Approval and Promulgation of Air Quality Implementation Plans;

Federal Register Volume 76, Number 126 (Thursday, June 30, 2011)

Proposed Rules

Pages 38334-38340

From the Federal Register Online via the Government Printing Office [www.gpo.gov]

FR Doc No: 2011-16376

ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52

EPA-R03-OAR-2010-0475; FRL-9426-3]

Approval and Promulgation of Air Quality Implementation Plans;

District of Columbia, Maryland, and Virginia; 2002 Base Year Emission

Inventory, Reasonable Further Progress Plan, Contingency Measures,

Reasonably Available Control Measures, and Transportation Conformity

Budgets for the Washington, DC Area 1997 8-Hour Moderate Ozone

Nonattainment Area

AGENCY: Environmental Protection Agency (EPA).

ACTION: Proposed rule.

SUMMARY: EPA is proposing to approve State Implementation Plan (SIP) revisions submitted by the District of Columbia, the State of Maryland, and the Commonwealth of Virginia (the States). These revisions pertain to the 2002 base year emissions inventory, the reasonable further progress (RFP) plan, RFP contingency measure, and reasonably available control measure (RACM) requirements of the Clean Air Act (CAA) for the

Washington, DC area moderate 1997 8-hour ozone nonattainment area

(Washington Area). EPA is also proposing to approve the transportation conformity motor vehicle emissions budgets (MVEBs) associated with this revision. EPA is proposing to approve the SIP revisions because they satisfy the emission inventory, RFP, RACM, RFP contingency measures, and transportation conformity requirements for areas classified as moderate nonattainment for the 1997 8-hour ozone national ambient air quality standard (NAAQS) and demonstrate further progress in reducing ozone precursors. This action is being taken under the CAA.

DATES: Written comments must be received on or before August 1, 2011.

ADDRESSES: Submit your comments, identified by Docket ID Number EPA-

R03-OAR-2010-0475 by one of the following methods:

  1. www.regulations.gov. Follow the on-line instructions for submitting comments.

  2. E-mail: fernandez.cristina@epa.gov.

  3. Mail: EPA-R03-OAR-2010-0475, Cristina Fernandez, Associate

    Director, Office of Air Program Planning, Mailcode 3AP30, U.S.

    Environmental Protection Agency, Region III, 1650 Arch Street,

    Philadelphia, Pennsylvania 19103.

  4. Hand Delivery: At the previously-listed EPA Region III address.

    Such deliveries are only accepted during the Docket's normal hours of operation, and special arrangements should be made for deliveries of boxed information.

    Instructions: Direct your comments to Docket ID No. EPA-R03-OAR- 2010-0475. EPA's policy is that all comments received will be included in the public docket without change, and may be made available online at http://www.regulations.gov, including any personal information provided, unless the comment includes information claimed to be

    Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Do not submit information that you consider to be CBI or otherwise protected through http://www.regulations.gov or e-mail. The http://www.regulations.gov Web site is an ``anonymous access'' system, which means EPA will not know your identity or contact information unless you provide it in the body of your comment. If you send an e-mail comment directly to EPA without going through http://www.regulations.gov, your e-mail address will be automatically captured and included as part of the comment that is placed in the public docket and made available on the Internet. If you submit an electronic comment, EPA recommends that you include your name and other contact information in the body of your comment and with any disk or CD-ROM you submit. If EPA cannot read your comment due to technical difficulties and cannot contact you for clarification, EPA may not be able to consider your comment. Electronic files should avoid the use of special characters, any form of encryption, and be free of any defects or viruses.

    Docket: All documents in the electronic docket are listed in the http://www.regulations.gov index.

    Page 38335

    Although listed in the index, some information is not publicly available, i.e., CBI or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either electronically in http://www.regulations.gov or in hard copy during normal business hours at the Air Protection Division,

    U.S. Environmental Protection Agency, Region III, 1650 Arch Street,

    Philadelphia, Pennsylvania 19103. Copies of the State submittal are available at the District of Columbia Department of the Environment,

    Air Quality Division, 51 N Street, NE., Fifth Floor, Washington, DC 20002; the Maryland Department of the Environment, 1800 Washington

    Boulevard, Suite 705, Baltimore, Maryland 21230; and the Virginia

    Department of Environmental Quality, 629 East Main Street, Richmond,

    Virginia 23219.

    FOR FURTHER INFORMATION CONTACT: Maria A. Pino, (215) 814-2181, or by e-mail at pino.maria@epa.gov.

    SUPPLEMENTARY INFORMATION: The following is provided to aid in locating information in this document.

    Table of Contents

    1. What is the background of this action?

    2. What is EPA's evaluation of the revision?

    3. General Information Pertaining to SIP Submittals From the

      Commonwealth of Virginia

    4. What action is EPA proposing?

    5. Statutory and Executive Order Reviews

    6. What is the background of this action?

      In 1997, EPA revised the health-based NAAQS for ozone, setting it at 0.08 parts per million (ppm) averaged over an 8-hour time frame. EPA set the 8-hour ozone standard based on scientific evidence demonstrating that ozone causes adverse health effects at lower ozone concentrations and over longer periods of time, than was understood when the pre-existing 1-hour ozone standard was set. EPA determined that the 8-hour standard would be more protective of human health, especially children and adults who are active outdoors, and individuals with a pre-existing respiratory disease, such as asthma.

      On April 30, 2004 (69 FR 23951), EPA finalized its attainment/ nonattainment designations for areas across the country with respect to the 8-hour ozone standard. These actions became effective on June 15, 2004. Among those nonattainment areas is the Washington Area. The

      Washington Area includes the District of Columbia (the District);

      Arlington, Fairfax, Loudoun, and Prince William Counties and the cities of Alexandria, Fairfax, Falls Church, Manassas, and Manassas Park in

      Virginia (the Northern Virginia area) and Calvert, Charles, Frederick,

      Montgomery, and Prince George's Counties in Maryland. Pursuant to Phase 1 of the 1997 8-hour ozone implementation rule (Phase 1 rule), published on April 30, 2004 (69 FR 23951), an area was classified under

      Subpart 2 of the CAA based on its 8-hour design value if that area had a 1-hour design value at or above 0.121 ppm (the lowest 1-hour design value in Table 1 of Subpart 2). Based on this criterion, the Washington

      Area was classified under Subpart 2 as a moderate nonattainment area.

      See 40 CFR 81.309, 81.321, and 81.347.

      These designations triggered the CAA's section 110(a)(1) requirement that states must submit attainment demonstrations for their nonattainment areas to EPA by no later than three years after the promulgation of a NAAQS. Accordingly, EPA's Phase 1 specifies that states must submit attainment demonstrations for their nonattainment areas to the EPA by no later than three years from the effective date of designation, that is, by June 15, 2007.

      On November 29, 2005 (70 FR 71612), as revised on June 8, 2007 (72

      FR 31727), EPA published the Phase 2 final rule for implementation of the 1997 8-hour standard (Phase 2 rule). The Phase 2 rule addressed the

      RFP control and planning obligations as they apply to areas designated nonattainment for the 1997 8-hour ozone NAAQS.

      Among other things, the Phase 1 and 2 rules outline the SIP requirements and deadlines for various requirements in areas designated as moderate nonattainment. The rules further require that modeling and attainment demonstrations, reasonable further progress plans, reasonably available control measures, projection year emission inventories, motor vehicle emissions budgets, and contingency measures were all due by June 15, 2007 (40 CFR 51.908(a), (c)).

      Section 182(b)(1) of the CAA and EPA's 1997 8-hour ozone implementation rule (40 CFR 51.910) require each 8-hour ozone nonattainment area designated moderate and above to submit an emissions inventory and RFP Plan for review and approval into its SIP.

    7. What is EPA's evaluation of the revision?

      The District of Columbia Department of the Environment (DDOE), the

      Maryland Department of the Environment (MDE), and the Virginia

      Department of Environmental Quality (VADEQ) worked together to develop a joint plan for the Washington Area to address the attainment demonstration, 2002 base year emissions inventory, the RFP plan, RFP contingency measure, and RACM requirements. This plan, entitled ``Plan to Improve Air Quality in the Washington, DC-MD-VA Region, State

      Implementation Plan (SIP) for 8-Hour Ozone Standard, Moderate Area

      SIP,'' will be referred to as ``the Washington Area 8-hour ozone plan'' throughout this document. The Washington Area 8-hour ozone plan was submitted to the EPA as a SIP revision by DDOE on June 12, 2007, by MDE on June 4, 2007, and by VADEQ on June 12, 2007. These SIP revisions also establish a MVEB for 2008 for the Washington Area. These SIP revisions were subject to notice and comment by the public and the

      States addressed the comments received on the proposed SIPs. All sections of these SIP submittals, with the exception of the attainment demonstration, will be discussed in this rulemaking. The attainment demonstration sections of the SIP submittals will be discussed in a separate rulemaking.

  5. Base Year Emissions Inventory

    An emissions inventory, required by section 172(c)(3) of the CAA, is a comprehensive, accurate, current inventory of actual emissions from all sources. For ozone nonattainment areas, the emissions inventory needs to contain volatile organic compound (VOC) and oxides of nitrogen (NOX) emissions because these pollutants are precursors to ozone formation. EPA recommended 2002 as the base year emissions inventory, and is therefore the starting point for calculating RFP. A summary of the Washington Area 2002 base year VOC and NOXemissions inventories is included in Table 1, below.

    Table 1--Washington Area 2002 Base-Year VOC Emissions in Tons per Day

    (tpd)

    Emission source category

    VOC

    NOX

    Point.............................................

    12.91

    220.6

    Stationary Area...................................

    192.64

    24.25

    Non-Road Mobile...................................

    125.79

    85.72

    On-Road Mobile....................................

    116.94

    266.65

    Page 38336

    Total (excluding Biogenics)...................

    448.28

    597.22

    Biogenics.........................................

    314.74

    3.07

    EPA reviewed the 2002 base year inventory for the Washington Area and determined that the procedures, methodologies, and results used to develop the Washington Area 2002 base year inventory are approvable.

  6. Adjusted Base Year Inventory, 2008 RFP Target Levels

    The process for determining the emissions baseline from which the

    RFP reductions are calculated is described in section 182(b)(1) of the

    CAA and 40 CFR 51.910. This baseline value has been determined to be the 2002 adjusted base year inventory. Sections 182(b)(1)(B) and (D) require the exclusion from the base year inventory of emissions benefits resulting from the Federal Motor Vehicle Control Program

    (FMVCP) regulations promulgated by January 1, 1990 and the Reid Vapor

    Pressure (RVP) regulations promulgated June 11, 1990 (55 FR 23666). The

    FMVCP and RVP emissions reductions are determined by the state using

    EPA's on-road mobile source emissions modeling software, MOBILE6. The

    FMVCP and RVP emission reductions are then removed from the base year inventory by the state, resulting in an adjusted base year inventory.

    The emission reductions needed to satisfy the RFP requirement are then calculated from the adjusted base year inventory. These reductions are then subtracted from the adjusted base year inventory to establish the emissions target for the RFP milestone year (2008).

    For moderate areas like the Washington Area, the CAA specifies a 15 percent reduction in ozone precursor emissions over an initial 6-year period. In the Phase 2 Rule (70 FR 71612), EPA interpreted this requirement for areas that were also designated nonattainment and classified as moderate or higher for the 1-hour ozone standard. In the

    Phase 2 Rule, EPA provided that an area classified as moderate or higher that has the same boundaries as an area, or is entirely composed of several areas or portions of areas, for which EPA fully approved a 15 percent plan for the 1-hour NAAQS, is considered to have met the requirements of section 182(b)(1) of the CAA for the 8-hour NAAQS. In this situation, a moderate nonattainment area is subject to RFP under section 172(c)(2) of the CAA and shall submit, no later than 3 years after designation for the 8-hour NAAQS, a SIP revision that meets the requirements of 40 CFR 51.910(b)(2). The RFP SIP revision must provide for a 15 percent emission reduction (either NOXand/or VOC) accounting for any growth that occurs during the 6-year period following the baseline emissions inventory year, that is, 2002-2008.

    The Washington nonattainment area under the 1-hour ozone standard was classified as severe. For the 1-hour ozone NAAQS, EPA fully approved the 15 percent ROP plans for the Washington, DC 1-hour severe ozone nonattainment area on August 5, 1999 (64 FR 42600), July 44686), and October 6, 2000 (65 FR 59727). Therefore, according to the Phase 2

    Rule, the RFP plan for the Washington Area may use either

    NOXor VOC emissions reductions (or both) to achieve the 15 percent emission reduction requirement.

    According to section 182(b)(1)(D) of the CAA, emission reductions that resulted from the FMVCP and RVP rules promulgated prior to 1990 are not creditable for achieving RFP emission reductions. Therefore, the 2002 base year inventory must be adjusted by subtracting the VOC and NOXemission reductions that are expected to occur between 2002 and the future milestone years due to the FMVCP and RVP rules.

    The States set out the calculations for the adjusted base year inventory and 2008 RFP target levels. The Washington Area 2002 anthropogenic base year inventory is shown in Table 2, below.

    Table 2--Washington Area 2002 Anthropogenic Base Year Inventory

    Ozone season tpd

    Source category

    VOC

    NOX

    Point............................................

    12.91

    220.6

    Area.............................................

    192.64

    24.25

    Nonroad..........................................

    125.79

    85.72

    On-Road..........................................

    116.94

    266.65

    Total........................................

    448.28

    597.22

    The States calculated the non-creditable emission reductions between 2002 and 2008 by modeling its 2002 and 2008 motor vehicle emissions with all post-1990 CAA measures turned off, and calculating the difference, as shown below in Table 3.

    Table 3--Washington Area Non-Creditable Emission Reductions

    Ozone season tpd

    Source category

    VOC

    NOX

    (i) 2002 On-Road..................................

    166.55

    308.24

    (ii) 2008 On-Road.................................

    154.10

    276.63

    Non-creditable Reductions (i)-(ii)................

    12.45

    31.61

    The State's calculations of the Washington Area 2002 VOC inventory adjusted to 2008 and the VOC target level for 2008 are summarized in

    Table 4, below.

    Table 4--Washington Area 2008 RFP Target Level Calculations

    Ozone season tpd

    Description

    Formula

    VOC

    A--2002 Rate-Of Progress Base Year

    ....................

    448.28

    Inventory.

    B--FMVCP/RVP Reductions Between 2002

    ....................

    12.45

    And 2008.

    C--2002 Adjusted Base Year Inventory

    A-B.................

    435.83

    Relative To 2008.

    D--RFP Ratio........................... ....................

    15%

    E--Emissions Reductions Required

    C * D...............

    65.37

    Between 2002 & 2008.

    F--Target Level for 2008............... C - E...............

    370.45

    The States elected to meet RFP in the Washington Area using only

    VOC reductions. A moderate 8-hour ozone nonattainment area with an approved 15 percent ROP plan under the 1-hour standard can use reductions from VOC or NOXor a combination of either.

  7. Projected Inventories and Determination of RFP

    The States described the methods used for developing its 2008 projected

    Page 38337

    VOC and NOXinventories and developed projected uncontrolled and controlled 2008 VOC and NOXemissions. EPA reviewed the procedures used to develop the projected inventories and found them to be reasonable.

    Projected controlled 2008 emissions for the Washington Area are summarized in Table 5, below.

    Table 5--Washington Area 2008 Projected Controlled VOC & NOX Emissions

    (tpd)

    VOC

    NOX

    Emission source category

    emissions emissions

    (tpd)

    (tpd)

    Point.............................................

    13.98

    229.36

    Area..............................................

    181.59

    26.93

    Nonroad...........................................

    92.48

    76.91

    Mobile............................................

    70.98

    160.30

    Total.........................................

    358.84

    493.22

    To determine if 2008 RFP is met in the Washington Area, the total projected controlled emissions must be compared to the target levels calculated in Section B of this notice. As shown below in Table 6, the total VOC emission projections meet the 2008 RFP emission target.

    Therefore, the 2008 RFP in the Washington Area is demonstrated.

    Table 6--Determination of Whether RFP Is Met in 2008 in the Washington

    Area

    VOC

    Description

    emissions

    (tpd)

    A--Total 2008 Projected Controlled Emissions.................

    358.84

    B--Target Level for 2008.....................................

    370.45

    RFP met if A X.

    Nonroad measures include phase I and II emissions standards for gasoline-powered nonroad utility engines, the Federal non-road diesel engines rule, Federal emissions standards for spark ignition marine engines, Federal emissions standards for large spark ignition engines, and Federal reformulated gasoline use in nonroad motor vehicles and equipment. Using EPA's NONROAD model, the States calculated emission reductions from these measures to be 36.91 tpd VOC and 11.68 tpd

    NOX. EPA reviewed the procedures that the State's used to develop its projected inventories, including the use of the NONROAD model, and found them to be reasonable.

    On-road mobile measures include high-tech vehicle inspection and maintenance (enhanced I/M), Federal tier I vehicle emission standards and new Federal evaporative test procedures, the national low emission vehicle (NLEV) program, tier 2 vehicle standards, and the heavy duty diesel engine (HDDE) rule. On-road 2008 emission reductions that the

    States calculated using EPA's MOBILE model are 6.19 tpd VOC and 29.67 tpd NOX. EPA reviewed the procedures that the States used to develop the projected inventories, including the use of the MOBILE model, and found them to be reasonable.

    Additional measures include national standards for locomotives, transportation control measures (TCMs) and vehicle technology, fuel, or maintenance measures, and a voluntary bundle. Table 7 summarizes the

    VOC emission reductions that the States claimed in the Washington Area 8-hour ozone plan to meet RFP in the Washington Area. While many of the emission control measures used to meet RFP also resulted in

    NOXemission reductions, the States elected to meet RFP in the Washington Area using only VOC reductions.

    Table 7--VOC Control Measures and 2008 Emission Reductions in the

    Washington Area

    Control measure

    VOC (tpd)

    Area Sources Measures........................................

    30.98

    Nonroad Measures (NONROAD Model).............................

    36.91

    Onroad Measures (MOBILE Model)...............................

    6.19

    Locomotive Standards.........................................

    0.05

    Transportation Control Measures..............................

    0.19

    Voluntary Bundle.............................................

    0.19

    Total....................................................

    74.51

  8. Contingency Measures for Failure To Meet RFP

    Section 172(c)(9) of the CAA requires a state with a moderate or above ozone nonattainment area to include sufficient additional contingency measures in its RFP plan in case the area fails to meet

    RFP. The same provision of the CAA also requires that the contingency measures must be fully adopted control measures or rules. Upon failure to meet an RFP milestone requirement, the state must be able to implement the contingency measures without any further rulemaking activities. Upon implementation of such measures, additional emission reductions of at least 3 percent of the adjusted 2002 baseline emissions must be achieved. For more information on contingency measures, see the April 16, 1992 General Preamble (57 FR 13512) and the

    November 29, 2005 Phase 2 8-hour ozone implementation rule (70 FR 71612).

    To meet the requirements for contingency emission reductions, EPA allows states to use NOXemission reductions to substitute for VOC emission reductions in their contingency plans. However, the

    States chose to use only VOC reductions to meet the contingency measure requirement in the Washington Area. The States calculated the contingency VOC reduction for the Washington Area as shown in Table 8, below. The RFP contingency requirement may be met by including in the

    RFP plan a demonstration of 18 percent VOC & NOXRFP. The additional 3 percent reduction above the 15 percent requirement must be attributed to specific measures.

    Table 8--Washington Area 2008 RFP Contingency Measure Target Level

    Calculations

    Description

    Formula

    VOC

    NOX

    A--2002 Rate-Of Progress Base ...................

    448.28

    597.22

    Year Inventory.

    B--FMVCP/RVP Reductions

    ...................

    12.45

    31.61

    Between 2002 and 2008.

    Page 38338

    C--2002 Adjusted Base Year

    A - B..............

    435.83

    565.61

    Inventory Relative To 2008.

    D--RFP Ratio................. ...................

    15%

    0

    E--RFP Emissions Reductions

    C * D..............

    65.37

    0

    Required Between 2002 & 2008.

    F--Contingency Percentage.... ...................

    0.3%

    2.7%

    G--Contingency Emission

    C * F..............

    1.31

    15.27

    Reduction Requirements.

    H--Contingency Measure Target C - E - G..........

    369.15

    550.34

    Level for 2008.

    To determine if the States meet the three percent contingency measure requirement for the Washington Area, the total projected controlled emissions must be compared to the contingency measure target levels calculated above. As shown below in Table 9, the total VOC and

    NOXemission projections meet the 2008 contingency measure targets. Therefore, the States have met the contingency measure requirement for the Washington Area.

    Table 9--Evaluation of the Washington Area 2008 RFP Contingency Measure

    Requirement

    Description

    VOC (tpd) NOX (tpd)

    A--Total 2008 Projected Controlled Emissions......

    358.84

    493.22

    B--Contingency Measure Target Level for 2008......

    369.15

    550.34

    Contingency measure requirement met if A The control measure is technologically feasible;

    The control measure is economically feasible;

    The control measure does not cause ``substantial widespread and long-term adverse impacts;''

    The control measure is not ``absurd, unenforceable, or impracticable;'' and

    The control measure can advance the attainment date by at least one year.

    The States evaluated 322 potential stationary, area, nonroad, and mobile source control measures against the RACM criteria. Several measures would have provided some emission reductions. However, the

    States determined that none of the mandatory measures would achieve reductions in the 2008 ozone season. Therefore, the States concluded that there are no RACM appropriate to advance the Washington Area's attainment date.

    EPA has reviewed the States' analysis. To meet the RACM requirement, the States must demonstrate that it has adopted all RACM necessary to move the Washington Area toward attainment as expeditiously as practicable and to meet all RFP requirements. As demonstrated above in section IV of this document, the States have met the RFP requirements for the Washington Area.

    The States evaluated all source categories that could contribute meaningful emission reductions, and compiled an extensive list of potential control measures. Furthermore, the States considered the time needed to develop and adopt regulations and the time it would take to see the benefit from these measures. While the States found that the measures could not be used to advance the Washington Area's attainment date, the State's determined that many of the measures were useful and would be considered for future SIPs for the Washington Area. Therefore,

    EPA concurs with the States' conclusion that there are no RACM that would have advanced the 2010 attainment date for the Washington Area.

  9. Transportation Conformity Budgets

    Transportation conformity is required by CAA section 176(c). EPA's conformity rule requires that transportation plans, programs and projects conform to state air quality implementation plans and establishes the criteria and procedure for determining whether or not they do. Conformity to a SIP means that transportation activities will not produce new air quality violations, worsen existing violations, or delay timely attainment of the national ambient air quality standards.

    The criteria by which EPA determines whether a SIP's MVEBs are adequate for conformity purposes are outlined in 40 CFR 93.118(e)(4). The process for determining the adequacy of submitted SIP budgets is described in 40 CFR 93.118(f).

    States must establish VOC and NOXMVEBs for each of the milestone years up to the attainment year and submit the mobile budgets to EPA for approval. Upon adequacy determination or approval by EPA, states must conduct transportation conformity analysis for their

    Transportation Improvement Programs (TIPs) and long range transportation plans to ensure highway vehicle emissions will not exceed relevant MVEBs. Failure to demonstrate such transportation conformity lapses results in freezing of Federal highway funds and all

    Federal highway projects in the lapsed area.

    The States discuss transportation conformity in Section 8.0 of the

    Washington Area 8-hour ozone plan. The States describe their methods and provide detailed input parameters used in modeling the inventories in Appendices E1 and E2 of the Washington Area 8-hour ozone plan. In the Washington Area, the Metropolitan Washington Air Quality Committee

    (MWAQC) consults with the Transportation Planning Board (TPB) to establish mobile source emissions

    Page 38339

    budgets. The Washington Area MVEB for the 2008 RFP is based on the projected 2008 mobile source emissions, accounting for all mobile control measures. The budgets are equal to the projected 2008 on-road mobile source emission inventories minus reductions from transportation control measures. The MVEBs for the 2008 RFP are shown in Table 10, below.

    Table 10--Washington Area 2008 RFP MVEBs

    VOC

    NOX

    (tpd)

    (tpd)

    (A) Projected Controlled Mobile Emissions.........

    70.98

    160.30

    (B) Transportation Control Measures...............

    0.19

    0.49

    (A)-(B)...........................................

    70.79

    159.81

    MVEB (rounded to nearest 0.1 tpd).................

    70.8

    159.8

    For budgets to be approvable, they must meet, at a minimum, EPA's adequacy criteria (40 CFR 93.118(e)(4)). In a September 4, 2009 Federal

    Register notice, EPA notified the public that EPA found that the 2008

    RFP MVEBs in the Washington Area 8-hour ozone plan are adequate for transportation conformity purposes (74 FR 45853). As a result of EPA's finding, the States must use the MVEBs from the Washington Area 8-hour ozone plan for future conformity determinations for the 1997 8-hour ozone standard.

    In addition to the budgets being adequate for transportation conformity purposes, EPA found the procedures the States used to develop the MVEBs to be reasonable. Because the 2008 RFP MVEBs are adequate for transportation conformity purposes and the methods the

    States used to develop them are correct, the 2008 RFP budgets are approvable.

    1. General Information Pertaining to SIP Submittals From the

      Commonwealth of Virginia

      In 1995, Virginia adopted legislation that provides, subject to certain conditions, for an environmental assessment (audit)

      ``privilege'' for voluntary compliance evaluations performed by a regulated entity. The legislation further addresses the relative burden of proof for parties either asserting the privilege or seeking disclosure of documents for which the privilege is claimed. Virginia's legislation also provides, subject to certain conditions, for a penalty waiver for violations of environmental laws when a regulated entity discovers such violations pursuant to a voluntary compliance evaluation and voluntarily discloses such violations to the Commonwealth and takes prompt and appropriate measures to remedy the violations. Virginia's

      Voluntary Environmental Assessment Privilege Law, Va. Code Sec. 10.1- 1198, provides a privilege that protects from disclosure documents and information about the content of those documents that are the product of a voluntary environmental assessment. The Privilege Law does not extend to documents or information (1) That are generated or developed before the commencement of a voluntary environmental assessment; (2) that are prepared independently of the assessment process; (3) that demonstrate a clear, imminent and substantial danger to the public health or environment; or (4) that are required by law.

      On January 12, 1998, the Commonwealth of Virginia Office of the

      Attorney General provided a legal opinion that states that the

      Privilege law, Va. Code Sec. 10.1-1198, precludes granting a privilege to documents and information ``required by law,'' including documents and information required by Federal law to maintain program delegation, authorization or approval,'' since Virginia must ``enforce Federally authorized environmental programs in a manner that is no less stringent than their Federal counterparts * * *.'' The opinion concludes that

      ``[r]egarding Sec. 10.1-1198, therefore, documents or other information needed for civil or criminal enforcement under one of these programs could not be privileged because such documents and information are essential to pursuing enforcement in a manner required by Federal law to maintain program delegation, authorization or approval.''

      Virginia's Immunity law, Va. Code Sec. 10.1-1199, provides that

      ``[t]o the extent consistent with requirements imposed by Federal law,'' any person making a voluntary disclosure of information to a state agency regarding a violation of an environmental statute, regulation, permit, or administrative order is granted immunity from administrative or civil penalty. The Attorney General's January 12, 1998 opinion states that the quoted language renders this statute inapplicable to enforcement of any Federally authorized programs, since

      ``no immunity could be afforded from administrative, civil, or criminal penalties because granting such immunity would not be consistent with

      Federal law, which is one of the criteria for immunity.''

      Therefore, EPA has determined that Virginia's Privilege and

      Immunity statutes will not preclude the Commonwealth from enforcing its program consistent with the Federal requirements. In any event, because

      EPA has also determined that a state audit privilege and immunity law can affect only state enforcement and cannot have any impact on Federal enforcement authorities, EPA may at any time invoke its authority under the CAA, including, for example, sections 113, 167, 205, 211 or 213, to enforce the requirements or prohibitions of the state plan, independently of any state enforcement effort. In addition, citizen enforcement under section 304 of the CAA is likewise unaffected by this, or any, state audit privilege or immunity law.

    2. What action is EPA proposing?

      EPA has reviewed the 2002 base year emissions inventory; the 2008 ozone projected emission inventory; the 2008 RFP plan; RFP contingency measures; RACM analysis; and 2008 transportation conformity budgets contained in the Washington Area 8-hour ozone plan, and found that those elements fully addressed the CAA's requirements. Therefore, EPA is proposing approval of those elements, which were submitted to EPA as a SIP revision by DDOE on June 12, 2007, by MDE on June 4, 2007, and by

      VADEQ on June 12, 2007. EPA is soliciting public comments on the issues discussed in this document. These comments will be considered before taking final action.

    3. Statutory and Executive Order Reviews

      Under the CAA, the Administrator is required to approve a SIP submission that complies with the provisions of the CAA and applicable

      Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the CAA. Accordingly, this action merely proposes to approve state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this proposed action:

      Is not a ``significant regulatory action'' subject to review by the Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993);

      Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);

      Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory

      Flexibility Act (5 U.S.C. 601 et seq.);

      Page 38340

      Does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded

      Mandates Reform Act of 1995 (Pub. L. 104-4);

      Does not have Federalism implications as specified in

      Executive Order 13132 (64 FR 43255, August 10, 1999);

      Is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);

      Is not a significant regulatory action subject to

      Executive Order 13211 (66 FR 28355, May 22, 2001);

      Is not subject to requirements of Section 12(d) of the

      National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the CAA; and

      Does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under

      Executive Order 12898 (59 FR 7629, February 16, 1994).

      In addition, this proposed rule pertaining to the 2002 base year emissions inventory, the 2008 ozone projected emission inventory, the 2008 RFP plan; RFP contingency measures, RACM analysis, and 2008 transportation conformity budgets for the Washington Area does not have tribal implications as specified by Executive Order 13175 (65 FR 67249,

      November 9, 2000), because the SIP is not approved to apply in Indian country located in the state, and EPA notes that it will not impose substantial direct costs on tribal governments or preempt tribal law.

      List of Subjects in 40 CFR Part 52

      Environmental protection, Air pollution control, Intergovernmental relations, Nitrogen dioxide, Ozone, Reporting and recordkeeping requirements, Volatile organic compounds.

      Authority: 42 U.S.C. 7401 et seq.

      Dated: June 15, 2011.

      W.C. Early,

      Acting Regional Administrator, Region III.

      FR Doc. 2011-16376 Filed 6-29-11; 8:45 am

      BILLING CODE 6560-50-P

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT