Applications:

Federal Register: August 30, 2010 (Volume 75, Number 167)

Notices

Page 52936-52937

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

DOCID:fr30au10-44

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

Project No. 13721-000

Energy Exchange, Inc.; Notice of Preliminary Permit Application

Accepted for Filing and Soliciting Comments, Motions to Intervene, and

Competing Applications

August 23, 2010.

On May 5, 2010, and amended on July 19, 2010, Energy Exchange, Inc. filed an application, pursuant to section 4(f) of the Federal Power Act

(FPA), proposing to study the feasibility of the Geren Island

Hydroelectric Project (Geren Island Project). The Geren Island Project would be located within the city of Salem, Marion County, Oregon.

The Geren Island Project would consist of: (1) The city of Salem's existing water delivery system consisting of two reservoirs (Frazen and

Fairmont) and two existing, 36- and 54- inch diameter steel pipelines;

(2) three proposed powerhouses, each to contain a 0.37-megawatt-(MW) turbine-generating unit, with a total capacity of 1.11 MW, and (3) a new three-phase transmission line (voltage to be determined) to connect with the nearest tie-in point of a local power company grid system. The project would produce an estimated average annual generation of about 8,000 megawatt-hours.

Applicant Contact: Duane Pratt, Energy Exchange, Inc., 2711

Centerville Rd., Suite 120--PMB 7023, Wilmington, DE 19808; phone (208) 371-1285.

FERC Contact: Patrick Murphy (202) 502-8755.

Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice.

Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet.

See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's

Web site. http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the

Page 52937

eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.

More information about this project, including a copy of the application, can be viewed or printed on the ``eLibrary'' link of

Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp.

Enter the docket number (P-13721-000) in the docket number field to access the document. For assistance, contact FERC Online Support.

Kimberly D. Bose,

Secretary.

FR Doc. 2010-21471 Filed 8-27-10; 8:45 am

BILLING CODE 6717-01-P