Drawbridge Operation Regulations: Elizabeth River - Eastern Branch, at Norfolk VA, Maintenance

Federal Register: November 18, 2008 (Volume 73, Number 223)

Rules and Regulations

Page 68345

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

DOCID:fr18no08-14

DEPARTMENT OF HOMELAND SECURITY

Coast Guard 33 CFR Part 117

USCG-2008-1104

RIN 1625-AA09

Drawbridge Operation Regulations; Elizabeth River--Eastern

Branch, at Norfolk, VA, Maintenance

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

SUMMARY: The Commander, Fifth Coast Guard District, has approved a temporary deviation from the regulations governing the operation of the

Norfolk Southern Railroad (NSV2.8) Bridge, at mile 2.7, across the Elizabeth River--Eastern Branch at Norfolk, VA. Under this temporary deviation, the drawbridge may remain in the closed position on specific dates and times to facilitate mechanical repairs.

DATES: This deviation is effective from 7 a.m. on December 8, 2008, to 11 p.m. on December 19, 2008.

ADDRESSES: Documents indicated in this preamble as being available in the docket are part of docket USCG-2008-1104 and are available online at www.regulations.gov. They are also available for inspection or copying at two locations: The Docket Management Facility (M-30), U.S.

Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays, and the Commander

(dpb), Fifth Coast Guard District, Federal Building, 1st Floor, 431

Crawford Street, Portsmouth, VA 23704-5004 between 8 a.m. and 4 p.m.,

Monday through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: Mr. Bill H. Brazier, Bridge Management

Specialist, Fifth Coast Guard District, at (757) 398-6422.

SUPPLEMENTARY INFORMATION: The Norfolk Southern Corporation, who owns and operates this single-leaf bascule drawbridge, has requested a temporary deviation from the current operating regulations set out in 33 CFR 117.1007(a) to facilitate mechanical repairs.

The NSV2.8 Bridge, a swing-type drawbridge, has a vertical clearance in the closed position to vessels of six feet, above mean high water

To facilitate repairs to the center wedge machinery of the swing span, the drawbridge will be maintained in the closed-to-navigation position from 7 a.m. on December 8, 2008, until and including 11 p.m. on December 19, 2008.

The Coast Guard will inform the users of the waterway through our

Local and Broadcast Notices to Mariners of the opening restrictions of the draw span to minimize transiting delays caused by the temporary deviation.

In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35.

Dated: November 5, 2008.

Waverly W. Gregory, Jr.,

Chief, Bridge Administration Branch Fifth Coast Guard District.

FR Doc. E8-27266 Filed 11-17-08; 8:45 am

BILLING CODE 4910-15-P

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT