Applications, hearings, determinations, etc.: Texas Eastern Transmission Corp.,

[Federal Register: January 11, 2000 (Volume 65, Number 7)]

[Notices]

[Page 1627-1628]

From the Federal Register Online via GPO Access [wais.access.gpo.gov]

[DOCID:fr11ja00-62]

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP00-150-000]

Texas Eastern Transmission Corporation; Notice of Proposed Changes in FERC Gas Tariff

January 4, 2000.

Take notice that on December 28, 1999 Texas Eastern Transmission Corporation (Texas Eastern) tendered for filing as part of its FERC Gas Tariff, Sixth Revised Volume No. 1 and Original Volume No. 2, revised tariff sheets listed on Appendix A to the filing to become effective February 1, 2000.

Texas Eastern states that these revised tariff sheets are filed pursuant to Section 15.1, Electric Power Cost (EPC) Adjustment, of the General Terms and Conditions of Texas Eastern's FERC Gas Tariff, Sixth Revised Volume No. 1. Texas Eastern states that Section 15.1 provides that Texas Eastern shall file to be effective each February 1 revised rates for each applicable zone and rate schedule based upon the projected annual electric power costs required for the operation of transmission compressor stations with electric motor prime movers and to also reflect the EPC Surcharge which is designed to clear the balance in the Deferred EPC Account.

Texas Eastern states that these revised tariff sheets are being filedto reflect increases in Texas Eastern's projected costs for the use of electric power for the twelve month period beginning February 1, 2000 and an increase in the balance in the EPC Deferred Account for the twelve months ended October 31, 1999.

Texas Eastern states that the rate increases proposed to the primary firm capacity reservation charges, usage rates and 100% load factor average costs for full Access Area Boundary service from the Access Area Zone, East Louisiana, to the three market area zones are as follows:

[[Page 1628]]

Zone

Reservation

Usage

100% LF

Market 1........................................................ $0.030/dth $.0016/dth $.0026/dth Market 2........................................................ 0.092/dth .0052/dth .0082/dth Market 3........................................................ 0.134/dth .0077/dth .0121/dth

Texas Eastern states that copies of its filing have been mailed to all affected customers and interested state commissions.

Any person desiring to be heard or to protest said filing should file a motion to intervene or a protest with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with section 385.214 or 385.211 of the Commission's Rules and Regulations. All such motions or protests must be filedin accordance with section 154.210 of the Commission's Regulations. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceedings. Any persons wishing to become a party must file a motion to intervene. Copies of this filing are on file with the Commission and are available for public inspection in the Public Reference Room. This filing may be viewed on the web at http:// www.ferc.fed.us/online/rims.htm (call 202-208-2222 for assistance). Linwood A. Watson, Jr., Acting Secretary.

[FR Doc. 00-466Filed1-10-00; 8:45 am]

BILLING CODE 6717-01-M

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT