Arkansas Regulatory Program and Abandoned Mine Land Reclamation Plan
Federal Register, Volume 77 Issue 175 (Monday, September 10, 2012)
Federal Register Volume 77, Number 175 (Monday, September 10, 2012)
Proposed Rules
Pages 55430-55435
From the Federal Register Online via the Government Printing Office www.gpo.gov
FR Doc No: 2012-22233
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Office of Surface Mining Reclamation and Enforcement
30 CFR Part 904
SATS No. AR-040-FOR; Docket ID OSM-2012-0017
Arkansas Regulatory Program and Abandoned Mine Land Reclamation Plan
AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior.
ACTION: Proposed rule; public comment period on proposed amendment.
-----------------------------------------------------------------------
SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are announcing receipt of a proposed amendment to the Arkansas regulatory program (Arkansas program) and the Arkansas abandoned mine land reclamation plan (Arkansas plan) under the Surface Mining Control and Reclamation Act of 1977 (SMCRA or the Act). Arkansas proposes to revise substantial portions of its regulatory program and abandoned mine land reclamation plan, make grammatical changes, correct punctuation, revise dates, and delete and add citations. The proposed amendment consists of substantive changes to Arkansas's regulations regarding: Subchapter A--General; Subchapter F--Areas Unsuitable for Mining; Subchapter G--Surface Coal Mining and Reclamation Operations Permits and Coal Exploration Procedures Systems; Subchapter J--Bond and Insurance Requirements for Surface Coal Mining and Reclamation Operations; Subchapter K--State Program Performance Standards; Subchapter L--State Program Inspection and Enforcement Procedures; Subchapter M--Training Programs for Blasters and Members of Blasting Crews, and Certification Programs for Blasters; and Subchapter R--
Abandoned Mine Land Reclamation.
This document provides the times and locations that the Arkansas program, Arkansas plan, and this proposed amendment are available for your review; the comment period during which you may submit written comments on the amendment; and the procedures that we will follow for the public hearing, if one is requested.
DATES: We will accept written comments on this amendment until 4:00 p.m., c.d.t., October 10, 2012. If requested, we will hold a public hearing on the amendment on October 5, 2012. We will accept requests to speak at a hearing until 4:00 p.m., c.d.t. on September 25, 2012.
ADDRESSES: You may submit comments, identified by SATS No. AR-040-FOR, by any of the following methods:
Mail/Hand Delivery: Alfred L. Clayborne, Director, Tulsa Field Office, Office of Surface Mining Reclamation and Enforcement, 1645 South 101st East Avenue, Suite 145, Tulsa, Oklahoma 74128-4629.
Fax: (918) 581-6419.
Federal eRulemaking Portal: http://www.regulations.gov. Follow the instructions for submitting comments.
Instructions: All submissions received must include the agency name and docket number for this rulemaking. For detailed instructions on submitting comments and additional information on the rulemaking process, see the ``Public Comment Procedures'' heading of the SUPPLEMENTARY INFORMATION section of this document.
Docket: For access to the docket to review copies of the Arkansas regulations, this amendment, a listing of any scheduled public hearings, and all written comments received in response to this document, you must go to the address listed below during normal business hours, Monday through Friday, excluding holidays. You may receive one free copy of the amendment by contacting OSM's Tulsa Field Office, or the full text of the program amendment available for you to read at www.regulations.gov.
Alfred L. Clayborne, Director, Tulsa Field Office, Office of Surface Mining Reclamation and Enforcement, 1645 South 101st East Avenue, Suite 145, Tulsa, Oklahoma 74128-4629, Telephone: (918) 581-
6430 .
In addition, you may review a copy of the amendment during regular business hours at the following location: Arkansas Department of Environmental Quality, 5301 Northshore Drive, North Little Rock, Arkansas 72118-5317, Telephone: (501) 682-0744.
FOR FURTHER INFORMATION CONTACT: Alfred L. Clayborne, Director, Tulsa Field Office. Telephone: (918) 581-6430. Email: aclayborne@osmre.gov.
SUPPLEMENTARY INFORMATION:
-
Background on the Arkansas Program
-
Description of the Proposed Amendment
-
Public Comment Procedures
-
Procedural Determinations
-
Background on the Arkansas Program
Section 503(a) of the Act permits a State to assume primacy for the regulation of surface coal mining and reclamation operations on non-
Federal and non-Indian lands within its borders by demonstrating that its program includes, among other things, ``a State law which provides for the regulation of surface coal mining and reclamation operations in accordance with the requirements of this Act * * *; and rules and regulations consistent with regulations issued by the Secretary pursuant to this Act.'' See 30 U.S.C. 1253(a)(1) and (7). On the basis of these criteria, the Secretary of the Interior (Secretary) conditionally approved the Arkansas program effective November 21, 1980. You can find background information on the Arkansas program, including the Secretary's findings, the disposition of comments, and the conditions of approval of the Arkansas program in the November 21, 1980, Federal Register (45 FR 77003). You can find later actions on the Arkansas program at 30 CFR 904.10, 904.12, and 904.15.
The Abandoned Mine Land Reclamation Program was established by Title IV of the Act in response to concerns over extensive environmental damage caused by past coal mining activities. The program is funded by a reclamation fee collected on each ton of
Page 55431
coal that is produced. The money collected is used to finance the reclamation of abandoned coal mines and for other authorized activities. Section 405 of the Act allows States and Indian Tribes to assume exclusive responsibility for reclamation activity within the State or on Indian lands if they develop and submit to the Secretary of the Interior for approval, a program (often referred to as a plan) for the reclamation of abandoned coal mines. On the basis of these criteria, the Secretary of the Interior approved the Arkansas plan on May 2, 1983. You can find background information on the Arkansas plan, including the Secretary's findings, the disposition of comments, and the approval of the plan in the May 2, 1983, Federal Register (48 FR 19710). You can find later actions concerning the Arkansas plan at 30 CFR 904.25 and 904.26.
-
Description of the Proposed Amendment
By letter dated June 25, 2012 (Administrative Record No. AR-572), Arkansas submitted a proposed amendment to its program and plan pursuant to SMCRA. Arkansas submitted the amendment in response to a September 30, 2009, letter (Administrative Record No. AR-571) from OSM in accordance with 30 CFR 732.17(c). Arkansas is also making substantial changes to other sections of its regulatory program and its abandoned mine land reclamation plan on its own initiative. The full text of the program amendment is available for you to read at the locations listed above under ADDRESSES.
Arkansas proposes to revise substantial portions of its regulatory program and abandoned mine land reclamation plan, make grammatical changes, correct punctuation, revise dates, update addresses, and delete and add citations. Arkansas proposes to revise every section title throughout its regulations by replacing ``Section'' with ``Reg.20.'' and by deleting the title dates. Arkansas also proposes to replace the word ``Director'' with ``Department'' and replace the word ``Chapter'' with ``Code'' throughout its entire regulations. The Arkansas regulations that contain substantive changes are listed in the table below.
Substantive Changes table
------------------------------------------------------------------------
ARKANSAS REG.20. SECTIONS TITLE
------------------------------------------------------------------------
SUBCHAPTER A--GENERAL
PART 700--GENERAL
------------------------------------------------------------------------
700.11, 700.12, and 700.16... Rulemaking Initiated by the Commission;
Petitions to Initiate Rulemaking; and
Employee Protection.
------------------------------------------------------------------------
PART 701 STATE PROGRAM
------------------------------------------------------------------------
701.5........................ Definitions.
------------------------------------------------------------------------
PART 702 EXEMPTION FOR COAL EXTRACTION INCIDENTAL TO THE EXTRACTION OF
OTHER MINERALS
------------------------------------------------------------------------
702.13....................... Public Availability of Information.
------------------------------------------------------------------------
PART 705--RESTRICTIONS ON FINANCIAL INTERESTS OF ENFORCEMENT PERSONNEL
------------------------------------------------------------------------
705.1 and 705.13............. Scope and When to File.
------------------------------------------------------------------------
SUBCHAPTER F--AREAS UNSUITABLE FOR MINING
PART 762--CRITERIA FOR DESIGNATING AREAS AS UNSUITABLE FOR SURFACE COAL
MINING OPERATIONS
------------------------------------------------------------------------
762.5........................ Definitions.
------------------------------------------------------------------------
SUBCHAPTER G--SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND
COAL EXPLORATION PROCEDURES SYSTEMS
PART 770--GENERAL
------------------------------------------------------------------------
770.5........................ Definitions.
------------------------------------------------------------------------
PART 771--GENERAL REQUIREMENTS FOR PERMITS AND APPLICATIONS
------------------------------------------------------------------------
771.25....................... Permit Fees.
------------------------------------------------------------------------
PART 776--GENERAL REQUIREMENTS FOR COAL EXPLORATION OPERATIONS
------------------------------------------------------------------------
776.17....................... Public Availability of Information.
------------------------------------------------------------------------
PART 778--SURFACE MINING PERMIT APPLICATIONS--MINIMUM REQUIREMENTS FOR
LEGAL, FINANCIAL, COMPLIANCE AND RELATED INFORMATION
------------------------------------------------------------------------
778.1, 778.2, 778.4, 778.6, Scope; Objectives; Responsibility;
778.9, 778.11, 778.12, Applicability, Certifying and Updating
778.13, 778.14, 778.15, Existing Permit Application Information;
778.16, 778.17, 778.20, Applicant and Operator Information;
778.21, and 778.22. Permit History Information; Property
Interest Information; Violation
Information; Right of Entry Information;
Status of Unsuitability Claims; Permit
Term Information; Identification of
Location of Public Office for Filing of
Application; Newspaper Advertisement and
Proof of Publication; and Facilities or
Structures Used in Common.
------------------------------------------------------------------------
Page 55432
PART 779--SURFACE MINING PERMIT APPLICATIONS--MINIMUM REQUIREMENTS FOR
INFORMATION ON ENVIRONMENTAL RESOURCES
------------------------------------------------------------------------
779.21....................... Analysis of Selected Overburden or
Topsoil Mixtures.
------------------------------------------------------------------------
PART 780--SURFACE MINING PERMIT APPLICATION--MINIMUM REQUIREMENT FOR
RECLAMATION AND OPERATION PLAN
------------------------------------------------------------------------
780.11, 780.13, 780.15, Operation Plan: General Requirements;
780.16, 780.18, 780.21, Operation Plan: Blasting; Air Pollution
780.23, 780.25, 780.28, Control Plan; Fish and Wildlife Plan;
780.29, 780.35, 780.37, and Reclamation Plan: General Requirements;
780.38. Reclamation Plan: Hydrologic
Information; Reclamation Plan:
Postmining Land Uses; Reclamation Plan:
Siltation Structures, Impoundments,
Banks, Dams, and Embankments; Activities
In or Adjacent to Perennial or
Intermittent Streams; Diversions;
Disposal of Excess Spoil; Road Systems;
and Support Facilities.
------------------------------------------------------------------------
PART 782--UNDERGROUND MINING PERMIT APPLICATIONS--MINIMUM REQUIREMENTS
FOR LEGAL, FINANCIAL, COMPLIANCE, AND RELATED INFORMATION
------------------------------------------------------------------------
782.1-782.21................. Scope; Objectives; Responsibilities;
Applicability; Identification of
Interests; Compliance Information; Right
of Entry and Operation Information;
Relationship to Areas Designated
Unsuitable For Mining; Permit Term
Information; Personal Injury and
Property Damage Insurance Information;
Identification of Other Licenses and
Permits; Identification of Location of
Public Office for Filing of Application;
and Newspaper Advertisement and Proof of
Publication.
------------------------------------------------------------------------
PART 784--UNDERGROUND MINING PERMIT APPLICATIONS--MINIMUM REQUIREMENTS
FOR RECLAMATION AND OPERATION PLAN
------------------------------------------------------------------------
784.14, 784.19, 784.20, and Reclamation Plan: Hydrologic Information;
784.28. Underground Development Waste;
Subsidence Control Plan; and Surface
Activities in or Adjacent to Perennial
or Intermittent Streams.
------------------------------------------------------------------------
PART 785--REQUIREMENTS FOR PERMITS FOR SPECIAL CATEGORIES OF MINING
------------------------------------------------------------------------
785.13, 785.14, 785.15, Experimental Practices Mining;
785.16, 785.18, 785.22, and Mountaintop Removal Mining; Steep Slope
785.25. Mining; Permits Incorporating Variances
from Approximate Original Contour
Restoration Requirements for Steep Slope
Mining; Variances for Delay in
Contemporaneous Reclamation Requirements
in Combined Surface and Underground
Mining Operations; In Situ Processing
Activities; and Lands Eligible for
Remining.
------------------------------------------------------------------------
PART 786--REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING
------------------------------------------------------------------------
786.1, and 786.3-786.31...... Scope; Responsibilities; Pre-Application
Conference; Regulatory Coordination with
Requirements under Other Laws; Public
Participation in Permit Processing;
Review of Permit Applications; General
Provisions for Review of Permit
Application Information and Entry of
Information into AVS; Review of
Applicant, Operator, and Ownership and
Control Information; Review of Permit
History; Review of Compliance History;
Permit Eligibility Determination;
Unanticipated Events or Conditions at
Remining Sites; Eligibility for
Provisionally Issued Permits; Written
Findings for Permit Application
Approval; Performance Bond Submittal;
Permit Conditions; Permit Issuance and
Right of Renewal; Initial Review and
Finding Requirements for Improvidently
Issued Permits; Notice Requirements for
Improvidently Issued Permits; Suspension
or Rescission Requirements for
Improvidently Issued Permits;
Eligibility to Challenge Ownership or
Control Listings and Findings;
Procedures for Challenging an Ownership
or Control Listing or Finding; Burden of
Proof for Ownership or Control
Challenges; Written Decision on
Challenges to Ownership or Control
Listings or Findings; Conditions of
Permits: Environment, Public Health, and
Safety; Improvidently Issued Permits:
General Procedures; and Improvidently
Issued Permits: Recision Procedures.
------------------------------------------------------------------------
PART 787--ADMINISTRATIVE AND JUDICIAL REVIEW OF DECISIONS
------------------------------------------------------------------------
787.12....................... Judicial Review.
------------------------------------------------------------------------
PART 788--REVISION; RENEWAL; TRANSFER, ASSIGNMENT, OR SALE OF PERMIT
RIGHTS; POST-PERMIT ISSUANCE REQUIREMENTS; AND OTHER ACTIONS BASED ON
OWNERSHIP, CONTROL, AND VIOLATION INFORMATION
------------------------------------------------------------------------
788.5, 788.9, 788.10, 788.11, Definitions; Post-Permit Issuance
788.13, 788.14, 788.15, Requirements and Other Actions Based on
788.16, 788.17, 788.18, and Ownership, Control, and Violation
788.19. Information; Post-Permit Issuance
Requirements for Permittees; Review of
Permits; Permit Renewals: General
Requirements; Permit Renewals: Completed
Applications; Permit Renewals: Terms;
Permit Renewals: Approval or Denial;
Transfer, Assignment, or Sale of Permit
Rights: General Requirements; Transfer,
Assignments, or Sale of Permit Rights:
Obtaining Approval; and Requirements for
New Permits for Persons Succeeding to
Rights Granted Under a Permit.
------------------------------------------------------------------------
Page 55433
SUBCHAPTER J--BOND AND INSURANCE REQUIREMENTS FOR SURFACE COAL MINING
AND RECLAMATION OPERATIONS
PART 800--BONDS AND INSURANCE REQUIREMENTS FOR SURFACE COAL MINING AND
RECLAMATION OPERATIONS UNDER THE STATE PROGRAM
------------------------------------------------------------------------
800.23 and 800.40............ Self-bonding; and Requirement to Release
Performance Bonds.
------------------------------------------------------------------------
SUBCHAPTER K--STATE PROGRAM PERFORMANCE STANDARDS
PART 810--STATE PROGRAM PERFORMANCE STANDARDS GENERAL PROVISIONS
------------------------------------------------------------------------
810.11....................... Applicability.
------------------------------------------------------------------------
PART 816--PERMANENT PROGRAM PERFORMANCE STANDARDS--SURFACE MINING
ACTIVITIES
------------------------------------------------------------------------
816.11, 816.13, 816.14, Signs and Markers; Casing and Sealing of
816.15, 816.22, 816.41, Drilled Holes: General Requirements;
816.42, 816.43, 816.44, Casing and Sealing of Drilled Holes:
816.45, 816.46, 816.48, Temporary; Casing and Sealing of Drilled
816.49, 816.50-S, 816.50-U, Holes: Permanent; Topsoil and Subsoil;
816.51-S, 816.52-S, 816.53, Hydrologic Balance: Protection;
816.54, 816.55, 816.56, Hydrologic Balance: Water Quality
816.57; 816.61-U, 816.64-U, Standards and Effluent Limitations;
816.68, 816.71, 816.100, Hydrologic Balance: Diversions;
816.101-S, 816.101-U, Hydrologic Balance: Stream Channel
816.102, 816.106, 816.107, Diversions; Hydrologic Balance: Sediment
816.113, 816.114, 816.116, Control Measures; Hydrologic Balance:
816.121-U, 816.122-U, Siltation Structures; Hydrologic
816.133, 816.151, 816.180, Balance: Acid-forming and Toxic-forming
and 816.181. Spoil; Impoundments, Hydrologic Balance:
Ground Water Protection; Hydrologic
Balance: Underground Mine Entry and
Access Discharges; Hydrologic Balance:
Protection of Groundwater Recharge
Capacity; Hydrologic Balance: Surface
And Groundwater Monitoring; Hydrologic
Balance: Transfer Of Wells; Hydrologic
Balance: Water Rights and Replacement;
Hydrologic Balance: Discharge of Water
into an Underground Mine; Hydrologic
Balance: Postmining Rehabilitation of
Sedimentation Ponds, Diversions,
Impoundments, and Treatment Facilities;
Hydrologic Balance: Activities in or
Adjacent to Perennial or Intermittent
Streams; Use of Explosives: General
Requirements; Use of Explosives: Public
Notice of Blasting Schedule; Use of
Explosives: Records of Blasting
Operations; Disposal of Excess Spoil:
General Requirements; Contemporaneous
Reclamation; Backfilling and Grading:
Time and Distance Requirements;
Backfilling and Grading: General
Requirements; Backfilling and Grading:
General Grading Requirements;
Backfilling and Grading: Previously
Mined Areas; Backfilling and Grading:
Steep Slopes; Revegetation: Timing;
Revegetation: Mulching and Other Soil
Stabilizing Practices; Revegetation:
Standards for Success; Subsidence
Control: General Requirements;
Subsidence Control: Public Notice;
Postmining Land Use; Roads: Primary
Roads; Utility Installations; and
Support Facilities.
