Federal Acquisition Regulation; Documenting Contractor Performance

Federal Register, Volume 77 Issue 173 (Thursday, September 6, 2012)

Federal Register Volume 77, Number 173 (Thursday, September 6, 2012)

Proposed Rules

Pages 54864-54872

From the Federal Register Online via the Government Printing Office www.gpo.gov

FR Doc No: 2012-21973

=======================================================================

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

GENERAL SERVICES ADMINISTRATION

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

48 CFR Parts 8, 12, 15, 17, 42, and 49

FAR Case 2012-009; Docket 2012-0009; Sequence 1

RIN 9000-AM34

Federal Acquisition Regulation; Documenting Contractor Performance

AGENCY: Department of Defense (DoD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: DoD, GSA, and NASA are proposing to amend the Federal Acquisition Regulation (FAR) to provide Governmentwide standardized past performance evaluation factors and performance rating categories and require that past performance information be entered into the Contractor Performance Assessment Reporting System (CPARS).

DATES: Interested parties should submit written comments to the Regulatory Secretariat on or before November 5, 2012 to be considered in the formulation of a final rule.

ADDRESSES: Submit comments identified by FAR Case 2012-009 by any of the following methods:

Regulations.gov: http://www.regulations.gov.

Submit comments via the Federal eRulemaking portal by searching for ``FAR Case 2012-009''. Select the link ``Send a Comment or Submission'' that corresponds with FAR Case 2012-009. Follow the instructions provided to complete the ``Public Comment and Submission Form''. Please include your name, company name (if any), and ``FAR Case 2012-009'' on your attached document.

Fax: 202-501-4067.

Mail: General Services Administration, Regulatory Secretariat (MVCB), ATTN: Hada Flowers, 1275 First Street NE., 7th Floor, Washington, DC 20417.

Instructions: Please submit comments only and cite FAR Case 2012-

009 in all correspondence related to this case. All comments received will be posted without change to http://www.regulations.gov, including any personal and/or business confidential information provided.

FOR FURTHER INFORMATION CONTACT: Mr. Curtis E. Glover, Sr., Procurement Analyst, at 202-501-1448 for clarification of content. For information pertaining to status or publication schedules, contact the Regulatory Secretariat at 202-501-4755. Please cite FAR Case 2012-009.

SUPPLEMENTARY INFORMATION:

  1. Background

    DoD, GSA, and NASA published a proposed rule in the Federal Register at 76 FR 37704 on June 28, 2011, under FAR Case 2009-042, to implement recommendations from Government Accountability Office (GAO) Report GAO-09-374, entitled ``Better Performance Information Needed to

    Page 54865

    Support Agency Contract Award Decisions,'' and Office of Federal Procurement Policy (OFPP) memorandum entitled ``Improving the Use of Contractor Performance Information'' (dated July 29, 2009). Two amendments to the Federal Register notice were published (76 FR 48776, dated August 9, 2011, and 76 FR 50714, dated August 16, 2011). The due date for receipt of public comments was extended twice and was ultimately set at September 29, 2011. Twentythree respondents submitted comments on the proposed rule. This proposed rule addresses all comments received in response to the proposed rule published in the Federal Register at 76 FR 37704 on June 28, 2011. This proposed rule also implements paragraphs (a), (b), and (d) of section 806 of the National Defense Authorization Act for Fiscal Year 2012 (Pub. L. 112-

    81) which requires, at a minimum--

    (1) Establishment of standards for the timeliness and completeness of past performance submissions for purposes of databases;

    (2) Assignment of responsibility and management accountability for the completeness of past performance submissions for such purposes; and

    (3) Assurance that past performance submissions are consistent with award fee evaluations in cases where such evaluations have been conducted.

    The FAR Council is soliciting public comments on a proposal to remove the appeal language at FAR 42.1503(d) to improve economy and efficiency. This proposal was included in and consistent with the FAR Council's Retrospective Plan and Analysis of Existing Rules as required by Executive Order 13563. The FAR currently requires agencies to provide for review of agency evaluations at a level above the contracting officer to consider disagreements between the parties regarding the evaluation. The Government is considering the merits of modifying the FAR requirements governing the appeal process to evaluate if this would improve or weaken the effectiveness of past performance policies and associated principles of impartiality and accountability.

  2. Discussion and Analysis of the Public Comments

    The Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council (the Councils) reviewed the public comments in the development of this proposed rule. A discussion of the comments and the changes made to the rule as a result of those comments are provided as follows:

    1. Summary of Significant Changes

      1. The Councils amended FAR 42.1503 language in this proposed rule to require the past performance report to include a clear, non-

        technical description of the principal purpose of the contract;

      2. FAR 42.1503(b)(4) is revised by adding two tables:

        Table 42-1--Evaluation Ratings Definitions; and

        Table 42-2--Evaluation Ratings Definitions (for the Small Business Subcontracting Evaluation factor when the clause at 52.219-9 is used).

      3. The Evaluation Ratings Definitions included in the Tables are based upon guidance provided in the Department of Defense CPARS Policy Guide currently available on the Web site. The U.S. Small Business Administration provided recommendations to Table 42-2, and the revised text is included in this proposed rule.

      4. Evaluation descriptions are revised under FAR 42.1503(b)(2) to the following:

        Evaluation factors for each assessment shall include, at a minimum, the following:

        (i) Technical (quality of product or service.)

        (ii) Cost control (not applicable for firm-fixed-price or fixed-

        price with economic price adjustment arrangements).

        (iii) Schedule/Timeliness.

        (iv) Management or Business Relations.

        (v) Small Business Subcontracting (as applicable, see Table 42-2).

        (vi) Other (as applicable) (e.g., late or nonpayment to subcontractors, trafficking violations, tax delinquency, failure to report in accordance with contract terms and conditions, defective cost and pricing data, terminations, suspension and debarments, etc.)

      5. Architect-Engineer Contract Administration Support System (ACASS) and Construction Contractor Appraisal Support System (CCASS) are not changed at this time. There is an effort that will combine all three systems into one, namely CPARS, and all evaluation rating scales will be the same at that point. This issue will be resolved when the systems are merged.

    2. Support for the Rule

      Comments: Seven respondents expressed support for the rule's purpose of standardizing the collection and evaluation of past performance information. One of these respondents deemed the proposed rule a positive implementation of the Government Accountability Office (GAO) recommendation.

      Response: Noted.

    3. OFPP Act Requirements

      Comments: Two respondents expressed concern that including the past performance categories and definitions in the CPARS Guide rather than in the text of the FAR was effectively a violation of the Office of Federal Procurement Policy Act (41 U.S.C. 1707 (formerly 41 U.S.C. 418b)) and the FAR 1.501-2 requirement to publish significant revisions that affect the public for comment. The CPARS Guide has not been published for public comment at this time. Both respondents recommended that the proposed FAR rule be revised to include the past performance ratings definitions in the FAR text and that the revised FAR rule be published for public comment.

      Response: The respondents' concerns have been addressed in FAR 42.1503(b)(4) and by this second proposed rule by adding Table 42-1 and Table 42-2.

    4. Alleged Weaknesses in CPARS System

      Comments: Four comments were received alleging weaknesses in the current CPARS system. One respondent noted the lack of standard, reliable past performance ratings. Other issues raised concerned the current high overdue rates Governmentwide for submission of past performance ratings, the failure of the Government's ``chain of command'' to ensure timely completion of past performance ratings, and the need to make the CPARS system even simpler and less time consuming.

      Response: The comment on the reliable past performance ratings definitions is addressed under category C of this rule. The comments on overdue rates and timely completion reflect issues related to administration, which can be addressed by the respective contracting officers. The comments related to the CPARS system have been provided to the appropriate office for consideration.

    5. Public Availability of Information/FAPIIS

      Comments: Four comments were submitted. One respondent recommended that the background section of the final rule explain how the Federal Awardee Performance and Integrity Information System (FAPIIS) is affected by the CPARS requirements and what role it will play in the process. Another respondent recommended increased clarity for FAR 42.1503(d) because it could be read to allow release of past performance information to third parties once the periods in FAR

      Page 54866

      42.1503(g) have expired. A third respondent advocated the wide release of past performance evaluations, i.e., not requiring the marking of such information ``Source Selection Information'' and releasing past performance evaluation information in FAPIIS.

      Response: The publication of past performance reviews in the public version of FAPIIS is currently prohibited by law (section 3010 of Pub. L. 111-212, enacted July 29, 2010). The relationship between FAPIIS and CPARS is explained at the FAPIIS Web site as follows:

      ``FAPIIS is a distinct application that is accessed through the Past Performance Information System (PPIRS) and is available to federal acquisition professionals for their use in award and responsibility determinations. FAPIIS provides users access to integrity and performance information from the FAPIIS reporting module in the Contractor Performance Assessment Reporting System (CPARS), proceedings information from the Central Contractor Registration (CCR) database, and suspension/disbarment information from the Excluded Parties List system (EPLS).''

      Regarding the release of past performance information, FAR 42.1503(d) reads as follows:

      ``The completed evaluation shall not be released to other than Government personnel and the contractor whose performance is being evaluated during the period the information may be used to provide source selection information. Disclosure of such information could cause harm both to the commercial interest of the Government and to the competitive position of the contractor being evaluated as well as impede the efficiency of Government operations.''

      These sentences, which were not in any way limited by the time periods in FAR 42.1503(g), were not changed by this proposed rule.

    6. Exceptions/Applicability

      Comment: One respondent recommended exempting all science and technology contracts from the requirement to evaluate past performance.

      Response: The Councils have determined that it is not in the Government's best interest to exempt science and technology contracts from past performance assessments.

      Comment: Respondent asked that the final rule clarify (1) whether past performance evaluations are required for individual task orders and delivery orders or only for the base indefinite-delivery contract; and (2) who is the responsible party for completing these evaluations.

      Response: The requirement for past performance assessments for individual task and delivery orders, and the parties responsible, are addressed in FAR 42.1502(c) and (d) as follows:

      (c) Multiple-agency orders. Agencies shall prepare an evaluation of contractor performance for each order that exceeds the simplified acquisition threshold placed against a Federal Supply Schedule contract, or under a task-order contract or a delivery-order contract awarded by another agency (i.e., Governmentwide acquisition contract or multi-agency contract). This evaluation shall not consider the requirements under paragraph (g) of this section. Agencies are required to prepare an evaluation if a modification to the order causes the dollar amount to exceed the simplified acquisition threshold.

      (d) Single-Agency orders. For single-agency task-order and delivery-order contracts, the contracting officer may require performance evaluations for each order in excess of the simplified acquisition threshold when such evaluations would produce more useful past performance for source selection officials than that contained in the overall contract evaluation (e.g., when the scope of the basic contract is very broad and the nature of individual orders could be significantly different). This evaluation need not consider the requirements under paragraph (g) of this section unless the contracting officer deems it appropriate.

    7. Rating Factors

      Comments: One respondent suggested that a sixth rating category, entitled ``Other,'' be added to the current five categories. Another respondent recommended that each past performance evaluation should be required to include an evaluation of the contractor's small business subcontracting instead of the current requirement to do so only ``when applicable.''

      Response: The Councils agree that adding the evaluation factor ``Other'' at FAR 42.1503(b)(2) allows the Government to consider contingencies not contemplated by factors (i) through (v) that are unique to each contract award and are relevant to the contractor's evaluation. FAR 42.1503(b)(2) is changed to add evaluation factor ``(vi) Other (as applicable) (e.g.; late or nonpayment to subcontractors, trafficking violations, tax delinquency, failure to report in accordance with contract terms and conditions, defective cost and pricing data, terminations, suspension and debarments, etc.)''. ``Small Business Subcontracting'' may be included as a past-performance factor ``as applicable.'' The Councils did not change this language because there are instances where ``Small Business Subcontracting'' may require a past performance assessment.

    8. Interim Ratings and Frequency of Ratings

      Comments: One respondent recommended revising FAR 42.1502(b) to require more than one past performance evaluation a year for on-going contracts. However, another respondent strongly urged a prohibition against including interim ratings in final past performance evaluations. The same respondent stated that problems can arise with performance evaluations when the Government rater for an interim evaluation is transferred before the contract is completed. This respondent also noted that it has observed evaluation disparities among various contracting entities.

      Response: FAR 42.1502(a) requires a minimum of one evaluation a year; however, agencies are not precluded from assessing past performance on a more frequent basis. The comments regarding interim evaluations and changes in Government personnel (rater) reflect issues of administration, and can be discussed with the respective contracting officer. The comment on observed evaluation disparities among various contracting entities is noted but this, too, is not a policy issue.

  3. Other Comments

    Comments: One respondent submitted a draft for a new past performance evaluation form. The respondent also asked whether additional items could be added to the CPARS past performance evaluation for comments from (1) Government quality assurance personnel, (2) contractor quality control personnel, and (3) the contracting officer's representative. Another respondent expressed concern that allowing contractors to ``report to the CPARS system'' would have a negative impact on future competitiveness because all contractors would give themselves a positive performance rating. A third respondent stated its concern that the proposed rule was ``essentially a creation of several memorandums and not a direct result of the traditional rulemaking process.''

    Response: CPARS has a pre-established, electronic format for assessment of past performance; therefore, a new form is not needed at this time. FAR 42.1503(a) provides agencies the flexibility of requesting and obtaining input from other Government representatives as the contracting officer considers necessary. It may not be appropriate to require past performance input from (1) Government quality assurance personnel, (2) contractor quality control personnel, and (3) the

    Page 54867

    contracting officer's representative in every case. These individuals, when requested by the Government past performance official, can provide input under the ``Assessing Official Representative'' field. Contractors have the opportunity to respond to the Government's past performance assessment in every case. This material is in addition to, not in lieu of, the Government's assessment. Therefore, a contractor's tendency to give itself a positive performance rating in every case will not have a negative impact on future competitiveness, the concern expressed by one respondent. The Councils complied with all of the drafting and approval requirements applicable to every FAR Case.

    Comment: One respondent commented on the proposed FAR 42.1503(a) statement that, if contracting officers' representatives and program managers are not specifically tasked with preparing interim and final past performance evaluations, then the contracting officer ``will remain responsible'' for their preparation. The respondent asked where past performance duties are assigned in the FAR as the responsibility of the contracting officer.

    Response: The Councils agree that FAR 42.1503 was not sufficiently clear. FAR 42.1503(a) is changed to reflect that the contracting officer ``is'' responsible for this function if agency procedures do not specify a different responsible individual.

    Comment: One respondent recommended that the duties of the CPARS Focal Point, at FAR 42.1503(h)(3), would be more accurate if the paragraph were revised to read as follows: ``The primary duties of the CPARS Focal Point include administering CPARS and FAPIIS access, monitoring CPARS compliance, and providing assistance, guidance, and training to CPARS and FAPIIS users.''

    Response: FAR 42.1503(h)(2) clarifies that only a CPARS Focal Point has the authority to grant access to the information in the system. FAR 42.1503(h)(3) merely listed some of the Focal Point's key duties. Upon reflection, the Councils decided that this information is not pertinent to an acquisition regulation and belongs, rather, in a position description. FAR 42.1503(h)(3) currently references the disclosure exemption under the Freedom of Information Act.

    Comment: One respondent proposed that FAR 42.1503 should be revised to include ``ACASS/CCASS'' and requiring that the standardized five ratings must be used in source selections.

    Response: The second proposed rule already requires agencies to use the standardized five ratings, with certain exceptions that were listed at FAR 42.1502. These exceptions are retained in the second proposed rule, e.g., for construction and architect-engineering contracts; language is added to 42.1502(b) on reporting into ACASS and CCASS.

    Comment: A respondent stated that FAR 42.1503(h)(1) was missing the ``vertical list that currently resides at FAR 42.1503(f).''

    Response: The vertical list referred to by the respondent was added to the previous proposed rule by the Federal Register notice correction, published August 9, 2011, at 76 FR 48776. The respondent submitted this comment prior to issuance of the correction.

    Comment: One respondent asked that the word ``generally,'' at FAR 42.1503(a), be removed because it allows for exceptions to the broad policy.

    Response: The term ``generally'' is in the current FAR and was not proposed for change in the previous proposed rule. The input of the technical office, contracting office, and end-users of the products or services is not always required in every case. Therefore, the requested change is not made.

    Comment: One respondent recommended revising FAR 42.1503(b)(1) to read as follows:

    ``The report should include a clear description of the principal purpose of the contract in plain English, a description of the contractor's performance based on objective facts supported by program, project, and contract performance data, and any unusual circumstances affecting contractor performance, e.g., hazardous location of performance. Ensure tailoring of each report to the contract dollar value, visibility, complexity, and value.''

    The respondent suggested that the revisions were needed because the terms ``size'' and ``content'' were unclear.

    Response: The Councils agree that the CPARS ratings will be more useful to those using the system during source selection if the report were to include a requirement to ``include a clear, non-technical description of the principal purpose of the contract.'' This language is added at FAR 42.1503(b)(1) in the second proposed rule.

    The balance of the respondent's comment was not adopted because the language proposed to be included at FAR 42.1503(b)(1) is considered to be appropriately clear and descriptive.

    Comment: At FAR 42.1503(b)(4), the respondent recommended revising the paragraph as follows in order to increase clarity: ``Each evaluation factor at paragraph (b)(2) of this section requires narrative that clearly supports the rating assigned using the rating definitions in the CPARS Policy Guide, http://www.cpars.gov/.''

    Response: Given that the CPARS rating categories and definitions are proposed to be added in this same paragraph by this proposed rule (see section II.C. above), the respondent's intent has been addressed.

    Comment: At FAR 42.1503(f), the respondent recommended that additional clarity could be achieved by changing the wording to read: ``Agencies shall prepare all past performance reports electronically in CPARS at http://www.cpars.gov/. All completed reports in CPARS transmit to the Past Performance Information Retrieval System (PPIRS) at http://www.ppirs.gov for viewing by Government source selection officials.''

    Response: Most of the material in the respondent's recommendation is now in this proposed rule; the part of the recommendation that is new is the addition of the phrase ``for viewing by Government source selection officials''. However, this is not adopted because, while access to the information in CPARS is limited, it is not limited in every case only to source selection officials.

  4. Executive Orders 12866 and 13563

    Executive Orders (E.O.s) 12866 and 13563 direct agencies to assess all costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits (including potential economic, environmental, public health and safety effects, distributive impacts, and equity). E.O. 13563 emphasizes the importance of quantifying both costs and benefits, of reducing costs, of harmonizing rules, and of promoting flexibility. This is not a significant regulatory action and, therefore, was not subject to review under Section 6(b) of E.O. 12866, Regulatory Planning and Review, dated September 30, 1993. This rule is not a major rule under 5 U.S.C. 804.

  5. Regulatory Flexibility Act

    DoD, GSA, and NASA do not expect this proposed rule to have a significant economic impact on a substantial number of small entities within the meaning of the Regulatory Flexibility Act, 5 U.S.C. 601, et seq., because this rule codifies in the FAR existing guidelines and practices. The evaluation factors and rating system language proposed are currently used by Federal

    Page 54868

    agencies. There are no new requirements placed on small entities. Therefore, an initial regulatory flexibility analysis was not performed, and no comments on the expected impact of this rule on small entities were received in response to the request for comments in the Federal Register notice for the prior proposed rule. DoD, GSA, and NASA invite comments from small business concerns and other interested parties on the expected impact of this rule on small entities.

    DoD, GSA, and NASA will also consider comments from small entities concerning the existing regulations in subparts affected by the rule in accordance with 5 U.S.C. 610. Interested parties must submit such comments separately and should cite 5 U.S.C. 610 (FAR Case 2012-009), in correspondence.

  6. Paperwork Reduction Act

    The rule does not contain any information collection requirements that require the approval of the Office of Management and Budget under the Paperwork Reduction Act (44 U.S.C. chapter 35). No public comments were received on the information collection requirements in response to the request in the proposed rule.

    List of Subjects in 48 CFR parts 8, 12, 15, 17, 42, and 49

    Government procurement.

    Dated: August 31, 2012.

    Laura Auletta,

    Director, Office of Governmentwide Acquisition Policy, Office of Acquisition Policy, Office of Governmentwide Policy.

    Therefore, DoD, GSA, and NASA propose amending 48 CFR parts 8, 12, 15, 17, 42, and 49 as set forth below:

    1. The authority citation for 48 CFR parts 8, 12, 15, 17, 42, and 49 is revised to read as follows:

      Authority: 40 U.S.C. 121(c); 10 U.S.C. chapter 137; and 51 U.S.C. 20113.

      PART 8--REQUIRED SOURCES OF SUPPLIES AND SERVICES

      8.406-4 Amended

    2. Amend section 8.406-4 by removing from paragraph (e) ``42.1503(f)'' and adding ``42.1503(h)'' in its place.

    3. Revise section 8.406-7 to read as follows:

      8.406-7 Contractor Performance Evaluation.

      Ordering activities must prepare at least annually and at the time the work under the order is completed, an evaluation of contractor performance for each order that exceeds the simplified acquisition threshold in accordance with 42.1502(c).

      PART 12--ACQUISITION OF COMMERCIAL ITEMS

      12.403 Amended

    4. Amend section 12.403 by removing from paragraph (c)(4) ``42.1503(f)'' and adding ``42.1503(h)'' in its place.

      PART 15--CONTRACTING BY NEGOTIATION

      15.407-1 Amended

    5. Amend section 15.407-1 by removing from paragraph (d) ``42.1503(f)'' and adding ``42.1503(h)'' in its place.

      PART 17--SPECIAL CONTRACTING METHODS

    6. Amend section 17.207 by adding paragraph (c)(6) to read as follows:

      17.207 Exercise of options.

      * * * * *

      (c) * * *

      (6) The contractor's past performance evaluations have been reviewed and the contractor's performance rated.

      * * * * *

      PART 42--CONTRACT ADMINISTRATION AND AUDIT SERVICES

    7. Revise sections 42.1500 and 42.1501 to read as follows:

      42.1500 Scope of subpart.

      This subpart provides policies and establishes responsibilities for recording and maintaining contractor performance information. This subpart does not apply to procedures used by agencies in determining fees under award or incentive fee contracts. See subpart 16.4. However, the fee amount paid to contractors should be reflective of the contractor's performance and the past performance evaluation should closely parallel and be consistent with the fee determinations.

      42.1501 General.

      (a) Past performance information (including the ratings and supporting narratives) is relevant information, for future source selection purposes, regarding a contractor's actions under previously awarded contracts. It includes, for example, the contractor's record of--

      (1) Conforming to contract requirements and to standards of good workmanship;

      (2) Forecasting and controlling costs;

      (3) Adherence to contract schedules, including the administrative aspects of performance;

      (4) Reasonable and cooperative behavior and commitment to customer satisfaction;

      (5) Reporting into databases (see subparts 4.14 and 4.15, and reporting requirements in the solicitation provisions and clauses referenced in 9.104-7);

      (6) Integrity and business ethics; and

      (7) Business-like concern for the interest of the customer.

      (b) Agencies shall monitor their compliance with the past performance evaluation requirements (see 42.1502), and use the CPARS and PPIRS metric tools to measure the quality and timely reporting of past performance information.

    8. Amend section 42.1502 by revising paragraphs (a) through (d) and (i) to read as follows:

      42.1502 Policy.

      (a) General. Past performance evaluations shall be prepared at least annually and at the time the work under the contract or order is completed. Past performance evaluations are required for contracts and orders for supplies, services, and research and development, including contracts and orders performed inside and outside the United States, with the exception of architect-engineer and construction contracts or orders, which will still be reported into ACAAS and CCASS databases. Past performance information shall be entered into the Contractor Performance Assessment Reporting System (CPARS), the Governmentwide evaluation reporting tool for all past performance reports. Instructions for submitting evaluations into CPARS are available at http://www.cpars.gov/.

      (b) Contracts. Except as provided in paragraphs (e), (f) and (h) of this section, agencies shall prepare evaluations of contractor performance for each contract or order that exceeds the simplified acquisition threshold. Agencies are required to prepare an evaluation if a modification to the contract causes the dollar amount to exceed the simplified acquisition threshold.

      (c) Multiple-agency orders. Agencies shall prepare an evaluation of contractor performance for each order that exceeds the simplified acquisition threshold placed against a Federal Supply Schedule contract, or under a task-order contract or a delivery-order contract awarded by another agency (i.e., Governmentwide acquisition contract or multi-agency contract). This evaluation shall not consider the requirements under paragraph (g) of this section. Agencies are required to prepare an evaluation if a modification to the order

      Page 54869

      causes the dollar amount to exceed the simplified acquisition threshold.

      (d) Single-Agency orders. For single-agency task-order and delivery-order contracts, the contracting officer may require performance evaluations for each order in excess of the simplified acquisition threshold when such evaluations would produce more useful past performance for source selection officials than that contained in the overall contract evaluation (e.g., when the scope of the basic contract is very broad and the nature of individual orders could be significantly different). This evaluation need not consider the requirements under paragraph (g) of this section unless the contracting officer deems it appropriate.

      * * * * *

      (i) Agencies shall promptly report other contractor information in accordance with 42.1503(h).

    9. Revise section 42.1503 to read as follows:

      42.1503 Procedures.

      (a) Agency procedures for the past performance evaluation system shall--

      (1) Generally provide for input to the evaluations from the technical office, contracting office and, where appropriate, end users of the product or service;

      (2) Identify and assign past performance evaluation roles and responsibilities to those individuals responsible for preparing and reviewing interim evaluation, if prepared, and final evaluations (e.g., contracting officers, contracting officer representatives and program managers); and

      (3) Address management controls and appropriate management reviews of past performance evaluations, to include accountability, for documenting past performance on PPIRS. If agency procedures do not specify the individuals responsible for past performance evaluation duties, the contracting officer is responsible for this function. Those individuals identified may obtain information for the evaluation of performance from the program office, administrative contracting office, audit office, end users of the product or service, and any other technical or business advisor, as appropriate.

      (b)(1) The evaluation should include a clear, non-technical description of the principal purpose of the contract. The evaluation should reflect how the contractor performed. The evaluation should include clear relevant information that accurately depicts the contractor's performance, and be based on objective facts supported by program and contract performance data. The evaluations should be tailored to the contract type, size, content, and complexity of the contractual requirements.

      (2) Evaluation factors for each assessment shall include, at a minimum, the following:

      (i) Technical (quality of product or service.)

      (ii) Cost control (not applicable for firm-fixed-price or fixed-

      price with economic price adjustment arrangements).

      (iii) Schedule/Timeliness.

      (iv) Management or Business Relations.

      (v) Small Business Subcontracting (as applicable see Table 42-2).

      (vi) Other (as applicable) (e.g., late or nonpayment to subcontractors, trafficking violations, tax delinquency, failure to report in accordance with contract terms and conditions, defective cost and pricing data, terminations, suspension and debarments, etc.)

      (3) Evaluation factors may include subfactors. Each factor and subfactor used shall be evaluated and a supporting narrative provided.

      (4) Each evaluation factor, as listed in paragraph (b)(2) of this section, shall be rated in accordance with a five scale rating system (e.g., exceptional, very good, satisfactory, marginal, and unsatisfactory). Rating definitions shall reflect those in the tables below:

      Table 42-1--Evaluation Ratings Definitions

      ------------------------------------------------------------------------

      Rating Definition Note

      ------------------------------------------------------------------------

      Exceptional................... Performance meets To justify an

      contractual Exceptional

      requirements and rating, identify

      exceeds many to multiple

      the Government's significant events

      benefit. The and state how they

      contractual were of benefit to

      performance of the the Government. A

      element or sub- singular benefit,

      element being however, could be

      evaluated was of such magnitude

      accomplished with that it alone

      few minor problems constitutes an

      for which Exceptional

      corrective actions rating. Also,

      taken by the there should have

      contractor was been NO

      highly effective. significant

      weaknesses

      identified.

      Very Good..................... Performance meets To justify a Very

      contractual Good rating,

      requirements and identify a

      exceeds some to significant event

      the Government's and state how it

      benefit. The was a benefit to

      contractual the Government.

      performance of the There should have

      element or sub- been no

      element being significant

      evaluated was weaknesses

      accomplished with identified.

      some minor

      problems for which

      corrective actions

      taken by the

      contractor was

      effective.

      Satisfactory.................. Performance meets To justify a

      contractual Satisfactory

      requirements. The rating, there

      contractual should have been

      performance of the only minor

      element or sub- problems, or major

      element contains problems the

      some minor contractor

      problems for which recovered from

      corrective actions without impact to

      taken by the the contract/

      contractor appear order. There

      or were should have been

      satisfactory. NO significant

      weaknesses

      identified. A

      fundamental

      principle of

      assigning ratings

      is that

      contractors will

      not be evaluated

      with a rating

      lower than

      Satisfactory

      solely for not

      performing beyond

      the requirements

      of the contract/

      order.

      Marginal...................... Performance does To justify Marginal

      not meet some performance,

      contractual identify a

      requirements. The significant event

      contractual in each category

      performance of the that the

      element or sub- contractor had

      element being trouble overcoming

      evaluated reflects and state how it

      a serious problem impacted the

      for which the Government. A

      contractor has not Marginal rating

      yet identified should be

      corrective supported by

      actions. The referencing the

      contractor's management tool

      proposed actions that notified the

      appear only contractor of the

      marginally contractual

      effective or were deficiency (e.g.,

      not fully management,

      implemented. quality, safety,

      or environmental

      deficiency report

      or letter).

      Page 54870

      Unsatisfactory................ Performance does To justify an

      not meet most Unsatisfactory

      contractual rating, identify

      requirements and multiple

      recovery is not significant events

      likely in a timely in each category

      manner. The that the

      contractual contractor had

      performance of the trouble overcoming

      element or sub- and state how it

      element contains a impacted the

      serious problem(s) Government. A

      for which the singular problem,

      contractor's however, could be

      corrective actions of such serious

      appear or were magnitude that it

      ineffective. alone constitutes

      an unsatisfactory

      rating. An

      Unsatisfactory

      rating should be

      supported by

      referencing the

      management tools

      used to notify the

      contractor of the

      contractual

      deficiencies

      (e.g., management,

      quality, safety,

      or environmental

      deficiency

      reports, or

      letters).

      ------------------------------------------------------------------------

      Note 1: Plus or minus signs may be used to indicate an improving (+) or

      worsening (-) trend insufficient to change the evaluation status.

      Note 2: N/A (not applicable) should be used if the ratings are not going

      to be applied to a particular area for evaluation.

      Table 42-2--Evaluation Ratings Definitions

      For the Small Business Subcontracting Evaluation Factor, when 52.219-9

      is used

      ------------------------------------------------------------------------

      Rating Definition Note

      ------------------------------------------------------------------------

      Exceptional................... Exceeded all To justify an

      statutory goals or Exceptional

      goals as rating, identify

      negotiated. Had multiple

      exceptional significant events

      success with and state how they

      initiatives to were a benefit to

      assist, promote, small business

      and utilize small utilization. A

      business (SB), singular benefit,

      small however, could be

      disadvantaged of such magnitude

      business (SDB), that it

      women-owned small constitutes an

      business (WOSB), Exceptional

      HUBZone small rating. Small

      business, veteran- businesses should

      owned small be given

      business (VOSB) meaningful and

      and service innovative work

      disabled veteran directly related

      owned small to the contract,

      business (SDVOSB). and opportunities

      Complied with FAR should not be

      52.219-8, limited to

      Utilization of indirect work such

      Small Business as cleaning

      Concerns. Exceeded offices, supplies,

      any other small landscaping, etc.

      business Also, there should

      participation have been no

      requirements significant

      incorporated in weaknesses

      the contract/ identified.

      order, including

      the use of small

      businesses in

      mission critical

      aspects of the

      program. Went

      above and beyond

      the required

      elements of the

      subcontracting

      plan and other

      small business

      requirements of

      the contract/

      order. Completed

      and submitted

      Individual

      Subcontract

      Reports and/or

      Summary

      Subcontract

      Reports in an

      accurate and

      timely manner.

      Very Good..................... Met all of the To justify a Very

      statutory goals or Good rating,

      goals as identify a

      negotiated. Had significant event

      significant and state how they

      success with were a benefit to

      initiatives to small business

      assist, promote utilization. Small

      and utilize SB, businesses should

      SDB, WOSB, be given

      HUBZone, VOSB, and meaningful and

      SDVOSB. Complied innovative

      with FAR 52.219-8, opportunities to

      Utilization of participate as

      Small Business subcontractors for

      Concerns. Met or work directly

      exceeded any other related to the

      small business contract, and

      participation opportunities

      requirements should not be

      incorporated in limited to

      the contract/ indirect work such

      order, including as cleaning

      the use of small offices, supplies,

      businesses in landscaping, etc.

      mission critical There should be no

      aspects of the significant

      program. weaknesses

      Endeavored to go identified.

      above and beyond

      the required

      elements of the

      subcontracting

      plan. Completed

      and submitted

      Individual

      Subcontract

      Reports and/or

      Summary

      Subcontract

      Reports in an

      accurate and

      timely manner.

      Satisfactory.................. Demonstrated a good To justify a

      faith effort to Satisfactory

      meet all of the rating, there

      negotiated should have been

      subcontracting only minor

      goals in the problems, or major

      various socio- problems the

      economic contractor has

      categories for the addressed or taken

      current period. corrective action.

      Complied with FAR There should have

      52.219-8, been no

      Utilization of significant

      Small Business weaknesses

      Concerns. Met any identified. A

      other small fundamental

      business principle of

      participation assigning ratings

      requirements is that

      included in the contractors will

      contract/order. not be assessed a

      Fulfilled the rating lower than

      requirements of Satisfactory

      the subcontracting solely for not

      plan included in performing beyond

      the contract/ the requirements

      order. Completed of the contract/

      and submitted order.

      Individual

      Subcontract

      Reports and/or

      Summary

      Subcontract

      Reports in an

      accurate and

      timely manner.

      Marginal...................... Deficient in To justify Marginal

      meeting key performance,

      subcontracting identify a

      plan elements. significant event

      Deficient in that the

      complying with FAR contractor had

      52.219-8, trouble overcoming

      Utilization of and how it

      Small Business impacted small

      Concerns, and any business

      other small utilization. A

      business Marginal rating

      participation should be

      requirements in supported by

      the contract/ referencing the

      order. Did not actions taken by

      submit Individual the government

      Subcontract that notified the

      Reports and/or contractor of the

      Summary contractual

      Subcontract deficiency.

      Reports in an

      accurate or timely

      manner. Failed to

      satisfy one or

      more requirements

      of a corrective

      action plan

      currently in

      place; however,

      does show an

      interest in

      bringing

      performance to a

      satisfactory level

      and has

      demonstrated a

      commitment to

      apply the

      necessary

      resources to do

      so. Required a

      corrective action

      plan.

      Page 54871

      Unsatisfactory................ Noncompliant with To justify an

      FAR 52.219-8 and Unsatisfactory

      52.219-9, and any rating, identify

      other small multiple

      business significant events

      participation that the

      requirements in contractor had

      the contract/ trouble overcoming

      order. Did not and state how it

      submit Individual impacted small

      Subcontract business

      Reports and/or utilization. A

      Summary singular problem,

      Subcontract however, could be

      Reports in an of such serious

      accurate or timely magnitude that it

      manner. Showed alone constitutes

      little interest in an Unsatisfactory

      bringing rating. An

      performance to a Unsatisfactory

      satisfactory level rating should be

      or is generally supported by

      uncooperative. referencing the

      Required a actions taken by

      corrective action the government to

      plan. notify the

      contractor of the

      deficiencies. When

      an Unsatisfactory

      rating is

      justified, the

      contracting

      officer must

      consider whether

      the contractor

      made a good faith

      effort to comply

      with the

      requirements of

      the subcontracting

      plan required by

      FAR 52.219-9 and

      follow the

      procedures

      outlined in FAR

      52.219-16,

      Liquidated Damages-

      Subcontracting

      Plan.

      ------------------------------------------------------------------------

      Note 1: Plus or minus signs may be used to indicate an improving (+) or

      worsening (-) trend insufficient to change evaluation status.

      Note 2: For subcontracting plans under the DoD Comprehensive Small

      Business Subcontracting Plan (Test Program), DFARS 252.219-7004

      (deviation), the ratings entered in CPARS shall mirror those assigned

      by the Defense Contract Management Agency who is responsible for

      monitoring such plans.

      Note 3: Generally, zero percent is not a goal unless the Contracting

      Officer determined when negotiating the subcontracting plan that no

      subcontracting opportunities exist in a particular socio-economic

      category. In such cases, the contractor shall be considered to have

      met the goal for any socio-economic category where the goal negotiated

      in the plan was zero.

      (c)(1) When the contract provides for incentive fees, the incentive-fee contract performance evaluation shall be entered into CPARS.

      (2) When the contract provides for award fee, the award fee-

      contract performance adjectival rating as described in 16.401(e)(3) shall be entered into CPARS.

      (d) Agency evaluations of contractor performance, including both negative and positive evaluations, prepared under this subpart shall be provided to the contractor as soon as practicable after completion of the evaluation. Contractor will receive a CPARS-system generated notification when an evaluation is ready for comment. Contractors shall be given a minimum of 30 days to submit comments, rebutting statements, or additional information. Agencies shall provide for review at a level above the contracting officer to consider disagreements between the parties regarding the evaluation. The ultimate conclusion on the performance evaluation is a decision of the contracting agency. Copies of the evaluation, contractor response, and review comments, if any, shall be retained as part of the evaluation. These evaluations may be used to support future award decisions, and should therefore be marked ``Source Selection Information.'' Evaluation of Federal Prison Industries (FPI) performance may be used to support a waiver request (see 8.604) when FPI is a mandatory source in accordance with subpart 8.6. The completed evaluation shall not be released to other than Government personnel and the contractor whose performance is being evaluated during the period the information may be used to provide source selection information. Disclosure of such information could cause harm both to the commercial interest of the Government and to the competitive position of the contractor being evaluated as well as impede the efficiency of Government operations. Evaluations used in determining award or incentive fee payments may also be used to satisfy the requirements of this subpart. A copy of the annual or final past performance evaluation shall be provided to the contractor as soon as it is finalized.

      (e) Agencies shall require frequent evaluation (e.g., quarterly) of agency compliance with the reporting requirements in 42.1502, so agencies can readily identify delinquent past performance reports and monitor their reports for quality control.

      (f) Agencies shall prepare and submit all past performance evaluations electronically in the CPARS at http://www.cpars.gov/. These evaluations are automatically transmitted to the Past Performance Information Retrieval System (PPIRS) at http://www.ppirs.gov. Past performance evaluations for classified contracts and special access programs shall not be reported in CPARS, but will be reported as stated in this subpart and in accordance with agency procedures. Agencies shall ensure that appropriate management and technical controls are in place to ensure that only authorized personnel have access to the data and the information safeguarded in accordance with 42.1503(d).

      (g) Agencies shall use the past performance information in PPIRS that is within three years (six for construction and architect-engineer contracts) and information contained in the Federal Awardee Performance and Integrity Information System (FAPIIS), e.g., terminations for default or cause.

      (h) Other contractor performance information. (1) Agencies shall ensure information is accurately reported in the FAPIIS module of CPARS within 3 calendar days after a contracting officer--

      (i) Issues a final determination that a contractor has submitted defective cost or pricing data;

      (ii) Makes a subsequent change to the final determination concerning defective cost or pricing data pursuant to 15.407-1(d);

      (iii) Issues a final termination for cause or default notice; or

      (iv) Makes a subsequent withdrawal or a conversion of a termination for default to a termination for convenience.

      (2) Agencies shall establish CPARS Focal Points who will register users to report data into the FAPIIS module of CPARS (available at http://www.cpars.gov/, then select FAPIIS).

      (3) With regard to information that may be covered by a disclosure exemption under the Freedom of Information Act, the contracting officer shall follow the procedures at 9.105-2(b)(2)(iv).

      Page 54872

      PART 49--TERMINATION OF CONTRACTS

      49.402-8 Amended

    10. Amend section 49.402-8 by removing ``42.1503(f)'' and adding ``42.1503(h)'' in its place.

      FR Doc. 2012-21973 Filed 9-5-12; 8:45 am

      BILLING CODE 6820-EP-P