Applications: Free Flow Power Ohio River 3, LLC

Federal Register: August 24, 2009 (Volume 74, Number 162)

Notices

Page 42657

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

DOCID:fr24au09-40

Page 42657

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

Project No. 13540-000

Free Flow Power Ohio River 3, LLC; Notice of Preliminary Permit

Application Accepted for Filing and Soliciting Comments, Motions To

Intervene, and Competing Applications

August 14, 2009.

On July 13, 2009, Free Flow Power Ohio River 3, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the

Federal Power Act, proposing to study the feasibility of the Cypress

Point Hydrokinetic Energy Project, located on the Atchafalaya River,

Avoyelles, Pointe Coupee, and Saint Landry Parishes, Louisiana. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission.

The proposed project would consist of: (1) 2,020 turbine-generator units configured in a series of turbine arrays which in turn will be grouped to form turbine fields; (2) a combination of freestanding pilings, a floating barge-like platform, or existing shore infrastructure such as dock pilings onto which the turbine arrays will be moored; (3) submersible electric cables interconnecting the arrays within each turbine field and transmit the turbine field's generation to a shore station; (4) several shore stations each consisting of less than 100 square meters which will transition the submersible cabling to the overhead transmission; (5) a 9.1 mile, 69 kV line interconnecting the shore stations and delivering power to the project substation; and

(6) appurtenant facilities. The proposed project would generate about 177 gigawatt-hours annually.

Applicant contact: Ramya Swaminathan, Free Flow Power Corporation, 33 Commercial Street, Gloucester, Massachusetts 01930, phone: (978) 226-1531.

FERC Contact: Sergiu Serban, 202-502-6211.

Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice.

Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the ``e-Filing'' link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy

Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission's Web site located at http://www.ferc.gov/filing- comments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ``eLibrary'' link of the Commission's Web site at http://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P-13540) in the docket number field to access the document. For assistance, call toll-free 1-866-208- 3372.

Kimberly D. Bose,

Secretary.

FR Doc. E9-20219 Filed 8-21-09; 8:45 am

BILLING CODE 6717-01-P