Drawbridge Operation Regulations: Hackensack River, Jersey City, NJ, Maintenance

Federal Register: September 8, 2009 (Volume 74, Number 172)

Rules and Regulations

Page 46010-46011

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

DOCID:fr08se09-14

DEPARTMENT OF HOMELAND SECURITY

Coast Guard 33 CFR Part 117

Docket No. USCG-2009-0735

Drawbridge Operation Regulations; Hackensack River, Jersey City,

NJ, Maintenance

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

SUMMARY: The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the

Witt Penn Bridge at mile 3.1, across the Hackensack River, at Jersey

City, New Jersey. Under this temporary deviation the Witt Penn Bridge may remain in the closed position for 45 days to facilitate necessary bridge maintenance.

DATES: This deviation is effective from September 8, 2009 through

October 22, 2009.

ADDRESSES: Documents mentioned in this preamble as being available in the docket are part of docket USCG-2009-0735 and are available online at www.regulations.gov, inserting USCG-2009-0735 in the ``Keyword'' and then clicking ``Search''. They are also available for inspection or copying at the Docket Management Facility (M-30), U.S. Department of

Transportation, West Building Ground Floor, Room W12-140, 1200 New

Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 p.m.,

Monday through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, call or e-mail Mr. Joe Arca, Project Officer, First Coast Guard

District, telephone (212) 668-7165. If you have questions on viewing the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone 202-366-9826.

SUPPLEMENTARY INFORMATION: The Witt Penn Bridge, across the Hackensack

River at mile 3.1 has a vertical clearance in the closed position of 35 feet at mean high water and 40 feet at mean low water. The existing drawbridge operation regulations are listed at 33 CFR 117.723.

Page 46011

The waterway has seasonal recreational vessels, and commercial vessels of various sizes.

The owner of the bridge, New Jersey Department of Transportation, requested a temporary deviation to facilitate the replacement of sheaves and wire ropes at the bridge.

Under this temporary deviation the Witt Penn Bridge, mile 3.1, across the Hackensack River may remain in the closed position for bridge maintenance from September 8, 2009 through October 22, 2009.

Vessels that can pass under the bridge without a bridge opening may do so at all times. This deviation has been coordinated with the waterway users.

The contractor will have a crane barge located at the bridge. The crane barge will move out of the main channel upon request after at least a 9 hour advance notice is given by calling the bridge at 201- 795-0631.

In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35.

Dated: August 27, 2009.

Gary Kassof,

Bridge Program Manager, First Coast Guard District.

FR Doc. E9-21561 Filed 9-4-09; 8:45 am

BILLING CODE 4910-15-P