------------------------------------------------------------------------
PART 817--PERMANENT PROGRAM PERFORMANCE STANDARDS--UNDERGROUND MINING
ACTIVITIES
------------------------------------------------------------------------
817.1-817.181................ Scope; Objectives; Signs and Markers;
Casing and Sealing of Exposed
Underground Openings: General
Requirements; Casing and Sealing of
Underground Openings: Temporary; Casing
and Sealing of Underground Openings:
Permanent; Topsoil and Subsoil;
Hydrologic Balance: Protection;
Hydrologic Balance: Water Quality
Standards and Effluent Limitations;
Hydrologic Balance: Diversions;
Hydrologic Balance: Sediment Control
Measures; Hydrologic Balance: Siltation
Structures; Hydrologic Balance:
Discharge Structures; Impoundments;
Hydrologic Balance: Postmining
Rehabilitation of Sedimentation Ponds,
Diversions, Impoundments, and Treatment
Facilities; Hydrologic Balance: Surface
Activities in or Adjacent to Perennial
or Intermittent Streams; Coal Recovery;
Use of Explosives: General Requirements;
Use of Explosives: Pre-blasting Survey;
Use of Explosives: Public Notice of
Blasting Schedule; Use of Explosives:
Blasting Signs, Warnings, and Access
Control; Use of Explosives: Control of
Adverse Effects; Use of Explosives:
Seismographic Measurements; Use of
Explosives: Records of Blasting
Operations; Disposal of Excess Spoil:
General Requirements; Disposal of Excess
Spoil: Valley Fills/Head-of Hollow
Fills; Disposal of Excess Spoil: Durable
Rock Fills; Disposal of Excess Spoil:
Pre-Existing Benches; Coal Mine Waste:
General Requirements; Coal Mine Waste:
Refuse Piles; Coal Mine Waste:
Impounding Structures; Coal Mine Waste:
Burning and Burned Waste Utilization;
Disposal of Noncoal Mine Wastes;
Stabilization of Surface Areas;
Protection of Fish, Wildlife, and
Related Environmental Values; Slides and
Other Damage; Contemporaneous
Reclamation; Backfilling and Grading:
General Requirements; Backfilling and
Grading: Previously Mined Areas;
Backfilling and Grading: Steep Slopes;
Revegetation: General Requirements;
Revegetation: Timing; Revegetation:
Mulching and Other Soil Stabilizing
Practices; Revegetation: Standards for
Success; Subsidence Control: General
Requirements; Subsidence Control: Public
Notice; Cessation of Operations:
Temporary; Cessation of Operations:
Permanent; Postmining Land Use; Roads:
General; Roads: Primary Roads; Utility
Installations; and Support Facilities.
------------------------------------------------------------------------
PART 818--SPECIAL STATE PROGRAM PERFORMANCE STANDARDS--CONCURRENT
SURFACE AND UNDERGROUND MINING
------------------------------------------------------------------------
818.1-818.15................. Scope; Objective; Responsibilities;
Applicability; Compliance with Variance;
and Additional Performance Standards.
------------------------------------------------------------------------
Page 55434
PART 819--SPECIAL STATE PROGRAM PERFORMANCE STANDARDS--AUGER MINING
------------------------------------------------------------------------
819.11, 819.13, 819.15, Auger Mining: General; Auger Mining: Coal
819.17, 819.19, and 819.21. Recovery; Auger Mining: Hydrologic
Balance; Auger Mining: Subsidence
Protection; Auger Mining: Backfilling
and Grading; and Auger Mining:
Protection of Underground Mining.
------------------------------------------------------------------------
PART 823--SPECIAL STATE PROGRAM PERFORMANCE STANDARDS--OPERATIONS ON
PRIME FARMLAND
------------------------------------------------------------------------
823.15....................... Revegetation and Restoration of Soil
Productivity.
------------------------------------------------------------------------
PART 827--SPECIAL STATE PROGRAM PERFORMANCE STANDARDS COAL PROCESSING
PLANTS AND SUPPORT FACILITIES NOT LOCATED AT OR NEAR THE MINE SITE OR
NOT WITHIN THE PERMIT AREA FOR A MINE
------------------------------------------------------------------------
827.12....................... Coal Processing Plants: Performance
Standards.
------------------------------------------------------------------------
SUBCHAPTER L--STATE PROGRAM INSPECTION AND ENFORCEMENT PROCEDURES
PART 842--INSPECTIONS
------------------------------------------------------------------------
842.11 and 842.15............ Inspections and Review of Decision Not to
Inspect or Enforce.
------------------------------------------------------------------------
PART 843--ENFORCEMENT
------------------------------------------------------------------------
843.11, 843.15, and 843.16... Cessation Orders; Informal Public
Hearing; and Formal Review of Citations.
------------------------------------------------------------------------
PART 845--CIVIL PENALTIES
------------------------------------------------------------------------
845.12, 845.13, 845.14, When Penalty Will Be Assessed; Point
845.15, 845.17, 845.18, System for Penalties; Determination of
845.19, and 845.20. Amount of Penalty; Assessment of
Separate Violations for Each Day;
Procedures for Assessment of Civil
Penalties; Procedures for Assessment
Conference; Request for Adjudicatory
Public Hearing; and Final Assessment and
Payment of Penalty.
------------------------------------------------------------------------
PART 846--INDIVIDUAL CIVIL PENALTIES
------------------------------------------------------------------------
846.5, 846.14, 846.17, and Definitions; Amount of Individual Civil
846.18. Penalty; Procedure for Assessment of
Individual Civil Penalty; and Payment of
Penalty.
------------------------------------------------------------------------
PART 847--ALTERNATIVE ENFORCEMENT
------------------------------------------------------------------------
847.1-847.16................. Scope; General Provisions; Criminal
Penalties; and Civil Actions for Relief.
------------------------------------------------------------------------
SUBCHAPTER M--TRAINING PROGRAMS FOR BLASTERS AND MEMBERS OF BLASTING
CREWS, AND CERTIFICATION PROGRAMS FOR BLASTERS
PART 850--PROGRAMS
------------------------------------------------------------------------
850.16....................... Reciprocity.
------------------------------------------------------------------------
SUBCHAPTER R--ABANDONED MINE LAND RECLAMATION
PART 874--GENERAL RECLAMATION REQUIREMENTS
------------------------------------------------------------------------
874.12, 874.13, and 874.16... Eligible Lands and Water; Reclamation
Objectives and Priorities; and
Contractor Eligibility.
------------------------------------------------------------------------
PART 877--RIGHTS OF ENTRY
------------------------------------------------------------------------
877.11, 877.12, 877.13, and Consent to Entry; Entry for Studies or
877.14. Exploration; Entry and Consent to
Reclaim; and Entry for Emergency
Reclamation.
------------------------------------------------------------------------
PART 879--ACQUISITION, MANAGEMENT AND DISPOSITION OF LANDS AND WATER
------------------------------------------------------------------------
879.11, 879.12, 879.13, and Land Eligible for Acquisition; Procedures
879.15. for Acquisition; Acceptance of Gifts of
Land; and Disposition of Reclaimed
Lands.
------------------------------------------------------------------------
PART 882--RECLAMATION ON PRIVATE LAND
------------------------------------------------------------------------
882.13....................... Liens.
------------------------------------------------------------------------
PART 900--PROCEDURES FOR HEARING AND APPEALS
------------------------------------------------------------------------
900.2, 900.3, 900.4, 900.5, Filing of Documents; Form of Documents;
900.6, 900.7, 900.9, and Service and Proof of Service;
900.12. Intervention, Voluntary Dismissal;
Motions; Advancement of Proceedings, and
Other Procedures.
------------------------------------------------------------------------
Page 55435
PART--920 ADJUDICATORY HEARINGS
------------------------------------------------------------------------
920.1, 920.2, 920.3, 920.7, Presiding Officers; Powers of Presiding
and 920.8. Officers; Notice of Hearing; Initial
Orders and Decisions; and Effect of
Initial Order or Decision.
------------------------------------------------------------------------
PART 930--DISCOVERY
------------------------------------------------------------------------
930.1........................ Discovery.
------------------------------------------------------------------------
PART 940--TEMPORARY AND EXPEDITED REVIEW
------------------------------------------------------------------------
940.3........................ Procedures for Expedited Review.
------------------------------------------------------------------------
PART 960--APPEALS
------------------------------------------------------------------------
960.2-960.7.................. Appeals: How Taken; Answer; Stay Pending
Appeal; Certified Transcript; Record on
Appeal; and Extended Time for Appeals.
------------------------------------------------------------------------
-
Public Comment Procedures
Under the provisions of 30 CFR 732.17(h), we are seeking your comments on whether Arkansas's proposed amendment satisfies the applicable program approval criteria of 30 CFR 732.15. If we approve the amendment, it will become part of the Arkansas State program.
Under the provisions of 30 CFR 884.15(a), we are requesting comments on whether the amendment satisfies the applicable State reclamation plan approval criteria of 30 CFR 884.14. If we approve the amendment, it will become part of the Arkansas plan.
Electronic or Written Comments
If you submit written comments, they should be specific, confined to issues pertinent to the proposed regulations, and explain the reason for any recommended change(s). We appreciate any and all comments, but those most useful and likely to influence decisions on the final regulations will be those that either involve personal experience or include citations to and analyses of SMCRA, its legislative history, its implementing regulations, case law, other pertinent State or Federal laws or regulations, technical literature, or other relevant publications.
We cannot ensure that comments received after the close of the comment period (see DATES) or sent to an address other than those listed (see ADDRESSES) will be included in the docket for this rulemaking and considered.
Public Availability of Comments
Before including your address, phone number, email address, or other personal identifying information in your comment, you should be aware that your entire comment--including your personal identifying information--may be made publicly available at any time. While you can ask us in your comment to withhold your personal identifying information from public review, we cannot guarantee that we will be able to do so.
Public Hearing
If you wish to speak at the public hearing, contact the person listed under FOR FURTHER INFORMATION CONTACT by 4:00 p.m., c.d.t. on September 25, 2012. If you are disabled and need reasonable accommodations to attend a public hearing, contact the person listed under FOR FURTHER INFORMATION CONTACT. We will arrange the location and time of the hearing with those persons requesting the hearing. If no one requests an opportunity to speak, we will not hold a hearing.
To assist the transcriber and ensure an accurate record, we request, if possible, that each person who speaks at the public hearing provide us with a written copy of his or her comments. The public hearing will continue on the specified date until everyone scheduled to speak has been given an opportunity to be heard. If you are in the audience and have not been scheduled to speak and wish to do so, you will be allowed to speak after those who have been scheduled. We will end the hearing after everyone scheduled to speak and others present in the audience who wish to speak, have been heard.
Public Meeting
If only one person requests an opportunity to speak, we may hold a public meeting rather than a public hearing. If you wish to meet with us to discuss the amendment, please request a meeting by contacting the person listed under FOR FURTHER INFORMATION CONTACT. All such meetings are open to the public and, if possible, we will post notices of meetings at the locations listed under ADDRESSES. We will make a written summary of each meeting a part of the administrative record.
-
Procedural Determinations
Executive Order 12866--Regulatory Planning and Review
This rule is exempted from review by the Office of Management and Budget (OMB) under Executive Order 12866.
Other Laws and Executive Orders Affecting Rulemaking
When a State submits a program amendment to OSM for review, our regulations at 30 CFR 732.17(h) require us to publish a notice in the Federal Register indicating receipt of the proposed amendment, its text or a summary of its terms, and an opportunity for public comment. We conclude our review of the proposed amendment after the close of the public comment period and determine whether the amendment should be approved, approved in part, or not approved. At that time, we will also make the determinations and certifications required by the various laws and executive orders governing the rulemaking process and include them in the final rule.
List of Subjects in 30 CFR Part 904
Intergovernmental relations, Surface mining, Underground mining.
Dated: July 18, 2012.
Ervin J. Barchenger,
Regional Director, Mid-Continent Region.
FR Doc. 2012-22233 Filed 9-7-12; 8:45 am
BILLING CODE 4310-05-P