Air quality implementation plans; approval and promulgation; various States Maryland,

[Federal Register: May 18, 2007 (Volume 72, Number 96)]

[Rules and Regulations]

[Page 27957-27972]

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

[DOCID:fr18my07-7]

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[MD201-3117; FRL-8313-2]

Approval and Promulgation of Air Quality Implementation Plans; Maryland; Update to Materials Incorporated by Reference

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule; Notice of administrative change.

SUMMARY: EPA is updating the materials submitted by Maryland that are incorporated by reference (IBR) into the State implementation plan (SIP). The regulations affected by this update have been previously submitted by the Maryland Department of the Environment (MDE) and approved by EPA. This update affects the SIP materials that are available for public inspection at the National Archives and Records Administration (NARA), the Air and Radiation Docket and Information Center located at EPA Headquarters in Washington, DC, and the Regional Office.

EFFECTIVE DATE: This action is effective May 18, 2007.

ADDRESSES: SIP materials which are incorporated by reference into 40 CFR part 52 are available for inspection at the following locations: Air Protection Division, U.S. Environmental Protection Agency, Region III, 1650 Arch Street, Philadelphia, Pennsylvania 19103; the Air and Radiation Docket and Information Center, EPA Headquarters Library, Room Number 3334, EPA West Building, 1301 Constitution Ave., NW., Washington, DC 20460, and the National Archives and Records Administration. If you wish to obtain materials from a docket in the EPA Headquarters Library, please call the Office of Air and Radiation (OAR) Docket/Telephone number: (202) 566-1742; or the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html .

FOR FURTHER INFORMATION CONTACT: Harold A. Frankford, (215) 814-2108 or by e-mail at frankford.harold@epa.gov.

SUPPLEMENTARY INFORMATION: The SIP is a living document which the State revises as necessary to address the unique air pollution problems. Therefore, EPA from time to time must take action on SIP revisions containing new and/or revised regulations to make them part of the SIP. On May 22, 1997 (62 FR 27968), EPA revised the procedures for incorporating by reference Federally-approved SIPs, as a result of consultations between EPA and the Office of the Federal Register (OFR). The description of the revised SIP document, IBR procedures and ``Identification of plan'' format are discussed in further detail in the May 22, 1997 Federal Register document. On November 29, 2004 (69 FR 69304), EPA published a document in the Federal Register beginning the new IBR procedure for Maryland. On February 2, 2006 (72 FR 5607), EPA published an update to the IBR material for Maryland. In this document, EPA is doing the following:

1. Announcing the update to the IBR material as of March 15, 2007.

2. Making corrections to the following entries listed in the paragraph 52.1070(c) chart, as described below:

  1. COMAR 26.11.01.04--revising the text in the ``Additional explanation/citation at 40 CFR Sec. 52.1100'' column by adding the SIP effective date.

  2. COMAR 26.11.09.01--revising the text in the ``Additional explanation/citation at 40 CFR Sec. 52.1100'' column by correcting the COMAR citation.

  3. Technical Memorandum (TM) 91-01--This entry is revised to reflect EPA's approval of revisions to this TM

    [[Page 27958]]

    document on September 7, 2001 (66 FR 46727).

    3. Making corrections to the following entries listed in the paragraph 52.1070(d) chart, as described below:

  4. Entry for Potomac Electric Power Company (PEPCO)--Chalk Point-- amending the Federal Register citation for EPA's approval action.

  5. Entry for Kaydon Ring and Seal, Inc.--revising the text in the ``Additional explanation'' column by removing the SIP effective date.

    4. Making a correction to the paragraph 52.1070(e) chart by adding an entry for the Mobile budgets associated with the 2005 Rate of Progress plan for the Metropolitan Baltimore (1-hour) Ozone Nonattaiment Area. The revised entry adds a date and Federal Register citation, inadvertently omitted in the November 29, 2004 and February 2, 2006 Federal Register documents, on which EPA approved revisions to these mobile budgets.

    EPA has determined that today's rule falls under the ``good cause'' exemption in section 553(b)(3)(B) of the Administrative Procedures Act (APA) which, upon finding ``good cause,'' authorizes agencies to dispense with public participation, and section 553(d)(3) which allows an agency to make a rule effective immediately (thereby avoiding the 30-day delayed effective date otherwise provided for in the APA). Today's rule simply codifies provisions which are already in effect as a matter of law in Federal and approved State programs. Under section 553 of the APA, an agency may find good cause where procedures are ``impractical, unnecessary, or contrary to the public interest.'' Public comment is ``unnecessary and contrary to the public interest'' since the codification only reflects existing law. Immediate notice in the CFR benefits the public by removing outdated citations and incorrect chart entries.

    Statutory and Executive Order Reviews

    1. General Requirements

      Under Executive Order 12866 (58 FR 51735, October 4, 1993), this action is not a ``significant regulatory action'' and therefore is not subject to review by the Office of Management and Budget. For this reason, this action is also not subject to Executive Order 13211, ``Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use'' (66 FR 28355, May 22, 2001). This action merely approves state law as meeting Federal requirements and imposes no additional requirements beyond those imposed by state law. Accordingly, the Administrator certifies that this rule will not have a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.). Because this rule approves pre-existing requirements under state law and does not impose any additional enforceable duty beyond that required by state law, it does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4). This rule also does not have tribal implications because it will not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes, as specified by Executive Order 13175 (65 FR 67249, November 9, 2000). This action also does not have Federalism implications because it does not have substantial direct effects on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government, as specified in Executive Order 13132 (64 FR 43255, August 10, 1999). This action merely approves a state rule implementing a Federal standard, and does not alter the relationship or the distribution of power and responsibilities established in the Clean Air Act. This rule also is not subject to Executive Order 13045 ``Protection of Children from Environmental Health Risks and Safety Risks'' (62 FR 19885, April 23, 1997), because it approves a state rule implementing a Federal standard. In reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the Clean Air Act. In this context, in the absence of a prior existing requirement for the State to use voluntary consensus standards (VCS), EPA has no authority to disapprove a SIP submission for failure to use VCS. It would thus be inconsistent with applicable law for EPA, when it reviews a SIP submission, to use VCS in place of a SIP submission that otherwise satisfies the provisions of the Clean Air Act. Thus, the requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) do not apply. This rule does not impose an information collection burden under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).

    2. Submission to Congress and the Comptroller General

      The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this rule and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. This rule is not a ``major rule'' as defined by 5 U.S.C. 804(2).

    3. Petitions for Judicial Review

      EPA has also determined that the provisions of section 307(b)(1) of the Clean Air Act pertaining to petitions for judicial review are not applicable to this action. Prior EPA rulemaking actions for each individual component of the Maryland SIP compilations had previously afforded interested parties the opportunity to file a petition for judicial review in the United States Court of Appeals for the appropriate circuit within 60 days of such rulemaking action. Thus, EPA sees no need in this action to reopen the 60-day period for filing such petitions for judicial review for this ``Identification of plan'' reorganization update action for Maryland.

      List of Subjects in 40 CFR Part 52

      Environmental protection, Air pollution control, Carbon monoxide, Incorporation by reference, Intergovernmental relations, Lead, Nitrogen dioxide, Ozone, Particulate matter, Reporting and recordkeeping requirements, Sulfur oxides, Volatile organic compounds.

      Dated: April 27, 2007. Donald S. Welsh, Regional Administrator, Region III.

      0 40 CFR part 52 is amended as follows:

      PART 52--[AMENDED]

      0 1. The authority for citation for part 52 continues to read as follows:

      Authority: 42.U.S.C. 7401 et seq.

      Subpart V--Maryland

      0 2. Section 52.1070 is amended by revising paragraphs (b), (c), (d), and (e) to read as follows:

      Sec. 52.1070 Identification of plan.

      * * * * *

      [[Page 27959]]

      (b) Incorporation by reference. (1) Material listed as incorporated by reference in paragraphs (c) and (d) was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates on or after March 15, 2007 will be incorporated by reference in the next update to the SIP compilation.

      (2) EPA Region III certifies that the rules/regulations provided by EPA at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State implementation plan as of March 15, 2007.

      (3) Copies of the materials incorporated by reference may be inspected at the EPA Region III Office at 1650 Arch Street, Philadelphia, PA 19103; the EPA, Air and Radiation Docket and Information Center, Room Number 3334, EPA West Building, 1301Constitution Avenue NW., Washington, DC 20460; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html .

      (c) EPA approved regulations.

      EPA-Approved Regulations in the Maryland SIP

      Additional Code of Maryland

      State effective EPA approval explanation/citation administrative regulations

      Title/subject

      date

      date

      at 40 CFR Sec. (COMAR) citation

      52.1100

      26.11.01 General Administrative Provisions

      26.11.01.01A., .01B

      Definitions.......... 10/10/01........ 5/28/02, 67 FR (c)(171); Additional Exceptions: .01B(3), (13),

      36810.

      EPA approvals are (21) through (23), (25).

      codified at Sec. Sec. 52.1100(c)(119), (c)(122), (c)(143), (c)(148), (c)(158), (c)(159), and (c)(164). 26.11.01.01B(53).............. Definitions--definiti 9/12/05......... 3/31/06, 71 FR Definition reflects on of volatile

      16239.

      the version of 40 organic compound

      CFR 51.100(s) in (VOC).

      effect as of 12/31/ 2004. 26.11.01.02................... Relationship of

      8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(1). Provisions in this

      49651. Subtitle. 26.11.01.03................... Delineation of Areas. 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(1). 49651. 26.11.01.04................... Testing and

      6/19/06......... 1/3/07, 72 FR 18 Paragraph .04C(2) is Monitoring.

      added. The SIP effective date is 3/ 6/07. 26.11.01.05................... Records and

      6/30/97, 12/10/ 5/28/02, 67 FR (c)(172). Information.

      01.

      36810. 26.11.01.05-1................. Emission Statements.. 12/7/92......... 10/12/94, 59 FR (c)(109). 51517. 26.11.01.06................... Circumvention........ 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(1). 49651. 26.11.01.07................... Malfunctions and 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(1). Other Temporary

      49651. Increases in Emissions. 26.11.01.08................... Determination of 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(5). Ground Level

      49651. Concentrations- Acceptable Techniques. 26.11.01.09................... Vapor Pressure of 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(5). Gasoline.

      49651. 26.11.01.10................... Continuous Emission 7/22/91......... 2/28/96, 61 FR (c)(106); TM90-01 was Monitoring (CEM)

      7418.

      approved as Requirements.

      ``additional material'', but not IBR'd.

      26.11.02 Permits, Approvals, and Registration

      26.11.02.01................... Definitions.......... 5/8/95.......... 2/27/03, 68 FR (c)(182); Exceptions: 9012.

      26.11.02.01B(1), (1- 1), (4)-(6), (10), (15), (16), (22), (29)-(33), (37), (39), (42), (46), (49), (50), (54). 26.11.02.02................... General Provisions... 5/8/95.......... 2/27/03, 68 FR (c)(182); Exception: 9012.

      .02D. 26.11.02.03................... Federally Enforceable 5/8/95.......... 2/27/03, 68 FR (c)(182). Permits to Construct

      9012. and State Permits to Operate. 26.11.02.04................... Duration of Permits.. 5/8/95.......... 2/27/03, 68 FR (c)(182); Exception: 9012.

      .04C(2). 26.11.02.05................... Violation of Permits 5/8/95.......... 2/27/03, 68 FR (c)(182). and Approvals.

      9012. 26.11.02.06................... Denial of

      5/8/95, 6/16/97. 2/27/03, 68 FR (c)(182). Applications for

      9012. State Permits and Approvals. 26.11.02.07................... Procedures for

      5/8/95.......... 2/27/03, 68 FR (c)(182). Denying, Revoking,

      9012. or Reopening and Revising a Permit or Approval.

      [[Page 27960]]

      26.11.02.08................... Late Applications and 5/8/95.......... 2/27/03, 68 FR (c)(182). Delays in Acting on

      9012. Applications. 26.11.02.09................... Sources Subject to 5/8/95, 5/4/98.. 2/27/03, 68 FR (c)(182). Permits to Construct

      9012. and Approvals. 26.11.02.10................... Sources Exempt from 5/8/95, 6/16/97, 2/27/03, 68 FR (c)(182). Permits to Construct 9/22/97, 3/22/ 9012. and Approvals.

      99. 26.11.02.11................... Procedures for

      5/8/95, 6/16/97. 2/27/03, 68 FR (c)(182); Exception: Obtaining Permits to

      9012.

      .11C. Construct Certain Significant Sources. 26.11.02.12................... Procedures for

      5/8/95.......... 2/27/03, 68 FR (c)(182). Obtaining Approvals

      9012. of PSD Sources and NSR Sources, Permits to Construct, Permits to Construct MACT Determinations on a Case-by-Case Basis in Accordance with 40 CFR Part 63, Subpart B, and Certain 100-Ton Sources. 26.11.02.13................... Sources subject to 5/8/95.......... 2/27/03, 68 FR (c)(182). State Permits to

      9012. Operate. 26.11.02.14................... Procedures for

      5/8/95, 6/16/97. 2/27/03, 68 FR (c)(182). Obtaining State

      9012. Permits to Operate and Permits to Construct Certain Sources and Permits to Construct Control Equipment on Existing Sources.

      26.11.04 Ambient Air Quality Standards

      26.11.04.02................... State-Adopted

      5/8/95.......... 8/20/01, 66 FR (c)(165). National Ambient Air

      43485. Quality Standards. 26.11.04.03................... Definitions,

      2/28/05......... 6/14/06, 71 FR ..................... Reference

      34257. Conditions, and Methods of Measurement. 26.11.04.04................... Particulate Matter... 2/28/05......... 6/14/06, 71 FR Addition of ambient 34257.

      air quality standard for PM2.5. 26.11.04.05................... Sulfur Oxides........ 2/28/05......... 6/14/06, 71 FR ..................... 34257. 26.11.04.06................... Carbon Monoxide...... 1/5/88;

      4/7/93, 58 FR (c)(92). recodified 8/1/ 18010. 88. 26.11.04.07................... Ozone................ 2/28/05......... 6/14/06, 71 FR Addition of an 8-hour 34257.

      ambient air quality standard for ozone. 26.11.04.08................... Nitrogen Dioxide..... 2/28/05......... 6/14/06, 71 FR ..................... 34257. 26.11.04.09................... Lead................. 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(3). 49651.

      26.11.05 Air Quality Episode System

      26.11.05.01................... Definitions.......... 6/18/90......... 4/14/94, 59 FR (c)(100). 17698. 26.11.05.02................... General Requirements. 6/18/90......... 4/14/94, 59 FR (c)(100). 17698. 26.11.05.03................... Air Pollution Episode 6/18/90......... 4/14/94, 59 FR (c)(100). Criteria.

      17698. 26.11.05.04................... Standby Emissions 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(4). Reduction Plan.

      49651. 26.11.05.05................... Control Requirements 6/18/90......... 4/14/94, 59 FR (c)(100). and Standby Orders.

      17698. 26.11.05.06................... Tables............... 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(4). 49651.

      26.11.06 General Emissions Standards, Prohibitions, and Restrictions

      26.11.06.01................... Definitions.......... 5/8/91.......... 11/29/94, 59 FR (c)(102)(i)(B)(14). 60908. 26.11.06.02 [Except:

      Visible Emissions.... 11/11/02........ 8/6/03, 68 FR (c)(181). .02A(1)(e), (1)(g), (1)(h),

      46487. (1)(i)]. 26.11.06.03................... Particulate Matter... 11/11/02........ 86/03, 68 FR (c)(181). 46487.

      [[Page 27961]]

      26.11.06.04................... Carbon Monoxide in 1/5/88;

      4/7/93, 58 FR (c)(92). Areas III and IV. recodified 8/1/ 18010. 88. 26.11.06.05................... Sulfur Compounds from 11/11/02........ 8/6/03, 68 FR (c)(181). Other than Fuel

      46487. Burning Equipment. 26.11.06.06................... Volatile Organic 9/22/97......... 5/7/01, 66 FR (c)(156). Note: On 2/ Compounds.

      22924.

      27/03 (68 FR 9012), EPA approved a revised rule citation with a State effective date of 5/8/95 [(c)(182)(i)(C)]. 26.11.06.10................... Refuse Burning

      8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(5). Prohibited in

      49651. Certain Installations. 26.11.06.14................... Control of PSD

      10/10/01........ 5/28/02, 67 FR (c)(171). sources.

      36810. 26.11.06.15................... Nitrogen Oxides from 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(5). Nitric Acid Plants.

      49651. 26.11.06.16................... Tables............... 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(5). 49651.

      26.11.07 Open Fires

      26.11.07.01................... Definitions.......... 5/22/95......... 6/11/02, 67 FR (c)(173). 39856. 26.11.07.02................... General.............. 5/22/95......... 2/25/97, 62 FR (c)(120). 8380. 26.11.07.03................... Control Officer May 8/11/97......... 6/11/02, 67 FR (c)(173). Authorize Certain

      39856. Open Fires. 26.11.07.04................... Public Officers May 5/22/95......... 2/25/97, 62 FR (c)(120). Authorize Certain

      8380. Fires. 26.11.07.05................... Open Fires Allowed 5/22/95......... 2/25/97, 62 FR (c)(120), .05A(3) & Without

      8380.

      (4), and .05B(3) are Authorization of

      State-enforceable Control Officer or

      only. Public Officer. 26.11.07.06................... Safety Determinations 8/11/97......... 6/11/02, 67 FR (c)(173). at Federal

      39856. Facilities.

      10.18.08 Control of Incinerators

      10.18.08.01................... Definitions.......... 3/25/84......... 7/2/85, 50 FR (c)(82). 27245. 10.18.08.02................... Applicability........ 7/18/80......... 8/5/81, 46 FR (c)(45). 39818. 10.18.08.03................... Prohibition of

      6/8/81.......... 5/11/82, 47 FR (c)(58). Certain Incinerators

      20126. in Areas III and IV. 10.18.08.04................... Visible Emissions.... 3/25/84......... 7/2/85, 50 FR (c)(82). 27245. 10.18.08.05................... Particulate Matter... 3/25/84......... 7/2/85, 50 FR (c)(82). 27245. 10.18.08.06................... Prohibition of

      3/25/84......... 7/2/85, 50 FR (c)(82). Unapproved Hazardous

      27245. Waste Incinerators.

      26.11.09 Control of Fuel Burning Equipment and Stationary Internal Combustion Engines, and Certain Fuel-Burning Installations

      26.11.09.01................... Definitions.......... 9/12/05......... 6/13/06, 71 FR Revised definition of 34014.

      ``interruptible gas service'' in 26.11.09.01B(4). 26.11.09.02................... Applicability........ 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(7). 49651. 26.11.09.03................... General Conditions 6/21/04......... 7/6/05, 70 FR Revised paragraphs for Fuel Burning

      38774.

      26.11.09.03C(1) and Equipment.

      .03C(2). 26.11.09.04................... Prohibition of

      8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(7). Certain New Fuel

      49651. Burning Equipment. 26.11.09.05................... Visible Emissions.... 11/11/02........ 5/1/03, 68 FR (c)(183). 23206. 26.11.09.06................... Control of

      6/21/04......... 7/6/05, 70 FR Addition of paragraph Particulate Matter.

      38774.

      26.11.09.06C. 26.11.09.07................... Control of Sulfur 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(7). Oxides from Fuel

      49651. Burning Equipment. 26.11.09.08................... Control of NOX

      11/24/03........ 9/20/04, 69 FR (c)(191). Emissions for Major

      56170. Stationary Sources. 26.11.09.09................... Tables and Diagrams.. 11/11/02........ 5/1/03, 68 FR (c)(183); Revised 23206.

      Table 1.

      [[Page 27962]]

      26.11.10 Control of Iron and Steel Production Installations

      26.11.10.01................... Definitions.......... 12/25/00........ 11/7/01, 66 FR (c)(163). 56222. 26.11.10.02................... Applicability........ 11/2/98......... 9/7/01, 66 FR (c)(153). 46727. 26.11.10.03................... Visible Emissions.... 11/2/98......... 9/7/01, 66 FR (c)(153). 46727. 26.11.10.04................... Control of

      11/2/98......... 9/7/01, 66 FR (c)(153). Particulate Matter.

      46727. 26.11.10.05................... Sulfur Content

      11/2/98......... 9/7/01, 66 FR (c)(153). Limitations for Coke

      46727. Oven Gas. 26.11.10.06[1]................ Control of Volatile 12/25/00........ 11/7/01, 66 FR (c)(163). Organic Compounds

      56222. from Iron and Steel Production Installations. 26.11.10.06[2]................ Carbon Monoxide...... 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(8). 49651. 26.11.10.07................... Testing and

      12/25/00........ 11/7/01, 66 FR (c)(163). Observation

      56222. Procedures.

      26.11.11 Control of Petroleum Products Installations, Including Asphalt Paving, Asphalt Concrete Plants, and Use of Waste Oils

      26.11.11.01................... Applicability........ 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(9). 49651. 26.11.11.02................... Asphalt Paving....... 4/26/93......... 1/6/95, 60 FR (c)(113)(i)(B)(1). 2018. 26.11.11.03................... Asphalt Concrete 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(9). Plants in Areas I,

      49651. II, V, and VI. 26.11.11.06................... Use of Waste Oils as 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(9). Fuel.

      49651.

      26.11.12 Control of Batch Type Hot-Dip Galvanizing Installations

      26.11.12.01................... Definitions.......... 5/8/95.......... 7/25/00, 64 FR (c)(149). 45743. 26.11.12.02................... Applicability........ 5/8/95.......... 7/25/00, 64 FR (c)(149). 45743. 26.11.12.03................... Prohibitions and 5/8/95.......... 7/25/00, 64 FR (c)(149). Exemptions.

      45743. 26.11.12.04................... Visible Emissions.... 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(10). 49651. 26.11.12.05................... Particulate Matter... 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(10). 49651. 26.11.12.06................... Reporting

      8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(10). Requirements.

      49651.

      26.11.13 Control of Gasoline and Other Volatile Organic Compound Storage and Handling

      26.11.13.01................... Definitions.......... 8/11/97......... 12/22/98, 63 FR (c)(130). 70667. 26.11.13.02................... Applicability and 4/26/93......... 1/6/95, 60 FR (c)(113)(i)(B)(3). Exemption.

      2018. 26.11.13.03................... Large Storage Tanks.. 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(12). 49651. 26.11.13.04................... Loading Operations... 8/11/97......... 12/22/98, 63 FR (c)(132). 70667. 26.11.13.05................... Gasoline Leaks from 2/15/93......... 1/6/95, 60 FR (c)(112). Tank Trucks.

      2018. 26.11.13.06................... Plans for Compliance. 4/26/93......... 1/6/95, 60 FR (c)(113)(i)(B)(5). 2018. 26.11.13.07................... Control of VOC

      1/21/02......... 6/29/04, 69 FR (c)(184). Emissions from

      38848. Portable Fuel Containers.

      26.11.14 Control of Emissions from Kraft Pulp Mills

      26.11.14.01................... Definitions.......... 1/8/01, 10/15/01 11/7/01, 66 FR (c)(170). 56220. 26.11.14.02................... Applicability........ 1/8/01.......... 11/7/01, 66 FR (c)(170). 56220.

      [[Page 27963]]

      26.11.14.06................... Control of Volatile 1/8/01, 10/15/01 11/7/01, 66 FR (c)(170). Organic Compounds.

      56220.

      26.11.17 Requirements for Major New Sources and Modifications

      26.11.17.01................... Definitions.......... 11/24/03........ 9/20/04, 69 FR 52.1070(c)(191). 56170. 26.11.17.02................... Applicability........ 4/26/93, 10/2/00 2/12/01, 66 FR 52.1070(c)(148). 9766. 26.11.17.03................... General Conditions... 4/26/93, 10/2/00 2/12/01, 66 FR 52.1070(c)(191). 9766. 26.11.17.04................... Baseline for

      4/26/93, 10/2/00 2/12/01, 66 FR 52.1070(c)(148). Determining Credit

      9766. for Emission and Air Quality Offsets. 26.11.17.05................... Administrative

      4/26/93, 10/2/00 2/12/01, 66 FR 52.1070(c)(148). Procedures.

      9766.

      26.11.19 Volatile Organic Compounds from Specific Processes

      26.11.19.01................... Definitions.......... 6/5/95.......... 9/2/97, 62 FR (c)(126). Note: On 5/ 46199.

      13/1998 (63 FR 26462), EPA approved the revised definition of ``major stationary source of VOC'' with a State effective date of 5/8/1995 [(c)(128)]. 26.11.19.02................... Applicability,

      5/4/98, 12/10/01 2/3/03, 68 FR (c)(174), (c)(175). Determining

      5228.

      1. Limited approval Compliance,

      of paragraph .02G (9/ Reporting, and

      4/98, 63 FR 47174) General Requirements.

      [(c)(131)( (c)(133)]. 2. On 2/27/03 (68 FR 9012), EPA approved a revised rule citation with a State effective date of 5/8/95 [(c)(182)(i)(D)]. 26.11.19.03................... Automotive and Light- 9/22/97......... 11/5/98, 63 FR (c)(140). Duty Truck Coating.

      59720. 26.11.19.04................... Can Coating.......... 8/1/88.......... 11/3/92, 57 FR (C)(90)(i)(B)(12). 49651. 26.11.19.05................... Coil Coating......... 8/1/88.......... 11/3/92, 57 FR (C)(90)(i)(B)(12). 49651. 26.11.19.06................... Large Appliance

      8/1/88.......... 11/3/92, 57 FR (C)(90)(i)(B)(12). Coating.

      49651. 26.11.19.07................... Paper, Fabric, Vinyl 8/24/98......... 1/14/2000, 64 FR (c)(147). and Other Plastic

      2334. Parts Coating. 26.11.19.07-1................. Control of VOC

      6/15/98......... 6/17/99, 64 FR (c)(142). Emissions from solid

      32415. Resin Decorative Surface Manufacturing. 26.11.19.08................... Metal Furniture

      8/1/88.......... 11/3/92, 57 FR (C)(90)(i)(B)(12). Coating.

      49651. 26.11.19.09................... Control of Volatile 6/5/95.......... 8/4/97, 62 FR (c)(123). Organic Compounds

      41853. (VOC) Emissions from cold and Vapor Degreasing. 26.11.19.10................... Flexographic and 6/5/95.......... 9/2/97, 62 FR (c)(126). Rotogravure Printing.

      46199. 26.11.19.11................... Control of Volatile 6/5/95.......... 9/2/97, 62 FR (c)(126). Organic Compounds

      46199. (VOC) Emissions from Sheet-Fed and Web Lithographic Printing. 26.11.19.12................... Dry Cleaning

      9/22/97......... 9/2/98, 63 FR (c)(131). Installations.

      46662. 26.11.19.13................... Miscellaneous Metal 5/8/91.......... 11/29/94, 59 FR (c)(102)(i)(B)(6). Coating.

      60908. 26.11.19.13-1................. Aerospace Coating 10/2/00, 10/15/ 11/7/01, 66 FR (c)(169). Operations.

      01.

      56220. 26.11.19.13-2................. Control of VOC

      8/24/98......... 6/17/99, 64 FR (c)(142). Emissions from Brake

      32415. Shoe Coating Operations. 26.11.19.13-3................. Control of VOC

      6/29/98......... 6/17/99, 64 FR (c)(142). Emissions from

      32415. Structural Steel Coating Operations. 26.11.19.14................... Manufacture of

      5/8/91.......... 11/29/94, 59 FR (c)(102)(i)(B)(14). Synthesized

      60908. Pharmaceutical Products.

      [[Page 27964]]

      26.11.19.15................... Paint, Resin, and 5/4/98, 3/22/99. 10/28/99, 64 FR (c)(145). Adhesive

      57989. Manufacturing and Adhesive Application. 26.11.19.16................... Control of VOC

      8/19/91......... 9/7/94, 59 FR (c)(103)(i)(B)(9). Equipment Leaks.

      46180. 26.11.19.17................... Control of Volatile 9/12/05......... 3/31/06, 71 FR ..................... Organic Compounds

      16237. (VOC) Emissions from Yeast Manufacturing. 26.11.19.18................... Control of Volatile 6/10/02......... 1/15/03, 68 FR (c)(177). Organic Compounds

      1972. (VOC) Emissions from Screen Printing and Digital Imaging. 26.11.19.19................... Control of Volatile 10/2/00......... 5/7/01, 66 FR (c)(156). Organic Compounds

      22924. (VOC) Emissions from Expandable Polystyrene Operations. 26.11.19.21................... Control of Volatile 7/3/95.......... 10/15/97, 62 FR (c)(125)(i)(B)(4). Organic Compounds

      53544. (VOC) Emissions from Commercial Bakery Ovens. 26.11.19.22................... Control of Volatile 8/11/97......... 9/23/99, 64 FR (c)(137). Organic Compounds

      41445. (VOC) Emissions from Vinegar Generators. 26.11.19.23................... Control of Volatile 5/22/95......... 8/4/97, 62 FR (c)(124). Organic Compounds

      41853. (VOC) Emissions from Vehicle Refinishing. 26.11.19.24................... Control of Volatile 8/11/97......... 9/23/99, 64 FR (c)(137). Organic Compounds

      41445. (VOC) Emissions from Leather Coating Operations. 26.11.19.25................... Control of Volatile 8/11/97......... 1/26/99, 64 FR (c)(141). Organic Compounds

      3852. from Explosives and Propellant Manufacturing. 26.11.19.26................... Control of Volatile 8/11/97......... 8/19/99, 64 FR (c)(139). Organic Compound

      45182. Emissions from Reinforced Plastic Manufacturing. 26.11.19.27................... Control of Volatile 10/20/97........ 9/5/01, 66 FR (c)(166). Organic Compounds

      46379. from Marine Vessel Coating Operations. 26.11.19.28................... Control of Volatile 10/2/00......... 5/7/01, 66 FR (c)(157). Organic Compounds

      22924. from Bread and Snack Food Drying Operations. 26.11.19.29................... Control of Volatile 10/2/00, 10/15/ 11/7/01, 66 FR (c)(160). Organic Compounds 01.

      56220. from Distilled Spirits Facilities. 26.11.19.30................... Control of Volatile 12/10/01, 11/11/ 6/3/03, 68 FR (c)(176). Organic Compounds 02.

      33000. from Organic Chemical Production and Polytetrafluoroethyl ene Installations. 26.11.19.31................... Control of Volatile 6/5/06.......... 1/11/07, 72 FR ..................... Organic Compounds

      1289. from Medical Device Manufacturing.

      26.11.20 Mobile Sources

      26.11.20.02................... Motor Vehicle

      8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(13) [as Emission Control

      49651.

      26.11.20.06]. Devices. 26.11.20.03................... Motor Vehicle Fuel 10/26/92........ 6/10/94, 59 FR (c)(101)(i)(B)(3). Specifications.

      29957. 26.11.20.04................... National Low Emission 3/22/99......... 12/28/99, 64 FR (c)(146). Vehicle Program.

      72564.

      26.11.24 Stage II Vapor Recovery at Gasoline Dispensing Facilities

      26.11.24.01................... Definitions.......... 4/15/02......... 5/7/03, 68 FR (c)(178). 24363. 26.11.24.01-1................. Incorporation by 4/15/02......... 5/7/03, 68 FR (c)(178). Reference.

      24363. 26.11.24.02................... Applicability,

      4/15/02......... 5/7/03, 68 FR (c)(178). Exemptions, and

      24363. Effective Date. 26.11.24.03................... General Requirements. 4/15/02......... 5/7/03, 68 FR (c)(178). 24363.

      [[Page 27965]]

      26.11.24.04................... Testing Requirements. 02/28/05........ 5/8/06, 71 FR ..................... 26688. 26.11.24.05................... Inspection

      2/15/93......... 6/9/94, 59 FR (c)(107). Requirements.

      29730. 26.11.24.06................... Training Requirements 2/15/93......... 6/9/94, 59 FR (c)(107). for Operation and

      29730. Maintenance of Approved Systems. 26.11.24.07................... Record-Keeping and 2/28/05......... 5/8/06, 71 FR ..................... Reporting

      26688. Requirements. 26.11.24.08................... Instructional Signs.. 2/15/93......... 6/9/94, 59 FR (c)(107). 29730. 26.11.24.09................... Sanctions............ 2/15/93......... 6/9/94, 59 FR (c)(107). 29730.

      26.11.25 Control of Glass Melting Furnaces

      26.11.25.01................... Definitions.......... 10/5/98......... 10/19/05, 70 FR ..................... 60738. 26.11.25.02................... Applicability and 10/5/98......... 10/19/05, 70 FR ..................... Exemptions.

      60738. 26.11.25.03................... Visible Emissions 10/5/98......... 10/19/05, 70 FR ..................... from Glass Melting

      60738. Furnaces. 26.11.25.04................... Particulate Matter 10/5/98......... 10/19/05, 70 FR ..................... Emissions from Glass

      60738. Melting Furnaces.

      26.11.26 Conformity

      26.11.26.01................... Definitions.......... 5/15/95, 6/5/95. 12/9/98, 63 FR (c)(136); definitions 67782.

      of Applicable implementation plan, Governor, State, and State air agency. 26.11.26.03................... General Conformity... 5/15/95, 6/5/95. 12/9/98, 63 FR (c)(136); current 67782.

      COMAR citation is 26.11.26.04.

      26.11.29 NOX Reduction and Trading Program

      26.11.29.01................... Definitions.......... 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1). 1866. 26.11.29.02................... Incorporation by 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1). Reference.

      1866. 26.11.29.03................... Scope and

      5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1). Applicability.

      1866. 26.11.29.04................... General Requirements 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1). for Affected Trading

      1866. Sources. 26.11.29.05................... NOX Allowance

      5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1). Allocations.

      1866. 26.11.29.06................... Compliance Supplement 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1). Pool.

      1866. 26.11.29.07................... Allowance Banking.... 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1). 1866. 26.11.29.08................... Emission Monitoring.. 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1). 1866. 26.11.29.09................... Requirements for New 11/24/03........ 3/22/04, 69 FR (c)(184)(i)(C)(1)-(5) Sources and Set-

      13236.

      . Aside Pool. 26.11.29.10................... Reporting............ 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1). 1866. 26.11.29.11................... Record Keeping....... 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1). 1866. 26.11.29.12................... End-of-Season

      5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1). Reconciliation.

      1866. 26.11.29.13................... Compliance

      5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1). Certification.

      1866. 26.11.29.14................... Penalties............ 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1). 1866. 26.11.29.15................... Requirements for 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1). Affected Nontrading

      1866. Sources.

      26.11.30 Policies and Procedures Relating to Maryland's NOX Reduction and Trading Program

      26.11.30.01................... Scope and

      5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(2). Applicability.

      1866.

      [[Page 27966]]

      26.11.30.02................... Definitions.......... 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(2). 1866. 26.11.30.03................... Procedures Relating 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(2). to Compliance

      1866. Accounts and Overdraft Accounts. 26.11.30.04................... Procedures Relating 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(2). to General Accounts.

      1866. 26.11.30.05................... Allowance Banking.... 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(2). 1866. 26.11.30.06................... Allowance Transfers.. 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(2). 1866. 26.11.30.07................... Early Reductions..... 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(2). 1866. 26.11.30.08................... Opt-In Procedures.... 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(2). 1866. 26.11.30.09................... Allocation of

      6/19/06......... 11/03/06, 71 FR New column for 2008 Allowances.

      64647.

      allocations.

      26.11.32 Control of Emissions of Volatile Organic Compounds from Consumer Products

      26.11.32.01................... Applicability and 8/18/03......... 12/9/03, 68 FR (c)(185). Exemptions.

      68523. 26.11.32.02................... Incorporation by 8/18/03......... 12/9/03, 68 FR (c)(185). Reference.

      68523. 26.11.32.03................... Definitions.......... 8/18/03......... 12/9/03, 68 FR (c)(185). 68523. 26.11.32.04................... Standards(General.... 8/18/03......... 12/9/03, 68 FR (c)(185). 68523. 26.11.32.05................... Standards--Requiremen 8/18/03......... 12/9/03, 68 FR (c)(185). ts for Charcoal

      68523. Lighter Materials. 26.11.32.06................... Standards--Requiremen 8/18/03......... 12/9/03, 68 FR (c)(185). ts for Aerosol

      68523. Adhesives. 26.11.32.07................... Standards--Requiremen 8/18/03......... 12/9/03, 68 FR (c)(185). ts for Floor Wax

      68523. Strippers. 26.11.32.08................... Innovative Products-- 8/18/03......... 12/9/03, 68 FR (c)(185). CARB Exemption.

      68523. 26.11.32.09................... Innovative Products-- 8/18/03......... 12/9/03, 68 FR (c)(185). Department Exemption.

      68523. 26.11.32.10................... Administrative

      8/18/03......... 12/9/03, 68 FR (c)(185). Requirements.

      68523. 26.11.32.11................... Reporting

      8/18/03......... 12/9/03, 68 FR (c)(185). Requirements.

      68523. 26.11.32.12................... Variances............ 8/18/03......... 12/9/03, 68 FR (c)(185). 68523. 26.11.32.13................... Test Methods......... 8/18/03......... 12/9/03, 68 FR (c)(185). 68523. 26.11.32.14................... Alternative Control 8/18/03......... 12/9/03, 68 FR (c)(185). Plan (ACP).

      68523. 26.11.32.15................... Approval of an ACP 8/18/03......... 12/9/03, 68 FR (c)(185). Application.

      68523. 26.11.32.16................... Record Keeping and 8/18/03......... 12/9/03, 68 FR (c)(185). Availability of

      68523. Requested Information. 26.11.32.17................... Violations........... 8/18/03......... 12/9/03, 68 FR (c)(185). 68523. 26.11.32.18................... Surplus Reductions 8/18/03......... 12/9/03, 68 FR (c)(185). and Surplus Trading.

      68523. 26.11.32.19................... Limited-Use Surplus 8/18/03......... 12/9/03, 68 FR (c)(185). Reduction Credits

      68523. for Early Reformulations of ACP Products. 26.11.32.20................... Reconciliation of 8/18/03......... 12/9/03, 68 FR (c)(185). Shortfalls.

      68523. 26.11.32.21................... Modifications to an 8/18/03......... 12/9/03, 68 FR (c)(185). ACP.

      68523. 26.11.32.22................... Cancellation of an 8/18/03......... 12/9/03, 68 FR (c)(185). ACP.

      68523. 26.11.32.23................... Transfer of an ACP... 8/18/03......... 12/9/03, 68 FR (c)(185). 68523.

      [[Page 27967]]

      26.11.33 Architectural Coatings

      26.11.33.01................... Applicability and 3/29/04......... 5/12/05, 70 FR ..................... Exemptions.

      24979. 26.11.33.02................... Test Methods--

      3/29/04......... 5/12/05, 70 FR ..................... Incorporation by

      24979. Reference. 26.11.33.03................... Definitions.......... 3/29/04......... 5/12/05, 70 FR ..................... 24979. 26.11.33.04................... General Standard--VOC 3/29/04......... 5/12/05, 70 FR ..................... Content Limits.

      24979. 26.11.33.05................... VOC Content Limits... 3/29/04......... 5/12/05, 70 FR ..................... 24979. 26.11.33.06................... Most Restrictive VOC 2/28/05......... 10/19/05, 70 FR Addition of sections Limit.

      60740.

      B(15) through B(19). 26.11.33.07................... Painting Restrictions 3/29/04......... 5/12/05, 70 FR ..................... 24979. 26.11.33.08................... Thinning............. 3/29/04......... 5/12/05, 70 FR ..................... 24979. 26.11.33.09................... Rust Preventive

      3/29/04......... 5/12/05, 70 FR ..................... Coatings.

      24979. 26.11.33.10................... Coatings Not Listed 2/28/05......... 10/19/05, 70 FR ..................... in Regulation .05.

      60740. 26.11.33.11................... Lacquers............. 3/29/04......... 5/12/05, 70 FR ..................... 24979. 26.11.33.12................... Container Labeling 2/28/05......... 10/19/05, 70 FR Deleted section K. Requirements.

      60740. 26.11.33.13................... Recordkeeping

      2/28/05......... 10/19/05, 70 FR ..................... Requirements.

      60740. 26.11.33.14................... Compliance Provisions 3/29/04......... 5/12/05, 70 FR ..................... and Test Methods.

      24979.

      11.14.08 Vehicle Emissions Inspection Program

      11.14.08.01................... Title................ 1/02/95......... 10/29/99, 64 FR (c)(144). 58340. 11.14.08.02................... Definitions.......... 1/02/95, 10/19/ 10/29/99, 64 FR (c)(144). 98.

      58340. 11.14.08.03................... Applicability........ 6/10/02......... 1/16/03, 68 FR (c)(179). 2208. 11.14.08.04................... Exemptions........... 1/02/95......... 10/29/99, 64 FR (c)(144). 58340. 11.14.08.05................... Schedule of the

      1/02/95, 12/16/ 10/29/99, 64 FR (c)(144). Program.

      96.

      58340. 11.14.08.06................... Certificates......... 6/10/02......... 1/16/03, 68 FR (c)(179). 2208. 11.14.08.07................... Extensions........... 1/02/95, 10/19/ 10/29/99, 64 FR (c)(144). 98.

      58340. 11.14.08.08................... Enforcement.......... 1/02/95......... 10/29/99, 64 FR (c)(144). 58340. 11.14.08.09................... Inspection Standards. 6/10/02......... 1/16/03, 68 FR (c)(179). 2208. 11.14.08.10................... General Requirements 1/02/95, 12/16/ 10/29/99, 64 FR (c)(144). for Inspection and 96, 10/19/98. 58340. Preparation for Inspection. 11.14.08.11................... Idle Exhaust

      10/18/98........ 10/29/99, 64 FR (c)(144). Emissions Test and

      58340. Equipment Checks. 11.14.08.11-1................. Transient Exhaust 12/16/96, 10/19/ 10/29/99, 64 FR (c)(144). Emissions Test and 98.

      58340. Evaporative Purge Test Sequence. 11.14.08.12................... Evaporative Integrity 6/10/02......... 1/16/03, 68 FR (c)(179). Test, Gas Cap Leak

      2208. Test, and On-Board Diagnostics Interrogation Procedures. 11.14.08.13................... Failed Vehicle and 1/02/95......... 10/29/99, 64 FR (c)(144). Reinspection

      58340. Procedures. 11.14.08.14................... Dynamometer System 1/02/95......... 10/29/99, 64 FR (c)(144). Specifications.

      58340. 11.14.08.15................... Constant Volume

      1/02/95, 10/19/ 10/29/99, 64 FR (c)(144). Sampler, Analysis 98.

      58340. System, and Inspector Control Specifications.

      [[Page 27968]]

      11.14.08.16................... Evaporative Test 6/10/02......... 1/16/03, 68 FR (c)(179). Equipment, Gas Cap

      2208. Leak Test Equipment, and on-Board Diagnostics Interrogation Equipment Specifications. 11.14.08.17................... Quality Assurance and 1/02/95......... 10/29/99, 64 FR (c)(144). Maintenance--General

      58340. Requirements. 11.14.08.18................... Test Assurance

      1/02/95......... 10/29/99, 64 FR (c)(144). Procedures.

      58340. 11.14.08.19................... Dynamometer Periodic 1/02/95......... 10/29/99, 64 FR (c)(144). Quality Assurance

      58340. Checks. 11.14.08.20................... Constant Volume

      1/02/95......... 10/29/99, 64 FR (c)(144). Sampler Periodic

      58340. Quality Assurance Checks. 11.14.08.21................... Analysis System

      1/02/95......... 10/29/99, 64 FR (c)(144). Periodic Quality

      58340. Assurance Checks. 11.14.08.22................... Evaporative Test 1/02/95, 10/19/ 10/29/99, 64 FR (c)(144). Equipment, Gas Cap 98.

      58340. Leak Test Equipment and On-board Diagnostics Interrogation Equipment Periodic Quality Assurance Checks. 11.14.08.23................... Overall System

      1/02/95......... 10/29/99, 64 FR (c)(144). Performance quality

      58340. Assurance. 11.14.08.24................... Control Charts....... 1/02/95......... 10/29/99, 64 FR (c)(144). 58340. 11.14.08.25................... Gas Specifications... 1/02/95......... 10/29/99, 64 FR (c)(144). 58340. 11.14.08.26................... Vehicle Emissions 1/02/95......... 10/29/99, 64 FR (c)(144). Inspection Station.

      58340. 11.14.08.27................... Technician's Vehicle 1/02//95, 10/19/ 10/29/99, 64 FR (c)(144). Report.

      98.

      58340. 11.14.08.28................... Feedback Reports..... 1/02/95, 10/19/ 10/29/99, 64 FR (c)(144). 98.

      58340. 11.14.08.29................... Certified Emissions 1/02/95, 12/16/ 10/29/99, 64 FR (c)(144). Technicians.

      96.

      58340. 11.14.08.30................... Certified Emissions 1/02/95, 12/16/ 10/29/99, 64 FR (c)(144). Repair Facility. 96.

      58340. 11.14.08.31................... On-Highway Emissions 1/02/95......... 10/29/99, 64 FR (c)(144). Test.

      58340. 11.14.08.32................... Fleet Inspection 1/02/95, 12/16/ 10/29/99, 64 FR (c)(144). Station.

      96, 10/19/98. 58340. 11.14.08.33................... Fleet Inspection 1/02/95......... 10/29/99, 64 FR (c)(144). Standards.

      58340. 11.14.08.34................... Fleet Inspection and 1/02/95......... 10/29/99, 64 FR (c)(144). Reinspection Methods.

      58340. 11.14.08.35................... Fleet Equipment and 1/02/95......... 10/29/99, 64 FR (c)(144). Quality Assurance

      58340. Requirements. 11.14.08.36................... Fleet Personnel

      1/02/95......... 10/29/99, 64 FR (c)(144). Requirements.

      58340. 11.14.08.37................... Fleet Calibration Gas 1/02/95......... 10/29/99, 64 FR (c)(144). Specifications and

      58340. Standard Reference Materials. 11.14.08.38................... Fleet Record-Keeping 1/02/95......... 10/29/99, 64 FR (c)(144). Requirements.

      58340. 11.14.08.39................... Fleet Fees........... 1/02/95......... 10/29/99, 64 FR (c)(144). 58340. 11.14.08.40................... Fleet License

      1/02/95......... 10/29/99, 64 FR (c)(144). Suspension and

      58340. Revocation. 11.14.08.41................... Audits............... 1/02/95......... 10/29/99, 64 FR (c)(144). 58340. 11.14.08.42................... Fleet Inspection 1/02/95, 2/16/ 10/29/99, 64 FR (c)(144). After 1998.

      96, 10/19/98. 58340.

      03.03.05 Motor Fuel Inspection [Contingency SIP Measure]

      03.03.05.01................... Definitions.......... 12/18/95........ 1/30/96, 61 FR (c)(101)(i)(B)(4); 2982.

      Approved as a contingency SIP measure as part of the CO Maintenance Plans for Baltimore and DC. [(c)(117) and (c)(118)].

      [[Page 27969]]

      03.03.05.01-1................. Standard

      12/18/95........ 1/30/96, 61 FR ..................... Specifications for

      2982. Gasoline. 03.03.05.02-1................. Other Motor Vehicle 10/26/92........ 6/10/94, 58 FR ..................... Fuels.

      29957. 03.03.05.05................... Labeling of Pumps.... 12/18/95........ 1/30/96, 61 FR ..................... 2982. 03.03.05.08................... Samples and Test 10/26/92........ 6/10/94, 58 FR ..................... Tolerance.

      29957. 03.03.05.15................... Commingled Products.. 10/26/92........ 6/10/94, 58 FR ..................... 29957.

      03.03.06 Emissions Control Compliance [Contingency SIP Measure]

      03.03.06.01................... Definitions.......... 12/18/95........ 1/30/96, 61 FR (c)(101)(i)(B)(5); 2982.

      Approved as a contingency SIP measure as part of the CO Maintenance Plans for Baltimore and DC. [(c)(117) and (c)(118)]. 03.03.06.02................... Vapor Pressure

      10/26/92........ 6/10/94, 58 FR ..................... Determination.

      29957. 03.03.06.03................... Oxygen Content

      12/18/95........ 1/30/96, 61 FR ..................... Determination.

      2982. 03.03.06.04................... Registration......... 10/26/92........ 6/10/94, 58 FR ..................... 29957. 03.03.06.05................... Recordkeeping........ 10/26/92........ 6/10/94, 58 FR ..................... 29957. 03.03.06.06................... Transfer

      12/18/95........ 1/30/96, 61 FR ..................... Documentation.

      2982.

      TM Technical Memoranda

      TM81-04....................... Procedures for

      5/1/81.......... 6/18/82, 47 FR (c)(67). Observing and

      26381. Evaluating Visible Emissions from Stationary Sources. TM83-05....................... Stack Test Methods 6/1/83.......... 2/23/85, 50 FR (c)(80). for Stationary

      7595. Sources. TM91-01 [Except Methods 1004A Test Methods and 11/2/98......... 9/7/01, 66 FR (c)(153)(i)(D)(5) through E].

      Equipment

      46727.

      (Supplement 3 is Specifications for

      added). Stationary Sources.

      (d) EPA approved state source-specific requirements.

      State effective

      Additional Name of source

      Permit No./type

      date

      EPA approval date explanation

      (PEPCO)--Chalk Point Units

      49352 1/27/78........... 4//2/79, 44 FR 52.1100(c) (22); 1 and 2.

      Amended Consent

      19192.

      FRN republished 5/ Order.

      3/79 (44 FR 25840). Beall Jr./Sr. High School....... Consent Order..... 1/30/79........... 3/18/80, 45 FR 52.1100(c)(26). 17144. Mt. Saint Mary's College........ Consent Order..... 3/8/79............ 3/18/80, 45 FR 52.1100(c)(26). 17144. Potomac Electric Power Company Secretarial Order. 7/19/79........... 9/3/80, 45 FR 52.1100(c)(34). (PEPCO)--Chalk Point.

      58340. Maryland Slag Co................ Consent Agreement 10/31/80.......... 9/8/81, 41 FR 52.1100(c)(49). (Order).

      44757. Northeast Maryland Waste

      Secretarial Order. 11/20/81.......... 7/7/82, 47 FR 52.1100(c)(65) Disposal Authority.

      29531.

      (Wheelabrator- Frye, Inc.). Northeast Maryland Waste

      Secretarial Order. 2/25/83........... 8/24/83, 45 FR 52.1100(c)(70) Disposal Authority and

      55179.

      (Shutdown of Wheelabrator-Frye, Inc. and the

      landfill for Mayor and City Council of

      offsets). Baltimore and BEDCO Development Corp. Westvaco Corp................... Consent Order..... 9/6/83, Rev. 1/26/ 12/20/84, 49 FR 52.1100(c)(74). 84.

      49457. Potomac Electric Power Company Administrative 9/13/99........... 12/15/00, 65 FR 52.1100(c)(151). (PEPCO).

      Consent Order.

      78416. Thomas Manufacturing Corp....... Consent Decree.... 2/15/01........... 11/15/01, 66 FR 52.1100(c)(167). 57395.

      [[Page 27970]]

      Constellation Power Source

      Consent Order and 4/25/01........... 2/27/02, 67 FR 52.1100(c)(168). Generation, Inc.--Brandon

      NOX RACT

      8897. Shores Units 1 & 2; Averaging Plan Gould Street Unit 3; Proposal. H.A. Wagner Units 1, 2, 3 & 4; C.P. Crane Units 1 & 3; and Riverside Unit 4. Kaydon Ring and Seal, Inc....... Consent Order..... 3/5/04............ 8/31/04, 69 FR (c)(190); SIP 53002.

      effective date is 11/1/04. Perdue Farms, Inc............... Consent Order..... 2/1/05............ 1/11/07, 72 FR 52.1070(d)(1). 1291.

      (e) EPA-approved nonregulatory and quasi-regulatory material.

      Name of non-regulatory SIP

      Applicable

      State submittal

      Additional revision

      geographic area

      date

      EPA approval date explanation

      Base Year Emissions Inventory... Metropolitan

      9/20/95........... 10/30/95, 60 FR 52.1075(a) CO. Baltimore Ozone

      55321. Nonattainment Area 1990. 1990 Base Year Emissions

      Metropolitan

      3/21/94, 10/12/95. 1/30/96, 61 FR 52.1075(b), CO. Inventory.

      Washington Ozone

      2931. Nonattainment Area. 1990 Base Year Emissions

      All ozone

      3/21/94........... 9/27/96, 61 FR 52.1075(c), VOC, Inventory.

      nonattainment

      50715.

      NOX, CO. areas. 1990 Base Year Emissions

      Kent & Queen

      3/21/94........... 4/23/97, 62 FR 52.1075(d), VOC, Inventory.

      Anne's Counties.

      19676.

      NOX, CO. 1990 Base Year Emissions

      Metropolitan

      3/21/94........... 4/23/97, 62 FR 52.1075(e), VOC, Inventory.

      Washington Ozone

      19676.

      NOX, CO. Nonattainment Area. 1990 Base Year Emissions

      Metropolitan

      12/24/97.......... 7/8/98, 63 FR 52.1075(f), VOC, Inventory.

      Washington Ozone

      36854.

      NOX. Nonattainment Area. 1990 Base Year Emissions

      Metropolitan

      12/24/97.......... 2/3/00, 63 FR 5245 52.1075(g), VOC, Inventory.

      Baltimore Ozone

      NOX. Nonattainment Area. 1990 Base Year Emissions

      Philadelphia- 12/24/97, 4/29/98, 2/3/00, 63 FR 5252 52.1075(h), VOC, Inventory.

      Wilmington-

      12/21/99, 12/28/ 9/19/01, 66 FR NOX. Trenton Ozone 00.

      44809. Nonattainment Area (Cecil County). 15% Rate of Progress Plan...... Philadelphia- 7/12/95, 95-20.

      40457. Trenton Ozone Nonattainment Area (Cecil County). Stage II Vapor Recovery

      Western Maryland & 11/5/97........... 12/9/98, 63 FR 52.1076(b). Comparability Plan.

      Eastern Shore

      67780. Counties. 15% Rate of Progress Plan....... Metropolitan

      10/7/98........... 2/3/00, 65 FR 5245 52.1076(c). Baltimore Ozone Nonattainment Area. 15% Rate of Progress Plan....... Metropolitan

      5/5/98............ 7/19/00, 65 FR 52.1076(d). Washington Ozone

      44686. Nonattainment Area. Post-1996 Rate of Progress Plan Philadelphia- 12/24/97, 4/24/98, 2/3/00, 63 FR 5252 52.1076(f). & contingency measures.

      Wilmington-

      8/18/98, 12/21/ 9/19/01, 66 FR 52.1076(f)(3). Trenton Ozone 99, 12/28/00, 3/8/ 44809. Nonattainment 04.

      4/15/04, 69 FR Area (Cecil

      19939. County). Ozone Attainment Plan........... Philadelphia- 4/29/98, 8/18/98, 10/29/01, 66 FR 52.1076(h). Wilmington-

      12/21/99, 12/28/ 54578. Trenton Ozone 00, 8/31/01. Nonattainment Area (Cecil County). 9/2/03............ 10/27/03, 68 FR .................. 61103. Transportation Conformity

      Philadelphia- 4/29/98, 8/18/98, 10/29/01, 66 FR 52.1076(i). Budgets.

      Wilmington-

      12/21/99, 12/28/ 54578. Trenton Ozone 00. Nonattainment Area (Cecil County). Post-1996 Rate of Progress Plan Metropolitan

      12/24/97, 4/24/98, 9/26/01, 66 FR 52.1076(j). & contingency measures.

      Baltimore Ozone 8/18/98, 12/21/ 49108. Nonattainment 99, 12/28/00. Area. Ozone Attainment Plan........... Metropolitan

      4/29/98, 8/18/98, 10/30/01, 66 FR 52.1076(k). Baltimore Ozone 12/21/99, 12/28/ 54666. Nonattainment 00, 8/31/01. Area. 9/2/03............ 10/27/03, 68 FR 52.1076(k). 61103.

      [[Page 27971]]

      Mobile budgets.................. Metropolitan

      8/31/01........... 10/30/01, 66 FR 52.1076(l) Baltimore Ozone 9/2/03............ 54666. Nonattainment

      10/27/03, 68 FR Area.

      61103. Mobile budgets (2005)........... Metropolitan

      9/2/03............ 10/27/03, 68 FR 52.1076(m). Baltimore Ozone

      61103. Nonattainment Area. Piladelphia- Wilmington- Trenton Ozone Nonattainment Area (Cecil County). Mobile budgets (2005 Rate of Metropolitan

      11/3/03........... 2/13/04, 69 FR 52.1076(n). Progress Plan).

      Baltimore Ozone

      7133. Nonattainment Area. Extension for incorporation of All ozone

      7/9/02............ 1/16/03, 68 FR 52.1078(b). the on-board diagnostics (OBD) nonattainment

      2208. testing program into the

      areas. Maryland I/M SIP. Photochemical Assessment

      Metropolitan

      3/24/94........... 9/11/95, 60 FR 52.1080. Monitoring Stations (PAMS)

      Baltimore and

      47081. Program.

      Metropolitan Washington Ozone Nonattainment Areas. Consultation with Local

      All nonattainment 10/8/81........... 4/8/82, 47 FR 52.1100(c)(63). Officials (CAA Sections 121 & & PSD areas.

      15140. 127). Lead (Pb) SIP................... City of Baltimore. 10/23/80.......... 2/23/82, 47 FR 52.1100(c)(60), 7835.

      (61). TM90-01-``Continuous Statewide......... 9/18/91........... 2/28/96, 61 FR 52.1100(c)(106); Emission Monitoring Policies

      7418.

      approved into SIP and Procedures''-October 1990.

      as ``additional material'', but not IBR'd. Carbon Monoxide Maintenance Plan City of Baltimore-- 9/20/95........... 10/31/95, 60 FR 52.1100(c)(117). Regional Planning

      55321. District 118. .................. 7/15/04........... 04/04/05, 70 FR Revised Carbon 16958.

      Monoxide Maintenance Plan Base Year Emissions Inventory using MOBILE6. Carbon Monoxide Maintenance Plan Montgomery County 10/12/95.......... 1/30/96 61 FR 2931 52.1100(c)(118). Election Districts 4, 7, and 13; Prince Georges County Election Districts 2, 6, 16, 17 and 18. 3/3/04............ 04/04/05, 70 FR Revised Carbon 16958.

      Monoxide Maintenance Plan Base Year Emissions Inventory using MOBILE6. Ozone Maintenance Plan.......... Kent and Queen 2/4/04............ 10/21/04, 69 FR 52.1100(c)(187); Anne's Counties.

      61766.

      SIP effective date is 11/22/04. 1996-1999 Rate-of-Progress Plan Washington DC 1- 12/20/97, 5/20/99. 5/16/05, 70 FR Only the TCMs in SIP and the Transportation

      hour ozone

      25688.

      Appendix H of the Control Measures (TCMs) in

      nonattainment

      5/20/1999 Appendix H.

      area.

      revision. 1999 motor vehicle emissions budgets of 128.5 tons per day (tpy) of VOC and 196.4 tpy of NOX. 1990 Base Year Inventory

      Washington DC 1- 9/2/03, 2/24/04... 5/16/05, 70 FR .................. Revisions.

      hour ozone

      25688. nonattainment area. 1999-2005 Rate-of-Progress Plan Washington DC 1- 9/2/03, 2/24/04... 5/16/05, 70 FR Only the TCMs in SIP Revision and the

      hour ozone

      25688.

      Appendix J of the Transportation Control Measures nonattainment

      2/24/2004 (TCMs) in Appendix J.

      area.

      revision. 2002 motor vehicle emissions budgets (MVEBs) of 125.2 tons per day (tpy) for VOC and 290.3 tpy of NOX, and, 2005 MVEBs of 97.4 tpy for VOC and 234.7 tpy of NOX.

      [[Page 27972]]

      VMT Offset SIP Revision......... Washington DC 1- 9/2/03, 2/24/04... 5/16/05, 70 FR .................. hour ozone

      25688. nonattainment area. Contingency Measure Plan........ Washington, DC 9/2/03, 2/24/04... 5/16/05, 70 FR .................. Area.

      25688. 1-hour Ozone Modeled

      Washington DC 1- 9/2/03, 2/24/04... 5/16/05, 70 FR Demonstration of Attainment. hour ozone

      25688. nonattainment area. Attainment Demonstration and Washington County. 12/20/04, 2/28/05. 8/17/05, 70 FR Early Action Plan for the

      48283. Washington County Ozone Early Action Compact Area. 1-hour Ozone Attainment Plan.... Washington DC 1- 9/2/2003, 2/24/ 11/16/05, 70 FR hour ozone

      2004.

      69440. nonattainment area. 8-hour Ozone Maintenance Plan Kent and Queen 05/2/06, 05/19/06. 12/22/06, 71 FR for the Kent and Queen Anne's Anne's Counties.

      76920. Area.

      [FR Doc. E7-9518 Filed 5-17-07; 8:45 am]

      BILLING CODE 6560-50-P

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT