Floodplain Management and Protection of Wetlands

Federal Register, Volume 76 Issue 245 (Wednesday, December 21, 2011)

Federal Register Volume 76, Number 245 (Wednesday, December 21, 2011)

Proposed Rules

Page 79145

From the Federal Register Online via the Government Printing Office www.gpo.gov

FR Doc No: C1-2011-31629

Page 79145

=======================================================================

-----------------------------------------------------------------------

DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT

24 CFR Parts 50, 55, and 58

Docket No. FR-5423-P-01

RIN 2501-AD51

Floodplain Management and Protection of Wetlands

Correction

In proposed rule document 2011-31629 appearing on pages 77162-77175 in the issue of December 12, 2011, make the following correction:

Sec. 55.11 Corrected

The table on page 77171 is corrected to read as set forth below:

Table 1

----------------------------------------------------------------------------------------------------------------

Type of proposed action

--------------------------------------------------------------------------------

Type of proposed action (new Wetlands or 100- Non-wetlands area

reviewable action or an year floodplain outside of the

amendment) \1\ Floodways Coastal high hazard outside coastal 100-year and

areas high hazard area within the 500-

and floodways year floodplain

----------------------------------------------------------------------------------------------------------------

Critical Actions as defined in Critical actions Critical actions Allowed if the Allowed if the

Sec. 55.12(b)(2). not allowed. not allowed. proposed critical proposed

action is critical action

processed under is processed

Sec. 55.20.\2\ under Sec.

55.20.\2\

Non-critical actions not Allowed only if the Allowed only if the Allowed if Any non-critical

excluded under Sec. 55.12(b) proposed non- proposed non- proposed non- action is

or (c). critical action is critical action: critical action allowed without

a functionally (A)(1) Is either is processed processing under

dependent use and (a) reconstruction under Sec. this part.

processed under of a structure 55.20.\2\

Sec. 55.20.\2\ destroyed by a

disaster, or

(b) an improvement

of an existing

structure;

(2) is designed for

a Coastal High

Hazard Area under

Sec. 55.1(c)(3);

and

(3) is processed

under Sec.

55.20; \2\ or

(B) Is a

functionally

dependent use

processed under

Sec. 55.20.

----------------------------------------------------------------------------------------------------------------

\1\ Under E.O. 11990, the decision making process in Sec. 55.20 only applies to Federal assistance for new

construction in wetlands locations.

\2\ Or those paragraphs of Sec. 55.20 that are applicable to an action listed in Sec. 55.12(a).

FR Doc. C1-2011-31629 Filed 12-20-11; 8:45 am

BILLING CODE 1505-01-D

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT