Exelon Generation Company, LLC; Peach Bottom Atomic Power Station; Units 2 and 3

Published date27 March 2019
Citation84 FR 11578
Record Number2019-05804
SectionNotices
CourtNuclear Regulatory Commission
11578
Federal Register / Vol. 84, No. 59 / Wednesday, March 27, 2019 / Notices
exclusive fields of use may exclude all
other fields, including but not limited to
any outer space applications intended
for use beyond 400,000 feet above
Earth’s mean sea level. NASA has not
yet made a determination to grant the
requested license and may deny the
requested license even if no objections
are submitted within the comment
period.
DATES
: The prospective partially
exclusive license may be granted unless
NASA receives written objections,
including evidence and argument no
later than April 11, 2019 that establish
that the grant of the license would not
be consistent with the requirements
regarding the licensing of federally
owned inventions as set forth in the
Bayh-Dohl Act and implementing
regulations. Competing applications
completed and received by NASA no
later than April 11, 2019 will also be
treated as objections to the grant of the
contemplated partially exclusive
license. Objections submitted in
response to this notice will not be made
available to the public for inspection
and, to the extent permitted by law, will
not be released under the Freedom of
Information Act.
ADDRESSES
: Objections relating to the
prospective license may be submitted to
Patent Counsel, Office of Chief Counsel,
NASA Langley Research Center, MS 30,
Hampton, Virginia 23681. Phone (757)
864–3221. Facsimile (757) 864–9190.
FOR FURTHER INFORMATION CONTACT
:
Jennifer L. Riley, Patent Attorney, Office
of Chief Counsel, NASA Langley
Research Center, MS 30, Hampton,
Virginia 23681. Phone (757) 864–3221.
Facsimile (757) 864–9190.
SUPPLEMENTARY INFORMATION
: This
notice of intent to grant a partially
exclusive patent license is issued in
accordance with 35 U.S.C. 209(e) and 37
CFR 404.7(a)(1)(i). The patent rights in
these invention(s) have been assigned to
the United States of America as
represented by the Administrator of the
National Aeronautics and Space
Administration. The prospective
partially exclusive license will comply
with the requirements of 35 U.S.C. 209
and 37 CFR 404.7.
Information about other NASA
inventions available for licensing can be
found online at http://
technology.nasa.gov.
Mark Dvorscak,
Agency Counsel for Intellectual Property.
[FR Doc. 2019–05778 Filed 3–26–19; 8:45 am]
BILLING CODE 7510–13–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–277 and 50–278; NRC–
2018–0266]
Exelon Generation Company, LLC;
Peach Bottom Atomic Power Station;
Units 2 and 3
AGENCY
: Nuclear Regulatory
Commission.
ACTION
: License amendment application;
withdrawal by applicant.
SUMMARY
: The U.S. Nuclear Regulatory
Commission (NRC) has granted the
request of Exelon Generation Company,
LLC to withdraw its application dated
September 27, 2018, for proposed
amendments to Renewed Facility
Operating License Nos. DPR–44 and
DPR–56. The proposed amendments
would have modified Technical
Specification (TS) 3.3.6.2, ‘‘Secondary
Containment Isolation
Instrumentation.’’
DATES
: March 27, 2019.
ADDRESSES
: Please refer to Docket ID
NRC–2018–0266 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
Federal Rulemaking Website: Go to
http://www.regulations.gov and search
for Docket ID NRC–2018–0266. Address
questions about Docket IDs in
Regulations.gov to Jennifer Borges;
telephone: 301–287–9127; email:
Jennifer.Borges@nrc.gov. For technical
questions, contact the individual listed
in the
FOR FURTHER INFORMATION
CONTACT
section of this document.
NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly-
available documents online in the
ADAMS Public Documents collection at
http://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. The ‘‘Peach Bottom, Units 2
and 3, License Amendment Request—
Technical Specifications Section 3.3.6.2
Functions 3 and 4 Applicability
Changes Pertaining to Reactor Building
and Refueling Floor Ventilation,’’ is
available in ADAMS under Accession
No. ML18271A009.
NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT
:
Jennifer Tobin, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington DC
20555–0001; telephone: 301–415–2328;
email: Jennifer.Tobin@nrc.gov.
SUPPLEMENTARY INFORMATION
: The NRC
has granted the request of Exelon
Generation Company, LLC (the licensee)
to withdraw its September 27, 2018,
application (ADAMS Accession No.
ML18271A009) for proposed
amendments to Renewed Facility
Operating License Nos. DPR–44 and
DPR–56 for the Peach Bottom Atomic
Power Station, Units 2 and 3,
respectively, located in York County,
Pennsylvania.
The proposed amendments would
have authorized revisions to TS 3.3.6.2,
‘‘Secondary Containment Isolation
Instrumentation,’’ to modify the
applicability of Functions 3 and 4.
Specifically, Function 3 (reactor
building ventilation exhaust radiation—
high) would have been revised to only
be required when Function 4 (refueling
floor ventilation exhaust radiation—
high) was not maintained. Function 4
would have been revised to only be
required when Function 3 was not
maintained. Further, this change would
have clarified which standby gas
treatment subsystems were required to
be put into operation or declared
inoperable as described in TS 3.3.6.2,
Condition C, for Required Actions C.2.1
and C.2.2.
On November 20, 2018, a Federal
Register notice was published (83 FR
58612) indicating a finding of no
significant impact for the proposed
license amendment. On March 11, 2019
(ADAMS Accession No. ML19071A062),
the licensee sent a letter requesting
withdrawal of the license amendment
application.
Dated at Rockville, Maryland, this 21st day
of March, 2019.
For the Nuclear Regulatory Commission.
Jennifer C. Tobin,
Project Manager, Plant Licensing Branch LPL–
1, Division of Operating Reactor Licensing,
Office of Nuclear Reactor Regulation.
[FR Doc. 2019–05804 Filed 3–26–19; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–18 and 50–183; NRC–2019–
0082]
GE Hitachi Nuclear Energy; Vallecitos
Nuclear Center Partial Site Release
AGENCY
: Nuclear Regulatory
Commission.
VerDate Sep<11>2014 21:13 Mar 26, 2019 Jkt 247001 PO 00000 Frm 00097 Fmt 4703 Sfmt 4703 E:\FR\FM\27MRN1.SGM 27MRN1