Archon Energy 1, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

Federal Register, Volume 78 Issue 47 (Monday, March 11, 2013)

Federal Register Volume 78, Number 47 (Monday, March 11, 2013)

Notices

Page 15366

From the Federal Register Online via the Government Printing Office www.gpo.gov

FR Doc No: 2013-05549

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

Project No. 14497-000

Archon Energy 1, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

On February 11, 2013, the Archon Energy 1, Inc., filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Kings River Drop 3 Hydroelectric Project (Kings river Drop 3 Project or project) to be located on Kings River, near the city of Sanger, Fresno County, California. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission.

The proposed project would consist of the following: (1) A VLH diversion canal intake and a gated turbine structure adjacent to the eastern abutment of the existing dam; (2) a 300-foot by 60-foot turbine structure enclosing three VLH 4000 turbo generators; (3) a 10 foot by 10 foot electrical control shack; and (4) appurtenant facilities. The proposed project would have a total installed capacity of 1.5 megawatts (MW) and generate an estimated average annual energy production of 10,000 megawatt-hours (MWh) by diverting existing stream flow into the diversion canal.

Applicant Contact: Mr. Paul Grist, Archon Energy 1, Inc., 101 E. Kennedy Blvd., Suite 2800, Tampa, Florida 33602, phone: (403) 618-2018.

FERC Contact: Kenneth Hogan; phone: (202) 502-8434, email: kenneth.hogan@ferc.gov.

Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, (202) 502-8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426.

More information about this project, including a copy of the application, can be viewed or printed on the ``eLibrary'' link of Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-14497) in the docket number field to access the document. For assistance, contact FERC Online Support.

Dated: March 4, 2013.

Kimberly D. Bose,

Secretary.

FR Doc. 2013-05549 Filed 3-8-13; 8:45 am

BILLING CODE 6717-01-P

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT