Applications, hearings, determinations, etc.: NorAm Gas Transmission Co.,

[Federal Register: June 22, 1998 (Volume 63, Number 119)]

[Notices]

[Page 33920]

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

[DOCID:fr22jn98-66]

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP98-602-000]

NorAm Gas Transmission Company; Notice of Request Under Blanket Authorization

June 16, 1998.

Take notice that on June 9, 1998, NorAm Gas Transmission Company (NGT), 525 Milam, P.O. Box 21734, Shreveport, Louisiana 71151, filedin Docket No. CP98-602-000 a request pursuant to Sections 157.205 and 157.211 of the Commission's Regulations under the Natural Gas Act (18 CFR 157.205, 157.211) for authorization to operate a tap, regulator, and metering facilities, located in Poinsett County, Arkansas, under NGT's blanket certificate issued in Docket Nos. CP82-384-000 and CP82- 384-001, pursuant to Section 7(c) of the Natural Gas Act, all as more fully set forth in the request that is on file with the Commission and open to public inspection.

NGT proposes to operate a 1-inch tap and 1-inch regulator on Line JM-25, located in Section 29, Township 11 North, Range 7 East, located in Poinsett County, Arkansas. NGT states that these facilities were constructed under Section 311 of the Natural Gas Policy Act and Subpart B, Part 284 of the Commission's Regulations and are necessary to provide increased service to the rural distribution system of Arkla, a distribution division of NorAm Energy Corporation (Arkla).

NGT states that the total estimated increased volumes to be delivered through this new tap are approximately 1,000 MMBtu annually and 10 MMBtu on a peak day. NGT declares that the total costs are estimated at $2,032 and Arkla will reimburse NGT an estimated $1,600 of those costs.

Any person or the Commission's staff may, within 45 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to Section 157.205 of the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the request. If no protest is filedwithin the time allowed therefor, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the Natural Gas Act. David P. Boergers, Acting Secretary.

[FR Doc. 98-16485Filed6-19-98; 8:45 am]

BILLING CODE 6717-01-M