Ala. Admin. Code r. 335-1-6 Schedule F Npdes Construction Materials, Non-Coal, Non-Mettalic Mining, Etc

LibraryAlabama Administrative Code
Edition2023
CurrencyCurrent through Register Vol. 42, No. 3, December 29, 2023
CitationAla. Admin. Code r. 335-1-6 Schedule F
Year2023

Construction Materials Non-Coal Non-Metallic Mining, Excavation, Borrow, Disturbance, Development Dry Processing Storage, and Transloading Sites Less Than Five Acres Base Annual and Additive Registration and General Permit Authorization Fees.

Description Base Annual Registration, Authorization Fee Major Modification Fee 1/ Tier 1 Water Fee Additive Increment Fee 2/
Base Fee - Sites less than 5
(Sites 5 acres and greater require Individual NPDES Permit Coverage) $375 $240 $170

Description

Base Annual Registration, Authorization Fee

Major Modification Fee 1/

Tier 1 Water Fee Additive Increment Fee 2/

Base Fee - Sites less than 5

(Sites 5 acres and greater require Individual NPDES Permit Coverage)

$375

$240

$170

1/ A Major Modification Additive Increment Fee is required for a request for Major Modification of an existing registration approval or authorization.

2/ An Impacted Watershed Additive Increment Fee...

To continue reading

Request your trial

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT