Drawbridge Operation Regulation; Willamette River at Portland, OR

Federal Register, Volume 78 Issue 146 (Tuesday, July 30, 2013)

Federal Register Volume 78, Number 146 (Tuesday, July 30, 2013)

Rules and Regulations

Pages 45863-45864

From the Federal Register Online via the Government Printing Office www.gpo.gov

FR Doc No: 2013-18229

-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

Docket No. USCG-2013-0679

Drawbridge Operation Regulation; Willamette River at Portland, OR

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the operating schedule that govern four Multnomah County bridges: The Broadway Bridge, mile 11.7, the Burnside Bridge, mile 12.4, the Morrison Bridge, mile 12.8, and the Hawthorne Bridge, mile 13.1, all crossing the Willamette River at Portland, OR. This deviation is necessary to accommodate the annual Portland Providence Bridge Pedal event. This deviation allows the bridges to remain in the closed position to allow safe movement of event participants.

DATES: This deviation is effective from 5 a.m. on August 11, 2013 to 12:30 p.m. August 11, 2013.

ADDRESSES: The docket for this deviation, USCG-2013-0679 is available at http://www.regulations.gov. Type the docket number in the ``SEARCH'' box and click ``SEARCH.'' Click on Open Docket Folder on the line associated with this deviation. You may also visit the Docket Management Facility in Room W12-140 on the ground floor of the Department of

Page 45864

Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, call or email Lieutenant Commander Steven Fischer, Bridge Specialist, Coast Guard Thirteenth District; telephone (206)220-

7282, email Steven.M.Fischer2@uscg.mil. If you have questions on viewing the docket, call Barbara Hairston, Program Manager, Docket Operations, telephone 202-366-9826.

SUPPLEMENTARY INFORMATION: Multnomah County has requested a temporary deviation from the operating schedule for the Broadway Bridge, mile 11.7, the Burnside Bridge, mile 12.4, the Morrison Bridge, mile 12.8, and the Hawthorne Bridge, mile 13.1, all crossing the Willamette River at Portland, OR. The requested deviation is to accommodate the annual Providence Bridge Pedal event. To facilitate this event, the draws of the bridges will be maintained in the closed-to-navigation positions as follows: the Broadway Bridge, mile 11.7; the Burnside Bridge, mile 12.4; Morrison Bridge, mile 12.8; and the Hawthorne Bridge, mile 13.1, need not open for vessel traffic from 5 a.m. August 11, 2013 until 12:30 p.m. August 11, 2013. Vessels which do not require bridge openings may continue to transit beneath these bridges during the closure period. The Broadway Bridge, mile 11.7, provides a vertical clearance of 90 feet in the closed position, the Burnside Bridge, mile 12.4, provides a vertical clearance of 64 feet in the closed position, the Morrison Bridge, mile 12.8, provides a vertical clearance of 69 feet in the closed position, and the Hawthorne Bridge, mile 13.1, provides a vertical clearance of 49 feet in the closed position; all clearances are referenced to the vertical clearance above Columbia River Datum 0.0. The current operating schedule for all four bridges is set out in 33 CFR 117.897. The normal operating schedule for all four bridges state that they need not open from 7 a.m. to 9 a.m. and from 4 p.m. to 6 p.m. Monday through Friday. This deviation period is from 5 a.m. on August 11, 2013 through 12:30 p.m. August 11, 2013. The deviation allows the Broadway Bridge, mile 11.7, the Burnside Bridge, mile 12.4, the Morrison Bridge, mile 12.8, and the Hawthorne Bridge, mile 13.1, across the Willamette River, to remain in the closed position and need not open for maritime traffic from 5 a.m. through 12:30 p.m. on August 11, 2013. The four bridges shall operate in accordance to 33 CFR Sec. 117.897 at all other times. Waterway usage on this stretch of the Willamette River includes vessels ranging from commercial tug and barge to small pleasure craft. Mariners will be notified and kept informed of the bridges' operational status via the Coast Guard Notice to Mariners publication and Broadcast Notice to Mariners as appropriate. The bridges will be required to open, if needed, for vessels engaged in emergency response operations during this closure period.

In accordance with 33 CFR 117.35(e), the drawbridges must return to their regular operating schedules immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35.

Dated: July 24, 2013.

Daryl R. Peloquin,

Acting Bridge Administrator.

FR Doc. 2013-18229 Filed 7-29-13; 8:45 am

BILLING CODE 9110-04-P