Commission Information Collection Activities; Comment Request; Extension
Published date | 14 March 2019 |
Citation | 84 FR 9317 |
Record Number | 2019-04678 |
Section | Notices |
Court | Energy Department,Federal Energy Regulatory Commission |
Federal Register, Volume 84 Issue 50 (Thursday, March 14, 2019)
[Federal Register Volume 84, Number 50 (Thursday, March 14, 2019)] [Notices] [Pages 9317-9319] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2019-04678] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC19-16-000] Commission Information Collection Activities; Comment Request; Extension AGENCY: Federal Energy Regulatory Commission. ACTION: Notice of information collection and request for comments. ----------------------------------------------------------------------- SUMMARY: In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission [[Page 9318]] (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-556 (Certification of Qualifying Facility (QF) Status for a Small Power Production or Cogeneration Facility). DATES: Comments on the collection of information are due May 13, 2019. ADDRESSES: You may submit comments (identified by Docket No. IC19-16- 000) by either of the following methods: eFiling at Commission's Website: http://www.ferc.gov/docs-filing/efiling.asp. Mail/Hand Delivery/Courier: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426. Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance, contact FERC Online Support by email at [email protected], or by phone at: (866) 208-3676 (toll-free), or (202) 502-8659 for TTY. Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp. FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at [email protected], telephone at (202) 502-8663, and fax at (202) 273-0873. SUPPLEMENTARY INFORMATION: Title: FERC-556, Certification of Qualifying Facility (QF) Status for a Small Power Production or Cogeneration Facility. OMB Control No.: 1902-0075. Type of Request: Three-year extension of the FERC-556 information collection requirements with no changes to the current reporting requirements. Abstract: Form No. 556 is required to implement sections 201 and 210 of the Public Utility Regulatory Policies Act of 1978 \1\ (PURPA). FERC is authorized, under those sections, to encourage cogeneration and small power production and to prescribe such rules as necessary in order to carry out the statutory directives. --------------------------------------------------------------------------- \1\ 16 U.S.C. 796, 824a-3. --------------------------------------------------------------------------- A primary statutory objective is efficient use of energy resources and facilities by electric utilities. One means of achieving this goal is to encourage production of electric power by cogeneration facilities which make use of reject heat associated with commercial or industrial processes, and by small power production facilities which use other wastes and renewable resources. PURPA encourages the development of small power production facilities and cogeneration facilities that meet certain technical and corporate criteria through establishment of various regulatory benefits. Facilities that meet these criteria are called Qualifying Facilities (QFs). FERC's regulations in 18 CFR part 292, as relevant here, specify: (a) The certification procedures which must be followed by owners or operators of small power production and cogeneration facilities; (b) the criteria which must be met; (c) the information which must be submitted to FERC in order to obtain qualifying status; and (d) the PURPA benefits which are available to QFs to encourage small power production and cogeneration. 18 CFR part 292 also exempts QFs from certain corporate, accounting, reporting, and rate regulation requirements of the Federal Power Act,\2\ certain state laws, and the Public Utility Holding Company Act of 2005.\3\ --------------------------------------------------------------------------- \2\ 16 U.S.C. 791, et seq. \3\ 42 U.S.C. 16, 451-63. --------------------------------------------------------------------------- Type of Respondents: Facilities that are self-certifying their status as a cogenerator or small power producer or that are submitting an application for FERC certification of their status as a cogenerator or small power producer. Estimate of Annual Burden: \4\ The Commission estimates the burden and cost for this information collection as follows: --------------------------------------------------------------------------- \4\ ``Burden'' is the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation of what is included in the information collection burden, refer to Title 5 Code of Federal Regulations 1320.3. [[Page 9319]] FERC-556--Certification of Qualifying Facility Status for a Small Power Production or Cogeneration Facility -------------------------------------------------------------------------------------------------------------------------------------------------------- Total annual Number of Annual number Total number Average burden burden hours & Cost per Facility type Filing type respondents of responses of responses hours & cost per total annual respondent ($) per respondent response \5\ cost (rounded) (rounded) (1) (2) (1) * (2) = (4) (3) * (4) = (5) (5) / (1) (3) -------------------------------------------------------------------------------------------------------------------------------------------------------- Cogeneration Facility > 1 MW Self- 63 1.25 78.75 1.5 hrs; $118.5.... 118.125 hrs; $148 \6\. certification. $9,332. Cogeneration Facility > 1 MW.. Application for 1 1.25 1.25 50 hrs; $3,950..... 62.5 hrs; $4,938 4,938 FERC certification. Small Power Production Self- 2,698 1.25 3,372.5 1.5 hrs; $118.5.... 5,058.75 hrs; 148 Facility > 1 MW. certification. $399,641. Small Power Production Application for 0 1.25 0 50 hrs; $3,950..... 0 hrs; $0....... 0 Facility > 1 MW. FERC certification. Cogeneration and Small Power Self- 692 1.25 865 1.5 hrs; $118.5.... 1,297.5 hrs; 148 Production Facility