Drawbridge operations: Louisiana,

[Federal Register: April 26, 1999 (Volume 64, Number 79)]

[Rules and Regulations]

[Page 20177-20178]

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

[DOCID:fr26ap99-23]

DEPARTMENT OF TRANSPORTATION

Coast Guard

33 CFR Part 117

[CGD 08-99-016]

Drawbridge Operating Regulation; Inner Harbor Navigation Canal, LA

AGENCY: Coast Guard, DOT.

ACTION: Notice of temporary deviation from regulations.

SUMMARY: The Commander, Eighth Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Norfolk Southern Railroad bascule span drawbridge across the Inner Harbor Navigation Canal, mile 4.5, at New Orleans, Orleans Parish, Louisiana. This deviation allows the Port of New Orleans to close the bridge to navigation from 8 a.m. until noon and from 1 p.m. until 5 p.m., Monday through Friday from May 17, 1999 through May 28, 1999. This temporary deviation is issued to allow for the replacement of the railroad ties on the bascule span deck. The draw will open at any time for a vessel in distress. Presently, the draw opens on signal at all times.

DATES: This deviation is effective from 8 a.m. on May 17, 1999 through 5 p.m. on May 28, 1999.

ADDRESSES: Unless otherwise indicated, documents referred to in this notice are available for inspection or copying at the office of the Eighth Coast Guard District, Bridge Administration Branch, Commander (ob), Eighth Coast Guard District, 501 Magazine Street, New Orleans, Louisiana, 70130-3396. The Bridge Administration Branch of the Eighth Coast Guard District maintains the public docket for this temporary deviation.

FOR FURTHER INFORMATION CONTACT: Phil Johnson, Bridge Administration Branch, telephone (504) 589-2965.

SUPPLEMENTARY INFORMATION: The Norfolk Southern Railroad bascule span drawbridge across the Inner Harbor Navigation Canal in New Orleans, Louisiana, has a vertical clearance of one foot above mean high water in the closed-to-navigation position and unlimited clearance in the open-to-navigation position. Navigation on the waterway consists of tugs with tows, fishing vessels, sailing vessels, and other recreational craft. The Port of New Orleans requested a temporary deviation from the normal operation of the drawbridge in order to accommodate the maintenance work, involving removal and replacement of the railroad ties on the bascule span deck.

[[Page 20178]]

The District Commander has, therefore, issued a deviation from the regulations in 33 CFR 117.5 authorizing the draw of the Norfolk Southern Railroad bascule span drawbridge across the Inner Harbor Navigation Canal, mile 4.5, at New Orleans, Orleans Parish, Louisiana to remain closed to navigation from 8 a.m. until noon and from 1 p.m. until 5 p.m., Monday through Friday from May 17, 1999 through May 28, 1999.

Dated: April 14, 1999. Paul J. Pluta, Rear Admiral, U.S. Coast Guard Commander Eighth Coast Guard District.

[FR Doc. 99-10430Filed4-23-99; 8:45 am]

BILLING CODE 4910-15-M

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT