Comprehensive Review of Licensing and Operating Rules for Satellite Services

Federal Register, Volume 79 Issue 211 (Friday, October 31, 2014)

Federal Register Volume 79, Number 211 (Friday, October 31, 2014)

Proposed Rules

Pages 65105-65137

From the Federal Register Online via the Government Printing Office www.gpo.gov

FR Doc No: 2014-25400

Page 65105

Vol. 79

Friday,

No. 211

October 31, 2014

Part III

Federal Communications Commission

-----------------------------------------------------------------------

47 CFR Parts 0 and 25

Comprehensive Review of Licensing and Operating Rules for Satellite Services; Proposed Rule

Page 65106

-----------------------------------------------------------------------

FEDERAL COMMUNICATIONS COMMISSION

47 CFR Parts 0 and 25

IB Docket No. 12-267; FCC 14-142

Comprehensive Review of Licensing and Operating Rules for Satellite Services

AGENCY: Federal Communications Commission.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: In this document, the Federal Communications Commission (Commission) proposes to amend its rules for licensing and operation of space stations and earth stations for communication by radio. The proposed changes would, among other things, facilitate international coordination of proposed satellite networks; eliminate the need to assess compliance with interim milestone requirements; revise bond requirements to more effectively deter spectrum warehousing; clarify requirements for routine earth station licensing; and expand applicability of routine licensing standards.

DATES: Submit comments on or before December 15, 2014 and reply comments on or before January 14, 2015.

ADDRESSES: You may submit comments, identified by IB Docket No. 12-267, by any of the following methods:

Federal eRulemaking Portal: http://www.regulations.gov. Follow the instructions for submitting comments.

Federal Communications Commission's Web site: http://www.fcc.gov/cgb/ecfs. Follow the instructions for submitting comments.

Paper filing: Paper filings can be sent by hand or messenger delivery, by commercial overnight courier, or by first-class or overnight U.S. Postal Service mail.

For detailed instructions for submitting comments and additional information on the rulemaking process, see the SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: William Bell (202) 418-0741 or Cindy Spiers (202) 418-1593, Satellite Division, International Bureau. For additional information concerning the information collection(s) contained in this document, contact Cathy Williams at 202-418-2918, or via the Internet at Cathy.Williams@fcc.gov.

SUPPLEMENTARY INFORMATION: This is a summary of the Commission's Further Notice of Proposed Rulemaking (FNPRM) in IB Docket No. 12-267, FCC 14-142, adopted and released on September 30, 2014. The full text of this document is available for public inspection and copying during regular business hours at the FCC Reference Information Center, Portals II, 445 12th Street SW., Room CY-A257, Washington, DC 20554 and may be downloaded from the Commission's internet Web site at https://apps.fcc.gov/edocs_public/Query.do?numberFld=14-142&numberFld2=&docket=12-267&dateFld=&docTitleDesc=. The document may also be purchased from the Commission's duplicating contractor, Best Copy and Printing, Inc., Portals II, 445 12th Street SW., Room CY-B402, Washington, DC 20554, telephone 202-488-5300, facsimile 202-488-5563, or via Web site at www.BCPIWEB.com. Alternative formats are available to person with disabilities by sending email to fcc504@fcc.gov or calling the Consider & Governmental Affairs Bureau at 202-418-0530 (voice), or 202-418-0432 (tty).

Pursuant to Sec. Sec. 1.415 and 1.419 of the Commission's rules, 47 CFR 1.415 and 1.419, interested parties may file comments and reply comments on or before the dates indicated on the first page of this document.

ssquf Electronic Filers: Comments may be filed electronically using the Internet by accessing the Commission's Electronic Comment Filing System (ECFS): http://fjallfoss.fcc.gov/ecfs2/. See Electronic Filing of Documents in Rulemaking Proceedings, 63 FR 24121 (1998).

ssquf Paper Filers: Parties who choose to file by paper must file an original and one copy of each filing.

ssquf Paper filings can be sent by hand or messenger delivery, by commercial overnight courier, or by first-class or overnight U.S. Postal Service mail. All filings must be addressed to the Commission's Secretary, Office of the Secretary, Federal Communications Commission.

ssquf All hand-delivered or messenger-delivered paper filings for the Commission's Secretary must be delivered to FCC Headquarters at 445 12th St. SW., Room TW-A325, Washington, DC 20554. The filing hours are 8:00 a.m. to 7:00 p.m. All hand deliveries must be held together with rubber bands or fasteners. Any envelopes and boxes must be disposed of before entering the building.

ssquf Commercial overnight mail (other than U.S. Postal Service Express Mail and Priority Mail) must be sent to 9300 East Hampton Drive, Capitol Heights, MD 20743.

ssquf U.S. Postal Service first-class, Express, and Priority mail must be addressed to 445 12th Street SW., Washington, DC 20554.

People with Disabilities: To request materials in accessible formats for people with disabilities (braille, large print, electronic files, audio format), send an email to fcc504@fcc.gov or call the Consumer & Governmental Affairs Bureau at 202-418-0530 (voice), 202-

418-0432 (tty).

Summary of Further Notice of Proposed Rulemaking

In the initial Notice of Proposed Rulemaking in IB Docket 12-267, 77 FR 67172, November 8, 2012, (2012 NPRM), the Commission proposed extensive changes in part 25. The Satellite Industry Association (SIA) and other parties filed comments in response to the 2012 NPRM. In a Report and Order released in August 2013, the Commission adopted most of the changes proposed in the 2012 NPRM but declined to rule on recommendations from commenters that could not properly be adopted without affording further opportunity for public comment. Some of the rule changes proposed in FCC 14-142 are based on such previous recommendations. In February 2014, an FCC staff working group issued recommendations for improving the Commission's procedures and management practices and eliminating or streamlining outdated rules in a Process Reform Report. Some of the recommendations concerned satellite-service regulation and licensing and are considered in FCC 14-142.

ITU Filings for GSO FSS Space Stations

The procedure for obtaining international recognition of satellite operation in non-planned Fixed-Satellite Service (FSS) bands under the Radio Regulations of the ITU includes several steps. First, an Advance Publication of Information (API) must be filed with the ITU. An API filing requires only a very general description of a proposed satellite network. Next, a Coordination Request must be filed. A Coordination Request is ``receivable'' between six months and two years after the associated API filing but may be submitted to the ITU simultaneously with an API filing. The date of receipt of the Coordination Request establishes the ``protection date'' of a satellite network, which is the basis of international coordination priority. A proposed satellite network must be coordinated with any co-frequency satellite network with an earlier ITU protection date that, according to certain criteria, is deemed to be ``affected'' by the proposed network.

The Commission's International Bureau submits an API or Coordination Request to the ITU for space station

Page 65107

operation in specified frequency bands at a specified orbital location only after a license application for the proposed space station operation has been filed with the Commission. The information required for a Commission space station license application is more specific than that required for an API or Coordination Request and includes technical data that would not be definitely known until significant progress has been made in the design of a proposed satellite. Consequently, an operator who decides to apply to the FCC for authority for space station operation in a new band and/or orbital location might not be prepared to submit a license application for such operation for a considerable time afterward.

In view of this, the Process Reform Report includes a recommendation for the Commission to consider adopting a procedure for filing satellite-network APIs and Coordination Requests prior to the filing of full license applications. Several parties address this issue in comments, and all of them support this recommendation.

We tentatively agree that it would serve the public interest for the Commission to adopt an optional procedure in which submission of APIs and Coordination Requests to the Commission for filing with the ITU for GSO space station operation in non-planned FSS bands would be a first step in an optional two-step license application process. More detailed information of the kind included currently in license applications would be due later. Given the specificity of the ITU's regulations pertaining to operation in FSS planned bands, we are not proposing to follow this procedure with respect to planned-band operation. We invite comment, however, as to whether the procedure should be available for other types of proposed space station operation. We contemplate that such requests would be electronically filed and considered in order of receipt and would be treated as confidential until the Commission submits the filings to the ITU. We invite comment as to whether the filing of such a request would be subject to the requirements in part 1, subpart G of the Commission's rules pertaining to filing fees.

We propose to adopt a two-year deadline for submitting the technical information needed to complete a satellite license application.

We invite comment on whether submission of a request for filing of an API and Coordination Request with a simplified description of the satellite network and a cost-recovery declaration should suffice to secure a position in a first-come, first-served space station application queue. A party that secures a place at the head of an application queue for space station operation in particular FSS frequency bands at a particular location in the GSO arc should not be free to walk away at some later time without any consequence, despite having preempted co-frequency applications for the same or a nearby orbital location in the meanwhile. We therefore propose a surety bond requirement, separate from the current post-licensing bond requirement in Sec. 25.165. Such a bond would be payable if a party who has secured a spot in the first-come, first-served queue by submitting a draft API and Coordination Request fails to complete an acceptable license application on schedule or its license application is denied. We invite comment as to whether a surety bond created in connection with a request for an ITU filing should be released when the party in interest files a post-grant surety bond pursuant to Sec. 25.165 or whether it would better serve the public interest to require an ``ITU filing bond'' to be maintained pending satisfaction of all milestone requirements.

A party that prefers to avoid the ITU filing bond would have the option of following the current procedure of filing a full license application concurrently with a request for submission of an API and Coordination Request. We invite comment as to whether a party should have the option to file an API and Coordination request without securing a spot in the first-come, first-served queue and without filing a bond. We also invite comment as to whether failure to meet the proposed two-year second-step filing deadline should count as a missed milestone for purposes of the ``three-strikes'' rule in Sec. 25.159(d).

Milestones and Bonds

In order to prevent or deter spectrum warehousing, the Commission requires space station licensees to adhere to standard milestone schedules and file surety bonds. The milestone requirements for most space station licensees are codified in Sec. 25.164 and are incorporated as conditions in license grants. Recipients of new licenses for geostationary-orbit (GSO) space stations, other than Direct Broadcast Satellite (DBS) and Satellite Digital Audio Radio Service (SDARS) space stations, are required to meet the following schedule:

Enter into a binding contract for construction of the authorized satellite(s) by one year after the grant of the space station license;

Complete critical design review for the satellite(s) by two years after the license grant;

Begin construction of the satellite(s) by three years after the license grant;

Launch and commence operation of the satellite(s) in the assigned orbital location(s) by five years after the license grant.

Recipients of new licenses for non-geostationary-orbit (NGSO) space stations are required to meet the following schedule:

Enter into a binding contract for construction of the authorized satellite(s) by one year after the grant of the space station license;

Complete critical design review for the satellite(s) by two years after the license grant;

Begin construction of one satellite by two years and six months after the license grant;

Launch and commence operation of the first satellite in the authorized orbit by three years and six months after the license grant.

Bring all authorized satellites into operation by six years after the license grant.

These milestone schedules also apply to construction and launch of non-

U.S.-licensed space stations approved for U.S. market access.

Under Sec. 25.165, the recipient of a new license for a GSO space station of any type other than DBS and SDARS must file a surety bond in the amount of $3 million, payable to the U.S. Treasury in the event of a milestone default, and the recipient of a new license for an NGSO constellation must file a surety bond in the amount of $5 million. The Commission adopted the bond requirement to establish a market-based mechanism for ensuring that licensees are willing and able to proceed with satellite construction and to discourage warehousing of scarce resources. The bond amount is successively reduced when the Commission finds that the licensee has met interim milestone requirements. In the event that a licensee fails to meet a milestone deadline and the Commission does not find good cause for granting an extension of time, the license becomes void and the remaining bond amount is paid to the U.S. Treasury. We believe it is worthwhile to consider whether alternative approaches might shorten review periods, reduce administrative burdens, and increase certainty for licensees.

One possible approach is to accept corroborative affidavits from satellite manufacturers and evidence of appropriate payment, in addition to certifications from licensees, as prima facie proof of compliance with the contracting and CDR milestone

Page 65108

requirements. This would eliminate any need for submission and assessment of confidential contract and design documents in cases where such prima facie evidence is presented. Deciding, on a case-by-case basis, how much payment is appropriate at contract signing and upon completion of CDR could entail some adjudicatory difficulty, however. We invite further comment on this proposal.

We also invite comment on simplifying the milestone schedules. Specifically, we request comment on eliminating the milestone deadlines for contracting for satellite construction and commencing construction and retaining the CDR milestone requirement as the only intermediate milestone deadline prior to the deadline for launch. This would reduce paperwork burdens and afford more flexibility for licensees and significantly reduce administrative burdens for the Commission's staff. In addition, we invite comment on the advisability of eliminating all interim milestone requirements, which would reduce administrative burdens still further and eliminate any need for submission of confidential construction contracts or proprietary design packages. And we seek comment on making all interim milestone requirements optional, so that a party could volunteer for Commission review of any interim milestone at any time as a means of reducing its surety bond, without requiring every applicant to do the same.

We have several proposals regarding post-grant surety bonds. First, the currently prescribed bond amounts--$3 million for GSO space stations and $5 million for NGSO space stations--may be inadequate. These amounts were prescribed ten years ago and have never been adjusted. We propose to require bond payment amounts due in the event of default to be calculated based on the Gross Domestic Product Chain-

type Price Index (GDP-CPI), so that adjustment for both past and future inflation (or deflation) will be routine and will take into account time that elapses from license grant to default, which could be as much as six years. We invite comment as to the appropriate baseline dollar amounts to be used for such calculations.

Second, from a public-interest standpoint, it is better for a satellite licensee to surrender a license soon after receiving it than to surrender it after holding it for several years--or, worse, to hold the license for five or six years and then request an unjustified extension of the milestone deadline for launch and commencement of operation. Should we therefore revise the bond rule to provide that the amount to be paid in the event a licensee surrenders a space station authorization without placing the authorized facility into operation or is found in default of the deadline for commencing in-orbit operation will increase progressively, pro rata, in proportion to the time that has elapsed since the license was granted? Rather than escalating the potential payment liability from a starting point of zero, initial liability could be set at an amount substantial enough to deter parties from filing applications for strategic motives with the intention of surrendering their licenses shortly after grant. We invite comment as to whether this approach should be combined with the current policy of reducing bond liability when it is found that a party has met an interim milestone. For example, should we make interim milestone showings optional and reduce bond payment liability for licensees that choose to submit such showings and demonstrate that they have met interim milestones within prescribed time periods?

If we were to assign queuing priority based on advanced ITU filings, as proposed above, we believe that the amount to be paid pursuant to an ``ITU filing bond'' in the event of default should be commensurate with post-grant bond payment liability, taking into consideration the amount of time that elapses before default occurs. We invite comment on this proposal and suggestions for other approaches that could strike a balance between achieving the desired flexibility with respect to ITU filings while preventing spectrum warehousing.

The Two-Degree Spacing Policy

The Commission's two-degree spacing policy, which has been in effect since 1983, applies to GSO FSS operation in the conventional C-

band, the conventional and extended Ku-band, and the 20/30 GHz band. ``Two-degree spacing'' refers to angular separation in the GSO arc between adjacent co-frequency space stations. There are several aspects to this policy, which is embodied in part 25 rules pertaining to licensing of both earth stations and space stations.

Applicants for earth station licenses authorizing transmission to GSO FSS satellites in the conventional C-band, conventional or extended Ku-band, or 20/30 GHz band must demonstrate one of two things with respect to uplink operation. One option is to show that the proposed earth stations will meet ``routine'' limits on off-axis EIRP density (or equivalent limits on off-axis antenna gain and input power density) designed to prevent harmful interference with co-frequency GSO space stations at orbital locations two or more degrees from the ``target'' satellites that the earth stations would communicate with. Alternatively, for proposed operation that would exceed the relevant routine limits, an applicant must submit certification from the operator(s) of the target satellite(s) that the proposed non-conforming uplink operation has been coordinated with operators of adjacent co-

frequency space stations and certify that it will operate in compliance with the coordination agreements.

License applicants for GSO FSS space stations must demonstrate the following with a technical analysis: (i) Their downlink transmissions will not harmfully interfere with reception of co-frequency downlink transmissions from any previously-licensed GSO satellite less than two degrees away or with reception of co-frequency downlinks from a current or future GSO satellite two degrees away by earth stations with gain patterns consistent with the relevant routine limits in Sec. 25.209 and (ii) uplink transmissions to their space stations will not harmfully interfere with uplink reception of any previously licensed GSO space station less than two degrees away or with uplink reception of a current or future satellite two degrees away. Space station applicants have routinely requested permission to deviate from parameters assumed for purposes of such interference analysis when permitted under the terms of subsequent coordination agreements, however, and the Commission has routinely granted such requests.

Thus, under current rules and practice, operating authority may be obtained based on coordination agreements for a GSO FSS system that does not conform to technical limits for two-degree compatibility. In the event that a two-degree-compliant U.S.-licensed space station subsequently commences co-frequency operation at an adjacent orbital location, however, the operator(s) of the non-conforming space station and/or associated earth stations will have to curtail non-conforming transmit operation adversely affecting the newcomer's system unless the newcomer consents to it, and will have to accept any downlink interference from the newcomer resulting from the use of earth station antennas with non-conforming gain patterns.

Intelsat contends that the two-degree spacing rules hinder U.S.-

licensed satellite operators from providing innovative ``broadband mobility''

Page 65109

services and services involving use of high power output to earth stations with small antennas and may place U.S.-licensed satellite operators at a competitive disadvantage compared with foreign-licensed operators that are granted access to the U.S. market. Intelsat proposes that instead of adhering to the two-degree spacing rules, the Commission should allow coordination between operators to control operational requirements and should resolve disputes based on ITU coordination priority.

We invite comment as to whether the Commission should require a new entrant to coordinate co-frequency, co-coverage operation with a U.S.-

licensed operator that has been providing non-two-degree-compliant GSO FSS services without causing unacceptable interference. If we were to adopt such a policy, should coordination priority and protection rights between U.S. licensees, or operators with U.S. market access, be based on ITU filing priority, as Intelsat recommends, or should it be based on FCC application filing dates?

Section 25.140(a) requires license applicants for GSO FSS space stations to provide an interference analysis demonstrating that the proposed system will be compatible with previously authorized GSO space stations within two angular degrees of the proposed space station. Intelsat maintains that there is no need for such a showing because protection of adjacent satellites is ensured by rules requiring adherence to technical limits or coordination of non-conforming operation. Furthermore, Intelsat maintains that interference showings submitted pursuant to Sec. 25.140(a) are often based on assumptions that may not accurately reflect the actual operational environment. We propose to amend Sec. 25.140(a) in several respects. To begin with, for reasons stated below, we propose to remove the routine limits on the power spectral density or power flux-density of downlink transmission in the conventional Ku-band and 20/30 GHz bands from Sec. Sec. 25.134, 25.138, and 25.212 and insert them in Sec. 25.140(a) as coordination triggers for space station applicants and licensees. The rules do not currently specify routine limits for downlink transmission in the conventional or extended C-band, but taking into account the capabilities of current C-band satellites and typical operational conditions, we propose to amend Sec. 25.140(a) to specify a 1 dBW/4 kHz coordination threshold for digital downlink transmission in the conventional or extended C-band and an 8 dBW/4kHz coordination threshold for analog downlink transmission in those bands.

Further, we propose to amend Sec. 25.140(a) to allow applicants to provide certifications in lieu of an interference analysis. Under the amended rule that we propose, an applicant for a GSO FSS space station at an orbital location less than two degrees from the assigned location of a co-frequency space station could either certify that the proposed operation has been coordinated with the operator of the co-frequency satellite or submit an interference analysis demonstrating the compatibility of the proposed system with the co-frequency satellite. An applicant for space station operation (other than analog video operation) at a location two degrees or more from the nearest co-

frequency satellite would not have to provide an interference analysis if it certifies that it will coordinate any uplink or downlink operation exceeding relevant routine limits with operators of co-

frequency satellites within six degrees.

Because there is no EIRP density limit in the Commission's rules for analog video downlinks and the number of satellites transmitting analog video signals is gradually diminishing, we do not propose technical criteria for routine licensing of analog video space station operation. Rather, we propose to require such operation to be coordinated with operators of co-frequency satellites within six degrees of the proposed space station that are U.S.-licensed or approved for U.S. market access.

The First-Come, First-Served Procedure for GSO-Like Satellite Systems

The Commission adopted the first-come, first-served licensing procedure for ``GSO-like'' space stations--that is, GSO space stations designed for communication with earth stations with directional antennas--in 2003. We have requested comment on a proposal to eliminate the two-degree spacing policy and instead rely on ITU filing priority, which is also based on the first-come, first-served principle. More generally, we invite comment as to whether modification of the first-

come-first-served procedure might be appropriate and how the statutory prohibition against assigning ``orbital locations or spectrum used for the provision of international or global satellite communications services'' by competitive bidding should affect consideration of this issue.

Other Proposed Changes in Part 25

The Commission is proposing other changes in part 25 as indicated in the following topic list. For details on these proposals, see FCC 14-142, available for download at https://apps.fcc.gov/edocs_public/Query.do?numberFld=14-142&numberFld2=&docket=12-267&dateFld=&docTitleDesc=.

  1. Codification of Replacement Satellite Policies (Sections 25.157 and 25.158)

  2. Licensing Rules for Earth Stations that Transmit to GSO Space Stations in FSS Frequency Bands

    1. Overview of Current Routine Licensing Rules (Sections 25.132, 25.134, 25.138, 25.209, 25.211, 25.212, 25.218, 25.220, 25.221, 25.222, 25.223, 25.226, and 25.227)

    2. Definition of ``theta''

    3. ``Plane Tangent to the GSO Arc''

    4. Emissions Outside the Plane Tangent to the GSO Arc

    5. Sidelobe and Backlobe Allowances

    6. EIRP Density Specifications for Cross-Polarized Signals

    7. Limits on Aggregate EIRP Density

    8. Operation With Contention Protocols

    9. Routine Licensing Criteria for Stations Transmitting Full-

    Transponder Analog Video Signals

    10. Analog Signal Bandwidth

    11. Criteria for Downlink Transmission

    12. Alternative Routine Licensing Criteria for 20/30 GHz Earth Stations

    13. Routine Gain Envelopes for 17/24 GHz BSS Feeder-Link Stations

    14. Other Proposed Changes in Sec. Sec. 25.134 and 25.212

    15. Clarification of the Applicability of Sec. 25.218

    16. Reference Bandwidth in EIRP Density Specifications in Sec. 25.138

    17. Routine Licensing Criteria for Extended C-Band Stations

    18. Off-Axis Gain Standards for FSS Earth Stations

    19. Demonstrating Conformance With Limits on Off-Axis Gain and EIRP Density

    20. Coordination Requirements for Non-Conforming Earth Station Operation

    21. Other Proposed Changes in Licensing Rules for Earth Stations on Vessels, Vehicle Mounted Earth Stations, and Earth Stations Aboard Aircraft

  3. Section 25.103 ``Definitions'' (Section 25.103)

    1. ``20/30 GHz Bands''

    2. ``Conventional C-Band'' ``Extended C-Band'' ``Conventional Ku-Band''

    3. ``NGSO FSS Gateway Earth Station''

    4. ``Permitted Space Station List''

    5. ``Plane Perpendicular/Tangent to the GSO Arc''

    6. ``Protection Areas''

    7. ``Skew Angle''

    8. ``Two-Degree-Compliant Space Station''

    9. ``VSAT Network''

  4. Rules Pertaining to Dismissal of Applications (Sections 25.112 and 25.152)

  5. Section 25.113 ``Station construction, launch authority, and operation of spare satellites''

  6. Section 25.114 ``Applications for space station authorizations''

  7. Further Proposed Changes in Sec. 25.115 ``Applications for earth station authorizations''

    Page 65110

  8. Section 25.117 ``Modification of station license''

    I. Section 25.118 ``Modifications not requiring prior authorization''

    1. Earth station modifications

    2. Fleet management rule

  9. Section 25.119 ``Assignment or transfer of control of station authorization''

  10. Section 25.129 ``Equipment authorization for portable earth-

    station transceivers''

    L. Section 25.130 ``Filing requirements for transmitting earth stations''

  11. Section 25.131 ``Filing requirements and registration for receive-only earth stations''

  12. Section 25.133 ``Period of construction; certification of commencement of operation''

  13. Other Proposed Changes in Sec. 25.138

  14. Service-Specific Space Station Licensing Rules

    1. Section 25.143 ``Licensing provisions for the 1.6/2.4 GHz Mobile-Satellite Service and 2 GHz Mobile-Satellite Service''

    2. Section 25.145 ``Licensing provisions for the Fixed-Satellite Service in the 20/30 GHz bands''

    3. Section 25.146 ``Licensing and operating rules for the non-

    geostationary orbit Fixed-Satellite Service in the 10.7 GHz-14.5 GHz bands''

    4. Section 25.147 ``Licensing provision for NGSO MSS feeder downlinks in the band 6700-6875 MHz''

    5. Section 25.264 ``Requirements to facilitate reverse-band operation in the 17.3-17.8 GHz band of 17/24 GHz Broadcasting-

    Satellite Service and Direct Broadcast Satellite Service space stations''

    6. Polarization Requirements for FSS Space Stations (Sections 25.210)

  15. Section 25.156 ``Consideration of applications''

  16. Section 25.159 ``Limits on pending applications and unbuilt satellite systems''

  17. Section 25.163 ``Reinstatement''

  18. Section 25.165 ``Posting of bonds''

  19. Section 25.202 ``Frequencies, frequency tolerance, and emission limits''

    V. Section 25.203 ``Choice of sites and frequencies''

  20. Operating Rules for Earth Stations

    1. Section 25.204 ``Power limits for earth stations''

    2. Section 25.205 ``Minimum angle of antenna elevation''

    3. Section 25.211 ``Analog video transmissions in the Fixed-

    Satellite Service''

    4. Section 25.258 ``Sharing between NGSO MSS Feeder links Stations and GSO FSS services in the 29.25-29.5 GHz bands''

    X. Section 25.283 ``End-of-life disposal''

    Regulatory Impact Conclusion

    The amendments we propose would update the Commission's rules for satellite services to reflect evolving technology, eliminate unnecessary technical and information-filing requirements, and reorganize, clarify, and simplify existing requirements. We believe that these changes would serve the public interest by promoting compliance with the Commission's operating rules, improving the ability of the public and Commission to assess the interference potential of proposed operations, affording more flexibility for incorporating state-of-the-art design, easing administrative burdens, and facilitating rapid deployment of new and improved satellite services. We believe that these benefits would outweigh any resultant costs and that the rule changes would reduce net costs, on average, for applicants and licensees. We invite comment on these conclusions.

    Ex Parte Presentations

    We will continue to treat this proceeding as a ``permit-but-

    disclose'' proceeding in accordance with the Commission's ex parte rules. Persons making ex parte presentations must file a copy of any written presentation or a memorandum summarizing any oral presentation within two business days after the presentation (unless a different deadline applicable to the Sunshine period applies). Persons making oral ex parte presentations are reminded that memoranda summarizing the presentation must (1) list all persons attending or otherwise participating in the meeting at which the ex parte presentation was made, and (2) summarize all data presented and arguments made during the presentation. If the presentation consisted in whole or in part of the presentation of data or arguments already reflected in the presenter's written comments, memoranda or other filings in the proceeding, the presenter may provide citations to such data or arguments in his or her prior comments, memoranda, or other filings (specifying the relevant page and/or paragraph numbers where such data or arguments can be found) in lieu of summarizing them in the memorandum. Documents shown or given to Commission staff during ex parte meetings are deemed to be written ex parte presentations and must be filed consistent with 47 CFR 1.1206(b). In proceedings governed by 47 CFR 1.49(f) or for which the Commission has made available a method of electronic filing, written ex parte presentations and memoranda summarizing oral ex parte presentations, and all attachments thereto, must be filed through the electronic comment filing system available for that proceeding, and must be filed in their native format (e.g., .doc, .xml, .ppt, searchable .pdf). Participants in this proceeding should familiarize themselves with the Commission's ex parte rules.

    Initial Regulatory Flexibility Analysis

    As required by the Regulatory Flexibility Act of 1980, as amended,\1\ the Commission has prepared an Initial Regulatory Flexibility Analysis (IRFA) of the possible economic impact on small entities of the rule changes proposed in the FNPRM. The IRFA is set forth in FCC 14-142 as Appendix D and is summarized here. Written public comments are requested on the IRFA. Comments must be identified as responses to the IRFA and must be filed by the comment deadlines specified above.

    ---------------------------------------------------------------------------

    \1\ 5 U.S.C. 601 et seq., as amended by the Contract With America Advancement Act of 1996, Public Law 104-121, 110 Stat. 847 (1996).

    ---------------------------------------------------------------------------

    The Regulatory Flexibility Act requires that a regulatory flexibility analysis be prepared for rulemaking proceedings unless the agency certifies that the rule will not have a significant economic impact on a substantial number of ``small entities.'' The RFA generally defines the term ``small entity'' as referring to any ``small business,'' ``small organization,'' or ``small governmental jurisdiction.'' A small business concern is one that: (1) Is independently owned and operated; (2) is not dominant in its field of operation; and (3) satisfies any additional criteria established by the Small Business Administration (SBA).\2\ The SBA considers a satellite telecommunications firm to be small if it has $32.5 million or less in annual receipts. Some earth station applicants and licensees that qualify as small firms by this criterion might be affected rule changes proposed in the FNPRM.

    ---------------------------------------------------------------------------

    \2\ Small Business Act, 15 U.S.C. 632 (1996).

    ---------------------------------------------------------------------------

    The FNPRM seeks comment on a variety of proposals for revision of rules governing licensing and operation of space stations and earth stations for provision of satellite communication services. Specifically, it proposes to:

    Allow space station applicants to file through the Commission a satellite network with the International Telecommunication Union up to two years before filing a complete space station application with the Commission.

    Eliminate some or all interim space station construction milestone requirements and simplify the showing needed to demonstrate compliance with the CDR milestone, if it is retained.

    Modify the space station bond requirements to provide better incentives against spectrum warehousing.

    Page 65111

    Modify the two-degree spacing policy to permit continued operation of a non-two-degree compliant satellite network to the extent that such operation can be coordinated with other operators prior to the introduction of a nearby two-degree-compliant satellite.

    Eliminate the requirement for a space station applicant that starts constructing its satellite prior to filing an application with the Commission to notify the Commission in writing that it is doing so at its own risk.

    Clarify the requirements to limit aggregate uplink power density from multiple earth stations transmitting to the same satellite.

    Provide for the automatic grant of applications for repositioning of space stations with a small offset from the originally authorized orbital location, and for minor repointing of space station antennas.

    Allow earth station operators to communicate with a replacement satellite deployed with a small offset from the originally authorized satellite without prior Commission authorization.

    Extend the frequency bands in which routine earth station licensing is permitted.

    Expand routine earth station license qualification options for 20/30 GHz earth station applicants.

    Clarify earth station off-axis antenna radiation pattern requirements, and the ranges over which the off-axis radiated power can exceed the specified limits.

    Permit earth station applicants to file off-axis antenna radiation charts instead of tables except in off-axis angular regions where the off-axis radiation exceeds specified limits.

    Eliminate the requirement for portable earth station manufacturers to demonstrate compliance with the radiated power limits in Sec. 25.204 of the Commission's rules.

    Lower the minimum permissible elevation angle for earth stations operating in bands not shared with terrestrial services from five degrees to three degrees above the horizontal plane.

    Eliminate the restrictions on the center frequencies on which analog video transmissions in the 3700-4200 MHz band can be conducted.

    Eliminate antenna polarization requirements for space stations operating in the 4/6 GHz bands.

    Eliminate the cross-polarization requirement for FSS space stations.

    Eliminate a requirement for earth station applicants to measure and specify mid-band antenna gain.

    Eliminate a requirement to license receive-only earth stations communicating with non-U.S. licensed space stations approved for U.S. market access.

    Update and improve definitions.

    Many of these proposed changes would reduce regulatory burdens for earth station applicants and licenses. The FNPRM invites comment from all interested parties. Small entities are encouraged to bring to the Commission's attention any specific concerns they may have with the proposals outlined in the FNPRM, which the Commission will consider in reaching its final conclusions and taking action in this proceeding.

    Paperwork Reduction Act

    The FNPRM proposes new and modified information collection requirements and also proposes to eliminate a number of existing information collection requirements. The Commission, as part of its continuing effort to reduce paperwork burdens, invites the general public and OMB to comment on the proposed information collection requirements. In addition, pursuant to the Small Business Paperwork Relief Act of 2002,\3\ we seek specific comment on how we might further reduce the information collection burden for small business concerns with fewer than 25 employees.\4\

    ---------------------------------------------------------------------------

    \3\ Public Law 107-198.

    \4\ 44 U.S.C. 3506(c)(4).

    ---------------------------------------------------------------------------

    Ordering Clauses

    It is ordered, pursuant to sections 4(i), 7(a), 11, 303(c), 303(f), 303(g), and 303(r) of the Communications Act of 1934, as amended, 47 U.S.C. 154(i), 157(a), 161, 303(c), 303(f), 303(g), and 303(r), that the Further Notice of Proposed Rulemaking in IB Docket No. 12-267 is adopted.

    It is further ordered that the Commission's Consumer and Governmental Affairs Bureau, Reference Information Center, will send a copy of this Further Notice of Proposed Rulemaking, including the initial regulatory flexibility act analysis, to the Chief Counsel for Advocacy of the Small Business Administration, in accordance with section 603(a) of the Regulatory Flexibility Act, 5 U.S.C. 601, et seq. (1981).

    List of Subjects in 47 CFR Part 25

    Definitions, Earth stations, Space stations.

    Federal Communications Commission.

    Sheryl D. Todd,

    Deputy Secretary, Office of the Secretary, Office of Managing Director.

    For the reasons discussed in the preamble, the Federal Communications Commission proposes to amend 47 CFR parts 0 and 25 as follows:

    PART 0--COMMISSION ORGANIZATION

    0

    1. The authority citation for part 0 continues to read as follows:

    Authority: Sec. 5, 48 Stat. 1068, as amended, 47 U.S.C. 155, 255, unless otherwise noted.

    0

    2. Amend Sec. 0.457 by adding paragraph (d)(1)(vii)(C) to read as follows:

    Sec. 0.457 Records not routinely available for public inspection.

    * * * * *

    (d) * * *

    (1) * * *

    (vii) * * *

    (C) Draft APIs and Coordination Requests filed pursuant to Sec. 25.110(b)(3) are not routinely available for public inspection before the Commission submits them to the ITU. Such ITU submissions will be announced by public notice pursuant to Sec. 25.151(a).

    PART 25--SATELLITE COMMUNICATIONS

    0

    3. The authority citation for part 25 is revised to read as follows:

    Authority: Interprets or applies sections 4, 301, 302, 303, 307, 309, 319, 332, 705, and 721 of the Communications Act, as amended, 47 U.S.C. 154, 301, 302, 303, 307, 309, 319, 332, 605, and 721, unless otherwise noted.

    Sec. 25.103 Amended.

    0

    4. Amend Sec. 25.103 as follows:

    0

    1. Remove the definitions of ``12/14 GHz band'' and ``C-band'';

      0

    2. Revise the definition of ``20/30 GHz bands'';

      0

    3. Add definitions of ``Conventional C-band,'' ``Conventional Ku-

      band,'' and ``Extended C-band'';

      0

    4. Revise the definition of ``NGSO FSS gateway earth station'';

      0

    5. Add definitions of ``Plane perpendicular to the GSO arc'' and ``Plane tangent to the GSO arc'';

      0

    6. Revise the definition of ``Protection areas'';

      0

    7. Add definitions of ``Skew angle,'' ``Two-degree-compliant space station,'' and ``VSAT network.''

      * * * * *

      20/30 GHz bands. The 18.3-18.8 GHz (space-to-Earth), 19.7-20.2 GHz (space-to-Earth), 28.35-28.6 GHz (Earth-to-space), and 29.25-30.0 GHz (Earth-to-

      Page 65112

      space) frequency bands, which the Commission has designated as primary for GSO FSS operation.

      * * * * *

      Conventional C-band. The 3700-4200 MHz (space-to-Earth) and 5925-

      6425 MHz (Earth-to-space) FSS frequency bands.

      Conventional Ku-band. The 11.7-12.2 GHz (space-to-Earth) and 14.0-

      14.5 GHz (earth-to-space) FSS frequency bands.

      * * * * *

      Extended C-band. As used in this part, this term refers to the 3600-3700 MHz (space-to-Earth), 5850-5925 MHz (Earth-to-space), 6425-

      6700 (Earth-to-space), and 6700-7025 MHz (bi-directional) FSS frequency bands.

      * * * * *

      NGSO FSS gateway earth station. An earth station or complex of multiple earth station antennas supporting the routing and switching functions of an NGSO FSS system. An NGSO FSS gateway earth station does not originate or terminate communication traffic, but interconnects multiple user-operated earth stations operating in other frequency bands with primary terrestrial networks, such as the public switched telephone network and Internet networks, communicating with the user-

      operated earth stations via links with NGSO satellites. An NGSO FSS gateway earth station may also be used for telemetry, tracking, and command transmissions and is not for the exclusive use of any customer.

      * * * * *

      Plane perpendicular to the GSO arc. The plane that is perpendicular to the ``plane tangent to the GSO arc,'' as defined below, and includes a line between the earth station in question and the GSO space station that it is communicating with.

      Plane tangent to the GSO arc. The plane defined by the location of an earth station's transmitting antenna and a line in the equatorial plane that is tangent to the GSO arc at the location of the GSO space station that the earth station is communicating with.

      * * * * *

      Protection areas. The geographic regions where U.S. Department of Defense meteorological satellite systems or National Oceanic and Atmospheric Administration meteorological satellite systems, or both such systems, receive signals from low earth orbiting satellites. Also, areas around NGSO MSS feeder-link earth stations in the 1.6/2.4 GHz Mobile-Satellite Service determined in the manner specified in Sec. 25.203(j).

      * * * * *

      Skew angle. The angle between the minor axis of an axially asymmetric antenna beam and the plane tangent to the GSO arc.

      * * * * *

      Two-degree-compliant space station. A GSO FSS space station operating in the conventional or extended C-band, the conventional or extended Ku-band, or the 20/30 GHz bands within the routine limits on downlink PSD or PFD specified in Sec. 25.140(a)(3) and communicating only with earth stations operating in conformance with routine uplink parameters specified in Sec. Sec. 25.134, 25.138(a), 25.211(d), 25.212(c), (d), or (f), 25.218, 25.221(a)(1) or (a)(3), 25.222(a)(1) or (a)(3), 25.223(b), 25.226(a)(1) or (a)(3), or Sec. 25.227(a)(1) or (a)(3).

      * * * * *

      VSAT network. A network consisting of ``remote'' earth stations with small antennas that communicate via one or more FSS space stations, which usually include one or more ``hub'' or ``gateway'' earth stations that route messages and may perform other network control functions.

      0

      5. Amend Sec. 25.110 by revising paragraphs (b) and (d) to read as follows:

      Sec. 25.110 Filing of applications, fees, and number of copies.

      * * * * *

      (b) Submitting your application.

      (1) All earth station license applications must be filed electronically on Form 312 in accordance with the applicable provisions of part 1, subpart Y of this chapter.

      (2) Except as provided in paragraph (b)(3) of this section, applications for space station licenses must be filed electronically on Form 312 in accordance with the applicable provisions of part 1, subpart Y of this chapter and include all information required by Sec. 25.114.

      (3) A license application for a GSO FSS space station not subject to the provisions in Appendix 30A or 30B of the ITU's Radio Regulations may be submitted in two steps, as follows:

      (i) Such an application may be initiated by filing, in accordance with the applicable provisions of part 1, subpart Y of this chapter, a draft API and Coordination Request for proposed space station operation in specified frequency bands at a specified orbital location with a letter signed by the party in interest or a designated representative requesting that the draft API and Coordination Request be submitted to the ITU and a declaration of acceptance of ITU cost-recovery responsibility in accordance with Sec. 25.111(d). Such a filing need not include a completed Form 312.

      (ii) An application initiated pursuant to paragraph (b)(3)(i) of this section may be completed by filing a complete Form 312 for the proposed space station and any other information required by Sec. 25.114 within two years of the date of the public notice announcing the filing of the API and Coordination Request.

      * * * * *

      (d) An applicant must pay the appropriate filing fee in accordance with part 1, subpart G of this chapter, at the time when it files Form 312.

      0

      6. Amend Sec. 25.112 by revising the section heading, the first sentence in paragraph (b), and paragraph (c), and adding paragraph (d) to read as follows:

      Sec. 25.112 Dismissal and return of applications.

      * * * * *

      (b) Applications for space station authority found defective under paragraph (a)(3) or (a)(4) of this section will not be considered. * * *

      (c) The Commission will dismiss an application for failure to respond substantially within a specified time period to official correspondence or requests for additional information. Dismissal will be without prejudice unless the application is mutually exclusive pursuant to Sec. 25.155, in which case it will be dismissed with prejudice.

      (d) An application will be dismissed without prejudice as a matter of right if the applicant requests its dismissal prior to final Commission action.

      0

      7. Amend Sec. 25.113 by revising paragraphs (f) through (h) and adding paragraph (i) to read as follows:

      Sec. 25.113 Station construction, deployment approval, and operation of spare satellites.

      * * * * *

      (f) Construction permits are not required for U.S.-licensed space stations, except for stations that the applicant proposes to operate to disseminate program content to be received by the public at large, rather than only by subscribers. Construction of a station for which a construction permit is not required may commence, at the applicant's own risk, prior to grant of a license.

      (g) Except as set forth in paragraphs (h) and (i) of this section, approval for orbital deployment and a station license (i.e., operating authority) must be applied for and granted before a space station may be deployed and operated in orbit. Approval for orbital deployment may be requested in an application for a space station license. However, an application for authority to deploy and operate an on-ground spare

      Page 65113

      satellite will be considered pursuant to the following procedures:

      (1) Applications for deployment and operation of an on-ground spare NGSO-like satellite will be considered pursuant to the procedures set forth in Sec. 25.157, except as set forth in paragraph (g)(3) of this section.

      (2) Applications for deployment and operation of an on-ground spare GSO-like satellite will be considered pursuant to the procedures set forth in Sec. 25.158, except as set forth in paragraph (g)(3) of this section.

      (3) Neither paragraph (g)(1) nor (g)(2) of this section will apply in cases where the space station to be deployed is determined to be an emergency replacement for a previously authorized space station that has been lost as a result of a launch failure or a catastrophic in-

      orbit failure.

      (h) Operators of NGSO satellite systems licensed by the Commission need not file separate applications to operate technically identical in-orbit spares deployed pursuant to a blanket license granted under Sec. 25.114(a). However, the licensee must notify the Commission within 30 days of bringing an in-orbit spare into operation and certify that its activation has not increased the number of operating space stations above the number previously authorized and that the licensee has determined by measurement that the activated spare is operating within the terms of the license.

      (i) Replacement of Space Stations within the System License Term. An operator of NGSO space stations under a blanket license granted by the Commission need not apply for license modification to deploy and operate technically identical replacement satellites in a previously-

      authorized orbit within the term of the system authorization. However, the licensee must notify the Commission of the intended launch at least thirty days in advance and certify that its operation of the additional space station(s) will not increase the number of operating space stations above the maximum number specified in the license.

      0

      8. Amend Sec. 25.114 by removing paragraph (c)(13) and revising paragraphs (a), (b), (c)(4)(vi)(D), (d)(10), (d)(15)(i), and (d)(15)(iii) and (iv) to read as follows:

      Sec. 25.114 Applications for space station authorizations.

      (a)(1) A license application filed pursuant to Sec. 25.110(b)(2) for a GSO space station or NGSO space station or space station constellation must comprise a comprehensive proposal and must be submitted on FCC Form 312, Main Form and Schedule S, with attached exhibits required by paragraph (d) of this section.

      (2) An application for blanket authority for an NGSO constellation of space stations that are not all technically identical must provide the information required by paragraphs (c) and (d) of this section for each type of station in the constellation.

      (3) For an application filed pursuant to the two-step procedure in Sec. 25.110(b)(3), the filing pursuant to Sec. 25.110(b)(3)(ii) must be submitted on FCC Form 312, Main Form and Schedule S, with attached exhibits as required by paragraph (d) of this section, and must constitute a comprehensive proposal.

      (b) Each application for a new or modified space station authorization must contain the formal waiver required by section 304 of the Communications Act, 47 U.S.C. 304.

      (c) * * *

      (4) * * *

      (vi) * * *

      (D) For a space station with steerable beams that are not shapeable, specify the applicable contours, as defined in paragraph(c)(4)(vi)(A) or (B) of this section, with a description of a proposed coverage area for each steerable beam or provide the contour information described in paragraph (c)(4)(vi)(C) of this section for each steerable beam.

      (d) * * *

      (10) Applications for space station authorizations in the 1.6/2.4 GHz or 2 GHz Mobile-Satellite Service must include information required by Sec. 25.143(b);

      * * * * *

      (15) * * *

      (i) Except as set forth in paragraph (d)(15)(ii) of this section, an applicant proposing to operate in the 17.3-17.7 GHz frequency band must demonstrate that the proposed space station will comply with the power flux density limits in Sec. 25.208(w).

      * * * * *

      (iii) An applicant proposing to provide international service in the 17.7-17.8 GHz band must certify that it will meet the power flux density limits in Sec. 25.208(c).

      (iv) Any information required by Sec. Sec. 25.264(a)(6), 25.264(b)(4), or 25.264(d).

      * * * * *

      0

      9. Amend Sec. 25.115 as follows:

      0

    8. Revise paragraphs (a)(2)(iii) through (vii);

      0

    9. Remove paragraphs (a)(2)(viii) and (ix);

      0

    10. Revise paragraph (c)(1);

      0

    11. Remove from paragraph (c) the terms ``CSAT'' and ``CSATs'' wherever they appear;

      0

    12. Revise paragraph (e), paragraph (g) introductory text, and paragraphs (g)(1) and (2); and

      0

    13. Remove and reserve paragraph (h).

      Sec. 25.115 Application for earth station authorizations.

      (a) * * *

      (2) * * *

      (iii) The application meets all relevant routine licensing criteria in Sec. Sec. 25.134, 25.211, or 25.212 or includes information filed pursuant to paragraph (g)(1) of this section indicating that off-axis EIRP density from the proposed earth stations will not exceed relevant routine levels specified in Sec. Sec. 25.138(a) or 25.218; and

      (iv) Operation of the proposed station has been successfully coordinated with terrestrial systems, if the station would transmit in the 5925-6425 MHz band; and

      (v) The application includes an environmental impact statement pursuant to Sec. 1.1311 of this chapter, if required; and

      (vi) The applicant does not propose to communicate via non-U.S.-

      licensed satellites not on the Permitted Space Station List; and

      (vii) If the proposed station(s) will transmit in the 28.35-28.6 GHz and/or 29.5-30 GHz bands, the applicant proposes to communicate only via satellites for which coordination has been completed pursuant to Footnote US334 of the U.S. Table of Frequency Allocations with respect to Federal Government systems authorized on a primary basis, under an agreement previously approved by the Commission and the National Telecommunications and Information Administration, and the applicant certifies that it will operate consistently with the agreement.

      * * * * *

      (c)(1) Large Networks of Small Antennas operating in the 11.7-12.2 GHz and 14.0-14.5 GHz frequency bands with U.S.-licensed or non-U.S.-

      licensed satellites for domestic or international services. Applications to license small antenna network systems operating in the 11.7-12.2 GHz and 14.0-14.5 GHz frequency band under blanket operating authority may be filed on FCC Form 312 or Form 312EZ, with a Schedule B for each large (5 meters or larger) hub station and each representative type of small antenna (less than 5 meters) operating within the network.

      * * * * *

      (e) License applications for earth stations operating in any portion of the

      Page 65114

      18.3-20.2 GHz and 28.35-30.0 GHz bands must be filed on FCC Form 312, Main Form and Schedule B, and must include any information required by paragraph (g) or (j) of this section or by Sec. 25.130. An applicant may request authority for operation of GSO FSS earth stations in the 20/30 GHz bands without specifying the location of user terminals but must specify the number of terminals to be covered by the license, the geographic area(s) in which they will operate, and the location of hub and/or gateway stations.

      * * * * *

      (g) Applications for earth stations that will transmit to geostationary satellites in any portion of the 5850-7025 MHz, 12.75-

      13.25 GHz, 13.75-14.5 GHz, 24.75-25.25 GHz, 28.35-28.6 GHz, or 29.25-

      30.0 GHz band must include, in addition to the particulars of operation identified on Form 312 and associated Schedule B, the information specified in either paragraph (g)(1) or (2) below for each earth station antenna type.

      (1) Specification of off-axis EIRP density calculated from measurements made consistent with the requirements in Sec. 25.132(b)(1), in accordance with the following requirements. For purposes of this rule, the ``off-axis angle'' is the angle in degrees from a line between an earth station antenna and the target satellite.

      (i) A plot of maximum co-polarized EIRP density in the plane tangent to the GSO arc, for off-axis angles from minus 180deg to plus 180deg;

      (ii) A plot of maximum cross-polarized EIRP spectral density in the plane tangent to the GSO arc at off-axis angles from minus 10deg to plus 10deg;

      (iii) A plot of maximum co-polarized EIRP density in the plane perpendicular to the GSO arc at off-axis angles from 0deg to plus 30deg;

      (iv) A plot of maximum cross-polarized EIRP density in the plane tangent to the GSO arc at off-axis angles from minus 10deg to plus 10deg;

      (v) A plot of maximum cross-polarized EIRP density in the plane perpendicular to the GSO arc at off-axis angles from minus 10deg to plus 10deg;

      (vi) The relevant off-axis EIRP density envelopes in Sec. Sec. 25.138, 25.218, 25.221, 25.222, 25.223, 25.226, or 25.227 must be superimposed on plots submitted pursuant to paragraphs (i) through (v) above.

      (vii) The showing must include a supplemental table for each off-

      axis angular range in which the relevant routine EIRP density envelope will be exceeded, specifying angular coordinates in degrees off-axis and corresponding calculated off-axis EIRP density at 0.2 degree increments over the angular range in which the routine envelope will be exceeded and one degree on each side of that range.

      (2) An applicant that certifies pursuant to Sec. 25.132(a)(1) that a proposed antenna's measured gain pattern conforms to relevant standards in Sec. 25.209(a) and (b) and that input power density to the antenna will not exceed a relevant limit in Sec. Sec. 25.134, 25.211, or 25.212 need not provide a showing pursuant to paragraph (g)(1) of this section for operation with that antenna.

      * * * * *

      0

      10. Amend Sec. 25.117 by adding paragraph (h) to read as follows:

      Sec. 25.117 Modification of station license.

      * * * * *

      (h) Unless otherwise ordered by the Commission, an application for any of the following kinds of modification of the operation of a GSO space station will be deemed granted 35 days after the date of the public notice that the application has been accepted for filing, provided no objection is filed during the 30-day notice period and the application does not propose a change that would be inconsistent with a Commission rule or require modification of the BSS plan in Appendix 30 or the associated feeder link plan in Appendix 30A of the ITU Radio Regulations.

      (1) Relocation of a DBS or GSO FSS space station by no more than 0.15 degrees from the initially authorized orbital location; or

      (2) Repositioning one or more antenna beams by no more than 0.3 angular degrees from a line between the space station and the initially authorized boresight location(s).

      0

      11. Amend Sec. 25.118 by revising paragraphs (a), (b), and (e) to read as follows:

      Sec. 25.118 Modifications not requiring prior authorization.

      (a) Earth station modifications, notification required. Earth station licensees may make the following modifications without prior Commission authorization, provided they notify the Commission, using FCC Form 312 and Schedule B, within 30 days of the modification. The notification must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter.

      (1) Authorized VSAT earth station operators may add VSAT remote terminals without prior authorization, provided that they have complied with all applicable frequency coordination procedures in accordance with Sec. 25.251.

      (2) A licensee providing service on a private carrier basis may change its operations to common carrier status without obtaining prior Commission authorization. The licensee must notify the Commission using Form 312 within 30 days after the completed change to common carrier status.

      (3) An earth station operator may change a point of communication without prior authorization, provided that the operator does not repoint the earth station's antenna and that (i) the change results from a space station relocation described in paragraph (e) of this section, or (ii) the new point of communication is a replacement GSO space station operated by the operator of the original point of communication within 0.15 degrees of orbital longitude of the same location, with authority to serve the U.S., and the change does not entail any increase in the earth station's EIRP or EIRP density.

      (4) Licensees may make other changes to their authorized earth stations without prior authority from the Commission, provided the modification does not involve:

      (i) An increase in EIRP or EIRP density (either main lobe or off-

      axis);

      (ii) A change in operating frequencies;

      (iii) A change from the originally authorized coordinates of more than 1 second in latitude or longitude for stations operating in frequency bands shared with terrestrial systems or more than 10 seconds of latitude or longitude for stations operating in frequency bands not shared with terrestrial systems;

      (iv) A change in polarization;

      (v) An increase in antenna height;

      (vi) Antenna repointing; or

      (iv) A change in the location of a remote control point.

      (b) Earth station license modifications, notification not required. Notwithstanding paragraph (a) of this section, equipment in an authorized earth station may be replaced without prior authorization and without notifying the Commission if the new equipment is electrically identical to the existing equipment.

      * * * * *

      (e) Relocation of GSO space stations. A space station licensee may relocate a GSO space station without prior authorization, but upon 30 days prior notice to the Commission and any potentially affected licensed spectrum user, provided that the operator meets the following requirements. The notification must be filed electronically on Form 312 through the International

      Page 65115

      Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter:

      (1) The space station will be relocated to a position within 0.15 degrees of another orbit location assigned to the same licensee.

      (2) The licensee certifies that the space station will operate after the relocation within the technical parameters authorized and coordinated for the space station previously assigned to that location.

      (3) The licensee certifies that it will comply with all the conditions of its license for operation at the changed location.

      (4) The licensee certifies that it will limit operations of the space station to Tracking, Telemetry, and Command (TT&C) functions during the relocation and satellite drift transition period.

      (5) The licensee certifies that it has coordinated the station-

      keeping volume of the relocated satellite with operators of adjacent space stations.

      (6) The licensee certifies that the relocation will not result in a lapse of service for any current customer.

      (7) If the space station to be relocated is a DBS space station, the licensee certifies that there will be no increase in interference due to the operations of the relocated space station that would require the Commission to submit a proposed modification to the ITU Appendix 30 Broadcasting-Satellite Service (``BSS'') Plan and/or the Appendix 30A feeder link Plan to the ITU Radiocommunication Bureau. A DBS licensee that meets this certification requirement is not subject to the requirements in paragraph (e)(2) of this section.

      (8) A DBS licensee must also certify that it will meet the geographic service requirements in Sec. 25.148(c) after the relocation.

      0

      12. Amend Sec. 25.129 by revising paragraph (c) to read as follows:

      Sec. 25.129 Equipment authorization for portable earth-station transceivers.

      * * * * *

      (c) In addition to the information required by Sec. Sec. 1.1307(b) and 2.1033(c) of this chapter, applicants for certification required by this section must submit any additional equipment test data necessary to demonstrate compliance with pertinent standards for transmitter performance prescribed in Sec. Sec. 25.138, 25.202(d) and (f), and 25.216, must submit the statements required by Sec. 2.1093(c) of this chapter, and must demonstrate compliance with the labeling requirement in Sec. 25.285(b).

      0

      13. Amend Sec. 25.130 by revising paragraph (b), paragraph (g) introductory text, and the note to paragraph (g) to read as follows:

      Sec. 25.130 Filing requirements for transmitting earth stations.

      * * * * *

      (b) A frequency coordination analysis in accordance with Sec. 25.203(b) must be provided for earth stations transmitting in the frequency bands shared with equal rights between terrestrial and space services, except applications for user transceiver units associated with the NVNG mobile-satellite service, which must instead provide the information required by Sec. 25.135, and applications for 1.6/2.4 GHz MSS user transceivers, which must demonstrate that the transceivers will operate in compliance with relevant requirements in Sec. 25.213. Also, applications for transmitting earth stations must include any notification or demonstration required by any other relevant provision in Sec. 25.203.

      * * * * *

      (g) Parties may apply, either in an initial application or an application for modification of license, for operating authority for multiple transmitting FSS earth stations that are not eligible for blanket or network licensing under another section of this part in the following circumstances:

      * * * * *

      Note to Paragraph (g): This paragraph does not apply to VSAT network applications filed pursuant to Sec. Sec. 25.115(c) or 25.218; applications for 20/30 GHz hub stations filed pursuant to Sec. 25.115(e); applications for NGSO FSS gateway earth stations filed pursuant to Sec. 25.115(f); applications filed pursuant to Sec. Sec. 25.221, 25.222, 25.226, or 25.227; or applications for 29 GHz NGSO MSS feeder link stations in a complex as defined in Sec. 25.257.

      0

      14. Amend Sec. 25.131 by revising paragraphs (b) and (j)(2) to read as follows:

      Sec. 25.131 Filing requirements and registration for receive-only earth stations.

      * * * * *

      (b) Receive-only earth stations in the Fixed-Satellite Service that operate with U.S.-licensed space stations, or with non-U.S.-licensed space stations that have been duly approved for U.S. market access, may be registered with the Commission in order to protect them from interference from terrestrial microwave stations in bands shared co-

      equally with the Fixed Service in accordance with the procedures of Sec. Sec. 25.203 and 25.251, subject to the stricture in Sec. 25.209(e).

      * * * * *

      (j) * * *

      (2) Operators of receive-only earth stations need not apply for license authority to receive transmissions from non-U.S.-licensed space stations that have been duly approved for U.S. market access, provided the space station operator and earth station operator comply with all applicable rules in this chapter and with applicable conditions in the Permitted Space Station List or market-access authorization.

      0

      15. Amend Sec. 25.132 by revising the section heading and paragraphs (a) and (b) to read as follows:

      Sec. 25.132 Verification of earth station antenna performance.

      (a)(1) Except as provided in paragraph (a)(2) of this section, applications for transmitting earth stations in the Fixed-Satellite Service, including feeder-link stations, must include certification that the applicant has reviewed the results of a series of radiation pattern tests performed by the antenna manufacturer on representative equipment in representative configurations, and the test results demonstrate that the equipment meets relevant off-axis gain standards in Sec. 25.209, measured in accordance with paragraph (b)(1) of this section. Applicants and licensees must be prepared to submit the radiation pattern measurements to the Commission on request.

      (2) Applicants that specify off-axis EIRP density pursuant to Sec. 25.115(g)(1) are exempt from the certification requirement in paragraph (a)(1) of this section.

      (b)(1) For purposes of paragraph (a)(1) of this section and Sec. 25.115(g)(1), the following measurements on a production antenna performed on calibrated antenna range must be made at the top and bottom of each frequency band assigned for uplink transmission:

      (i)(A) Co-polarized gain in the azimuth plane must be measured across a range extending to 180 degrees on each side of the main-lobe axis, and the measurements must be represented in two plots: One across the entire angular range of 180 degrees from the main-lobe axis and the other across 10 degrees from the main-lobe axis.

      (B) Co-polarized gain must be measured from 0 to 30 degrees from beam peak in the elevation plane.

      (ii) Cross-polarization gain must be measured across a range of plus and minus 10 degrees from beam peak in the azimuth and elevation planes.

      (iii) Main beam gain.

      (iv) For antennas with asymmetric apertures or beams, where the minor axis of the antenna beam (major axis of

      Page 65116

      the antenna aperture) will not always be aligned parallel to the plane tangent to the GSO arc, measurements must be made at the worst-case skew angle at which the antenna will operate.

      (2) The relevant envelope specified in Sec. 25.209 must be superimposed on each measured pattern.

      * * * * *

      0

      16. Amend Sec. 25.133 by removing and reserving paragraph (c), and revising paragraphs (a)(2), (b)(1)(v) and (vi), and (b)(2) to read as follows:

      Sec. 25.133 Period of construction; certification of commencement of operation.

      (a) * * *

      (2) Operation of a network of earth stations at unspecified locations under an initial blanket license must commence within 12 months from the date of the license grant unless the Commission orders otherwise.

      (b)(1) * * *

      (v) A certification that the facility as authorized has been completed and that each antenna has been tested and found to perform within authorized gain patterns or off-axis EIRP density levels; and

      (vi) The date when the earth station became operational.

      (2) For FSS earth stations authorized under a blanket license, the licensee must notify the Commission when the earth station network commences operation. The notification should include the information described in paragraphs (b)(1)(i) through (iv) of this section and a certification that each hub antenna, and each type of antenna used in remote stations in the network, has been tested and found to perform within authorized gain patterns or off-axis EIRP density levels.

      * * * * *

      0

      17. Amend Sec. 25.134 by removing paragraph (g), redesignating paragraph (h) as paragraph (g), revising the section heading and paragraphs (a) and (b), and adding paragraph (c) to read as follows:

      Sec. 25.134 Licensing provisions for 4/6 GHz, 12/14 GHz, and 20/30 GHz VSAT networks.

      (a) A license application for operation of a VSAT network in the 4/

      6 GHz bands may be routinely processed if frequency coordination has been satisfactorily completed pursuant to Sec. 25.203 and the criteria in paragraph (a)(1) or (2) of this section are met:

      (1)(i) Equivalent antenna diameter is 4.5 meters or more, and the applicant certifies pursuant to Sec. 25.132(a)(1) that the off-axis gain of transmitting antennas in the network will not exceed the relevant levels specified in Sec. 25.209(a) and (b);

      (ii) The input power of any full-transponder analog video transmission will not exceed the relevant limit in Section 25.211(d), and the bandwidth and input power density of any other type of analog transmission will not exceed the relevant limits in Sec. 25.212(d);

      (iii) The power density of any digitally modulated carrier will not exceed -2.7 - 10log(N) dBW/4 kHz at the input of any network antenna. ``N'' is the number of network earth stations transmitting simultaneously in the same frequencies to the same target satellite, not counting burst collisions resulting from operation with a contention protocol. N=1 for any station not transmitting simultaneously with others on common frequencies to the same target satellite and stations in networks that permit such simultaneous co-

      frequency transmission only in contention protocol operation.

      (2) The application is not subject to an exclusion in Sec. 25.218(a)(1) or (2) and includes tables filed pursuant to Sec. 25.115(g)(1) indicating that off-axis EIRP density from the proposed earth stations will not exceed relevant routine levels specified in Sec. 25.218.

      (b) Applications for VSAT operation in the 12/14 GHz bands may be routinely processed if the criteria in the following paragraph (1) or (2) are met.

      (1) (i) Equivalent antenna diameter is 1.2 meters or more, and the applicant certifies pursuant to Sec. 25.132(a)(1) that the off-axis gain of transmitting antennas in the network will not exceed the relevant levels specified in Sec. 25.209(a) and (b);

      (ii) The input power of any full-transponder analog video transmission will not exceed the relevant limit in Sec. 25.211(d), and the bandwidth and input power density of any other type of analog transmission will not exceed the relevant limits in Sec. 25.212(c);

      (iii) The power spectral density of any digitally modulated carrier into any transmitting earth station antenna in the proposed network will not exceed -14.0 - 10log(N) dBW/4 kHz. N is the number of network earth stations that transmitting simultaneously in the same frequencies to the same target satellite, not counting packet burst collisions resulting from operation with a contention protocol. N=1 for any station not transmitting simultaneously with others on common frequencies to the same target satellite and stations in networks that permit such simultaneous co-frequency transmission only in contention protocol operation.

      (2) The application is not subject to an exclusion in Sec. 25.218(a)(1) or (2) and includes tables filed pursuant to Sec. 25.115(g)(1) indicating that off-axis EIRP density from the proposed earth stations will not exceed relevant routine levels specified in Sec. 25.218.

      (c) Applications for VSAT stations that will transmit digitally modulated signals to GSO space stations in the 28.35-28.6 GHz and/or 29.25-30.0 GHz band may be routinely processed if the criteria in the following paragraph (1) or (2) are met:

      (1) (i) Equivalent antenna diameter is at least 0.66 meters and the applicant certifies pursuant to Sec. 25.132(a)(1) that the off-axis gain of transmitting antennas in the network will not exceed the relevant levels specified in Sec. 25.209(a) and (b);

      (ii) The power spectral density of any digitally modulated carrier into any transmitting earth station antenna in the proposed network will not exceed 3.5 - 10log(N) dBW/MHz. ``N'' is the number of network earth stations transmitting simultaneously in the same frequencies to the same target satellite, not counting burst collisions resulting from operation with a contention protocol. N=1 for any station not transmitting simultaneously with others on common frequencies to the same target satellite and stations in networks that permit such simultaneous co-frequency transmission only in contention protocol operation.

      (2) The application includes tables filed pursuant to Sec. 25.115(g)(1) indicating that off-axis EIRP density from the proposed earth stations will not exceed relevant routine levels specified in Sec. 25.138.

      * * * * *

      0

      18. Amend Sec. 25.138 by removing and reserving paragraphs (c) through (e); removing paragraph (g); and revising the section heading, paragraph (a) introductory text, paragraphs (a)(1) through (5), and paragraph (b) to read as follows:

      Sec. 25.138 Licensing requirements for GSO FSS Earth Stations in the 20/30 GHz bands.

      (a) Applications for earth station licenses in the GSO FSS in the 20/30 GHz bands that indicate that the following requirements will be met and include the information required by relevant provisions in Sec. Sec. 25.115 and 25.130 may be routinely processed:

      (1) The EIRP spectral density of co-polarized signals in the plane tangent to the GSO arc, as defined in Sec. 25.103, will not exceed the following values under clear sky conditions:

      Page 65117

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      32.5-25log(thetas)-10log(N) dBW/MHz for

      2.0deg10deg, over 10% of the range of theta (thetas) angles from 10-

      180deg on each side of the line from the earth station to the target satellite.

      (4) The EIRP density of cross-polarized signals will not exceed the following values in the plane tangent to the GSO arc or in the plane perpendicular to the GSO arc under clear sky conditions:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      22.5-25log(thetas)-10log(N) dBW/MHz for

      2.0deg0.15 degrees of the assigned location of the satellite to be replaced and which will be launched before the satellite(s) to be replaced are, or is, retired from service or within a reasonable time after loss of a satellite during launch or due to premature failure in orbit.

      (c) Each application for NGSO-like satellite operation that is acceptable for filing under Sec. 25.112, except replacement applications described in paragraph (b) of this section, will be reviewed to determine whether it is a ``competing application,'' i.e., filed in response to a public notice initiating a processing round, or a ``lead application,'' i.e., all other applications for NGSO-like satellite operation.

      * * * * *

      (g)(1) In the event that a license granted in a processing round pursuant to this section is cancelled for any reason, the Commission will redistribute the bandwidth allocated to that applicant equally among the remaining applicants whose licenses were granted concurrently with the cancelled license, unless the Commission determines that such a redistribution would not result in a sufficient number of licensees remaining to make reasonably efficient use of the frequency band.

      (2) * * * Parties already holding licenses for NGSO-like satellite operation in that frequency band will not be permitted to participate in that processing round.

      * * * * *

      0

      30. Amend Sec. 25.158 by revising the section heading, paragraph (a), paragraph (b) introductory text, paragraphs (b)(2) and (c), and paragraph (d) introductory text to read as follows:

      Sec. 25.158 Consideration of applications for GSO-like satellite systems.

      (a)(1) Except as provided in paragraph (a)(2) of this section, this section specifies the Commission's procedures for considering license applications for ``GSO-like'' satellite operation. For purposes of this section, the term ``GSO-like satellite system'' means a GSO satellite designed to communicate with earth stations with directional antennas, including operation of GSO satellites to provide MSS feeder links.

      (2) The procedures prescribed in this section do not apply to an application for authority to launch and operate a replacement satellite with the same operating frequencies and at the same orbital location as a space station currently licensed to the applicant, to be launched before the satellite to be replaced is retired from service or within a reasonable time after loss of the satellite to be replaced due to launch failure or premature failure in orbit.

      (b) Except as provided in paragraph (a)(2) of this section, license applications for GSO-like satellite systems, including first-step filings pursuant to Sec. 25.110(b)(3)(i), will be placed in a queue and considered in the order that they are filed, pursuant to the following procedure:

      * * * * *

      (2) If the application is acceptable for filing, the application will be placed on public notice pursuant to Sec. 25.151.

      (i) For applications filed pursuant to Sec. 25.110(b)(3)(i), the public notice will announce that the API and Coordination Request has been submitted to the ITU. When further information is filed pursuant to Sec. 25.110(b)(3)(ii), it will be reviewed to determine whether it is substantially complete within the meaning of Sec. 25.112. If so, a second public notice will be issued pursuant to Sec. 25.151 to give interested parties an opportunity to file pleadings pursuant to Sec. 25.154.

      (ii) For any other license application for a GSO-like satellite system, the public notice will announce that the application has been found acceptable for filing and will give interested parties an opportunity to file pleadings pursuant to Sec. 25.154.

      (c) An applicant for a license for a GSO-like satellite system is not allowed to transfer, assign, or otherwise permit any other entity to assume its place in any queue.

      (d) In the event that two or more applications for GSO-like satellite systems are mutually exclusive within the meaning of Sec. 25.155(c), the Commission will consider those applications pursuant to the following procedure:

      * * * * *

      0

      31. Amend Sec. 25.163 by revising paragraph (a)(3) to read as follows:

      Sec. 25.163 Reinstatement.

      (a) * * *

      (3) The petition sets forth with specificity the procedures that have been established to ensure timely filings in the future.

      * * * * *

      0

      32. Amend Sec. 25.165 by revising the section heading, paragraphs (a)(1) through (4), and paragraphs (c) and (e), and adding paragraphs (f) and (g) to read as follows:

      Sec. 25.165 Surety bonds.

      (a) * * *

      Page 65120

      (1) An NGSO licensee must file a surety bond requiring payment, in the event of a default as defined paragraph (c) of this section, in an amount to be determined by adjusting a baseline amount of $x million for inflation in accordance with paragraph (a)(4) of this section, with the resulting dollar amount rounded to the nearest $10,000.

      (2) A GSO licensee must file a surety bond requiring payment, in the event of a default as defined paragraph (c) of this section, in an amount to be determined by adjusting a baseline amount of $y million for inflation in accordance with paragraph (a)(4) of this section, with the resulting dollar amount rounded to the nearest $10,000.

      (3) Licensees of satellite systems including both NGSO satellites and GSO satellites that will operate in the same frequency bands must file a bond requiring payment, in the event of a default as defined paragraph (c) of this section, in an amount to be determined by adjusting a baseline amount of $x million for inflation in accordance with paragraph (a)(4) of this section, with the resulting dollar amount rounded to the nearest $10,000.

      (4) Inflation adjustment for purposes of paragraphs (a)(1) through (3) and paragraph (f) of this section shall be computed by multiplying the baseline dollar amount by the Bureau of Economic Analysis ``GDPChain-type Price Index'' (GDP-CPI) for the most recent quarter and dividing the product by the GDP-CDI for year and quarter when inflation-adjustment rule is adopted.

      * * * * *

      (c) A licensee will be considered to be in default if it surrenders the license before meeting all milestone requirements or if it fails to meet any milestone deadline set forth in Sec. 25.164, and, at the time of milestone deadline, the licensee has not provided a sufficient basis for extending the milestone.

      * * * * *

      (e) A replacement satellite is one that:

      (1) Is authorized to be operated at an orbital location within 0.15 degrees of the assigned location of a GSO satellite licensed to the same party or is authorized for NGSO operation and will replace an existing NGSO satellite licensed to the same party;

      (2) Is authorized to operate in the same frequency bands, and with the same coverage area as the satellite to be replaced; and

      (3) Is scheduled to be launched so that it will be brought into use at approximately the same time as, but no later than, the existing satellite is retired.

      (f) An applicant that has filed an API and Coordination Request pursuant to Sec. 25.110(b)(3)(i) must obtain a surety bond in accordance with the requirements in paragraph (b) of this section. The bond must require payment, in the event of a default as defined in paragraph (g) of this section, of an amount to be determined by adjusting a baseline amount of $y1 \5\ million in accordance with paragraph (a)(4) of this section, with the resulting dollar amount rounded to the nearest $10,000. The application will be returned as defective pursuant to Sec. 25.112 if a copy of the required bond is not filed with the Commission within 30 days after release of a public notice announcing that the Commission has filed the API and Coordination Request with the ITU.

      ---------------------------------------------------------------------------

      \5\ The value of y1 would be two fifths of the baseline amount specified in paragraph (a)(2) for a post-grant bond for a GSO licensee.

      ---------------------------------------------------------------------------

      (g) An applicant or licensee will be deemed to be in default with respect to a bond filed pursuant to paragraph (f) of this section under any of the following circumstances:

      (1) If the applicant fails to file complete Form 312 and Schedule S information pursuant to Sec. 25.110(b)(3)(ii) within two years after the issuance of the public notice announcing the submission of the API and Coordination Request to the ITU.

      (2) If the license application filed pursuant to Sec. 25.110(b)(3) is dismissed and is not refiled prior to the two-year deadline in Sec. 25.110(b)(3)(ii) or the application is denied and the ruling is administratively final.

      (3) If a license granted for a space station proposed in the application filed pursuant to Sec. 25.110(b)(3) is surrendered before the authorized space station is launched.

      (4) If a license granted for the space station proposed in the application filed pursuant to Sec. 25.110(b)(3) is declared null and void for failure to meet a milestone requirement in Sec. 25.164 and the milestone ruling is administratively final.

      0

      33. Amend Sec. 25.202 by revising the table in paragraph (a)(1) and paragraph (g) to read as follows:

      Sec. 25.202 Frequencies, frequency tolerance, and emission limits.

      (a)(1) * * *

      ------------------------------------------------------------------------

      Earth-to-space

      Space-to-earth (GHz) (GHz)

      ------------------------------------------------------------------------

      3.6-3.65............................................. \8\ 5.091-5.25

      3.65-3.7............................................. 5.85-5.925

      3.7-4.2.............................................. 5.925-6.425

      4.5-4.8.............................................. 6.425-6.525

      6.7-7.025 \8\........................................ 6.525-6.7

      7.025-7.075.......................................... 6.7-7.025

      10.7-11.7 \8\........................................ 7.025-7.075

      11.7-12.2............................................ 12.7-12.75

      12.2-12.7............................................ \8\ 12.75-13.25

      18.3-18.58 \1 2\..................................... 13.75-14

      18.58-18.8........................................... 14-14.2

      18.8-19.3............................................ 14.2-14.5

      19.3-19.7............................................ \8\ 15.43-15.63

      19.7-20.2............................................ 17.3-17.8

      37.5-40 \3\.......................................... 24.75-25.05

      40-42................................................ 25.05-25.25

      \2\ 27.5-28.35

      \4\ 28.35-28.6

      \5\ 28.6-29.1

      \6\ 29.1-29.25

      \7\ 29.25-29.5

      \4\ 29.5-30.0

      47.2-50.2

      ------------------------------------------------------------------------

      \1\ The 18.3-18.58 GHz band is shared co-equally with existing

      terrestrial radiocommunication systems until November 19, 2012.

      \2\ FSS is secondary to LMDS in this band.

      \3\ Use of this band by the Fixed-Satellite Service is limited to

      gateway earth station operations, provided the licensee under this

      Part obtains a license under part 101 of this chapter or an agreement

      from a part 101 licensee for the area in which an earth station is to

      be located. Satellite earth station facilities in this band may not be

      ubiquitously deployed and may not be used to serve individual

      consumers.

      \4\ This band is primary for GSO FSS and secondary for NGSO FSS.

      \5\ This band is primary for NGSO FSS and secondary for GSO FSS.

      \6\ This band is primary for MSS feeder links and LMDS hub-to-subscriber

      transmission.

      \7\ This band is primary for MSS feeder links and GSO FSS.

      \8\ Use of this band by NGSO FSS systems is limited to transmissions to

      or from gateway earth stations.

      * * * * *

      (g)(1) Except as provided in paragraph (g)(2) below, telemetry, tracking, and command signals must be transmitted at either or both edges of the allocated band(s).

      (2) Additional, non-emergency telemetry, tracking, and command signals may be transmitted in frequencies within the assigned bands that are not at a band edge if such transmissions cause no more interference and require no greater protection from harmful interference than the communications traffic on the satellite network.

      (3) Frequencies, polarization, and coding of telemetry, tracking, and command transmissions must be selected to minimize interference into other satellite networks.

      0

      34. Amend Sec. 25.203 by adding paragraph (c)(6), revising the first sentence in paragraph (f), and revising paragraphs (g)(1) and (j) to read as follows:

      Page 65121

      Sec. 25.203 Choice of sites and frequencies.

      * * * * *

      (c) * * *

      (6) Multiple antennas in an NGSO FSS gateway earth station complex located within an area bounded by one second of latitude and one second of longitude may be regarded as a single earth station for purposes of coordination with terrestrial services.

      * * * * *

      (f) Notification to the National Radio Astronomy Observatory: In order to minimize possible harmful interference at the National Radio Astronomy Observatory site at Green Bank, Pocahontas County, W. Va., and at the Naval Radio Research Observatory site at Sugar Grove, Pendleton County, W. Va., any applicant for operating authority under this part for a new transmit or transmit-receive earth station, other than a mobile or temporary fixed station, within the area bounded by 39deg15' N. on the north, 78deg30' W. on the east, 37deg30' N. on the south and 80deg30' W. on the west or for modification of an existing license for such station to change the station's frequency, power, antenna height or directivity, or location must, when filing the application with the Commission, simultaneously notify the Director, National Radio Astronomy Observatory, P.O. Box No. 2, Green Bank, W. Va. 24944, in writing, of the technical particulars of the proposed station. * * *

      (g) * * *

      (1) Applicants for authority to operate a new transmitting earth station in the vicinity of an FCC monitoring station or to modify the operation of a transmitting earth station in a way that would increase the field strength produced at such a monitoring station above that previously authorized should consider the possible need to protect the FCC stations from harmful interference. Geographic coordinates of the facilities that require protection are listed in Sec. 0.121(c) of the Commission's Rules. Applications for fixed stations that will produce field strength greater than 10 mV/m or power flux density greater than -65.8 dBW/m\2\ in the authorized emission bandwidth at any of the referenced coordinates may be examined to determine the extent of possible interference. Depending on the theoretical field strength value and existing root-sum-square or other ambient radio field signal levels at the referenced coordinates, a condition to protect the monitoring station may be included in the station authorization.

      * * * * *

      (j) Applicants for non-geostationary 1.6/2.4 GHz Mobile-Satellite Service/Radiodetermination-Satellite Service feeder links in the 17.7-

      20.2 GHz and 27.5-30.0 GHz bands must coordinate with licensees of Fixed-Satellite Service and terrestrial-service systems sharing the band to determine geographic protection areas around each non-

      geostationary Mobile-Satellite Service/Radiodetermination-Satellite Service feeder-link earth station.

      * * * * *

      Sec. 25.204 Amended.

      0

      35. Amend Sec. 25.204 by removing the last sentence from paragraph (e)(1).

      0

      36. Revise Sec. 25.205 to read as follows:

      Sec. 25.205 Minimum antenna elevation angle.

      (a) Earth station antennas may not transmit at elevation angles less than 5 degrees, measured from the horizontal plane to the direction of maximum radiation, in a frequency band shared with terrestrial radio services or at elevation angles less than 3 degrees in other frequency bands. In some instances, it may be necessary to specify greater minimum elevation angles because of interference considerations.

      (b) ESAAs in aircraft on the ground may not transmit at elevation angles less than 3 degrees. There is no minimum angle of antenna elevation for ESAAs while airborne.

      0

      37. Amend Sec. 25.209 by revising paragraphs (a) through (c), removing and reserving paragraph (e), removing from paragraph (f) the word ``procedures'' wherever it appears and adding in its place the word ``requirements,'' and revising paragraph (h) to read as follows:

      Sec. 25.209 Earth station antenna performance standards.

      (a) Except as provided in paragraph (f) of this section, the gain of any earth station antenna operating in the Fixed-Satellite Service, including earth stations providing feeder links for satellite services other than FSS, may not exceed the following limits:

      (1) In the plane tangent to the GSO arc, as defined in Sec. 25.103, for earth stations not operating in the conventional Ku-band, the 28.35-30 GHz band, or the 24.75-25.25 GHz band:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      29-25log10thgr............. dBi for

      1.5deg7-180deg.

      (2) In the plane tangent to the GSO arc, for earth stations operating in the conventional Ku-band:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      29-25log10thgr............. dBi for

      1.5deg7-180deg.

      (3) In the plane tangent to the GSO arc, for earth stations operating in the 28.35-30 GHz or 24.75-25.25 GHz band:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      29-25log10thgr............. dBi for

      2deg7-180deg.

      (4) In the plane perpendicular to the GSO arc, as defined in Sec. 25.103, for earth stations not operating in the conventional Ku-band, 28.35-30 GHz band, or 24.75-25.25 GHz band:

      Outside the main beam, the gain of the antenna shall lie below the envelope defined by:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      32-25log10thgr............. dBi for

      3deg3-180deg.

      (5) In the plane perpendicular to the GSO arc, for earth stations operating in the conventional Ku-band:

      Outside the main beam, the gain of the antenna shall lie below the envelope defined by:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      32-25log10thgr............. dBi for

      3deg3-180deg.

      (6) In the plane perpendicular to the GSO arc, for earth stations operating in the 28.35-30 GHz band or 24.75-25.25 GHz band:

      Outside the main beam, the gain of the antenna shall lie below the envelope defined by:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      32-25log10thgr............. dBi for

      3.5deg3-180deg.

      (b) Except as provided in paragraph (f) of this section, the off-

      axis cross-polarization gain of any antenna used for transmission from an FSS earth station, including earth stations providing feeder links for satellite services other than FSS, may not exceed the following limits:

      (1) In the plane tangent to the GSO arc, for earth stations not operating in the 28.35-30 GHz band or the 24.75-25.25 GHz band:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      19-25log10thetas........... dBi for

      1.8deg7-180deg.

      0

      38. Amend Sec. 25.210 by removing and reserving paragraph (a) and revising paragraph (i) to read as follows:

      Sec. 25.210 Technical requirements for space stations.

      * * * * *

      (i) Space station antennas in the 17/24 GHz Broadcasting Satellite Service must be designed to provide a cross-polarization isolation such that the ratio of the on axis co-polar gain to the cross-polar gain of the antenna in the assigned frequency band shall be at least 25 dB within its primary coverage area.

      * * * * *

      0

      39. Amend Sec. 25.211 by removing and reserving paragraph (a) and revising paragraphs (b) and (e) to read as follows:

      Sec. 25.211 Analog video transmissions in the Fixed-Satellite Service.

      * * * * *

      (b) All 4/6 GHz analog video transmissions shall contain an energy dispersal signal at all times with a minimum peak-to-peak bandwidth set at whatever value is necessary to meet the power flux density limits specified in Sec. 25.208(a) and successfully coordinated internationally and accepted by adjacent U.S. satellite operators based on the use of state of the art space and earth station facilities. All transmissions in frequency bands described in Sec. 25.208(b) and (c) shall also contain an energy dispersal signal at all times with a minimum peak-to-peak bandwidth set at whatever value is necessary to meet the power flux density limits specified in Sec. 25.208(b) and (c) and successfully coordinated internationally and accepted by adjacent U.S. satellite operators based on the use of state of the art space and earth station facilities.

      * * * * *

      (e) Applications for authority for analog video uplink transmission in the 5925-6425 MHz or 14.0-14.5 GHz band that are not eligible for routine processing under paragraph (d) of this section are subject to the requirements of Sec. 25.220.

      0

      40. Amend Sec. 25.212 by revising paragraph (c)(1) and paragraphs (d) and (e), and adding paragraph (g) to read as follows:

      Sec. 25.212 Narrowband analog transmissions and digital transmissions in the GSO Fixed Satellite Service.

      * * * * *

      (c)(1) An earth station that is not subject to licensing under Sec. Sec. 25.134, 25.222, 25.226, or Sec. 25.227 may be routinely licensed for analog transmissions in the 14.0-14.5 GHz band with bandwidths up to 200 kHz (or up to 1 MHz for command carriers at the band edge) if the equivalent diameter of the transmitting antenna is 1.2 meters or greater, input power spectral density into the antenna will not exceed -8-10log10(N) dBW/4 kHz, and the applicant certifies conformance with relevant antenna performance standards in Sec. 25.209(a) and (b). ``N'' is the number of earth stations transmitting simultaneously in the same frequencies to the same target satellite. For stations not transmitting simultaneously on common frequencies to the same target satellite, N=1.

      * * * * *

      (d) An individual earth station that is not subject to licensing under Sec. 25.221 may be routinely licensed for digital transmission in the 5925-6425 MHz band or analog transmission in that band with carrier bandwidths up to 200 kHz (or up to 1 MHz for command carriers at the band edge) if the equivalent diameter of the transmit antenna is 4.5 meters or greater, the applicant certifies conformance with relevant antenna performance standards in Sec. 25.209(a) and (b), and power density into the antenna will not exceed +0.5-

      10log10(N) dBW/4 kHz for analog carriers or -2.7-

      10log10(N) dBW/4 kHz for digital carriers, where ``N'' is as defined in paragraph (c)(1) of this section.

      (e) Applications for authority for fixed earth station operation in the 5925-6425 GHz or 14.0-14.5 GHz band that do not qualify for routine processing under relevant criteria in this section, Sec. Sec. 25.211, or 25.218 are subject to the requirements in Sec. 25.220.

      * * * * *

      (g) An earth station not subject to network licensing under Sec. 25.134 may be routinely licensed for digital transmission in the 28.35-

      28.6 GHz and/or 29.25-30.0 GHz bands if the equivalent diameter of the transmitting antenna is 66 centimeters or greater, input power spectral density into the antenna will not exceed 3.5 dBW/MHz, and the application includes certification pursuant to Sec. 25.132(a)(1) of conformance with the antenna gain performance requirements in Sec. 25.209(a) and (b).

      0

      41. Revise Sec. 25.218 to read as follows:

      Sec. 25.218 Off-axis EIRP density envelopes for FSS earth stations transmitting in certain frequency bands.

      (a) This section applies to applications for Fixed-Satellite Service earth stations transmitting to geostationary-orbit space stations in the conventional C-band, extended C-band, conventional Ku-

      band, or extended Ku band, including VSAT applications not meeting routine licensing criteria in Sec. 25.134, with the following exceptions:

      (1) ESV, VMES, and ESAA applications and

      (2) Applications proposing transmission of analog command signals at a band edge with bandwidths greater than 1 MHz or transmission of any other type of analog signal with bandwidths greater than 200 kHz.

      (b) Earth station applications subject to this section may be routinely processed if they meet the applicable off-axis EIRP density envelopes set forth in this section below and include the table required by Sec. 25.115(h).

      (c) Analog earth station operation in the conventional or extended C-band. (1) In the plane tangent to the GSO arc, as defined in Sec. 25.103:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      29.5-10log10(N)- dBW/4 kHz for

      25log10thetas. 1.5deg7deg may be exceeded by up to 3 dB in up to 10% of the range of theta (thetas) angles from 7-180deg.

      (2) In the plane perpendicular to the GSO arc, as defined in Sec. 25.103:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      32.5-10log10(N)- dBW/4 kHz for

      25log10thetas. 3deg7deg may be exceeded by up to 3 dB in up to 10% of the range of theta (thetas) angles from 7-180deg. For stations in networks that allow multiple terminals to transmit simultaneously in shared frequencies with equal on-axis EIRP, ``N'' is the number of network earth stations transmitting simultaneously in the same frequencies to the same target satellite, not counting burst collisions resulting from operation with a contention protocol. N=1 for any station not transmitting simultaneously with others on common frequencies to the same target satellite and stations in networks that permit such simultaneous co-frequency transmission only in contention protocol operation.

      (2) In the plane perpendicular to the GSO arc:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      29.3-10log10(N)- dBW/4 kHz for

      25log10thetas. 3deg7deg may be exceeded by up to 3 dB in up to 10% of the range of theta (thetas) angles from 7-180deg.

      (2) In the plane perpendicular to the GSO arc:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      24-10log10(N)-25log10thetas dBW/4 kHz for

      3deg7deg may be exceeded by up to 3 dB in up to 10% of the range of theta (thetas) angles from 7-

      180deg.

      (2) In the plane perpendicular to the GSO arc:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      18-10log10(N)-25log10thetas dBW/4 kHz for

      3deg7deg may be exceeded by up to 3 dB in up to 10% of the range of theta (thgr) angles from 7-

      180deg.

      (2) In the plane perpendicular to the GSO arc:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      24-10log10(N)-25log10thgr.. dBW/4 kHz for

      3deg7deg may be exceeded by up to 3 dB in up to 10% of the range of theta (thgr) angles from 7-

      180deg.

      (2) In the plane perpendicular to the GSO arc:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      18-10log10(N)-25log10thgr.. dBW/4 kHz for

      3deg 7deg may be exceeded by up to 3 dB in up to 10% of the range of theta (thgr) angles from 7-180deg.

      (B) In the plane perpendicular to the GSO arc, as defined in Sec. 25.103, EIRP spectral density of co-polarized signals shall not exceed the following values:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      29.3-10log(N)-25logthgr.... dBW/4 kHz for

      3.0deg 7deg may be exceeded by up to 3 dB in up to 10% of the range of theta (theta) angles from 7-180deg.

      (B) The off-axis EIRP density of co-polarized signals shall not exceed the following values in the plane perpendicular to the GSO arc, as defined in Sec. 25.103:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      18-10log(N)-25logtheta..... dBW/4 kHz for

      3.0deg10deg, in 10% of the range of theta (theta) angles from 10deg-180deg on each side of the line from the earth station to the target satellite.

      (4) The EIRP density of cross-polarized signals shall not exceed the following values in the plane tangent to the GSO arc or in the plane

      Page 65130

      perpendicular to the GSO arc, under clear sky conditions:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      22.5-25log(theta).......... dBW/MHz for

      2deg6deg from the proposed satellite points of communication. For proposed EIRP density levels more than 3 dB but not more than 6 dB in excess of the limits defined in paragraph (b) of this section, potentially affected parties are operators of co-frequency U.S.-

      authorized space stations up to 10deg from the proposed satellite points of communication.

      (2) Notwithstanding paragraph (c)(1) of this section, an applicant need not certify that the operator of a co-frequency space station consents to proposed non-conforming operation if EIRP density from the proposed earth station will not exceed the levels specified in paragraph (b) toward any position in the geostationary arc within 1 degree of the assigned orbital location of the co-frequency space station.

      (3) Power density levels more than 6 dB in excess of the limits defined in paragraph (b) of this section will not be permitted.

      (d)(1) The operator of an earth station licensed pursuant to paragraph (c) of this section shall bear the burden of coordinating with the operator of a co-frequency space station subsequently licensed by the Commission for operation at an orbital location 10 degrees or less from the earth station's target satellite if the co-frequency space station's reception of conforming uplink transmissions is, or would be, adversely affected by the earth station's non-conforming operation. If no agreement is reached, the earth station operator must reduce EIRP density toward that co-frequency space station to a level in conformance with the envelopes specified in paragraph (b) of this section.

      (2) The operator of an earth station licensed pursuant to paragraph (c)(1) or (c)(2) of this section must reduce EIRP density to levels at or within those specified in paragraph (b) toward a U.S.-licensed space station receiving in the same uplink band at a position more than 6 or 10 degrees away from the earth station's target satellite if the co-

      frequency space station's reception of conforming uplink transmissions is adversely affected by the non-conforming earth station operation, unless the non-conforming operation is permitted under a coordination agreement with the operator of the co-frequency space station.

      * * * * *

      0

      46. Amend Sec. 25.226 by revising paragraphs (a)(1)(i)(A) through (D), paragraphs (a)(2) and (3), paragraphs (b) and (b)(1) introductory text, removing and reserving paragraphs (b)(1)(i) and (ii), and revising paragraphs (b)(2) and (b)(3) to read as follows:

      Sec. 25.226 Blanket Licensing provisions for domestic, U.S. Vehicle-

      Mounted Earth Stations (VMESs) receiving in the 10.95-11.2 GHz (space-

      to-Earth), 11.45-11.7 GHz (space-to-Earth), and 11.7-12.2 GHz (space-

      to-Earth) bands and transmitting in the 14.0-14.5 GHz (Earth-to-space) band, operating with Geostationary Satellites in the Fixed-Satellite Service.

      (a) * * *

      (1) * * *

      (i) * * *

      (A) Off-axis EIRP spectral density emitted in the plane tangent to the GSO arc, as defined in Sec. 25.103, shall not exceed the following values:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      15-10log(N)-25logtheta..... dBW/4 kHz for

      1.5deg7deg may be exceeded by up to 3 dB in up to 10% of the range of theta (theta) angles from 7-180deg.

      (B) The off-axis EIRP spectral density of co-polarized signals shall not exceed the following values in the plane perpendicular to the GSO arc, as defined in Sec. 25.103:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      18-10log(N)-25logtheta..... dBW/4 kHz for

      3.0deg7deg may be exceeded by up to 3 dB in up to 10% of the range of theta (thetas) angles from 7-180deg.

      (B) The EIRP spectral density of co-polarized signals must not exceed the following values in the plane perpendicular to the GSO arc, as defined in Sec. 25.103:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      18-10log(N)-25logthetas.... dBW/4 kHz for 3.0deg7-180deg.

      (2) In the plane tangent to the GSO arc, for earth stations operating in the conventional Ku-band:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      29-25log10thgr............. dBi for

      1.5deg7-180deg.

      (3) In the plane tangent to the GSO arc, for earth stations operating in the 28.35-30 GHz band:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      29-25log10thgr............. dBi for

      2deg7-180deg.

      (4) In the plane perpendicular to the GSO arc, as defined in Sec. 25.103, for earth stations not operating in the conventional Ku-band, 28.35-30 GHz band, or 24.75-25.25 GHz band:

      Outside the main beam, the gain of the antenna shall lie below the envelope defined by:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      32-25log10thgr............. dBi for

      3deg3-180deg.

      (5) In the plane perpendicular to the GSO arc, for earth stations operating in the conventional Ku-band:

      Outside the main beam, the gain of the antenna shall lie below the envelope defined by:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      32-25log10thgr............. dBi for

      3deg3-180deg.

      (6) In the plane perpendicular to the GSO arc, for earth stations operating in the 28.35-30 GHz band or 24.75-25.25 GHz band:

      Outside the main beam, the gain of the antenna shall lie below the envelope defined by:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      32-25log10thgr............. dBi for

      3.5deg3-180deg.

      (b) Except as provided in paragraph (f) of this section, the off-

      axis cross-polarization gain of any antenna used for transmission from an FSS earth station, including earth stations providing feeder links for satellite services other than FSS, may not exceed the following limits:

      (1) In the plane tangent to the GSO arc, for earth stations not operating in the 28.35-30 GHz band or the 24.75-25.25 GHz band:

      ------------------------------------------------------------------------

      ------------------------------------------------------------------------

      19-25log10thgr............. dBi for

      1.8deg7-180deg.

      0

      3. Amend Sec. 25.220 by redesignating paragraph (a)(1) as paragraph (a), removing paragraph (a)(2), removing and reserving paragraphs (d)(1)(i) and (d)(2), and revising the redesignated paragraph (a), paragraph (b), and the third sentence in paragraph (d)(1) introductory text to read as follows:

      Sec. 25.220 Non-conforming transmit/receive earth station operations.

      (a) The requirements in this section apply to applications for, and operation of, earth stations transmitting in the conventional or extended C-band, the conventional or extended Ku-band, or the 20/30 GHz bands that do not qualify for routine licensing under relevant criteria in Sec. Sec. 25.134, 25.138, 25.211, 25.212, 25.218, 25.221(a)(1) or (3), 25.222(a)(1) or (3), 25.226(a)(1) or (3), or Sec. 25.227(a)(1) or (3).

      (b) Applications filed pursuant to this section must include the information required by Sec. 25.115(g)(1).

      * * * * *

      (d)(1) * * * The applicant will be granted protection from receiving interference from the satellite systems included in the coordination agreements referred to in the certification required by paragraph (d)(1)(ii) of this section only to the extent that protection from receiving interference is afforded by those coordination agreements.

      * * * * *

      FR Doc. 2014-25400 Filed 10-30-14; 8:45 am

      BILLING CODE 6712-01-P

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT