Approval and Promulgation of Air Quality Implementation Plans; Delaware; Infrastructure Requirements for the 2010 Sulfur Dioxide National Ambient Air Quality Standards

Federal Register, Volume 79 Issue 14 (Wednesday, January 22, 2014)

Federal Register Volume 79, Number 14 (Wednesday, January 22, 2014)

Rules and Regulations

Pages 3506-3507

From the Federal Register Online via the Government Printing Office www.gpo.gov

FR Doc No: 2014-01066

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

EPA-R03-OAR-2013-0492; FRL-9905-63-Region-3

Approval and Promulgation of Air Quality Implementation Plans; Delaware; Infrastructure Requirements for the 2010 Sulfur Dioxide National Ambient Air Quality Standards

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) is approving a State Implementation Plan (SIP) revision submitted by the State of Delaware pursuant to the Clean Air Act (CAA). Whenever new or revised national ambient air quality standards (NAAQS) are promulgated, the CAA requires states to submit a plan for the implementation, maintenance, and enforcement of such NAAQS. The plan is required to address basic program elements, including, but not limited to regulatory structure, monitoring, modeling, legal authority, and adequate resources necessary to assure attainment and maintenance of the standards. These elements are referred to as infrastructure requirements. The State of Delaware has made a submittal addressing the infrastructure requirements for the 2010 sulfur dioxide (SO2) NAAQS.

DATES: This final rule is effective on February 21, 2014.

ADDRESSES: EPA has established a docket for this action under Docket ID Number EPA-R03-OAR-2013-0492. All documents in the docket are listed in the www.regulations.gov Web site. Although listed in the electronic docket, some information is not publicly available, i.e., confidential business information (CBI) or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either electronically through www.regulations.gov or in hard copy for public inspection during normal business hours at the Air Protection Division, U.S. Environmental Protection Agency, Region III, 1650 Arch Street, Philadelphia, Pennsylvania 19103. Copies of the State submittal are available at the Delaware Department of Natural Resources and Environmental Control, 89 Kings Highway, P.O. Box 1401, Dover, Delaware 19903.

FOR FURTHER INFORMATION CONTACT: Rose Quinto, (215) 814-2182, or by email at quinto.rose@epa.gov.

SUPPLEMENTARY INFORMATION:

  1. Summary of SIP Revision

    On October 24, 2013 (78 FR 63437), EPA published a notice of proposed rulemaking (NPR) for the State of Delaware proposing approval of Delaware's May 29, 2013 SIP submittal to satisfy several requirements of section 110(a)(2) of the CAA for the 2010 SO2 NAAQS. In the NPR, EPA proposed approval of the following infrastructure elements: Sections 110(a)(2)(A), (B), (C), (D)(i)(II), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). The NPR does not include section 110(a)(2)(I), which pertains to the nonattainment planning requirements of part D, Title I of the CAA, since this element is not required to be submitted by the 3-year submission deadline of section 110(a)(1), and will be addressed in a separate process. The NPR also did not address section 110(a)(2)(D)(i)(I) of the CAA. In accordance with the EME Homer City decision from the United States Court of Appeals for the District of Columbia Circuit, EPA at this time is not treating the 110(a)(2)(D)(i)(I) SIP submission from Delaware as a required SIP submission.

    See EME Homer City Generation, LP v. EPA, 696 F.3d 7 (D.C. Cir. 2012), cert. granted, 2013 U.S. LEXIS 4801 (2013). Unless the EME Homer City decision is reversed or otherwise modified by the Supreme Court, states such as Delaware are not required to submit section 110(a)(2)(D)(i)(I) SIPs until EPA has quantified their obligations under that section. Therefore, EPA will address the portion of Delaware's May 29, 2013 SIP submittal addressing section 110(a)(2)(D)(i)(I) in a separate action.

    The rationale supporting EPA's proposed action, including the scope of infrastructure SIPs in general, is explained in the NPR and the technical support document (TSD) accompanying the NPR and will not be restated here. The TSD is available online at www.regulations.gov, Docket ID Number EPA-R03-OAR-2013-0492.

  2. Final Action

    EPA is approving as a revision to the Delaware SIP, Delaware's submittal which provides the basic program elements specified in sections 110(a)(2)(A), (B), (C), (D)(i)(II), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M) of the CAA, necessary to implement, maintain, and enforce the 2010 SO2 NAAQS. This rulemaking action does not include approval of Delaware's submittal for sections 110(a)(2)(I) and 110(a)(2)(D)(i)(I), which EPA will address in separate actions.

  3. Statutory and Executive Order Reviews

    1. General Requirements

      Under the CAA, the Administrator is required to approve a SIP submission that complies with the provisions of the CAA and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the CAA. Accordingly, this action merely approves state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action:

      Is not a ``significant regulatory action'' subject to review by the Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993);

      Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);

      Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.);

      Does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4);

      Does not have Federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999);

      Is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);

      Is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001);

      Is not subject to requirements of Section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the CAA; and

      Does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994).

      Page 3507

      In addition, this rule does not have tribal implications as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), because the SIP is not approved to apply in Indian country located in the state, and EPA notes that it will not impose substantial direct costs on tribal governments or preempt tribal law.

    2. Submission to Congress and the Comptroller General

      The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this action and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. A major rule cannot take effect until 60 days after it is published in the Federal Register. This action is not a ``major rule'' as defined by 5 U.S.C. 804(2).

    3. Petitions for Judicial Review

      Under section 307(b)(1) of the CAA, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by March 24, 2014. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this action for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action pertaining to Delaware's section 110(a)(2) infrastructure elements for the 2010 SO2 NAAQS may not be challenged later in proceedings to enforce its requirements. (See section 307(b)(2).)

      List of Subjects in 40 CFR Part 52

      Environmental protection, Air pollution control, Incorporation by reference, Sulfur dioxide, Reporting and recordkeeping requirements.

      Dated: December 23, 2013.

      W.C. Early,

      Acting Regional Administrator, Region III.

      40 CFR part 52 is amended as follows:

      PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

      0

      1. The authority citation for part 52 continues to read as follows:

        Authority: 42 U.S.C. 7401 et seq.

        Subpart I-- Delaware

        0

      2. In Sec. 52.420, the table in paragraph (e) is amended by adding an entry for Section 110(a)(2) Infrastructure Requirements for the 2010 SO2 NAAQS at the end of the table to read as follows:

        Sec. 52.420 Identification of plan.

        * * * * *

        (e) * * *

        ----------------------------------------------------------------------------------------------------------------

        State

        Name of non-regulatory SIP Applicable geographic submittal EPA approval date Additional

        revision area date explanation

        ----------------------------------------------------------------------------------------------------------------

        * * * * * * *

        Section 110(a)(2) Infrastructure Statewide............. 5/29/13 1/22/14 Insert This rulemaking

        Requirements for the 2010 SO2 Federal Register action addresses

        NAAQS. page number where the following CAA

        the document elements:

        begins and date. 110(a)(2)(A),

        (B), (C),

        (D)(i)(II),

        (D)(ii), (E),

        (F), (G), (H),

        (J), (K), (L),

        and (M).

        ----------------------------------------------------------------------------------------------------------------

        FR Doc. 2014-01066 Filed 1-21-14; 8:45 am

        BILLING CODE 6560-50-P

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT