014.09.97 Ark. Code R. § 003
Library | Arkansas Administrative Code |
Edition | 2023 |
Currency | Current through Register Vol. 48, No. 12, December, 2023 |
Citation | 014.09.97 Ark. Code R. § 003 |
Year | 2023 |
SECTION 1
-
1.1
SECTION 2
- The purpose of this regulation is to provide for the
following:
-
2.1 To protect public
health and safety and the environment;
-
2.2 To administer and enforce a program for
the licensing of
-
2.3 To establish standards for demolitions
renovations, and disposal of friable asbestos-containing materials in order to
reduce visible emission of asbestos-containing materials
SECTION 3
-
3.1 The provisions of
this regulation are applicable to all owners and operators conducting a
demolition or renovation activity; persons conducting inspections, air
monitoring, developing management plans, and designing and/or conducting
asbestos response actions; and training providers.
SECTION 4
- Click here
to view image
- Click here
to view image
- Click here
to view image
- Click here
to view image
- Click here
to view image
- Click here
to view image
- Click here
to view image
- Click here
to view image
- Click here
to view image
- Click
here to view image
SECTION 5
-
5.1 The owner or operator of a demolition
renovation, or response action shall thoroughly inspect the affected facility
or part of the facility for the presence of asbestos including category I and
category II nonfriable asbestos prior to the commencement of the demolition
renovation, or response action.
-
5.2
A project design is required prior to renovation, demolition, or for any job
greater than a SSSD or minor release episode that involves RACM. The person
performing the project design must meet the certification provisions of this
regulation.
-
5.3 A person must meet
the licensing and/or certification provisions of this regulation prior to
engaging in renovations, demolitions, or response activities involving RACM
including the following:
SECTION 6 - NOTIFICATIONS
-
6.1 For any
demolition of a facility or facility component, the owner or operator shall
submit a written NOI which must be either hand delivered, post-marked by U.S.
Postal Service, or post-marked by a commercial delivery service to the
Department at least 10 working days before any demolition activity begins (such
as site preparation which would break up, dislodge, or similarly disturb
asbestos material). Such notice must be accompanied by the required fee which
is described in Section 22 of this regulation.
-
6.2 For any facility being demolished under
order of a State or local government agency, issued because the facility is
structurally unsound and in danger of imminent collapse, the owner or operator
shall hand deliver, deliver by U.S. Postal Service, or commercial delivery
service a NOI as early as possible before, but not later than the following
working day to the Department. Such notice shall be accompanied by the required
fee which is described in Section 22 of this regulation.
-
6.3 For any renovation project, including any
nonscheduled renovation operation, involving the following amounts of RACM: at
least 80 linear meters (260 linear feet) on pipes or at
-
6.4 For planned renovation operations
involving individual, nonscheduled operations of a combined additive amount of
RACM to be removed or stripped during a calendar year in the amounts of at
least 80 linear meters (260 linear feet) of pipe, at least 15 square meters (or
160 square feet) on other facility components, or at least 1 cubic meter (or 35
cubic feet) of facility components where the length or area could not be
measured previously, the owner or operator shall hand deliver, post-marked U.S.
Postal Service, or post-marked commercial delivery service a NOI to the
Department by December 21 for the upcoming calendar period of January 1 through
December 31. This notice must be accompanied by the required fee which is
described in Section 22 of this regulation. To determine whether this paragraph
applies to planned operations involving nonscheduled operations, the owner or
operator shall predict the combined additive amount of RACM to be removed or
stripped during a calendar year of January 1 through December 31.
-
6.5 For emergency renovation operations
involving the sudden, unexpected event necessitating the renovation greater
than a SSSD or minor episode of RACM, the owner or operator shall hand deliver,
or post-marked U.S. Postal Service, or post-marked commercial delivery service
a NOI to the Department as early as possible before, but not later than the
following working day. Such notice must be accompanied by the required fee
which is described in Section 22 of this regulation.
-
6.6 All written NOI shall be submitted on a
form provided by the Department (see Attachment A) and shall include the
following: