Application for a License To Export Steel Forging
Federal Register, Volume 77 Issue 47 (Friday, March 9, 2012)
Federal Register Volume 77, Number 47 (Friday, March 9, 2012)
Notices
Pages 14445-14446
From the Federal Register Online via the Government Printing Office www.gpo.gov
FR Doc No: 2012-5749
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Application for a License To Export Steel Forging
Pursuant to 10 CFR 110.70(b) ``Public Notice of Receipt of an Application,'' please take notice that the Nuclear Regulatory Commission (NRC) has received the following request for an export license. Copies of the request are available electronically through ADAMS and can be accessed through the Public Electronic Reading Room (PERR) link http://www.nrc.gov/reading-rm.html at the NRC Homepage.
A request for a hearing or petition for leave to intervene may be filed within thirty days after publication of this notice in the Federal Register. Any request for hearing or petition for leave to intervene shall be served by the requestor or petitioner upon the applicant, the office of the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555; the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555; and the Executive Secretary, U.S. Department of State, Washington, DC 20520.
A request for a hearing or petition for leave to intervene may be filed with the NRC electronically in accordance with NRC's E-Filing rule promulgated in August 2007, 72 FR 49139 (Aug. 28, 2007). Information about filing electronically is available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html. To ensure timely electronic filing, at least 5 (five) days prior to the filing deadline, the petitioner/requestor should contact the Office of the Secretary by email at HEARINGDOCKET@NRC.GOV, or by calling (301) 415-1677, to request a digital ID certificate and allow for the creation of an electronic docket.
In addition to a request for hearing or petition for leave to intervene, written comments, in accordance with 10 CFR 110.81, should be submitted within thirty (30) days after publication of this notice in the Federal Register to Office of the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555, Attention: Rulemaking and Adjudications.
The information concerning this application for an export license follows.
Page 14446
NRC Export License Application
Description of material
----------------------------------------------------------------------------------------------------------------
Name of applicant Date of
application Date received Material type Total quantity End use Destination
Application No. Docket No.
----------------------------------------------------------------------------------------------------------------
FirstEnergy Nuclear Operating Co Reactor vessel One................ The reactor vessel Spain.
December 15, 2011............... head steel head steel
February 7, 2012................ forging. forging will be
XR175........................... machined into the
11005983........................ finished vessel
head at ENSA
Equipos
Nucleares, S.A.
in Spain, for use
in Beaver Valley
(Unit 2) Power
Station,
Shippingport, PA.
----------------------------------------------------------------------------------------------------------------
Dated this 2nd day of March 2012 at Rockville, Maryland.
For the Nuclear Regulatory Commission.
Stephen Dembek,
Acting Deputy Director, Office of International Programs.
FR Doc. 2012-5749 Filed 3-8-12; 8:45 am
BILLING CODE 7590-01-P