Applications:

Federal Register: April 19, 2011 (Volume 76, Number 75)

Notices

Page 21885-21886

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

DOCID:fr19ap11-45

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

Project No. 12758-003

BOST5 Hydroelectric Company, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests

Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Original Major License. b. Project No.: P-12758-003. c. Date filed: March 28, 2011. d. Applicant: BOST5 Hydroelectric Company, LLC (BOST5). e. Name of Project: Red River Lock & Dam No. 5 Hydroelectric

Project. f. Location: The proposed project would be located at the existing

Army Corps of Engineer's (Corps) Red River Lock & Dam No. 5 on the Red

River, near the town of Ninock near the City of Shreveport, Louisiana. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r). h. Applicant Contacts: Mr. Douglas A. Spalding, BOST5 Hydroelectric

Company, LLC, 8441 Wayzata Blvd., Suite 101, Golden Valley, MN 55426;

(952) 544-8133. i. FERC Contact: Jeanne Edwards (202) 502-6181 or by e-mail at jeanne.edwards@ferc.gov. j. Cooperating agencies: Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests described in item l below. Cooperating agencies should note the Commission's policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See, 94 FERC ] 61,076 (2001). k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's regulations, if any resource agency, Indian Tribe, or person believes that an additional scientific study should be conducted in order to form an adequate factual basis for a complete analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request for a study with the Commission not later than 60 days from the date of filing of the application, and serve a copy of the request on the applicant. l. Deadline for filing additional study requests and requests for cooperating agency status: June 11, 2011.

All documents may be filed electronically via the internet. See 18

CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site (http://www.ferc.gov/docs-filing/ferconline.asp) under the ``e-

Filing'' link. For a simpler method of submitting text only comments, click on ``eComment.'' For assistance, please contact FERC Online

Support at FERCOnlineSupport@ferc.gov; call toll-free at (866) 208- 3676; or, for TTY, contact (202) 502-8659. Although the Commission strongly encourages electronic filing, documents may also be paper- filed. To paper-file, mail an

Page 21886

original and eight copies to: Kimberly D. Bose, Federal Energy

Regulatory Commission, 888 First Street, NE., Washington, DC 20426. m. The application is not ready for environmental analysis at this time. n. The proposed project would utilize the existing U.S. Army Corps of Engineers (Corps) Red River Lock and Dam No. 5, and operate consistent with the Corps current operation policy. The proposed project consists of: (1) An excavated 416-foot-long headrace channel to convey water from the upstream Pool No. 5 of the Red River to a 301- foot-long by 90-foot-wide concrete powerhouse located northeast of the end of the existing overflow weir; (2) an excavated 495-foot-long tailrace channel to discharge water from the powerhouse to the downstream Pool No. 4 of the Red River; (3) one 28.1-megawatt (MW) horizontal Kaplan bulb turbine/generator unit; (4) one 7-mile-long, 34.5-kilovolt (kV) overhead transmission line leading from the project's powerhouse and connecting to Central Louisiana Electric

Company's new substation; and (5) appurtenant facilities. The proposed project would generate about 129,400 megawatt-hours (MWh) annually which would be sold to a local utility. o. A copy of the application is available for review at the

Commission in the Public Reference Room, or may be viewed on the

Commission's Web site at http://www.ferc.gov, using the ``eLibrary'' link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact

FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1- 866-208-3676, or for TTY, (202) 502-8659. A copy is also available for inspection and reproduction at the address in item h above.

You may also register online at http://www.ferc.gov/docs-filing/ esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. p. With this notice, we are initiating consultation with the

Louisiana State Historic Preservation Officer (SHPO), as required by 106, National Historic Preservation Act, and the regulations of the

Advisory Council on Historic Preservation, 36, CFR, at 800.4. q. Procedural schedule: The application will be processed according to the following Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate.

Issue Deficiency Letter................ May 2011.

Issue Acceptance Letter................ September 2011.

Issue Scoping Document 1 for comments.. October 2011.

Request Additional Information (if

December 2011. necessary).

Notice of application is ready for

April 2012. environmental analysis.

Notice of the availability of the EA... April 2013.

Dated: April 12, 2011.

Kimberly D. Bose,

Secretary.

FR Doc. 2011-9375 Filed 4-18-11; 8:45 am

BILLING CODE 6717-01-P

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT