Ala. Admin. Code r. 335-6-5-.05 Duties of Industrial Users
Library | Alabama Administrative Code |
Edition | 2023 |
Currency | Current through Register Vol. 42, No. 3, December 29, 2023 |
Year | 2023 |
Citation | Ala. Admin. Code r. 335-6-5-.05 |
(1) All industrial users shall comply with the requirements of this Chapter and all prohibitions listed in 40 CFR Section . 403.5
(2) All categorical industrial users shall comply with the provisions of applicable categorical pretreatment standards.
(3) All existing categorical industrial users shall submit to the Department a baseline report containing the information required by 40 CFR Section within 180 days after the effective date of a categorical standard applying to that users process(s) or 180 days after the final decision has been made upon a category determination submittal by the industrial user. New sources shall submit the baseline report as a part of the SID Permit Application. 403.12(1994)
(4) Any holder of a SID Permit shall comply with all provisions of the SID Permit.
(5) An existing significant industrial user shall apply for reissuance of an expiring SID Permit no later than 180 days prior to the expiration date of the expiring SID Permit.
(6) A new significant industrial user shall apply for a SID Permit at least 180 days prior to the date that commencement of discharge is expected.
(7) An industrial user shall notify the publicly owned treatment works, the Department, and the EPA Region IV Waste Management Division Director of any discharge into a publicly owned treatment works of a substance which is a listed or characteristic waste under Section 3001 of RCRA.
-
(a) Such notification must include a
description of any such wastes discharged, specifying the volume and
concentration of such wastes and the type of discharge (continuous, batch, or
other), identifying the hazardous constituents contained in the listed wastes
and estimating the volume of hazardous wastes expected to be discharged during
the following twelve months. The notification must take place within 180 days
of the effective date of this Rule. This requirement shall not apply to
pollutants already reported under the requirements of a SID Permit.
-
(b) Dischargers are exempt from these
reporting requirements during a calendar month in which they generate no more
than 100 kilograms of hazardous wastes, unless the wastes are acute hazardous
wastes as specified in
40 CFR
(1994)... 261.5(e), (f), (g) and (j)
To continue reading
Request your trial