Air quality implementation plans; approval and promulgation; various States: Pennsylvania,

[Federal Register: March 8, 2006 (Volume 71, Number 45)]

[Rules and Regulations]

[Page 11514-11519]

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

[DOCID:fr08mr06-5]

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[EPA-R03-OAR-2006-0123; FRL-8042-3]

Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; RACT Determinations for Thirteen Individual Sources

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

SUMMARY: The Environmental Protection Agency (EPA) is approving State Implementation Plan (SIP) revisions submitted by the Commonwealth of Pennsylvania (Pennsylvania). The revisions impose reasonably available control technology (RACT) on thirteen major sources of volatile organic compounds (VOC) or nitrogen oxides (NOX) located in the Commonwealth of Pennsylvania. EPA is approving these revisions to establish RACT requirements in the SIP in accordance with the Clean Air Act (CAA or the Act).

DATES: This final rule is effective on April 7, 2006.

ADDRESSES: EPA has established a docket for this action under Docket ID Number EPA-R03-OAR-2006-0123. All documents in the docket are listed in the http://www.regulations.gov Web site. Although listed in the electronic

docket, some information is not publicly available, i.e., confidential business information (CBI) or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either electronically through http://www.regulations.gov or in hard

copy for public inspection during normal business hours at the Air Protection Division, U.S. Environmental Protection Agency, Region III, 1650 Arch Street, Philadelphia, Pennsylvania 19103. Copies of the State submittal are available at the Pennsylvania Department of Environmental Protection, Bureau of Air Quality, P.O. Box 8468, 400 Market Street, Harrisburg, Pennsylvania 17105.

FOR FURTHER INFORMATION CONTACT: Marcia Spink (215) 814-2104 or by e- mail at spink.marcia@epa.gov.

SUPPLEMENTARY INFORMATION:

  1. Background

    On April 18, 2000 (65 FR 20788), EPA published a direct final rule approving RACT determinations submitted by the

    [[Page 11515]]

    Pennsylvania Department of Environmental Protection (DEP) for twenty- six major sources of NOXand/or volatile organic compounds (VOC) and a companion notice of proposed rulemaking. We received adverse comments on the direct final rule and a request for an extension of the comment period. We had indicated in our April 18, 2000 direct final rulemaking that if we received adverse comments, we would withdraw the direct final rule and address all public comments in a subsequent final rule based on the proposed rule (65 FR 20788). On June 19, 2000 (65 FR 38168), EPA published a withdrawal notice in the Federal Register informing the public that the direct final rule did not take effect. On June 19, 2000 (65 FR 38169), we also published a notice providing an extension of the comment period and making corrections to our original proposed rule.

    This rule takes final action approving RACT for thirteen of the twenty-six sources that were included in the April 18, 2000 proposed rulemaking (65 FR 20788). Approvals of RACT for ten of the twenty-six sources have already been the subjects of separate final rulemakings. Elsewhere in today's Federal Register, EPA is withdrawing its April 18, 2000 proposed rule with regard to the three remaining sources, namely, Doverspike Brothers Coal Co., Hedstrom Corporation, and the thermal coal dryers at EME Homer City, LP. These formerly RACT-subject sources have been permanently shut down, and the Pennsylvania DEP has indicated to EPA that no RACT need be approved for them.

  2. Summary of the SIP Revisions

    The Pennsylvania DEP submitted NOXand/or VOC RACT determinations for thirteen sources located in the Commonwealth of Pennsylvania. The names of those sources, the DEP Plan Approval (PA) or Operating Permit (OP) number for each source, the name of the County in which each source is located, and the pollutant for which RACT has been imposed are provided in the following table.

    Name of source

    PA or OP No.

    County

    Pollutant

    Cogentrix of Pennsylvania Inc. (Now 33-0137, 33-302-014, 33- Jefferson.............. NOX Village Farms LP)*.

    399-004. Scrubgrass Generating Company, LP*..... 61-0181................. Venango................ NOX Wheelabrator Frackville Energy Co.*.... 54-005.................. Schuylkill............. NOX Indiana University of Pennsylvania-- 32-000-200.............. Indiana................ NOX S.W. Jack Cogeneration Facility*. Fleetwood Motor Homes.................. 49-0011................. Northcumberland........ VOC Piney Creek, LP*....................... 16-0127................. Clarion................ NOX Statoil Energy Power Paxton, LP (Now 22-02015................ Dauphin................ NOX NRG Energy CTR Paxton LLC). Harrisburg Steamworks (Now owned by NRG 22-02005................ Dauphin................ NOX Energy CTR Paxton LLC). Cove Shoe Company (Now H.H. Brown Shoe 07-02028................ Blair.................. VOC Company). PP&L--Fichbach C.T. Facility........... 54-0011................. Schuylkill............. NOX PP&L--Allentown C.T. Facility.......... 39-0009................. Lehigh................. NOX PP&L--Harwood C.T. Facility............ 40-0016................. Luzerne................ NOX PP&L--Jenkins C.T. Facility............ 40-0017................. Luzerne................ NOX

    \*\ For these large NOX sources, the Commonwealth has adopted and implemented additional ``post RACT requirements'' to reduce seasonal NOX emissions in the form of a NOX cap and trade regulation, 25 Pa Code Chapters 121 and 123, based upon a model rule developed by the States in the Ozone Transport Region. That regulation was approved as a SIP revision on June 6, 2000 (65 FR 35842). Pennsylvania has also adopted 25 Pa Code Chapter 145 to satisfy the NOX SIP call. That regulation was approved as a SIP revision on August 21, 2001 (66 FR 43795). Federal approval of a source-specific RACT determination for these major sources of NOX in no way relieves those sources from any applicable requirements found in 25 PA Code Chapters 121, 123 and 145.

    On April 18, 2000 (65 FR 20788), EPA proposed to approve RACT SIP revisions for these thirteen sources. Detailed descriptions of the RACT determination for these thirteen sources were provided in EPA's Technical Support Documents (TSDs) prepared in support of its April 18, 2000 rulemaking as well as in the SIP submissions made by DEP, and shall not be restated here. In short, EPA proposed that the DEP had established and imposed RACT requirements in accordance with the criteria set forth in the SIP-approved RACT regulations applicable to these sources. The DEP has also imposed record-keeping, monitoring, and testing requirements on these sources sufficient to determine compliance with the applicable RACT determinations.

  3. Summary of Public Comments Received and EPA's Responses

    EPA received comments on its April 18, 2000 proposal to approve Pennsylvania's RACT SIP submittals from Citizens for Pennsylvania's Future (PennFuture) and from a concerned citizen. Those comments and EPA's responses are as follows:

    PennFuture's Comments: PennFuture comments that EPA should require that each RACT submittal include ``effective and enforceable numerical emission limits'' as a condition for approval. Additionally, PennFuture requests that EPA only approve limits that are no higher than the best emission rate actually achieved after the application of RACT, adjusted only to reflect legally and technically valid averaging times and deviations. PennFuture contends that such an approach will ensure maximum environmental benefits and minimize the opportunity for sources to generate spurious emission reduction credits (ERCs) against limits that exceed emission levels actually achieved following the application of RACT. Lastly PennFuture comments that EPA should describe the RACT determinations in its rulemaking notices published in the Federal Register rather than simply citing to technical support documents and other materials available in docket of the rulemaking.

    EPA's Responses: While RACT, as defined for an individual source or source category, often does specify an emission rate, such is not always the case. EPA has issued Control Technique Guidelines (CTGs) which states are to use as guidance in development of their RACT determinations/rules for certain sources or source categories. Not every CTG issued by EPA includes an emission rate. There are several examples of CTGs issued by EPA wherein equipment standards and/or

    [[Page 11516]]

    work practice standards alone are provided as RACT guidance for all or part of the processes covered. Such examples include the CTGs issued for Bulk gasoline plants, Gasoline service stations--Stage I, Petroleum Storage in Fixed-roof tanks, Petroleum refinery processes, Solvent metal cleaning, Pharmaceutical products, External Floating roof tanks and Synthetic Organic Chemical Manufacturing (SOCMI)/polymer manufacturing. (See http://www. epa.gov/ ttn/catc/ dir1/ctg. txt.)

    In EPA's proposed conditional limited approval of the Commonwealth's RACT regulations (62 FR 43134, August 12, 1997) and in EPA's final conditional limited approval of those regulations (63 FR 13789, March 23, 1998), EPA addressed the issue of what types of RACT provisions would be acceptable. In the proposed rule EPA noted that while it defines RACT as ``the lowest emission limitation that a source is capable of meeting by the application of control technology that is reasonably available considering technological and economic feasibility,'' the definition of emission limitation did not necessarily require the establishment of a numerical emission limitation. EPA further noted that ``[s]ection 302 of the Act in turn defines `emission limitation' as a `requirement * * * which limits the quantity, rate or concentration of air pollutants on a continuous basis, * * *, and any design, equipment, work practice or operational standard promulgated under this chapter.' '' Furthermore, in the March 23, 1998 final rule EPA stated that, ``it is possible that RACT for certain sources and source categories could consist of requirements that do not specifically include emission limitations, but instead have other limitations.''

    With regard to the criteria EPA uses to determine whether to approve or disapprove RACT SIP revisions submitted by DEP pursuant to 25 Pa Code Chapter 129.91-129.95, we look to the provisions of those SIP-approved regulations and to the requirements of the Clean Air Act and relevant EPA guidance. As previously stated, on March 23, 1998 (63 FR 13789), EPA granted conditional limited approval of Pennsylvania's generic RACT regulations, 25 PA Code Chapters 121 and 129, thereby approving the definitions, provisions and procedures contained within those regulations under which the Commonwealth would require and impose RACT. Subsection 129.91, Control of major sources of NOXand VOCs, requires subject facilities to submit a RACT plan proposal to both the Pennsylvania DEP and to EPA Region III by July 15, 1994 in accordance with subsection 129.92, entitled, RACT proposal requirements. Under subsection 129.92, that proposal is to include among other information (1) A list of each subject source at the facility; (2) The size or capacity of each affected source, and the types of fuel combusted, and the types and amounts of materials processed or produced at each source; (3) A physical description of each source and its operating characteristics; (4) Estimates of potential and actual emissions from each affected source with supporting documentation; (5) A RACT analysis which meets the requirements of subsection 129.92(b), including technical and economic support documentation for each affected source; (6) A schedule for implementation as expeditiously as practicable but not later than May 15, 1995; (7) The testing, monitoring, recordkeeping and reporting procedures proposed to demonstrate compliance with RACT; and (8) any additional information requested by the DEP necessary to evaluate the RACT proposal. Under subsection 129.91, the DEP will approve, deny or modify each RACT proposal, and submit each RACT determination to EPA for approval as a SIP revision. The conditional nature of EPA's March 23, 1998 conditional limited approval did not impose any conditions pertaining to the regulation's procedures for the submittal of RACT plans and analyses by subject sources and approval of case-by case RACT determinations by the DEP. Rather, EPA stated that ``* * *RACT rules may not merely be procedural rules (emphasis added) that require the source and the State to later agree to the appropriate level of control; rather the rules must identify the appropriate level of control for source categories or individual sources.''

    EPA reviews the case-by-case RACT plan approvals and/or permits submitted as individual SIP revisions by the Commonwealth to verify and determine if they are consistent with the RACT requirements of the Act and any relevant EPA guidance. EPA first reviews a SIP submission to ensure that the source and the Commonwealth followed the SIP-approved generic rule when applying for and imposing RACT, respectively. Then EPA performs a thorough review of the technical and economic analyses conducted by the source and the state. If EPA believes additional information may further support or would undercut the RACT analyses submitted by the state, then we may add additional EPA-generated analyses to the record. Thus, EPA does not believe it would be appropriate to only approve limits that are no higher than the best emission rate actually achieved after the application of RACT, adjusted only to reflect legally and technically valid averaging times and deviations.

    EPA does note that an approved RACT emission limitation alone does not constitute the baseline against which ERCs may be generated. There are many other factors that must be considered in the calculation of eligible ERCs under Pennsylvania's approved SIP regulations governing the creation ERCs. Moreover, the scenario posed in PennFuture's comment would not create eligible ERC's under the Commonwealth approved SIP regulations. Under the Commonwealth's regulations pertaining to ERCs, found at 25 Pa. Code Chapter 127, sections 127.206 through 127.210

    [approved by the EPA at 62 FR 64722 on December 9, 1997] , sources cannot obtain ERCs if they find that their RACT controls result in lower emissions than allowed by their specified RACT limits.

    EPA believes that Federal rulemaking procedures allow for the format used in April 18, 2000 rulemaking (65 FR 20788). EPA believes that anyone interested in the specific requirements of the individual RACT determinations did have the opportunity to obtain that information, as in the preamble of the April 18, 2000 Federal Register notice, EPA offered to send anyone, upon request, a copy of the our TSDs prepared in support of the action. Copies of those TSDs are included in the docket established for this final rule under Docket ID Number at EPA-R03-OAR-2006-0123.

    Additional Comments: A private citizen submitted comments on the NOXRACT determinations made for the PP&L facilities and for Harrisburg Steamworks. With regard to the PP&L facilities, the commenter suggests if the capacity factors upon which the RACT determinations are based are ever exceeded, the RACT determinations should be re-reviewed, and that such a condition should be placed in the RACT permits with appropriate record-keeping and reporting. With regard to Harrisburg Steam, the commenter cites to the fact that EPA's Technical Support Document (TSD) states that the boilers typically operate at a 15% capacity factor, and asserts that if this capacity factor was used to determine RACT, then the permit should either limit the capacity factor of the boilers or require RACT to be re-evaluated when the capacity factor reaches 30% or some other reasonable capacity factor.

    EPA's Responses: EPA concurs with these comments. Pennsylvania's SIP-

    [[Page 11517]]

    approved generic RACT rules require that sources operate in accordance with the parameters specified in their RACT applications and/or RACT permits including capacity factors. The DEP has imposed record-keeping, monitoring, and testing requirements on these sources sufficient to determine compliance with the applicable parameters of their applications and RACT determinations. Sources seeking variances from the operating parameters specified in their applications and/or RACT permits that could result in emissions increases are subject to re- evaluation to determine whether those emission increases trigger a more stringent RACT determination or the more stringent Pennsylvania SIP requirements for new source review.

  4. Final Action

    EPA is approving thirteen revisions to the Pennsylvania SIP submitted by DEP to establish and require VOC and/or NOX RACT at the thirteen sources indicated herein. EPA is approving these RACT SIP submittals because DEP established and imposed these RACT requirements in accordance with the criteria set forth in the SIP- approved RACT regulations applicable to these sources and EPA has determined they meet the RACT requirements of section 182 of the CAA. The DEP has also imposed recordkeeping, monitoring, and testing requirements on these sources sufficient to determine compliance with the applicable RACT determinations.

  5. Statutory and Executive Order Reviews

    1. General Requirements

      Under Executive Order 12866 (58 FR 51735, October 4, 1993), this action is not a ``significant regulatory action'' and therefore is not subject to review by the Office of Management and Budget. For this reason, this action is also not subject to Executive Order 13211, ``Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use'' (66 FR 28355, May 22, 2001). This action merely approves state law as meeting Federal requirements and imposes no additional requirements beyond those imposed by state law. Accordingly, the Administrator certifies that this rule will not have a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.). Because this rule approves pre-existing requirements under state law and does not impose any additional enforceable duty beyond that required by state law, it does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4). This rule also does not have tribal implications because it will not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes, as specified by Executive Order 13175 (65 FR 67249, November 9, 2000). This action also does not have Federalism implications because it does not have substantial direct effects on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government, as specified in Executive Order 13132 (64 FR 43255, August 10, 1999). This action merely approves a state rule implementing a Federal requirement, and does not alter the relationship or the distribution of power and responsibilities established in the Clean Air Act. This rule also is not subject to Executive Order 13045 ``Protection of Children from Environmental Health Risks and Safety Risks'' (62 FR 19885, April 23, 1997), because it is not economically significant. In reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the Clean Air Act. In this context, in the absence of a prior existing requirement for the State to use voluntary consensus standards (VCS), EPA has no authority to disapprove a SIP submission for failure to use VCS. It would thus be inconsistent with applicable law for EPA, when it reviews a SIP submission, to use VCS in place of a SIP submission that otherwise satisfies the provisions of the Clean Air Act. Thus, the requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) do not apply. This rule does not impose an information collection burden under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).

    2. Submission to Congress and the Comptroller General

      The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. Section 804 exempts from section 801 the following types of rules: (1) rules of particular applicability; (2) rules relating to agency management or personnel; and (3) rules of agency organization, procedure, or practice that do not substantially affect the rights or obligations of non-agency parties. 5 U.S.C. 804(3). EPA is not required to submit a rule report regarding today's action under section 801 because this is a rule of particular applicability establishing source- specific requirements for thirteen named sources.

    3. Petitions for Judicial Review

      Under section 307(b)(1) of the Clean Air Act, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by May 8, 2006. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this rule for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action approving revisions to the Pennsylvania SIP submitted by DEP to establish and require VOC and/or NOX RACT for thirteen sources located in the Commonwealth of Pennsylvania may not be challenged later in proceedings to enforce its requirements. (See section 307(b)(2).)

      List of Subjects in 40 CFR Part 52

      Environmental protection, Air pollution control, Nitrogen dioxide, Reporting and recordkeeping requirements, Volatile organic compounds.

      Dated: February 28, 2006. William Early, Acting Regional Administrator, Region III.

      0 40 CFR part 52 is amended as follows:

      PART 52--[AMENDED]

      0 1. The authority citation for part 52 continues to read as follows:

      Authority: 42 U.S.C. 7401 et seq.

      Subpart NN--Pennsylvania

      0 2. In Sec. 52.2020, the table in paragraph (d)(1) is amended by adding the entries for Cogentrix of Pennsylvania Inc.; Scrubgrass Generating Company, LP; Wheelabrator Frackville Energy Co.; Indiana University of Pennsylvania--S.W. Jack Cogeneration Facility; Fleetwood Motor Homes; Piney Creek, LP; Statoil Energy Power Paxton, LP; Harrisburg Steamworks; Cove Shoe Company; PP&L--Fichbach C.T.

      [[Page 11518]]

      Facility; PP&L--Allentown C.T. Facility; PP&L--Harwood C.T. Facility; and PP&L--Jenkins C.T. Facility at the end of the table to read as follows:

      Sec. 52.2020 Identification of plan.

      * * * * *

      (d) * * *

      (1) EPA-Approved Source--Specific Reasonably Available Control Technology (RACT) Requirements for Volatile Organic Compounds (VOC) and Oxides of Nitrogen (NOX)

      Additional State

      EPA approval explanation/ Name of source

      Permit No.

      County effective date

      date

      Sec. 52.2063 citation

      * * * * * * * Cogentrix of Pennsylvania OP-33-0137..... Jefferson......

      1/27/98 3/8/06 [Insert 52.2020(d)(1)(l Inc.

      page number ) where the document begins]. PA-33-302-014.. ...............

      11/15/90 ............... Except for all ton per year limits and expiration dates in these permits, for Conditions 4, 5, and 6. OP-33-302-014.. ...............

      5/31/93 ............... Except for Condition 2. PA-33-399-004.. ...............

      10/31/98 ............... Except for Conditions 1, 2, 3, 4b, 4c, 4d, 4e, 5, 6, 7, 8, 9, 10, 12, 13, 14, 15, and 16. OP-33-399-004.. ...............

      5/31/93 ............... Except for Condition 2. Scrubgrass Generating

      OP-61-0181..... Venango........

      4/30/98 3/8/06 [Insert 52.2020(d)(1)(l Company, LP.

      page number ) Except for where the

      Conditions 4, document

      6, 7, and 9. begins]. Wheelabrator Frackville OP-54-005...... Schuylkill.....

      9/18/98 3//8/06 [Insert 52.2020(d)(1)(l Energy Co.

      page number ) Except for where the

      the document

      particulate begins].

      and SO2 emission limits found in Condition 4, Condition 5, 6, 7, 9, 10, 11, 12 and 13 and the expiration date. Indiana University of

      OP-32-000-200.. Indiana........

      9/24/98 3/8/06 [Insert 52.2020(d)(1)(l Pennsylvania--S.W. Jack

      page number ) Except for Cogeneration Facility.

      where the

      the expiration document

      date and begins].

      Conditions 5, 7, 10, 12, 20, 21, and 22. Fleetwood Motor Homes....... OP-49-0011..... Northumberland.

      10/30/98 3/8/06 [Insert 52.2020(d)(1)(l page number ) Except for where the

      Conditions 3, document

      5, 23-31 and begins].

      the expiration date. Piney Creek, LP............. OP-16-0127..... Clarion........

      12/18/98 3/8/06 [Insert 52.2020(d)(1)(l page number ) Except for where the

      the ton per document

      year and begins].

      /hr limits in Condition 4, Conditions 5 and 9. Statoil Energy Power Paxton, OP-22-02015.... Dauphin........

      6/30/99 3/8/06 [Insert 52.2020(d)(1)(l LP.

      page number ) Except for where the

      the expiration document

      date and begins].

      Conditions 6, 16, 19 and 20. Harrisburg Steamworks....... OP-22-02006.... Dauphin........

      3/23/99 3/8/06 [Insert 52.2020(d)(1)(l page number ) Except for where the

      Conditions 5, document

      8, 11, 9, 10, begins].

      18, 19, 22, 23, 24 and the expiration date. Cove Shoe Company........... OP-07-02028.... Blair..........

      4/7/99 3/8/06 [Insert 52.2020(d)(1)(l page number ) except for where the

      Conditions 5, document

      10 and the begins].

      expiration date. PP&L--Fichbach C.T. Facility OP-54-0011..... Schuylkill.....

      6/1/99 3/8/06 [Insert 52.2020(d)(1)(l page number ) Except for where the

      the expiration document

      date. begins].. PP&L--Allentown C.T.

      OP-39-0009..... Lehigh.........

      6/1/99 3/8/06 [Insert 52.2020(d)(1)(l Facility.

      page number ) Except for where the

      the expiration document

      date. begins]. PP&L--Harwood C.T. Facility. OP-40-0016..... Luzerne........

      6/1/99 3/8/06 [Insert 52.2020(d)(1)(l page number ) Except for where the

      the expiration document

      date. begins].

      [[Page 11519]]

      PP&L--Jenkins C.T. Facility. OP-40-0017..... Luzerne........

      6/1/99 3/8/06 [Insert 52.2020(d)(1)(l page number ) Except for where the

      the expiration document

      date. begins].

      * * * * *

      [FR Doc. 06-2150 Filed 3-7-06; 8:45 am]