Applications: Symbiotics, LLC; Fall River Rural Electric Cooperative, Inc.

Federal Register: September 26, 2008 (Volume 73, Number 188)

Notices

Page 55829-55830

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

DOCID:fr26se08-45

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

Project No. 11879-003

Symbiotics, LLC; Fall River Rural Electric Cooperative, Inc.;

Notice of Application for Transfer of License and Soliciting Comments,

Motions To Intervene and Protests

September 19, 2008.

Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Transfer of License. b. Project No.: 11879-003. c. Date filed: August 12, 2008. d. Applicants: Symbiotics, LLC (transferor); Fall River Rural

Electric Cooperative, Inc. (transferee). e. Name and Location of Project: The Chester Diversion Dam Project is located on the Henry's Fork River in Fremont County, Idaho. f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).

Page 55830

g. Applicant Contact: For the transferor: Mr. Brent L. Smith, 4110

East 300 North, P.O Box 535, Rigby, ID 83442, (208) 745-0834.

For the transferee: Mr. Dee M. Reynolds, 1150 N 3400 E, Ashton, ID 83420, (208) 652-7431. h. FERC Contact: Steven Sachs, (202) 502-8666. i. Deadline for filing comments, protests and motions to intervene:

October 21, 2008.

All documents (original and eight copies) should be filed with:

Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,

Washington, DC 20426. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the ``e-Filing'' link. The Commission strongly encourages electronic filings. Please include the project number (P-11879-003) on any comments or motions filed.

The Commission's Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the

Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. j. Description of Application: Applicants seek Commission approval to transfer the license for the Chester Diversion Dam Project from

Symbiotics, LLC to Fall River Rural Electric Cooperative, Inc. k. This filing is available for review at the Commission in the

Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the ``eLibrary'' link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call toll-free 1-866-208-3372 or e-mail FERCONLINESUPPORT@FERC.GOV. For TTY, call (202) 502-8659. A copy is also available for inspection and reproduction at the address in item g above. l. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission. m. Comments, Protests, or Motions to Intervene--Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,

.214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. n. Filing and Service of Responsive Documents--Any filings must bear in all capital letters the title ``COMMENTS'', ``PROTEST'', OR

``MOTION TO INTERVENE'', as applicable, and the Project Number of the particular application to which the filing refers. Any of the above- named documents must be filed by providing the original and eight copies to: The Secretary, Federal Energy Regulatory Commission, 888

First Street, NE., Washington, DC 20426. A copy of any motion to intervene must also be served upon each representative of the

Applicants specified in the particular application. o. Agency Comments--Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicants.

If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicants' representatives.

Kimberly D. Bose,

Secretary.

FR Doc. E8-22617 Filed 9-25-08; 8:45 am

BILLING CODE 6717-01-P

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT