-13-003, May 2013. Available at http://www.epa.gov/ttnamti1/files/ambient/pm25/qa/QA-Handbook-Vol-II.pdf.

        4. Brown, R.H., Charlton, J. and Saunders, K.J.: The development of an improved diffusive sampler. Am. Ind. Hyg. Assoc. J. 1981, 42(12): 865-869.

        5. Brown, R. H. Environmental use of diffusive samplers: evaluation of reliable diffusive uptake rates for benzene, toluene and xylene. J. Environ. Monit. 1999, 1 (1), 115-116.

        6. Ballach, J.; Greuter, B.; Schultz, E.; Jaeschke, W. Variations of uptake rates in benzene diffusive sampling as a function of ambient conditions. Sci. Total Environ. 1999, 244, 203-217.

        7. Brown, R. H. Monitoring the ambient environment with diffusive samplers: theory and practical considerations. J Environ. Monit. 2000, 2 (1), 1-9.

        8. Buzica, D.; Gerboles, M.; Plaisance, H. The equivalence of diffusive samplers to reference methods for monitoring O3, benzene and NO2 in ambient air. J. Environ. Monit. 2008, 10 (9), 1052-1059.

        9. Woolfenden, E. Sorbent-based sampling methods for volatile and semi-volatile organic compounds in air. Part 2. Sorbent selection and other aspects of optimizing air monitoring methods. J. Chromatogr. A 2010, 1217, (16), 2685-94.

        10. Pfeffer, H. U.; Breuer, L. BTX measurements with diffusive samplers in the vicinity of a cokery: Comparison between ORSA-type samplers and pumped sampling. J. Environ. Monit. 2000, 2 (5), 483-

        486.

        11. US EPA. 2000. Meteorological Monitoring Guidance for Regulatory Modeling Applications. EPA-454/R-99-005. Office of Air Quality Planning and Standards, Research Triangle Park, NC. February 2000. Available at http://www.epa.gov/scram001/guidance/met/mmgrma.pdf.

        12. Quality Assurance Handbook for Air Pollution Measurement Systems. Volume IV: Meteorological Measurements Version 2.0 Final, EPA-454/B-08-002 March 2008. Available at http://www.epa.gov/ttnamti1/files/ambient/met/Volume%20IV_Meteorological_Measurements.pdf.

        13. ISO 16017-2:2003(E), Indoor, ambient and workplace air--Sampling and analysis of volatile organic compounds by sorbent tube/thermal desorption/capillary gas chromatography. Part 2: Diffusive sampling.

        14. ASTM D6196-03 (Reapproved 2009): Standard practice for selection of sorbents, sampling, and thermal desorption analysis procedures for volatile organic compounds in air.

        17.0 Tables, Diagrams, Flowcharts and Validation Data

        Page 75333

        GRAPHIC TIFF OMITTED TR01DE15.030

        Page 75334

        Method 325B--Volatile Organic Compounds from Fugitive and Area Sources:

        Sampler Preparation and Analysis

        1.0 Scope and Application

        1.1 This method describes thermal desorption/gas chromatography (TD/GC) analysis of volatile organic compounds (VOCs) from fugitive and area emission sources collected onto sorbent tubes using passive sampling. It could also be applied to the TD/GC analysis of VOCs collected using active (pumped) sampling onto sorbent tubes. The concentration of airborne VOCs at or near potential fugitive- or area-emission sources may be determined using this method in combination with Method 325A. Companion Method 325A (Sampler Deployment and VOC Sample Collection) describes procedures for deploying the sorbent tubes and passively collecting VOCs.

        1.2 The preferred GC detector for this method is a mass spectrometer (MS), but flame ionization detectors (FID) may also be used. Other conventional GC detectors such as electron capture (ECD), photoionization (PID), or flame photometric (FPD) may also be used if they are selective and sensitive to the target compound(s) and if they meet the method performance criteria provided in this method.

        1.3 There are 97 VOCs listed as hazardous air pollutants in Title III of the Clean Air Act Amendments of 1990. Many of these VOC are candidate compounds for this method. Compounds with known uptake rates for CarbographTM 1 TD, CarbopackTM B, or CarbopackTM X are listed in Table 12.1. This method provides performance criteria to demonstrate acceptable performance of the method (or modifications of the method) for monitoring one or more of the compounds listed Table 12.1. If standard passive sampling tubes are packed with other sorbents or used for other analytes than those listed in Table 12.1, then method performance and relevant uptake rates should be verified according to Addendum A to this method or by one of the following national/international standard methods: ISO 16017-2:2003(E), ASTM D6196-03 (Reapproved 2009), or BS EN 14662-4:2005 (all incorporated by reference--see Sec. 63.14), or reported in the peer-reviewed open literature.

        1.4 The analytical approach using TD/GC/MS is based on previously published EPA guidance in Compendium Method TO-17 (http://www.epa.gov/ttnamti1/airtox.html#compendium) (Reference 1), which describes active (pumped) sampling of VOCs from ambient air onto tubes packed with thermally stable adsorbents.

        1.5 Inorganic gases not suitable for analysis by this method include oxides of carbon, nitrogen and sulfur, ozone (O3), and other diatomic permanent gases. Other pollutants not suitable for this analysis method include particulate pollutants, (i.e., fumes, aerosols, and dusts), compounds too labile (reactive) for conventional GC analysis, and VOCs that are more volatile than propane.

        2.0 Summary of Method

        2.1 This method provides procedures for the preparation, conditioning, blanking, and shipping of sorbent tubes prior to sample collection.

        2.2 Laboratory and field personnel must have experience of sampling trace-level VOCs using sorbent tubes (References 2,5) and must have experience operating thermal desorption/GC/multi-detector instrumentation.

        2.3 Key steps of this method as implemented for each sample tube include: Stringent leak testing under stop flow, recording ambient temperature conditions, adding internal standards, purging the tube, thermally desorbing the sampling tube, refocusing on a focusing trap, desorbing and transferring/injecting the VOCs from the secondary trap into the capillary GC column for separation and analysis.

        2.4 Water management steps incorporated into this method include: (a) Selection of hydrophobic sorbents in the sampling tube; (b) optional dry purging of sample tubes prior to analysis; and (c) additional selective elimination of water during primary (tube) desorption (if required) by selecting trapping sorbents and temperatures such that target compounds are quantitatively retained while water is purged to vent.

        3.0 Definitions

        (See also Section 3.0 of Method 325A).

        3.1 Blanking is the desorption and confirmatory analysis of conditioned sorbent tubes before they are sent for field sampling.

        3.2 Breakthrough volume and associated relation to passive sampling. Breakthrough volumes, as applied to active sorbent tube sampling, equate to the volume of air containing a constant concentration of analyte that may be passed through a sorbent tube at a given temperature before a detectable level (5 percent) of the input analyte concentration elutes from the tube. Although breakthrough volumes are directly related to active rather than passive sampling, they provide a measure of the strength of the sorbent-sorbate interaction and therefore also relate to the efficiency of the passive sampling process. The best direct measure of passive sampling efficiency is the stability of the uptake rate. Quantitative passive sampling is compromised when the sorbent no longer acts as a perfect sink--i.e., when the concentration of a target analyte immediately above the sorbent sampling surface no longer approximates to zero. This causes a reduction in the uptake rate over time. If the uptake rate for a given analyte on a given sorbent tube remains relatively constant --i.e., if the uptake rate determined for 48 hours is similar to that determined for 7 or 14 days--the user can be confident that passive sampling is occurring at a constant rate. As a general rule of thumb, such ideal passive sampling conditions typically exist for analyte:sorbent combinations where the breakthrough volume exceeds 100 L (Reference 4).

        3.3 Continuing calibration verification sample (CCV). Single level calibration samples run periodically to confirm that the analytical system continues to generate sample results within acceptable agreement to the current calibration curve.

        3.4 Focusing trap is a cooled, secondary sorbent trap integrated into the analytical thermal desorber. It typically has a smaller i.d. and lower thermal mass than the original sample tube allowing it to effectively refocus desorbed analytes and then heat rapidly to ensure efficient transfer/injection into the capillary GC analytical column.

        3.5 High Resolution Capillary Column Chromatography uses fused silica capillary columns with an inner diameter of 320 mum or less and with a stationary phase film thickness of 5 mum or less.

        3.6 h is time in hours.

        3.7 i.d. is inner diameter.

        3.8 min is time in minutes.

        3.9 Method Detection Limit is the lowest level of analyte that can be detected in the sample matrix with 99% confidence.

        3.10 MS-SCAN is the mode of operation of a GC quadrupole mass spectrometer detector that measures all ions over a given mass range over a given period of time.

        3.11 MS-SIM is the mode of operation of a GC quadrupole mass spectrometer detector that measures only a single ion or a selected number of discrete ions for each analyte.

        3.12 o.d. is outer diameter.

        3.13 ppbv is parts per billion by volume.

        3.14 Thermal desorption is the use of heat and a flow of inert (carrier) gas to extract volatiles from a solid matrix. No solvent is required.

        3.15 Total ion chromatogram is the chromatogram produced from a mass spectrometer detector collecting full spectral information.

        3.16 Two-stage thermal desorption is the process of thermally desorbing analytes from a sorbent tube, reconcentrating them on a focusing trap (see Section 3.4), which is then itself rapidly heated to ``inject'' the concentrated compounds into the GC analyzer.

        3.17 VOC is volatile organic compound.

        4.0 Analytical Interferences

        4.1 Interference from Sorbent Artifacts. Artifacts may include target analytes as well as other VOC that co-elute chromatographically with the compounds of interest or otherwise interfere with the identification or quantitation of target analytes.

        4.1.1 Sorbent decomposition artifacts are VOCs that form when sorbents degenerate, e.g., when exposed to reactive species during sampling. For example, benzaldehyde, phenol, and acetophenone artifacts are reported to be formed via oxidation of the polymeric sorbent Tenaxsupreg when sampling high concentration (100-500 ppb) ozone atmospheres (Reference 5).

        4.1.2 Preparation and storage artifacts are VOCs that were not completely cleaned from the sorbent tube during conditioning or that are an inherent feature of that sorbent at a given temperature.

        4.2 Humidity. Moisture captured during sampling can interfere with VOC analysis. Passive sampling using tubes packed with hydrophobic sorbents, like those described in this method, minimizes water retention. However, if water interference is found to be an issue under extreme conditions, one or more of the water management steps described in Section 2.4 can be applied.

        4.3 Contamination from Sample Handling. The type of analytical thermal

        Page 75335

        desorption equipment selected should exclude the possibility of outer tube surface contamination entering the sample flow path (see Section 6.6). If the available system does not meet this requirement, sampling tubes and caps must be handled only while wearing clean, white cotton or powder free nitrile gloves to prevent contamination with body oils, hand lotions, perfumes, etc.

        5.0 Safety

        5.1 This method does not address all of the safety concerns associated with its use. It is the responsibility of the user of this standard to establish appropriate field and laboratory safety and health practices prior to use.

        5.2 Laboratory analysts must exercise extreme care in working with high-pressure gas cylinders.

        5.3 Due to the high temperatures involved, operators must use caution when conditioning and analyzing tubes.

        6.0 Equipment and Supplies

        6.1 Tube Dimensions and Materials. The sampling tubes for this method are 3.5-inches (89 mm) long, \1/4\ inch (6.4 mm) o.d., and 5 mm i.d. passive sampling tubes (see Figure 6.1). The tubes are made of inert-coated stainless steel with the central section (up to 60 mm) packed with sorbent, typically supported between two 100 mesh stainless steel gauze. The tubes have a cross sectional area of 19.6 square mm (5 mm i.d.). When used for passive sampling, these tubes have an internal diffusion (air) gap (DG) of 1.5 cm between the sorbent retaining gauze at the sampling end of the tube, and the gauze in the diffusion cap.

        GRAPHIC TIFF OMITTED TR01DE15.031

        6.2 Tube Conditioning Apparatus

        6.2.1 Freshly packed or newly purchased tubes must be conditioned as described in Section 9 using an appropriate dedicated tube conditioning unit or the thermal desorber. Note that the analytical TD system should be used for tube conditioning if it supports a dedicated tube conditioning mode in which effluent from contaminated tubes is directed to vent without passing through key parts of the sample flow path such as the focusing trap.

        6.2.2 Dedicated tube conditioning units must be leak-tight to prevent air ingress, allow precise and reproducible temperature selection (5 degC), offer a temperature range at least as great as that of the thermal desorber, and support inert gas flows in the range up to 100 mL/min.

        Note: For safety and to avoid laboratory contamination, effluent gases from freshly packed or highly contaminated tubes should be passed through a charcoal filter during the conditioning process to prevent desorbed VOCs from polluting the laboratory atmosphere.

        6.3 Tube Labeling

        6.3.1 Label the sample tubes with a unique permanent identification number and an indication of the sampling end of the tube. Labeling options include etching and TD-compatible electronic (radio frequency identification (RFID)) tube labels.

        6.3.2 To avoid contamination, do not make ink markings of any kind on clean sorbent tubes or apply adhesive labels.

        Note: TD-compatible electronic (RFID) tube labels are available commercially and are compatible with some brands of thermal desorber. If used, these may be programmed with relevant tube and sample information, which can be read and automatically transcribed into the sequence report by the TD system (see Section 8.6 of Method 325A).

        6.4 Blank and Sampled Tube Storage Apparatus

        6.4.1 Long-term storage caps. Seal clean, blank and sampled sorbent tubes using inert, long-term tube storage caps comprising non-greased, 2-piece, 0.25-inch, metal SwageLoksupreg-type screw caps fitted with combined polytetrafluoroethylene ferrules.

        6.4.2 Storage and transportation containers. Use clean glass jars, metal cans or rigid, non-emitting polymer boxes.

        Note: You may add a small packet of new activated charcoal or charcoal/silica gel to the shipping container for storage and transportation of batches of conditioned sorbent tubes prior to use. Coolers without ice packs make suitable shipping boxes for containers of tubes because the coolers help to insulate the samples from extreme temperatures (e.g., if left in a parked vehicle).

        6.5 Unheated GC Injection Unit for Loading Standards Onto Blank Tubes

        A suitable device has a simple push fit or finger-tightening connector for attaching the sampling end of blank sorbent tubes without damaging the tube. It also has a means of controlling carrier gas flow through the injector and attached sorbent tube at 50-100 mL/min and includes a low emission septum cap that allows the introduction of gas or liquid standards via appropriate syringes. Reproducible and quantitative transfer of higher boiling compounds in liquid standards is facilitated if the injection unit allows the tip of the syringe to just touch the sorbent retaining gauze inside the tube.

        6.6 Thermal Desorption Apparatus

        The manual or automated thermal desorption system must heat sorbent tubes while a controlled flow of inert (carrier) gas passes through the tube and out of the sampling end. The apparatus must also incorporate a focusing trap to quantitatively refocus compounds desorbed from the tube. Secondary desorption of the focusing trap should be fast/efficient enough to transfer the compounds into the high resolution capillary GC column without band broadening and without any need for further pre- or on-column focusing. Typical TD focusing traps comprise small sorbent traps (Reference 16) that are electrically-cooled using multistage Peltier cells (References 17, 18). The direction of gas flow during trap desorption should be the reverse of that used for focusing to extend the compatible analyte volatility range. Closed cycle coolers offer another cryogen-free trap cooling option. Other TD system requirements and operational stages are described in Section 11 and in Figures 17-2 through 17-4.

        6.7 Thermal Desorber--GC Interface

        6.7.1 The interface between the thermal desorber and the GC must be heated uniformly and the connection between the transfer line insert and the capillary GC analytical column itself must be leak tight.

        6.7.2 A portion of capillary column can alternatively be threaded through the heated transfer line/TD interface and connected directly to the thermal desorber.

        Note: Use of a metal syringe-type needle or unheated length of fused silica pushed through the septum of a conventional GC

        Page 75336

        injector is not permitted as a means of interfacing the thermal desorber to the chromatograph. Such connections result in cold spots, cause band broadening and are prone to leaks.

        6.8 GC/MS Analytical Components

        6.8.1 The GC system must be capable of temperature programming and operation of a high resolution capillary column. Depending on the choice of column (e.g., film thickness) and the volatility of the target compounds, it may be necessary to cool the GC oven to subambient temperatures (e.g., -50 degC) at the start of the run to allow resolution of very volatile organic compounds.

        6.8.2 All carrier gas lines supplying the GC must be constructed from clean stainless steel or copper tubing. Non-

        polytetrafluoroethylene thread sealants. Flow controllers, cylinder regulators, or other pneumatic components fitted with rubber components are not suitable.

        6.9 Chromatographic Columns

        High-resolution, fused silica or equivalent capillary columns that provide adequate separation of sample components to permit identification and quantitation of target compounds must be used.

        Note: 100-percent methyl silicone or 5-percent phenyl, 95-

        percent methyl silicone fused silica capillary columns of 0.25- to 0.32-mm i.d. of varying lengths and with varying thicknesses of stationary phase have been used successfully for non-polar and moderately polar compounds. However, given the diversity of potential target lists, GC column choice is left to the operator, subject to the performance criteria of this method.

        6.10 Mass Spectrometer

        Linear quadrupole, magnetic sector, ion trap or time-of-flight mass spectrometers may be used provided they meet specified performance criteria. The mass detector must be capable of collecting data from 35 to 300 atomic mass units (amu) every 1 second or less, utilizing 70 volts (nominal) electron energy in the electron ionization mode, and producing a mass spectrum that meets all the instrument performance acceptance criteria in Section 9 when 50 etag or less of p-bromofluorobenzene is analyzed.

        7.0 Reagents and Standards

        7.1 Sorbent Selection

        7.1.1 Use commercially packed tubes meeting the requirements of this method or prepare tubes in the laboratory using sieved sorbents of particle size in the range 20 to 80 mesh that meet the retention and quality control requirements of this method.

        7.1.2 This passive air monitoring method can be used without the evaluation specified in Addendum A if the type of tubes described in Section 6.1 are packed with 4-6 cm (typically 400-650 mg) of the sorbents listed in Table 12.1 and used for the respective target analytes.

        Note: Although CarbopackTM X is the optimum sorbent choice for passive sampling of 1,3-butadiene, recovery of compounds with vapor pressure lower than benzene may be difficult to achieve without exceeding sorbent maximum temperature limitations (see Table 8.1). See ISO 16017-2:2003(E) or ASTM D6196-03 (Reapproved 2009) (both incorporated by reference--see Sec. 63.14) for more details on sorbent choice for air monitoring using passive sampling tubes.

        7.1.3 If standard passive sampling tubes are packed with other sorbents or used for analytes other than those tabulated in Section 12.0, method performance and relevant uptake rates should be verified according to Addendum A to this method or by following the techniques described in one of the following national/international standard methods: ISO 16017-2:2003(E), ASTM D6196-03 (Reapproved 2009), or BS EN 14662-4:2005 (all incorporated by reference--see Sec. 63.14)--or reported in the peer-reviewed open literature. A summary table and the supporting evaluation data demonstrating the selected sorbent meets the requirements in Addendum A to this method must be submitted to the regulatory authority as part of a request to use an alternative sorbent.

        7.1.4 Passive (diffusive) sampling and thermal desorption methods that have been evaluated at relatively high atmospheric concentrations (i.e., mid-ppb to ppm) and published for use in workplace air and industrial/mobile source emissions testing (References 9-20) may be applied to this procedure. However, the validity of any shorter term uptake rates must be verified and adjusted if necessary for the longer monitoring periods required by this method by following procedures described in Addendum A to this method or those presented in national/international standard methods: ISO 16017-2:2003(E), ASTM D6196-03 (Reapproved 2009), or BS EN 14662-4:2005 (all incorporated by reference-see Sec. 63.14).

        7.1.5 Suitable sorbents for passive sampling must have breakthrough volumes of at least 20 L (preferably >100 L) for the compounds of interest and must quantitatively release the analytes during desorption without exceeding maximum temperatures for the sorbent or instrumentation.

        7.1.6 Repack/replace the sorbent tubes or demonstrate tube performance following the requirements in Addendum A to this method at least every 2 years or every 50 uses, whichever occurs first.

        7.2 Gas Phase Standards

        7.2.1 Static or dynamic standard atmospheres may be used to prepare calibration tubes and/or to validate passive sampling uptake rates and can be generated from pure chemicals or by diluting concentrated gas standards. The standard atmosphere must be stable at ambient pressure and accurate to 10 percent of the target gas concentration. It must be possible to maintain standard atmosphere concentrations at the same or lower levels than the target compound concentration objectives of the test. Test atmospheres used for validation of uptake rates must also contain at least 35 percent relative humidity.

        Note: Accurate, low-(ppb-) level gas-phase VOC standards are difficult to generate from pure materials and may be unstable depending on analyte polarity and volatility. Parallel monitoring of vapor concentrations with alternative methods, such as pumped sorbent tubes or sensitive/selective on-line detectors, may be necessary to minimize uncertainty. For these reasons, standard atmospheres are rarely used for routine calibration.

        7.2.2 Concentrated, pressurized gas phase standards. Accurate (5 percent or better), concentrated gas phase standards supplied in pressurized cylinders may also be used for calibration. The concentration of the standard should be such that a 0.5-5.0 mL volume contains approximately the same mass of analytes as will be collected from a typical air sample.

        7.2.3 Follow manufacturer's guidelines concerning storage conditions and recertification of the concentrated gas phase standard. Gas standards must be recertified a minimum of once every 12 months.

        7.3 Liquid Standards

        Target analytes can also be introduced to the sampling end of sorbent tubes in the form of liquid calibration standards.

        7.3.1 The concentration of liquid standards must be such that an injection of 0.5-2 microl of the solution introduces the same mass of target analyte that is expected to be collected during the passive air sampling period.

        7.3.2 Solvent Selection. The solvent selected for the liquid standard must be pure (contaminants 5 percent. The concentration should be such that the mass of internal standard components introduced is similar to those of the target analytes collected during field monitoring.

        7.5 Preloaded Standard Tubes

        Certified, preloaded standard tubes, accurate within 5 percent for each analyte at the microgram level and 10 percent at the nanogram level, are available commercially

        Page 75337

        and may be used for auditing and quality control purposes. (See Section 9.5 for audit accuracy evaluation criteria.) Certified preloaded tubes may also be used for routine calibration.

        Note: Proficiency testing schemes are also available for TD/GC/

        MS analysis of sorbent tubes preloaded with common analytes such as benzene, toluene, and xylene.

        7.6 Carrier Gases

        Use inert, 99.999-percent or higher purity helium as carrier gas. Oxygen and organic filters must be installed in the carrier gas lines supplying the analytical system according to the manufacturer's instructions. Keep records of filter and oxygen scrubber replacement.

        8.0 Sorbent Tube Handling (Before and After Sampling)

        8.1 Sample Tube Conditioning

        8.1.1 Sampling tubes must be conditioned using the apparatus described in Section 6.2.

        8.1.2 New tubes should be conditioned for 2 hours to supplement the vendor's conditioning procedure. Recommended temperatures for tube conditioning are given in Table 8.1.

        8.1.3 After conditioning, the blank must be verified on each new sorbent tube and on 10 percent of each batch of reconditioned tubes. See Section 9.0 for acceptance criteria.

        Table 8.1--Example Sorbent Tube Conditioning Parameters

        ----------------------------------------------------------------------------------------------------------------

        Maximum Conditioning

        Sampling sorbent temperature temperature Carrier gas

        (degC) (degC) flow rate

        ----------------------------------------------------------------------------------------------------------------

        Carbotrapsupreg C............................................. >400 350 100 mL/min

        CarbopackTM C

        Anasorbsupreg GCB2

        CarbographTM 1 TD

        Carbotrapsupreg

        CarbopackTM B

        Anasorbsupreg GCB1

        Tenaxsupreg TA 350 330 100 mL/min

        CarbopackTM X...................................................

        ----------------------------------------------------------------------------------------------------------------

        8.2 Capping, Storage and Shipment of Conditioned Tubes

        8.2.1 Conditioned tubes must be sealed using long-term storage caps (see Section 6.4) pushed fully down onto both ends of the PS sorbent tube, tightened by hand and then tighten an additional quarter turn using an appropriate tool.

        8.2.2 The capped tubes must be kept in appropriate containers for storage and transportation (see Section 6.4.2). Containers of sorbent tubes may be stored and shipped at ambient temperature and must be kept in a clean environment.

        8.2.3 You must keep batches of capped tubes in their shipping boxes or wrap them in uncoated aluminum foil before placing them in their storage container, especially before air freight, because the packaging helps hold caps in position if the tubes get very cold.

        8.3 Calculating the Number of Tubes Required for a Monitoring Exercise

        8.3.1 Follow guidance given in Method 325A to determine the number of tubes required for site monitoring.

        8.3.2 The following additional samples will also be required: Laboratory blanks as specified in Section 9.1.2 (one per analytical sequence minimum), field blanks as specified in Section 9.3.2 (two per sampling period minimum), CCV tubes as specified in Section 10.9.4. (at least one per analysis sequence or every 24 hours), and duplicate samples as specified in Section 9.4 (at least one duplicate sample is required for every 10 sampling locations during each monitoring period).

        8.4 Sample Collection

        8.4.1 Allow the tubes to equilibrate with ambient temperature (approximately 30 minutes to 1 hour) at the monitoring location before removing them from their storage/shipping container for sample collection.

        8.4.2 Tubes must be used for sampling within 30 days of conditioning (Reference 4).

        8.4.3 During field monitoring, the long-term storage cap at the sampling end of the tube is replaced with a diffusion cap and the whole assembly is arranged vertically, with the sampling end pointing downward, under a protective hood or shield--See Section 6.1 of Method 325A for more details.

        8.5 Sample Storage

        8.5.1 After sampling, tubes must be immediately resealed with long-term storage caps and placed back inside the type of storage container described in Section 6.4.2.

        8.5.2 Exposed tubes may not be placed in the same container as clean tubes. They should not be taken back out of the container until ready for analysis and after they have had time to equilibrate with ambient temperature in the laboratory.

        8.5.3 Sampled tubes must be inspected before analysis to identify problems such as loose or missing caps, damaged tubes, tubes that appear to be leaking sorbent or container contamination. Any and all such problems must be documented together with the unique identification number of the tube or tubes concerned. Affected tubes must not be analyzed but must be set aside.

        8.5.4 Intact tubes must be analyzed within 30 days of the end of sample collection (within one week for limonene, carene, bis-

        chloromethyl ether, labile sulfur or nitrogen-containing compounds, and other reactive VOCs).

        Note: Ensure ambient temperatures stay below 23 degC during transportation and storage. Refrigeration is not normally required unless the samples contain reactive compounds or cannot be analyzed within 30 days. If refrigeration is used, the atmosphere inside the refrigerator must be clean and free of organic solvents.

        9.0 Quality Control

        9.1 Laboratory Blank

        The analytical system must be demonstrated to be contaminant free by performing a blank analysis at the beginning of each analytical sequence to demonstrate that the secondary trap and TD/

        GC/MS analytical equipment are free of any significant interferents.

        9.1.1 Laboratory blank tubes must be prepared from tubes that are identical to those used for field sampling.

        9.1.2 Analysis of at least one laboratory blank is required per analytical sequence. The laboratory blank must be stored in the laboratory under clean, controlled ambient temperature conditions.

        9.1.3 Laboratory blank/artifact levels must meet the requirements of Section 9.2.2 (see also Table 17.1). If the laboratory blank does not meet requirements, stop and perform corrective actions and then re-analyze laboratory blank to ensure it meets requirements.

        9.2 Tube Conditioning

        9.2.1 Conditioned tubes must be demonstrated to be free of contaminants and interference by running 10 percent of the blank tubes selected at random from each conditioned batch under standard sample analysis conditions (see Section 8.1).

        9.2.2 Confirm that artifacts and background contamination are 30 percent using Equation 9.1. Analytical bias must be demonstrated during initial setup of this method and as part of the CCV carried out with every sequence of 10 samples or less (see Section 9.14). Calibration standard tubes (see Section 10.0) may be used for this purpose.

        GRAPHIC TIFF OMITTED TR01DE15.032

        Eq. 9.1Where:

        Spiked Value = A known mass of VOCs added to the tube.

        Measured Value = Mass determined from analysis of the tube.

        9.8 Analytical Precision

        Demonstrate an analytical precision within 20 percent using Equation 9.2. Analytical precision must be demonstrated during initial setup of this method and at least once per year. Calibration standard tubes may be used (see Section 10.0) and data from CCV may also be applied for this purpose.

        GRAPHIC TIFF OMITTED TR01DE15.033

        Eq. 9.2Where:

        A1 = A measurement value taken from one spiked tube.

        A2 = A measurement value taken from a second spiked tube.

        A = The average of A1 and A2.

        9.9 Field Replicate Precision

        Use Equation 9.3 to determine and report replicate precision for duplicate field samples (see Section 9.4). The level of agreement between duplicate field samples is a measure of the precision achievable for the entire sampling and analysis procedure. Flag data sets for which the duplicate samples do not agree within 30 percent.

        GRAPHIC TIFF OMITTED TR01DE15.034

        Eq. 9.3Where:

        F1 = A measurement value (mass) taken from one of the two field replicate tubes used in sampling.

        F2 = A measurement value (mass) taken from the second of two field replicate tubes used in sampling.

        F = The average of F1 and F2.

        9.10 Desorption Efficiency and Compound Recovery

        The efficiency of the thermal desorption method must be determined.

        9.10.1 Quantitative (>95 percent) compound recovery must be demonstrated by repeat analyses on a same standard tube.

        9.10.2 Compound recovery through the TD system can also be demonstrated by comparing the calibration check sample response factor obtained from direct GC injection of liquid standards with that obtained from thermal desorption analysis response factor using the same column under identical conditions.

        9.10.3 If the relative response factors obtained for one or more target compounds introduced to the column via thermal desorption fail to meet the criteria in Section 9.10.1, you must adjust the TD parameters to meet the criteria and repeat the experiment. Once the thermal desorption conditions have been optimized, you must repeat this test each time the analytical system is recalibrated to demonstrate continued method performance.

        9.11 Audit Samples

        Certified reference standard samples must be used to audit this procedure (if available). Accuracy within 30 percent must be

        Page 75339

        demonstrated for relevant ambient air concentrations (0.5 to 25 ppb).

        9.12 Mass Spectrometer Tuning Criteria

        Tune the mass spectrometer (if used) according to manufacturer's specifications. Verify the instrument performance by analyzing a 50 etag injection of bromofluorobenzene. Prior to the beginning of each analytical sequence or every 24 hours during continuous GC/MS operation for this method demonstrate that the bromofluorobenzene tuning performance criteria in Table 9.1 have been met.

        Table 9.1--GC/MS Tuning Criteria \1\

        ----------------------------------------------------------------------------------------------------------------

        Target mass Rel. to mass Lower limit % Upper limit %

        ----------------------------------------------------------------------------------------------------------------

        50.............................................................. 95 8 40

        75.............................................................. 95 30 66

        95.............................................................. 95 100 100

        96.............................................................. 95 5 9

        173............................................................. 174 0 2

        174............................................................. 95 50 120

        175............................................................. 174 4 9

        176............................................................. 174 93 101

        177............................................................. 176 5 9

        ----------------------------------------------------------------------------------------------------------------

        \1\ All ion abundances must be normalized to m/z 95, the nominal base peak, even though the ion abundance of m/z

        174 may be up to 120 percent that of m/z 95.

        9.13 Routine CCV at the Start of a Sequence

        Run CCV before each sequence of analyses and after every tenth sample to ensure that the previous multi-level calibration (see Section 10.6.3) is still valid.

        9.13.1 The sample concentration used for the CCV should be near the mid-point of the multi-level calibration range.

        9.13.2 Quantitation software must be updated with response factors determined from the CCV standard. The percent deviation between the initial calibration and the CCV for all compounds must be within 30 percent.

        9.14 CCV at the End of a Sequence

        Run another CCV after running each sequence of samples. The initial CCV for a subsequent set of samples may be used as the final CCV for a previous analytical sequence, provided the same analytical method is used and the subsequent set of samples is analyzed immediately (within 4 hours) after the last CCV.

        9.15 Additional Verification

        Use a calibration check standard from a second, separate source to verify the original calibration at least once every three months.

        9.16 Integration Method

        Document the procedure used for integration of analytical data including field samples, calibration standards and blanks.

        9.17 QC Records

        Maintain all QC reports/records for each TD/GC/MS analytical system used for application of this method. Routine quality control requirements for this method are listed below and summarized in Table 17.1.

        10.0 Calibration and Standardization

        10.1 Calibrate the analytical system using standards covering the range of analyte masses expected from field samples.

        10.2 Analytical results for field samples must fall within the calibrated range of the analytical system to be valid.

        10.3 Calibration standard preparation must be fully traceable to primary standards of mass and/or volume, and/or be confirmed using an independent certified reference method.

        10.3.1 Preparation of calibration standard tubes from standard atmospheres.

        10.3.1.1 Subject to the requirements in Section 7.2.1, low-level standard atmospheres may be introduced to clean, conditioned sorbent tubes in order to produce calibration standards.

        10.3.1.2 The standard atmosphere generator or system must be capable of producing sufficient flow at a constant rate to allow the required analyte mass to be introduced within a reasonable time frame and without affecting the concentration of the standard atmosphere itself.

        10.3.1.3 The sampling manifold may be heated to minimize risk of condensation but the temperature of the gas delivered to the sorbent tubes may not exceed 100emsp14degF.

        10.3.1.4 The flow rates passed through the tube should be in the order of 50-100 mL/min and the volume of standard atmosphere sampled from the manifold or chamber must not exceed the breakthrough volume of the sorbent at the given temperature.

        10.4 Preparation of calibration standard tubes from concentrated gas standards.

        10.4.1 If a suitable concentrated gas standard (see Section 7.2.2) can be obtained, follow the manufacturer's recommendations relating to suitable storage conditions and product lifetime.

        10.4.2 Introduce precise 0.5 to 500.0 mL aliquots of the standard to the sampling end of conditioned sorbent tubes in a 50-

        100 mL/min flow of pure carrier gas.

        Note: This can be achieved by connecting the sampling end of the tube to an unheated GC injector (see Section 6.6) and introducing the aliquot of gas using a suitable gas syringe. Gas sample valves could alternatively be used to meter the standard gas volume.

        10.4.3 Each sorbent tube should be left connected to the flow of gas for 2 minutes after standard introduction. As soon as each spiked tube is removed from the injection unit, seal it with long-

        term storage caps and place it in an appropriate tube storage/

        transportation container if it is not to be analyzed within 24 hours.

        10.5 Preparation of calibration standard tubes from liquid standards.

        10.5.1 Suitable standards are described in Section 7.3.

        10.5.2 Introduce precise 0.5 to 2 microl aliquots of liquid standards to the sampling end of sorbent tubes in a flow (50-100 mL/

        min) of carrier gas using a precision syringe and an unheated injector (Section 6.5). The flow of gas should be sufficient to completely vaporize the liquid standard.

        Note: If the analytes of interest are higher boiling than n-

        decane, reproducible analyte transfer to the sorbent bed is optimized by allowing the tip of the syringe to gently touch the sorbent retaining gauze at the sampling end of the tube.

        10.5.3 Each sorbent tube is left connected to the flow of gas for 5 minutes after liquid standard introduction.

        10.5.3.1 As soon as each spiked tube is removed from the injection unit, seal it with long-term storage caps and place it in an appropriate tube storage container if it is not to be analyzed within 24 hours.

        Note: In cases where it is possible to selectively purge the solvent from the tube while all target analytes are quantitatively retained, a larger 2 microL injection may be made for optimum accuracy. However, if the solvent cannot be selectively purged and will be present during analysis, the injection volume should be as small as possible (e.g., 0.5 microL) to minimize solvent interference.

        Note: This standard preparation technique requires the entire liquid plug including the tip volume be brought into the syringe barrel. The volume in the barrel is recorded, the syringe is inserted into the septum of the spiking apparatus. The liquid is then quickly injected. Any remaining liquid in the syringe tip is brought back into the syringe barrel. The volume in the barrel is recorded and the amount spiked onto the tube is the difference between the before spiking volume and the after spiking volume. A bias occurs with this method when sample is drawn continuously up into the syringe to the specified volume

        Page 75340

        and the calibration solution in the syringe tip is ignored.

        10.6 Preparation of calibration standard tubes from multiple standards.

        10.6.1 If it is not possible to prepare one standard containing all the compounds of interest (e.g., because of chemical reactivity or the breadth of the volatility range), standard tubes can be prepared from multiple gas or liquid standards.

        10.6.2 Follow the procedures described in Sections 10.4 and 10.5, respectively, for introducing each gas and/or liquid standard to the tube and load those containing the highest boiling compounds of interest first and the lightest species last.

        10.7 Additional requirements for preparation of calibration tubes.

        10.7.1 Storage of Calibration Standard Tubes

        10.7.1.1 Seal tubes with long-term storage caps immediately after they have been disconnected from the standard loading manifold or injection apparatus.

        10.7.1.2 Calibration standard tubes may be stored for no longer than 30 days and should be refrigerated if there is any risk of chemical interaction or degradation. Audit standards (see section 9.11) are exempt from this criteria and may be stored for the shelf-

        life specified on their certificates.

        10.8 Keep records for calibration standard tubes to include the following:

        10.8.1 The stock number of any commercial liquid or gas standards used.

        10.8.2 A chromatogram of the most recent blank for each tube used as a calibration standard together with the associated analytical conditions and date of cleaning.

        10.8.3 Date of standard loading.

        10.8.4 List of standard components, approximate masses and associated confidence levels.

        10.8.5 Example analysis of an identical standard with associated analytical conditions.

        10.8.6 A brief description of the method used for standard preparation.

        10.8.7 The standard's expiration date.

        10.9 TD/GC/MS using standard tubes to calibrate system response.

        10.9.1 Verify that the TD/GC/MS analytical system meets the instrument performance criteria given in Section 9.1.

        10.9.2 The prepared calibration standard tubes must be analyzed using the analytical conditions applied to field samples (see Section 11.0) and must be selected to ensure quantitative transfer and adequate chromatographic resolution of target compounds, surrogates, and internal standards in order to enable reliable identification and quantitation of compounds of interest. The analytical conditions should also be sufficiently stringent to prevent buildup of higher boiling, non-target contaminants that may be collected on the tubes during field monitoring.

        10.9.3 Calibration range. Each TD/GC/MS system must be calibrated at five concentrations that span the monitoring range of interest before being used for sample analysis. This initial multi-

        level calibration determines instrument sensitivity under the analytical conditions selected and the linearity of GC/MS response for the target compounds. One of the calibration points must be within a factor of five of the detection limit for the compounds of interest.

        10.9.4 One of the calibration points from the initial calibration curve must be at the same concentration as the daily CCV standard (e.g., the mass collected when sampling air at typical concentrations).

        10.9.5 Calibration frequency. Each GC/MS system must be recalibrated with a full 5-point calibration curve following corrective action (e.g., ion source cleaning or repair, column replacement) or if the instrument fails the daily calibration acceptance criteria.

        10.9.5.1 CCV checks must be carried out on a regular routine basis as described in Section 9.14.

        10.9.5.2 Quantitation ions for the target compounds are shown in Table 10.1. Use the primary ion unless interferences are present, in which case you should use a secondary ion.

        Table 10.1--Clean Air Act Volatile Organic Compounds for Passive Sorbent Sampling

        --------------------------------------------------------------------------------------------------------------------------------------------------------

        Vapor Characteristic ion(s)

        Compound CAS No. BP (degC) pressure MW \b\ ----------------------------------

        (mmHg) \a\ Primary Secondary

        --------------------------------------------------------------------------------------------------------------------------------------------------------

        1,1-Dichloroethene................................... 75-35-4 32 500 96.9 61 96

        3-Chloropropene...................................... 107-05-1 44.5 340 76.5 76 41, 39, 78

        1,1,2-Trichloro-1,2,2-trifluoroethane-1,1- 75-34-3 57.0 230 99 63 65, 83, 85, 98,

        Dichloroethane...................................... 100

        1,2-Dichloroethane................................... 107-06-2 83.5 61.5 99 62 98

        1,1,1-Trichloroethane................................ 71-55-6 74.1 100 133.4 97 99, 61

        Benzene.............................................. 71-43-2 80.1 76.0 78 78 .................

        Carbon tetrachloride................................. 56-23-5 76.7 90.0 153.8 117 119

        1,2-Dichloropropane.................................. 78-87-5 97.0 42.0 113 63 112

        Trichloroethene...................................... 79-01-6 87.0 20.0 131.4 95 97, 130, 132

        1,1,2-Trichloroethane................................ 79-00-5 114 19.0 133.4 83 97, 85

        Toluene.............................................. 108-88-3 111 22.0 92 92 91

        Tetrachloroethene.................................... 127-18-4 121 14.0 165.8 164 129, 131, 166

        Chlorobenzene........................................ 108-90-7 132 8.8 112.6 112 77, 114

        Ethylbenzene......................................... 100-41-4 136 7.0 106 91 106

        m,p-Xylene........................................... 108-38-3, 106- 138 6.5 106.2 106 91

        42-3

        Styrene.............................................. 100-42-5 145 6.6 104 104 78

        o-Xylene............................................. 95-47-6 144 5.0 106.2 106 91

        p-Dichlorobenzene.................................... 106-46-7 173 0.60 147 146 111, 148

        --------------------------------------------------------------------------------------------------------------------------------------------------------

        \a\ Pressure in millimeters of mercury.

        \b\ Molecular weight.

        11.0 Analytical Procedure

        11.1 Preparation for Sample Analysis

        11.1.1 Each sequence of analyses must be ordered as follows:

        11.1.1.1 CCV.

        11.1.1.2 A laboratory blank.

        11.1.1.3 Field blank.

        11.1.1.4 Sample(s).

        11.1.1.5 Field blank.

        11.1.1.6 CCV after 10 field samples.

        11.1.1.7 CCV at the end of the sample batch.

        11.2 Pre-desorption System Checks and Procedures

        11.2.1 Ensure all sample tubes and field blanks are at ambient temperature before removing them from the storage container.

        11.2.2 If using an automated TD/GC/MS analyzer, remove the long-

        term storage caps from the tubes, replace them with appropriate analytical caps, and load them into the system in the sequence described in Section 11.1. Alternatively, if using a manual system, uncap and analyze each tube, one at a time, in the sequence described in Section 11.1.

        11.2.3 The following thermal desorption system integrity checks and procedures are required before each tube is analyzed.

        Page 75341

        Note: Commercial thermal desorbers should implement these steps automatically.

        11.2.3.1 Tube leak test: Each tube must be leak tested as soon as it is loaded into the carrier gas flow path before analysis to ensure data integrity.

        11.2.3.2 Conduct the leak test at the GC carrier gas pressure, without heat or gas flow applied. Tubes that fail the leak test should not be analyzed, but should be resealed and stored intact. On automated systems, the instrument should continue to leak test and analyze subsequent tubes after a given tube has failed. Automated systems must also store and record which tubes in a sequence have failed the leak test. Information on failed tubes should be downloaded with the batch of sequence information from the analytical system.

        11.2.3.3 Leak test the sample flow path. Leak check the sample flow path of the thermal desorber before each analysis without heat or gas flow applied to the sample tube. Stop the automatic sequence of tube desorption and GC analysis if any leak is detected in the main sample flow path. This process may be carried out as a separate step or as part of Section 11.2.3.2.

        11.2.4 Optional Dry Purge

        11.2.4.1 Tubes may be dry purged with a flow of pure dry gas passing into the tube from the sampling end, to remove water vapor and other very volatile interferents if required.

        11.2.5 Internal Standard (IS) Addition

        11.2.5.1 Use the internal standard addition function of the automated thermal desorber (if available) to introduce a precise aliquot of the internal standard to the sampling end of each tube after the leak test and shortly before primary (tube) desorption).

        Note: This step can be combined with dry purging the tube (Section 11.2.4) if required.

        11.2.5.2 If the analyzer does not have a facility for automatic IS addition, gas or liquid internal standard can be manually introduced to the sampling end of tubes in a flow of carrier gas using the types of procedure described in Sections 10.3 and 10.4, respectively.

        11.2.6 Pre-purge. Each tube should be purged to vent with carrier gas flowing in the desorption direction (i.e., flowing into the tube from the non-sampling end) to remove oxygen before heat is applied. This is to prevent analyte and sorbent oxidation and to prevent deterioration of key analyzer components such as the GC column and mass spectrometer (if applicable). A series of schematics illustrating these steps is presented in Figures 17.2 and 17.3.

        11.3 Analytical Procedure

        11.3.1 Steps Required for Thermal Desorption

        11.3.1.1 Ensure that the pressure and purity of purge and carrier gases supplying the TD/GC/MS system, meet manufacturer specifications and the requirements of this method.

        11.3.1.2 Ensure also that the analytical method selected meets the QC requirements of this method (Section 9) and that all the analytical parameters are at set point.

        11.3.1.3 Conduct predesorption system checks (see Section 11.2).

        11.3.1.4 Desorb the sorbent tube under conditions demonstrated to achieve >95 percent recovery of target compounds (see Section 9.5.2).

        Note: Typical tube desorption conditions range from 280-350 degC for 5-15 minutes with a carrier gas flow of 30-100 mL/min passing through the tube from the non-sampling end such that analytes are flushed out of the tube from the sampling end. Desorbed VOCs are concentrated (refocused) on a secondary, cooled sorbent trap integrated into the analytical equipment (see Figure 17.4). The focusing trap is typically maintained at a temperature between -30 and +30 degC during focusing. Selection of hydrophobic sorbents for focusing and setting a trapping temperature of +25 to 27 degC aid analysis of humid samples because these settings allow selective elimination of any residual water from the system, prior to GC/MS analysis.

        Note: The transfer of analytes from the tube to the focusing trap during primary (tube) desorption can be carried out splitless or under controlled split conditions (see Figure 17.4) depending on the masses of target compounds sampled and the requirements of the system--sensitivity, required calibration range, column overload limitations, etc. Instrument controlled sample splits must be demonstrated by showing the reproducibility using calibration standards. Field and laboratory blank samples must be analyzed at the same split as the lowest calibration standard. During secondary (trap) desorption the focusing trap is heated rapidly (typically at rates >40 degC/s) with inert (carrier) gas flowing through the trap (3-100 mL/min) in the reverse direction to that used during focusing.

        11.3.1.5 The split conditions selected for optimum field sample analysis must also be demonstrated on representative standards.

        Note: Typical trap desorption temperatures are in the range 250-360 degC, with a ``hold'' time of 1-3 minutes at the highest temperature. Trap desorption automatically triggers the start of GC analysis. The trap desorption can also be carried out under splitless conditions (i.e., with everything desorbed from the trap being transferred to the analytical column and GC detector) or, more commonly, under controlled split conditions (see Figure 17.4). The selected split ratio depends on the masses of target compounds sampled and the requirements of the system--sensitivity, required calibration range, column overload limitations, etc. If a split is selected during both primary (trap) desorption and secondary (trap) desorption, the overall split ratio is the product of the two. Such `double' split capability gives optimum flexibility for accommodating concentrated samples as well as trace-level samples on the TD/GC/MS analytical system. High resolution capillary columns and most GC/MS detectors tend to work best with approximately 20-200 ng per compound per tube to avoid saturation. The overall split ratio must be adjusted such that, when it is applied to the sample mass that is expected to be collected during field monitoring, the amount reaching the column will be attenuated to fall within this range. As a rule of thumb this means that ~20 ng samples will require splitless or very low split analysis, ~2 microg samples will require a split ratio in the order of ~50:1 and 200 microg samples will require a double split method with an overall split ratio in the order of 2,000:1.

        11.3.1.6 Analyzed tubes must be resealed with long-term storage caps immediately after analysis (manual systems) or after completion of a sequence (automated systems). This prevents contamination, minimizing the extent of tube reconditioning required before subsequent reuse.

        11.3.2 GC/MS Analytical Procedure

        11.3.2.1 Heat/cool the GC oven to its starting set point.

        11.3.2.2 If using a GC/MS system, it can be operated in either MS-Scan or MS-SIM mode (depending on required sensitivity levels and the type of mass spectrometer selected). As soon as trap desorption and transfer of analytes into the GC column triggers the start of the GC/MS analysis, collect mass spectral data over a range of masses from 35 to 300 amu. Collect at least 10 data points per eluting chromatographic peak in order to adequately integrate and quantify target compounds.

        11.3.2.3 Use secondary ion quantitation only when there are sample matrix interferences with the primary ion. If secondary ion quantitation is performed, flag the data and document the reasons for the alternative quantitation procedure.

        11.3.2.4 Data reduction is performed by the instruments post processing program that is automatically accessed after data acquisition is completed at the end of the GC run. The concentration of each target compound is calculated using the previously established response factors for the CCV analyzed in Section 11.1.1.6.

        11.3.2.5 Whenever the thermal desorption--GC/MS analytical method is changed or major equipment maintenance is performed, you must conduct a new five-level calibration (see Section 10.6.3). System calibration remains valid as long as results from subsequent CCV are within 30 percent of the most recent 5-point calibration (see Section 10.9.5). Include relevant CCV data in the supporting information in the data report for each set of samples.

        11.3.2.6 Document, flag and explain all sample results that exceed the calibration range. Report flags and provide documentation in the analytical results for the affected sample(s).

        12.0 Data Analysis, Calculations, and Reporting

        12.1 Recordkeeping Procedures for Sorbent Tubes

        12.1.1 Label sample tubes with a unique identification number as described in Section 6.3.

        12.1.2 Keep records of the tube numbers and sorbent lots used for each sampling period.

        12.1.3 Keep records of sorbent tube packing if tubes are manually prepared in the

        Page 75342

        laboratory and not supplied commercially. These records must include the masses and/or bed lengths of sorbent(s) contained in each tube, the maximum allowable temperature for that tube and the date each tube was packed. If a tube is repacked at any stage, record the date of tube repacking and any other relevant information required in Section 12.1.

        12.1.4 Keep records of the conditioning and blanking of tubes. These records must include, but are not limited to, the unique identification number and measured background resulting from the tube conditioning.

        12.1.5 Record the location, dates, tube identification and times associated with each sample collection. Record this information on a Chain of Custody form that is sent to the analytical laboratory.

        12.1.6 Field sampling personnel must complete and send a Chain of Custody to the analysis laboratory (see Section 8.6.4 of Method 325A for what information to include and Section 17.0 of this method for an example form). Duplicate copies of the Chain of Custody must be included with the sample report and stored with the field test data archive.

        12.1.7 Field sampling personnel must also keep records of the unit vector wind direction, sigma theta, temperature and barometric pressure averages for the sampling period. See Section 8.3.4 of Method 325A.

        12.1.8 Laboratory personnel must record the sample receipt date, and analysis date.

        12.1.9 Laboratory personnel must maintain records of the analytical method and sample results in electronic or hardcopy in sufficient detail to reconstruct the calibration, sample, and quality control results from each sampling period.

        12.2 Calculations

        12.2.1 Complete the calculations in this section to determine compliance with calibration quality control criteria (see also Table 17.1).

        12.2.1.1 Response factor (RF). Calculate the RF using Equation 12.1:

        GRAPHIC TIFF OMITTED TR01DE15.035

        Where:

        As = Peak area for the characteristic ion of the analyte.

        Ais = Peak area for the characteristic ion of the internal standard.

        Ms = Mass of the analyte.

        Mis = Mass of the internal standard.

        12.2.1.2 Standard deviation of the response factors (SDRF). Calculate the SDRF using Equation 12.2:

        GRAPHIC TIFF OMITTED TR01DE15.036

        Where:

        RFi = RF for each of the calibration compounds.

        RF = Mean RF for each compound from the initial calibration.

        n = Number of calibration standards.

        12.2.1.3 Percent deviation (%DEV). Calculate the %DEV using Equation 12.3:

        GRAPHIC TIFF OMITTED TR01DE15.037

        Where:

        SDRF = Standard deviation.

        RF = Mean RF for each compound from the initial calibration.

        12.2.1.4 Relative percent difference (RPD). Calculate the RPD using Equation 12.4:

        GRAPHIC TIFF OMITTED TR01DE15.038

        Where:

        R1, R2 = Values that are being compared (i.e., response factors in CCV).

        12.2.2 Determine the equivalent concentration of compounds in atmospheres as follows.

        12.2.3 Correct target concentrations determined at the sampling site temperature and atmospheric pressure to standard conditions (25 degC and 760 mm mercury) using Equation 12.5 (Reference 21).

        GRAPHIC TIFF OMITTED TR01DE15.039

        Where:

        tss = The average temperature during the collection period at the sampling site (K).

        Pss = The average pressure at the sampling site during the collection period (mm Hg).

        U = The diffusive uptake rate (sampling rate) (mL/min).

        Page 75343

        12.2.4 For passive sorbent tube samples, calculate the concentration of the target compound(s) in the sampled air, in mug/m3 by using Equation 12.6 (Reference 22).

        GRAPHIC TIFF OMITTED TR01DE15.040

        Where:

        Cm = The concentration of target compound in the air sampled (mug/m3).

        mmeas = The mass of the compound as measured in the sorbent tube (mug).

        UNTP = The diffusive uptake rate corrected for local conditions (sampling rate) (mL/min).

        t = The exposure time (minutes).

        Note: Diffusive uptake rates for common VOCs, using carbon sorbents packed into sorbent tubes of the dimensions specified in Section 6.1, are listed in Table 12.1. Adjust analytical conditions to keep expected sampled masses within range (see Sections 11.3.1.3 to 11.3.1.5). Best possible method detection limits are typically in the order of 0.1 ppb for 1,3-butadiene and 0.05 ppb for volatile aromatics such as benzene for 14-day monitoring. However, actual detection limits will depend upon the analytical conditions selected.

        Table 12.1--Validated Sorbents and Uptake Rates (mL/min) for Selected Clean Air Act Compounds

        ----------------------------------------------------------------------------------------------------------------

        Compound Carbopack\TM\ X\a\ Carbograph\TM\ 1 TD Carbopack\TM\ B

        ----------------------------------------------------------------------------------------------------------------

        1,1-Dichloroethene............... 0.57 not available.............. not available.

        0.14

        3-Chloropropene.................. 0.51 not available.............. not available.

        0.3

        1,1-Dichloroethane............... 0.57 not available.............. not available.

        0.1

        1,2-Dichloroethane............... 0.57 not available.............. not available.

        0.08

        1,1,1-Trichloroethane............ 0.51 not available.............. not available.

        0.1

        Benzene.......................... 0.67 0.63 0.07\b\.. 0.63 0.07\b\.

        0.06

        Carbon tetrachloride............. 0.51 not available.............. not available.

        0.06

        1,2-Dichloropropane.............. 0.52 not available.............. not available.

        0.1

        Trichloroethene.................. 0.5 not available.............. not available.

        0.05

        1,1,2-Trichloroethane............ 0.49 not available.............. not available.

        0.13

        Toluene.......................... 0.52 0.56 0.06\c\.. 0.56 0.06\c\.

        0.14

        Tetrachloroethene................ 0.48 not available.............. not available.

        0.05

        Chlorobenzene.................... 0.51 not available.............. not available.

        0.06

        Ethylbenzene..................... 0.46 not available.............. 0.50\c\.

        0.07

        m,p-Xylene....................... 0.46 0.47 0.04\c\.. 0.47 0.04\c\.

        0.09

        Styrene.......................... 0.5 not available.............. not available.

        0.14

        o-Xylene......................... 0.46 0.47 0.04\c\.. 0.47 0.04\c\.

        0.12

        p-Dichlorobenzene................ 0.45 not available.............. not available.

        0.05

        ----------------------------------------------------------------------------------------------------------------

        \a\ Reference 3, McClenny, J. Environ. Monit. 7:248-256. Based on 24-hour duration.

        \b\ Reference 24, BS EN 14662-4:2005 (incorporated by reference--see Sec. 63.14). Based on 14-day duration.

        \c\ Reference 25, ISO 16017-2:2003(E) (incorporated by reference--see Sec. 63.14). Based on 14-day duration.

        13.0 Method Performance

        The performance of this procedure for VOC not listed in Table 12.1 is determined using the procedure in Addendum A of this Method or by one of the following national/international standard methods: ISO 16017-2:2003(E), ASTM D6196-03 (Reapproved 2009), or BS EN 14662-4:2005 (all incorporated by reference--see Sec. 63.14).

        13.1 The valid range for measurement of VOC is approximately 0.5 microg/m\3\ to 5 mg/m\3\ in air, collected over a 14-day sampling period. The upper limit of the useful range depends on the split ratio selected (Section 11.3.1) and the dynamic range of the analytical system. The lower limit of the useful range depends on the noise from the analytical instrument detector and on the blank level of target compounds or interfering compounds on the sorbent tube (see Section 13.3).

        13.2 Diffusive sorbent tubes compatible with passive sampling and thermal desorption methods have been evaluated at relatively high atmospheric concentrations (i.e., mid-ppb to ppm) and published for use in workplace air and industrial/mobile source emissions (References 15-16, 21-22).

        13.3 Best possible detection limits and maximum quantifiable concentrations of air pollutants range from sub-part-per-trillion (sub-ppt) for halogenated species such as CCl4 and the freons using an electron capture detector (ECD), SIM Mode GC/MS, triple quad MS or GC/TOF MS to sub-ppb for volatile hydrocarbons collected over 72 hours followed by analysis using GC with quadrupole MS operated in the full SCAN mode.

        13.3.1 Actual detection limits for atmospheric monitoring vary depending on several key factors. These factors are:

        Minimum artifact levels.

        GC detector selection.

        Time of exposure for passive sorbent tubes.

        Selected analytical conditions, particularly column resolution and split ratio.

        14.0 Pollution Prevention

        This method involves the use of ambient concentrations of gaseous compounds that post little or no danger of pollution to the environment.

        15.0 Waste Management

        Dispose of expired calibration solutions as hazardous materials. Exercise standard laboratory environmental practices to minimize the use and disposal of laboratory solvents.

        16.0 References

        1. Winberry, W. T. Jr., et al., Determination of Volatile Organic Compounds in Ambient Air Using Active Sampling onto Sorbent Tubes: Method TO-17r, Second Edition, U.S. Environmental Protection Agency, Research Triangle Park, NC 27711, January 1999. http://www.epa.gov/ttnamti1/airtox.html#compendium

        2. Ciccioli, P., Brancaleoni, E., Cecinato, A., Sparapini, R., and Frattoni, M., ``Identification and Determination of Biogenic and Anthropogenic VOCs in Forest Areas of Northern and Southern Europe and a Remote Site of the Himalaya Region by High-resolution GC-MS,'' J. of Chrom., 643, pp 55-69, 1993.

        3. McClenny, W.A., K.D. Oliver, H.H. Jacumin, Jr., E.H. Daughtrey, Jr., D.A. Whitaker. 2005. 24 h diffusive sampling of toxic VOCs in air onto Carbopack\TM\ X solid adsorbent followed by thermal

        Page 75344

        desorption/GC/MS analysis--laboratory studies. J. Environ. Monit. 7:248-256.

        4. Markes International (www.markes.com/publications): Thermal desorption Technical Support Note 2: Prediction of uptake rates for diffusive tubes.

        5. Ciccioli, P., Brancaleoni, E., Cecinato, A., DiPalo, C., Brachetti, A., and Liberti, A., ``GC Evaluation of the Organic Components Present in the Atmosphere at Trace Levels with the Aid of CarbopackTM B for Preconcentration of the Sample,'' J. of Chrom., 351, pp 433-449, 1986.

        6. Broadway, G. M., and Trewern, T., ``Design Considerations for the Optimization of a Packed Thermal Desorption Cold Trap for Capillary Gas Chromatography,'' Proc. 13th Int'l Symposium on Capil. Chrom., Baltimore, MD, pp 310-320, 1991.

        7. Broadway, G. M., ``An Automated System for use Without Liquid Cryogen for the Determination of VOC's in Ambient Air,'' Proc. 14th Int'l. Symposium on Capil. Chrom., Baltimore, MD, 1992.

        8. Gibitch, J., Ogle, L., and Radenheimer, P., ``Analysis of Ozone Precursor Compounds in Houston, Texas Using Automated Continuous GCs,'' in Proceedings of the Air and Waste Management Association Conference: Measurement of Toxic and Related Air Pollutants, Air and Waste Management Association, Pittsburgh, PA, May 1995.

        9. Vandendriessche, S., and Griepink, B., ``The Certification of Benzene, Toluene and m-Xylene Sorbed on Tenaxsupreg TA in Tubes,'' CRM-112 CEC, BCR, EUR12308 EN, 1989.

        10. MDHS 2 (Acrylonitrile in Air), ``Laboratory Method Using Porous Polymer Adsorption Tubes, and Thermal Desorption with Gas Chromatographic Analysis,'' Methods for the Determination of Hazardous Substances (MDHS), UK Health and Safety Executive, Sheffield, UK.

        11. MDHS 22 (Benzene in Air), ``Laboratory Method Using Porous Polymer Adsorbent Tubes, Thermal Desorption and Gas Chromatography,'' Method for the Determination of Hazardous Substances (MDHS), UK Health and Safety Executive, Sheffield, UK.

        12. MDHS 23 (Glycol Ether and Glycol Acetate Vapors in Air), ``Laboratory Method Using Tenaxsupreg Sorbent Tubes, Thermal Desorption and Gas Chromatography,'' Method for the Determination of Hazardous Substances (MDHS), UK Health and Safety Executive, Sheffield, UK.

        13. MDHS 40 (Toluene in air), ``Laboratory Method Using Pumped Porous Polymer Adsorbent Tubes, Thermal Desorption and Gas Chromatography,'' Method for the Determination of Hazardous Substances (MDHS), UK Health and Safety Executive, Sheffield, UK.

        14. MDHS 60 (Mixed Hydrocarbons (C to C) in Air), ``Laboratory Method Using Pumped Porous Polymer 3 10 and Carbon Sorbent Tubes, Thermal Desorption and Gas Chromatography,'' Method for the Determination of Hazardous Substances (MDHS), UK Health and Safety Executive, Sheffield, UK.

        15. Price, J. A., and Saunders, K. J., ``Determination of Airborne Methyl tert-Butyl Ether in Gasoline Atmospheres,'' Analyst, Vol. 109, pp. 829-834, July 1984.

        16. Coker, D. T., van den Hoed, N., Saunders, K. J., and Tindle, P. E., ``A Monitoring Method for Gasoline Vapour Giving Detailed Composition,'' Ann. Occup, Hyg., Vol 33, No. 11, pp 15-26, 1989.

        17. DFG, ``Analytische Methoden zur prufing gesundheitsschadlicher Arbeistsstoffe,'' Deutsche Forschungsgemeinschaft, Verlag Chemie, Weinheim FRG, 1985.

        18. NNI, ``Methods in NVN Series (Luchtkwaliteit; Werkplekatmasfeer),'' Nederlands Normailsatie--Institut, Delft, The Netherlands, 1986-88.

        19. ``Sampling by Solid Adsorption Techniques,'' Standards Association of Australia Organic Vapours, Australian Standard 2976, 1987.

        20. Woolfenden, E. A., ``Monitoring VOCs in Air Using Pumped Sampling onto Sorbent Tubes Followed by Thermal Desorption-capillary GC Analysis: Summary of Reported Data and Practical Guidelines for Successful Application,'' J. Air & Waste Manage. Assoc., Vol. 47, 1997, pp. 20-36.

        21. Validation Guidelines for Air Sampling Methods Utilizing Chromatographic Analysis, OSHA T-005, Version 3.0, May 2010, http://www.osha.gov/dts/sltc/methods/chromguide/chromguide.pdf.

        22. ASTM D4597-10, Standard Practice for Sampling Workplace Atmospheres to collect Gases or Vapors with Solid Sorbent Diffusive Samplers.

        23. Martin, http://www.hsl.gov.uk/media/1619/issue14.pdf.

        24. BS EN 14662-4:2005, Ambient air quality--Standard method for the measurement of benzene concentrations--Part 4: Diffusive sampling followed by thermal desorption and gas chromatography.

        25. ISO 16017-2:2003(E): Indoor, ambient and workplace air--Sampling and analysis of volatile organic compounds by sorbent tube/thermal desorption/capillary gas chromatography--Part 2: Diffusive sampling.

        17.0 Tables, Diagrams, Flowcharts and Validation Data

        Table 17.1--Summary of GC/MS Analysis Quality Control Procedures

        ----------------------------------------------------------------------------------------------------------------

        Parameter Frequency Acceptance criteria Corrective action

        ----------------------------------------------------------------------------------------------------------------

        Bromofluorobenzene Instrument Tune Daily\a\ prior to Evaluation criteria (1) Retune and or

        Performance Check. sample analysis. presented in Section (2) Perform

        9.5 and Table 9.2. Maintenance.

        Five point calibration bracketing the Following any major (1) Percent Deviation (1) Repeat calibration

        expected sample concentration. change, repair or (%DEV) of response sample analysis.

        maintenance or if factors 30%. check.

        meet method (2) Relative Retention (3) Prepare new

        requirements. Times (RRTs) for calibration standards

        Recalibration not to target peaks 0.06 units from repeat analysis.

        mean RRT.

        Calibration Verification (CCV Second Following the The response factor (1) Repeat calibration

        source calibration verification calibration curve. 30% DEV check.

        check). from calibration curve (2) Repeat calibration

        average response curve.

        factor.

        Laboratory Blank Analysis............ Daily \a\ following (1) 40% and IS

        Retention Time (RT)

        0.33 min.

        of most recent

        calibration check.

        Blank Sorbent Tube Certification..... One tube analyzed for 40% and IS RT invalidation.

        0.33 min.

        of most recent

        calibration validation.

        ----------------------------------------------------------------------------------------------------------------

        \a\ Every 24 hours.

        Page 75345

        BILLING CODE 6560-50-P

        GRAPHIC TIFF OMITTED TR01DE15.041

        Page 75346

        GRAPHIC TIFF OMITTED TR01DE15.042

        Page 75347

        GRAPHIC TIFF OMITTED TR01DE15.043

        Page 75348

        GRAPHIC TIFF OMITTED TR01DE15.044

        BILLING CODE 6560-50-C

        ADDENDUM A to Method 325B--Method 325 Performance Evaluation

        A.1 Scope and Application

        A.1.1 To be measured by Methods 325A and 325B, each new target volatile organic compound (VOC) or sorbent that is not listed in Table 12.1 must be evaluated by exposing the selected sorbent tube to a known concentration of the target compound(s) in an exposure chamber following the procedure in this Addendum or by following the procedures in the national/international standard methods: ISO 16017-2:2003(E),

        Page 75349

        ASTM D6196-03 (Reapproved 2009), or BS EN 14662-4:2005 (all incorporated by reference--see Sec. 63.14), or reported in peer-

        reviewed open literature.

        A.1.2 You must determine the uptake rate and the relative standard deviation compared to the theoretical concentration of volatile material in the exposure chamber for each of the tests required in this method. If data that meet the requirement of this Addendum are available in the peer reviewed open literature for VOCs of interest collected on your passive sorbent tube configuration, then such data may be submitted in lieu of the testing required in this Addendum.

        A.1.3 You must expose sorbent tubes in a test chamber to parts per trillion by volume (pptv) and low parts per billion by volume (ppbv) concentrations of VOCs in humid atmospheres to determine the sorbent tube uptake rate and to confirm compound capture and recovery.

        A.2 Summary of Method

        Note: The technique described here is one approach for determining uptake rates for new sorbent/sorbate pairs. It is equally valid to follow the techniques described in any one of the following national/international standards methods: ISO 16017-

        2:2003(E), ASTM D6196-03 (Reapproved 2009), or BS EN 14662-4:2005 (all incorporated by reference--see Sec. 63.14).

        A.2.1 Known concentrations of VOC are metered into an exposure chamber containing sorbent tubes filled with media selected to capture the volatile organic compounds of interest (see Figure A.1 and A.2 for an example of the exposure chamber and sorbent tube retaining rack). VOC are diluted with humid air and the chamber is allowed to equilibrate for 6 hours. Clean passive sampling devices are placed into the chamber and exposed for a measured period of time. The passive uptake rate of the passive sampling devices is determined using the standard and dilution gas flow rates. Chamber concentrations are confirmed with whole gas sample collection and analysis or direct interface volatile organic compound measurement methods.

        A.2.2 An exposure chamber and known gas concentrations must be used to challenge and evaluate the collection and recovery of target compounds from the sorbent and tube selected to perform passive measurements of VOC in atmospheres.

        A.3 Definitions

        A.3.1 cc is cubic centimeter.

        A.3.2 ECD is electron capture detector.

        A.3.3 FID is flame ionization detector.

        A.3.4 LED is light-emitting diode.

        A.3.5 MFC is mass flow controller.

        A.3.6 MFM is mass flow meter.

        A.3.7 min is minute.

        A.3.8 ppbv is parts per billion by volume.

        A.3.9 ppmv is parts per million by volume.

        A.3.10 PSD is passive sampling device.

        A.3.11 psig is pounds per square inch gauge.

        A.3.12 RH is relative humidity.

        A.3.13 VOC is volatile organic compound.

        A.4 Interferences

        A.4.1 VOC contaminants in water can contribute interference or bias results high. Use only distilled, organic-free water for dilution gas humidification.

        A.4.2 Solvents and other VOC-containing liquids can contaminate the exposure chamber. Store and use solvents and other VOC-

        containing liquids in the exhaust hood when exposure experiments are in progress to prevent the possibility of contamination of VOCs into the chamber through the chamber's exhaust vent.

        Note: Whenever possible, passive sorbent evaluation should be performed in a VOC free laboratory.

        A.4.3 PSDs should be handled by personnel wearing only clean, white cotton or powder free nitrile gloves to prevent contamination of the PSDs with oils from the hands.

        A.4.4 This performance evaluation procedure is applicable to only volatile materials that can be measured accurately with direct interface gas chromatography or whole gas sample collection, concentration and analysis. Alternative methods to confirm the concentration of volatile materials in exposure chambers are subject to Administrator approval.

        A.5 Safety

        A.5.1 This procedure does not address all of the safety concerns associated with its use. It is the responsibility of the user of this standard to establish appropriate field and laboratory safety and health practices and determine the applicability of regulatory limitations prior to use.

        A.5.2 Laboratory analysts must exercise appropriate care in working with high-pressure gas cylinders.

        A.6 Equipment and Supplies

        A.6.1 You must use an exposure chamber of sufficient size to simultaneously expose a minimum of eight sorbent tubes.

        A.6.2 Your exposure chamber must not contain VOC that interfere with the compound under evaluation. Chambers made of glass and/or stainless steel have been used successfully for measurement of known concentration of selected VOC compounds.

        A.6.3 The following equipment and supplies are needed:

        Clean, white cotton or nitrile gloves;

        Conditioned passive sampling device tubes and diffusion caps; and

        NIST traceable high resolution digital gas mass flow meters (MFMs) or flow controllers (MFCs).

        A.7 Reagents and Standards

        A.7.1 You must generate an exposure gas that contains between 35 and 75 percent relative humidity and a concentration of target compound(s) within 2 to 5 times the concentration to be measured in the field.

        A.7.2 Target gas concentrations must be generated with certified gas standards and diluted with humid clean air. Dilution to reach the desired concentration must be done with zero grade air or better.

        A.7.3 The following reagents and standards are needed:

        Distilled water for the humidification;

        VOC standards mixtures in high-pressure cylinder certified by the supplier (Note: The accuracy of the certified standards has a direct bearing on the accuracy of the measurement results. Typical vendor accuracy is 5 percent accuracy but some VOC may only be available at lower accuracy (e.g., acrolein at 10 percent)); and

        Purified dilution air containing less than 0.2 ppbv of the target VOC.

        A.8 Sample Collection, Preservation and Storage

        A.8.1 You must use certified gas standards diluted with humid air. Generate humidified air by adding distilled organic free water to purified or zero grade air. Humidification may be accomplished by quantitative addition of water to the air dilution gas stream in a heated chamber or by passing purified air through a humidifying bubbler. You must control the relative humidity in the test gas throughout the period of passive sampler exposure.

        Note: The RH in the exposure chamber is directly proportional to the fraction of the purified air that passes through the water in the bubbler before entering the exposure chamber. Achieving uniform humidification in the proper range is a trial-and-error process with a humidifying bubbler. You may need to heat the bubbler to achieve sufficient humidity. An equilibration period of approximately 15 minutes is required following each adjustment of the air flow through the humidifier. Several adjustments or equilibration cycles may be required to achieve the desired RH level.

        Note: You will need to determine both the dilution rate and the humidification rate for your design of the exposure chamber by trial and error before performing method evaluation tests.

        A.8.2 Prepare and condition sorbent tubes following the procedures in Method 325B Section 7.0.

        A.8.3 You must verify that the exposure chamber does not leak.

        A.8.4 You must complete two evaluation tests using a minimum of eight passive sampling tubes in each test with less than 5-percent depletion of test analyte by the samplers.

        A.8.4.1 Perform at least one evaluation at two to five times the estimated analytical detection limit or less.

        A.8.4.2 Perform second evaluation at a concentration equivalent to the middle of the analysis calibration range.

        A.8.5 You must evaluate the samplers in the test chamber operating between 35 percent and 75 percent RH, and at 25 5 degC. Allow the exposure chamber to equilibrate for 6 hours before starting an evaluation.

        A.8.6 The flow rate through the chamber must be 10 percent at the 95 percent confidence limit and the uptake ratio is equal to greater than 0.5 mL/min (1 ng/ppm-min).

        Note: For example, there is a maximum deviation comparing Perkin-Elmer passive type sorbent tubes packed with Carbopack\TM\ X of 1.3 to 10 percent compared to active sampling using the following uptake rates.

        ----------------------------------------------------------------------------------------------------------------

        1,3-butadiene Estimated Estimated

        uptake rate mL/ detection limit Benzene uptake detection limit (2

        min (2 week) rates mL/min week)

        ----------------------------------------------------------------------------------------------------------------

        Carbopack\TM\ X (2 week)........ 0.61 0.1 ppbv 0.67 \a\ 0.05 ppbv

        0.11 \a\

        ----------------------------------------------------------------------------------------------------------------

        \a\ McClenny, W.A., K.D. Oliver, H.H. Jacumin, Jr., E.H. Daughtrey, Jr., D.A. Whitaker. 2005. 24 h diffusive

        sampling of toxic VOCs in air onto Carbopack\TM\ X solid adsorbent followed by thermal desorption/GC/MS

        analysis--laboratory studies. J. Environ. Monit. 7:248-256.

        A13.2 Data Analysis and Calculations for Method Evaluation

        A.13.2.1 Calculate the theoretical concentration of VOC standards using Equation A.1.

        GRAPHIC TIFF OMITTED TR01DE15.048

        Where:

        Cf = The final concentration of standard in the exposure chamber (ppbv).

        FRi = The flow rate of the target compound I (mL/min).

        FRt = The flow rate of all target compounds from separate if multiple cylinders are used (mL/min).

        FRa = The flow rate of dilution air plus moisture (mL/

        min).

        Cs = The concentration of target compound in the standard cylinder (parts per million by volume).

        A.13.2.3 Determine the uptake rate of the target gas being evaluated using Equation A.2.

        GRAPHIC TIFF OMITTED TR01DE15.049

        Where:

        Mx = The mass of analyte measured on the sampling tube (etag).

        Ce = The theoretical exposure chamber concentration (etag/mL).

        Tt = The exposure time (minutes).

        A.13.2.4 Estimate the variance (relative standard deviation (RSD)) of the inter-sampler results at each condition tested using Equation A.3. RSD for the sampler is estimated by pooling the variance estimates from each test run.

        GRAPHIC TIFF OMITTED TR01DE15.050

        Where:

        Xi = The measured mass of analyte found on sorbent tube i.

        Xi = The mean value of all Xi.

        n = The number of measurements of the analyte.

        A.13.2.4 Determine the percent relative standard deviation of the inter-sampler results using Equation A.4.

        Page 75354

        GRAPHIC TIFF OMITTED TR01DE15.051

        A.13.2.5 Determine the 95 percent confidence interval for the sampler results using Equation A.5. The confidence interval is determined based on the number of test runs performed to evaluate the sorbent tube and sorbent combination. For the minimum test requirement of eight samplers tested at two concentrations, the number of tests is 16 and the degrees of freedom are 15.

        GRAPHIC TIFF OMITTED TR01DE15.052

        Where:

        Delta95% = 95 percent confidence interval.

        %RSD = percent relative standard deviation.

        t0.95 = The Students t statistic for f degrees of freedom at 95 percent confidence.

        f = The number of degrees of freedom.

        n = Number of samples.

        A.13.2.6 Determine the relative accuracy of the sorbent tube combination compared to the active sampling results using Equation A.6.

        GRAPHIC TIFF OMITTED TR01DE15.053

        Where:

        RA = Relative accuracy.

        Xi = The mean value of all Xi.

        Xi = The average concentration of analyte measured by the active measurement method.

        Delta95% = 95 percent confidence interval.

        A.14 Pollution Prevention

        This method involves the use of ambient concentrations of gaseous compounds that post little or no pollution to the environment.

        A.15 Waste Management

        Expired calibration solutions should be disposed of as hazardous materials.

        A.16 References

        1. ISO TC 146/SC 02 N 361 Workplace atmospheres--Protocol for evaluating the performance of diffusive samplers.

        FR Doc. 2015-26486 Filed 11-30-15; 8:45 am

        BILLING CODE 6560-50-P